Loading...
HomeMy WebLinkAboutWQ0002503_Final Permit_19990325State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director March 25, 1999 Mr. Darrell B. Matthews, Plant Manager Frit Car, Incorporated Post Office Box 569 Bridgeton, North Carolina 28519 Dear Mr. Matthews: LT?WAI IT A&4 0 2 A VOW-ftl ft a __ NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL., RESOURCES Subject: Permit No. WQ0002503 Frit Car, Incorporated Wastewater Spray Irrigation/Recycle System Craven County In accordance with your application received November 23, 1998, we are forwarding herewith Permit No. WQ0002503, dated March 25, 1999, to Frit Car, Incorporated for the continued operation of the subject wastewater treatment and spray irrigation facilities and the construction and operation of the subject recycle system_ This permit shall be effective from the date of issuance until February 28, 2004, shall void Permit No. WQ0002503 issued .June 16, 1994, and shall be subject to the conditions and limitations as specified therein. Please pay particular attention to the monitoring requirements in this permit. Failure to establish an adequate system for collecting and maintaining the required operational information will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you need additional information concerning this matter, please contact Mark Craig at (919) 733- 5083 extension 362. Sincer , Derr T. Stevens cc. Craven County Health Department Washington Regional Office, Water Quality Section Washington Regional Office, Groundwater Section Bob Cheek, Groundwater Section, Central Office Technical Assistance and Certification Unit Non -Discharge Compliance/Enforcement Unit PO Box 29535, Raleigh, North Carolina 27626-0535 An Equal Opportunity Affirmative Action Employer Telephone (919) 733-5083 Fax (919) 733-0719 50% recycled/10% post -consumer paper NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH SPRAY IRRIGATION SYSTEM PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Frit Car, Incorporated Craven County FOR THE construction and operation of a 7,200 GPD recycle system consisting of a 15 GPM high pressure hydro blast, a service pump, a supply tank, a static screen and a solids storage area and the continued operation of a 867 GPD spray irrigation treatment and disposal facility (with an additional 173 GPD available upon modification of the spray field) consisting of a 1,900 gallon sump with oil skimming system, a 50 GPM sump pump, a 1,100 gallon clarifier with mechanical agitation, chemical addition and pH monitor, two (2) fifty (50) foot squared sludge drying beds, a 6,000 gallon septic tank with at 35 GPM pump, a 45,000 gallon aerated storage tank with 115 GPM pumps and a 1.33 acre land application spray field to serve Frit Car, Incorporated, with no discharge of wastes to the surface waters, pursuant to the application received November 23, 1998, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until February 28, 2004, shall void Permit No. WQ0002503 issued June 16, 1994, and shall be subject to the following specified conditions and limitations: L PERFORMANCE STANDARDS Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. Mail the Certification to the Non -Discharge Permitting Unit, P.O. Box 29535, Raleigh, NC 27626-0535. 2. The Washington Regional Office, telephone number (252) 946-6481, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5.00 p.m. on Monday through Friday, excluding State Holidays. The spray irrigation facilities shall be effectively maintained and operated at all times so that there is no discharge to the surface waters, nor any contamination of ground waters which will render them unsatisfactory for normal use. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions or failure of the irrigation area to adequately assimilate the wastewater, the Permittee shall take immediate corrective actions including those actions that may be required by the Division of Water Quality (Division), such as the construction of additional or replacement wastewater treatment and disposal facilities. 4. The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface or groundwaters resulting from the operation of this facility. 5. The residuals generated from these treatment facilities must be disposed in accordance with General Statute 143-215.1 and in a manner approved by the Division. Diversion or bypassing of the untreated wastewater from the treatment facilities is prohibited. The following buffers shall be maintained: a) 400 feet between wetted area and any residence or places of public assembly under separate ownership, b) 150 feet between wetted area and property lines, c) 100 feet between wetted area and wells, d) 100 feet between wetted area and drainageways or surface water bodies, e) 50 feet between wetted area and public right of ways, f) 100 feet between wastewater treatment units and wells, and g) 50 feet between wastewater treatment units and property lines. Some of the buffers specified above may not have been included in previous permits for this waste treatment and disposal system. These buffers are not intended to prohibit or prevent modifications, which are required by the Division, to improve performance of the existing treatment facility. These buffers do, however, apply to modifications of the treatment and disposal facilities which are for the purpose of increasing the flow that is tributary to the facility. These buffers do apply to any expansion or modification of the spray irrigation areas and apply in instances in which the sale of property would cause any of the buffers now complied with, for the treatment and disposal facilities, to be violated. The applicant is advised that any modifications to the existing facilities will require a permit modification. II. OPERATION AND MAINTENANCE REQUIREMENTS The facilities shall be properly maintained and operated at all times. Upon classification of the facility by the Water Pollution Control System Operators Certification Commission (WPCSOCC), the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the WPCSOCC. