Loading...
HomeMy WebLinkAboutWQ0001921_Final Permit_19890714s�4 •. �.�sa 53ATEw� ^Arse, �fry _ k QiurA �d}�• State of North Carolina Department of Natural Resources and Community Development Asheville Regional Office James G. Martin, Governor William W Cobey, Jr., Secretary DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION July 14, 1989 Mr. Ronnie Proffitt, Assistant Superintendent Yancey County Schools 621 West Main Street Burnsville, North Carolina 28714 Dear Mr. Proffitt: Ann B. Orr Regional Manager Subject: Revision of Plans Permit No. WQ0001921 Cane River Middle School LPP Disposal System Yancey County The Division of School Planning has submitted revised plans of the Low Pressure Pipe Disposal System to be installed at the Cane River Middle School. The revisions include the addition of field pressure control valves between the dosing tanks and disposal fields and a pump control box located above the pumps. We have reviewed these revisions and they are hereby approved and will become part of Permit No. WQ0001921. One set (1) of revised plans is being forwarded to you and should replace the plans previously approved_ All other terms and conditions of Permit No. WQ0001921 remain in full force and effect. If you have questions or need assistance, please contact Mr. Mike Parker at 704/251--6208. Sincerely, v 1 Roy M_ Davis, Regional ,..S,upervisor Division of Enviromen-Eal''MAft'age�ment Enclosure xc. Yancey County Health Department Division of School Piannig Permits and Engineering Interchange Building, 59 Wooar Place, Asheville, N.C. 28801 0 Telephone 704-25[-6208 ry - .1r ✓111 lf�{ NORTH CAROLINA DEPARTMENT OF PUBLIC INSTRUCTION 116 West Edenton Street . Education Building Raleigh, NC 27£03-1712 July 7, 1989 Mr. Forrest Westall, P.E. Water Quality Regional Supervisor Division of Environmental Management P.O. Box 370 Asheville, N.C. 28802 Subject: Revision of LPP System Plans Gane Riven Middle School Permit Number WQ0001921 Yancey County Dear Mr. Westall: Bob Etheridge Superintendent Y, i -. -,. .a,�.,r .lryi�➢ern '. 'JUL 11 1969 In followup to our conversations during the week of June 19, 1989, please find included herein four copies of the revised plans for the subject facility. All revisions are minor and none should require any amendments or additions to the already issued non -discharge permit. This packet is provided simply for your information and inclusion in the overall permit file. The following changes should be noted: 1. Field pressure control valves have been added between the dosing tanks and the diEposal fields. 2. A pump control box has been located above the pumps. 3. A note, to address the possibility of not using earthen dams, has been added. Once the revisions are approved, please return one copy of the plans to my office and one to the school system. If the site is not too wet, construction should begin during the wE:ek of July 10, 1989. It was most helpful having the speedy plans review and permit issuance that you provided., and we thar.k you. If you have questions or concerns about the Plans, construction scheduling, or this project in general, you may contact me at my office or through Mr. Ronnie Proffitt at Yancey County Schools. Those telephone numbers are (919) 733-3739 and (704) 682-3066 respectively. Res y, i L. Bush, Jr. M1 ¥ Water Systems Engineer Division of Plant Operation TLB: rym c Vernon B. � P Chapman, Superintendent P � r-..:, .... Ronnie Proffitt, Assistant Superintendent an egte f actir»r ompl(;wi,