Loading...
HomeMy WebLinkAboutWQ0000603_Final Permit_19881123STAB State of Noah Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor R. Paul Wilms S.Thomas Rhodes, Secretary November 23, 1988 Director Mr. Gary Lo f l i.n Harrison Construction Company P. 0. Box 359 Alcoa, TN 37701 SUBJECT! Permit No. WQ0000603 Harrison Construction Co.--Dillsboro Quarry Recycle Wastewater Treatment Facility Jackson County Dear Mr. Loflin: In accordance with your application received October 12, 1988, we are forwarding herewith Permit No. WQ0000603, dated November. 23, 1988, to Harrison Construction Company for the construction and operation of the subject recycle wastewater treatment facility extensions. This pormi.t shall be effective from the date of issuance until October 31, 1993, and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have the right to request an adjudicatory hearing upon wri.tte.n request within 30 days folJuwin.g receipt of this permit. This request must be in the form of a written petition, conforming, to Chapter 150B of North Carolina Gensr.al Statutes, and filed with the 0ffice of Administrative Hearings, Post Office Drawer 11666, Raleigh, North Carolina 27604. Unless such demands are made this permit shall be final and binding;. One (1) set of approved plans and specifications is being .forwarded to you, If you need additional information concerning this matter, pl.case contact Jack Floyd, telephone No. 919%733--5083, ext. .549. SIrce;ral , R. Paul. Wilms cc: Jacksonville County Health Department Asheville Regional Supervisor John Campbq l.l. Groundwater Pollution Preventiosi Pars P.O. Box 27687, Raleigh, Noah Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer I NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF NATURAL RESOURCES AND COMMUNITY DEVELOPMENT RATE I GH P E R M I T For the discharge of Sewage, Industrial Wastes, or Other Wastes In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Harrison Construction Company Jackson County FOR THE construction and operation of a 400 GPM recycle wastewater treatment facility consisting of two (2) lagoons in series (total capacity of 555,000 gallons) and a 400 GPM recirculating pumping station to serve Dillsboro Sand Quarry with no discharge of wastewater into the surface waters pursuant to the application received October 12, 1988, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Natural Resources and Community Development and considered a part of this permit. This permit shall be effective from the date of issuance until October 31, 1993 and shall be subject to the following specified conditions and limitations: I. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and. specifications. Mail the certification to the Permits and Engineering Unit, P. 0. Bozo 27687, Raleigh,N.C. 27611-7687. This permit shall become voidable unless the facilities are constructed in accordance with the approved plans, specifications, and other supporting data. 2. This permit shall become voidable unless the facilities are constructed in accordance with the approved plans, specifications, and other supporting data. 3. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4. The facilities shall, be properly maintained and operated at all times. 5. This permit is not transferable. N 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take such immediate corrective action as may be required by this Division, including the construction of additional or replacement wastewater treatment or disposal facilities. 7. The Asheville Regional Office, phone no. 704/251-6208 shall be notified at least twenty --four (24) hours in advance of operation of the installed facility so that an in --place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. 8. The sludge generated from these treatment facilities must be disposed of in accordance with General Statute 143-215.1 and in a manner approvable by the North Carolina Division of Environmental Management. 9. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension. Upon receipt of the request, the Commission will review the adequacy of the facilities described therein, and if warranted, will extend the Permit for such period of time and under such conditions and limitations as it may deem appropriate. 10. Freeboard in the lagoons shall not be less than 2 feet at any time. 11. The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface or groundwaters resulting from the operation of this facility. 1.2. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the discharge of any wastewater resulting from the operation of this facility. 13. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper operation of the subject facilities. 14. Any additional groundwater quality monitoring as deemed necessary by the Department, shall be provided. 15. Issuance of the Permit shall void Permit No. 2449R3 Permit issued this the 23rd day of November, 1988, NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION R. Paul Wilms, Director / Division of Environmental Management By Authority of the Environmental Management Commission Permit No. WQ0000603 '.i Engineer's Certification I I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for the (Project) (Name or Location) hereby state that, to the best of my (Project Owner) abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date Permit No. WQ0000603