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of I SA NCAC 8A .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class 11, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of 15A NCAC 8A .0202. 3. A suitable year round vegetative cover shall be maintained. 4. Irrigation shall not be performed during inclement weather or when the ground is in a condition that will cause runoff. 5. Adequate measures shall be taken to prevent wastewater runoff from the spray field. 6. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the discharge of any wastewater resulting from the operation of this facility. 7. The average annual weekly application rate shall not exceed 0.14 inches/acre. 8. No type of wastewater other than that from Frit Car, Incorporated shall be sprayed onto the irrigation area. 9. No traffic or equipment shall be allowed on the disposal area except while installation occurs or while normal maintenance is being performed. 10. Public access to the land application sites shall be controlled during active site use. Such controls may include the posting of signs showing the activities being conducted at each site. 11. Sprayed wastewater pH shall be maintained between 7.5 and 8.5 s.u. 12. The spray irrigation facilities shall only be used or occasional blowdown of clean filtered water through the existing treatment system. III. MONITORING AND REPORTING REOUIREMENTS Any monitoring (including groundwater, surface water, soil or plant tissue analyses) deemed necessary by the Division to insure surface and ground water protection will be established and an acceptable sampling reporting schedule shall be followed. 2. Adequate records shall be maintained by the Permittee tracking the amount of wastewater disposed. These records shall include, but are not necessarily limited to, the following information: a. date of irrigation, b. volume of wastewater irrigated, c. field irrigated, d. Iength of time field is irrigated, e. continuous weekly, monthly, and year-to-date hydraulic (inches/acre) loadings for each field, f. weather conditions, and g. maintenance of cover crops. 3. The Permittee shall submit a monthly report of the size, type, and number of cars cleaned per month and the date each car was cleaned. 4. The effluent from the subject facilities shall be monitored by the Permittee at the point prior to irrigation every month for the following parameters: BOD5 TOC NH3 as N Phenols Sodium TSS Sulfate Phosphate Chloride 3 y 5. The effluent from the subject facilities shall be monitored by the Permittee at the point prior to irrigation quarterly for the following parameters: Total Chromium Copper Nickel Lead Zinc Cadmium 6. Three (3) copies of all operation and disposal records (as specified in condition III 2 and 11I 3) on Form NDAR-1 shall be submitted on or before the last day of the following month. Three (3) copies of all effluent monitoring data (as specified in condition 1114 and 111 5) on Form NDMR-1 shall be submitted on or before the last day of the following month. All information shall be submitted to the following address: NC Division of Water Quality Water Quality Section Non -Discharge Compliance/Enforcement Unit Post Office Box 29535 Raleigh, North Carolina 27626-0535 6. Noncompliance Notification: The Permittee shall report by telephone to the Washington Regional Office, telephone number (252) 946-6481, as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a. Any occurrence at the wastewater treatment facility which results in the treatment of significant amounts of wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a sludge digester; the known passage of a slug of hazardous substance through the facility; or any other unusual circumstances. b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc. c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. d. Any time that self -monitoring information indicates that the facility has gone out of compliance with its permit limitations. Persons reporting such occurrences by telephone shall also file a written report in letterform within five (5) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. GROUNDWATER REQUIREMENTS Monitor wells MW-1, 2, 3, and 4 (as indicated on the attached site map), shall continue to be sampled every March, July, and November for the following parameters: . Water Level pH Sulfate Chloride Total Dissolved Solids (TDS) Iron Total Organic Carbon (TOC) Nitrate Nitrogen Total Ammonia Lead Chromium Nickel Copper Volatile Organic Compounds - In November only using one of the following: (A) Standard Method 6230D, PQL at 0.5 ug/L or less (B) Standard Method 621 OD, PQL at 0.5 ug/L or less (C) EPA Method 8021, Low Concentration, PQL at 0.5 ug/L or less (D) EPA Method 8260, Low Concentration, PQL at 0.5 ug/L or less (E) Another method with prior approval by the Groundwater Section Chief Any method used must meet the following qualifications- (1) A laboratory must be DWQ certified to run any method used. (2) The method used must, at a minimum, include all the constituents listed in Table VIII of Standard Method 6230D. (3) The method used must provided a PQL at 05 ug/L or less which must be supported by laboratory proficiency studies as required by the DWQ Laboratory Certification Unit. Any constituents detected above the MDL but below the PQL at 0.5 ug/L must be qualified (estimated) and reported. 2. If any volatile organic compounds are detected by the methods listed, then the Washington Regional Office Groundwater Supervisor, telephone number (910) 395-3900, must be contacted immediately for further instructions regarding any additional follow-up analyses required. The results of all initial and follow-up analyses must be submitted simultaneously. The measurement of water levels must be made prior to sampling for the remaining parameters. The depth to water in each well shall be measured from the surveyed point on the top of the casing. 