Loading...
HomeMy WebLinkAboutWQ0001304_Final Permit_19890602ea�STMEn State of North Carolina Department of Natural Resources and Community Development Northeastern Region 1424 Carolina Avenue, Washington, North Carolina 27889 James G. Martin, Governor William W. Cobey, Jr., Secretary DIVISION OF ENVIRONMENTAL MANAGEMENT June 2, 1989 Mr. Louis Midgett, Sr., Chairman Dare County Board of Education Post Office Box 640 Manteo, North Carolina 27954 SUBJECT: Permit No. WQ0001304 Dare County Board of Education Cape Hatteras School Dare County Dear Mr. Midgett: Lorraine G. Shinn Regional Manager In accordance with your application received February 28, 1989, we are forwarding herewith Permit No. WQ0001304, dated June 2, 1989, to the Dare County Board of Education for the construction and operation of the subject wastewater treatment system. This permit shall be effective from the date of issuance until June 1, 1994, and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, Post Office Drawer 11666, Raleigh, North Carolina 27604. P.O. Box 1507, Washington, North Carolina 27889-1507 Telephone 919-946-6481 An Equal Opportunity Affirmative Action Employer Mr. Louis Midgett, Sr. Page 2 .lune 2, 1989 If you wish to have the hearing before the Hearing Officer with this Department, you must indicate in the petition that you waive the right to have the contested case conducted by a Hearing Officer in the Office of Administrative Hearings, and wish to have the matter conducted in the Department of Natural Resources and Community Development. Unless such demands are made, this permit shall be final and binding. One (1) set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact Mr. Alton Hodge, telephone No. 946-6481. Sincerely, r J m AiL.11igan egional Supervisor cc: Dare County Heal Department Diane McMillan �/ NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF NATURAL RESOURCES AND COMMUNITY DEVELOPMENT RALEIGH P E R M I T For the Discharge of Sewage, Industrial Wastes, or Other Wastes In accordance with the provisions of Article 21 of Chapter 143 , General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, PERMISSION IS HEREBY GRANTED TO Dare County Board of Education Dare County FOR THE construction and operation of a Phase 18,060 gpd & Phase II 11,682 gpd non -discharge type domestic wastewater treatment and disposal facility consisting of Ph I - "system I" 4,1.70 gal. septic tank, 1616 pump tank, 9-100 l.f. nitrification lines "system II" 3366 gal. septic tank, 3000 gal. combination septic & pump tank, 11-81 l.f. nitrification lines / Ph II - "system I" 8,265 gal. septic tank, 4,821 gal. pump tank, total 13-100 l.f. nitrification lines "system II" 8,515 gal. septic tank, 3000 gal. pump tank, total 16-81 1.f, nitrification lines to serve the Cape Hatteras School. There will be no discharge of any wastewater to the surface waters of the State,pursuant to the application received February 28, 1989 and in conformity with the project plans, specifications, and other supporting data, subsequently filed and approved by the Department of Natural Resources and Community Development and considered a part of this Permit. This Permit shall be effective from the date of issuance until June 1, 1994 and shall be subject to the following specified conditions and limitations; 1. This permit shall become voidable unless the facilities were constructed in accordance with the approved plans, specifications and supporting data. 2 2. This permit is effective only with respect to the nature and volume of waters described in the application and other supporting data. 3. The facilities shall be properly maintained and operated at all times. 4. This permit is not transferable. 5. This permit shall become voidable in, the event of failure of the soil to adequately absorb the wastes, and may be rescinded unless the facilities are maintained and operated in a manner which will protect the assigned water quality standards of the surface waters, and prevent any contamination of the ground waters which will render them unsatisfactory for normal use. 6. In the event the facilities fail to perform satisfactorily, the Permittee shall take such immediate corrective action as may be required by the Department. 7. Solids, sludges, or other pollutants removed or resulting from the wastewater treatment process shall be contained and disposed of in such a manner as to prevent any contamination of the surface or ground waters of the State. 8. Diversion or bypassing of the untreated wastewater from the treatment facilities is prohibited. 9. Monitoring wells shall be constructed and sampling schedules arranged as required by the Division of Environmental Management. 10. Wastewater flows shall be monitored for each system and reported to A.R. Hodge , N. C. D. of N. R. & C. D. ,p.o. box 1507, Washington N.C. 27889. Monitoring shall be performed and submitted as set forth by the Division of Environmental Management. 3 11. The Washington Regional Office, telephone no. (919) 946-6481 shall be notified at least twenty-four (24) hours in advance of backfilling of the installed subsurface disposal system so that an in-place inspection can be made of said system prior to back -filling. Such notification to the Regional supervisor shall be made during the normal office hours from 8:00 AM until 5:00 PM on Monday through Friday, excluding state holidays. 12. A professional engineer shall certify that the Cape Hatteras School wastewater treatment system was constructed according to the approved plans and specifications. The certification should be send to A.R. Hodge , North Carolina Department of Natural Resources and Community Development ,p.o. box 1507, Washington N.C. 27889. 13. The phase II construction shall be initiated within sixty days in the event either of the following conditions are met: a. The wastewater flow is equal too or greater than 900 of phase I design flow (7,254 gpd) b. The expected or actual enrollment is equal to or greater than 900 of phase I design capacity (550 students) Permit issued this the 2th day of June NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION J1m'Mu111g Regional Supervisor Division of 1EAivironmental Management by Authority of the Environmental Management Commission Permit NO.WQ0001304