4. If TOC concentrations greater than 10 mg/I are detected in any downgradient monitoring well, additional sampling and analysis must be conducted to identify the individual constituents comprising this TOC concentration. If the TOC concentration as measured in the background monitor well exceeds 10 mg/l, this concentration will be taken to represent the naturally occurring TOC concentration. Any exceedances of this naturally occurring TOC concentration in the downgradient wells shall be subject to the additional sampling and analysis as described above. The results of the sampling and analysis must be received on Form GW-59 (Groundwater Quality Monitoring: Compliance Report Form) by the Groundwater Section, Permits and Compliance Unit, P.O. Box 29578 Raleigh, N.C. 27626-0578 on or before the last working day of the month following the sampling month. Any additional groundwater duality monitoring, as deemed necessary by the Division, shall be provided. The COMPLIANCE BOUNDARY for the disposal system is specified by regulations in 15A NCAC 2L, Groundwater Classifications and Standards, The Compliance Boundary is for the disposal system constructed after December 31, 1983 is established at either (1) 250 feet from the waste disposal area, or (2) 50 feet within the property boundary, whichever is closest to the waste disposal area. An exceedance of Groundwater Quality Standards at or beyond the Compliance Boundary is subject to immediate remediation action in addition to the penalty provisions applicable under General Statute 143-215.6A(a)(1). In accordance with 15A NCAC 2L, a REVIEW BOUNDARY is established around the disposal systems midway between the Compliance Boundary and the perimeter of the waste disposal area. Any exceedance of standards at the Review Boundary shall require remediation action on the part of the permittee. V. INSPECTIONS Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper operation of the subject facilities. 2. The Permittee or his designee shall inspect the wastewater treatment and disposal facilities to prevent malfunctions and deterioration, operator errors and discharges which may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. The Permittee shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Permittee. This log of inspections shall be maintained by the Permittee for a period of three years from the date of the inspection and shall be made available upon request to the Division or other permitting authority. Any duly authorized officer, employee, or representative of the Division may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the disposal site or facility at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be maintained under the terms and conditions of this permit, and may obtain samples of groundwater, surface water, or leachate. VI. GENERAL CONDITIONS This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 6. A set of approved plans and specifications for the subject project must be retained by the Permittee for the life of the project. 7. The annual administering and compliance fee must be paid by the Permittee within thirty (30) days after being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revoke this permit as specified by 15A NCAC 2H .0205 (c)(4). The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension. Upon receipt of the request, the Commission will review the adequacy of the facilities described therein, and if warranted, will extend the permit for such period of time and under such conditions and limitations as it may deem appropriate. 6 9. The subject wastewater treatment and disposal facilities shall be connected to an operational publicly owned wastewater collection system within 180 days of its availability to the subject facilities, if the subject wastewater treatment or disposal facilities are in noncompliance with the terns and conditions of this non -discharge permit or the governing statutes or regulations. Prior to the initiation of these connection activities, appropriate approval must be received from this Division. 10. All Ammonia and LPG cars shall be flared and air washed with the vapors passing through equipment with temperature controlled, modulation flame to maintain combustion temperatures. 11. This permit shall become voidable in the event the Permittee cleans rail cars with other than LPG, Ammonia, Caustic Soda, and Acid (Sulfuric, Hydrochloric and Phosphoric), specifically, herbicide and pesticide rail cars_ Permit issued this thowenty-fifth day of March, 1999 NORTH C OL1N EN RO M TAL MANAGEMENT COMMISSION Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0002503 Permit No. WQ0002503 March 25, 1999 ENGINEER'S CERTIFICATION Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, S Project Name Location and County for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of this permit, the approved plans and specifications, and other supporting materials. Signature Date Registration No. 2.r 3 cem - 16I7 ' ^r �• ��� We` ` iAntioch 1 Ch `� Cv o ; m r/s ' 1 CD /6a •'. Dr • • i Z S I Forest.. a -Aem `" •u �; " XE 41 14 Wildlife Landing `1_ 4 Pfrk l" ' 100 �\• �� • ` I615 1 CD swagesposal Dicke orsin • `M - • i „' - Ferry 6"_ - _. �. »"'- y0 ✓ Y •a =~ 8 M a •\•.� 0 M9\' • � �� � to \BFldg•E Oil r* NEW BERN \ 1 , \ 311 1 MILE 5000 6000 7000 FEET 1 KILOMETER F21iEMS 12 Ml, y • • INTEMOR—GEOLOGICAL 5URVEY, RESTON, V[RGINIA— Say ,IACKSONVlLLE 39 Mi. ` 316 317000m,E. ROAD 'CLASSIFICATION Primary highway, Light -duty road, hard - hard surface ........ ......... ...• improved surface ...__ Secondary highway, FRIT CAR AND EQUIPMENT, INC, BRIDGETON, N.C. { PRo1�'DSEO _ .F/ f ZOC4idEz TlOA7 TREA 7 M FAIT SYSTE�tq • ' 1. • r •" 41k '• 1" e W • 1' irRi r . • • �f• • � x P . Ci � `y t�•Y T� � . ti 'y• cam„ - •�ORfp4_ - o �9 r F ,T. ••/ � P f 'UELISE' RI vER i. c� i. �� 4 f♦t ti� I # y gyp• !• �� ♦ `j t {{ I ttion and Topographic Map Ile: Approximate V = 2000` Taken from Askin, N.C. Quadrangle, 7,5 minute series (Topographic), Photo date 1978 by u. S. Department of the Interior Geological Survey. -------------- 4 I N- 0 'PVC rUPPLY ONE r V �Ok 7 L �av LLL V � U O d V �