Loading...
HomeMy WebLinkAboutIMPs 4th Quarter 2018_20180928NORTH CAROLINA Roy COOPED EnIr entaJQualay c MICHAEL S. PEGAN 50"W"), LINDA CULPEPPER lrtterbn llir+eaor September 28, 2018 Paul Draovitch Senior Vice President Environmental, Health & Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, North Carolina 28202 Subject: Revised Interim Monitoring Plans for 14 Duke Energy Facilities 4'' Quarter 2018 Dear Mr. Draovitch: The North Carolina Department of Environmental Quality (DEQ) is providing the attached revised Interim Monitoring Plans (IMPs) for the respective coal ash facilities. Per our agreement, DEQ will be providing Duke Energy with updated IMPs quarterly until the individual facility Corrective Action Plans are approved or as directed otherwise by DEQ, and Duke Energy will include and begin sampling any newly installed groundwater assessment wells as part of the facility IMP which DEQ will formally include in the subsequent IMPs. The attached IMPs only contain references to groundwater monitoring locations. DEQ may elect to require establishment of surface water monitoring program in the future related to the ongoing IMPs or corrective action performance monitoring. The requirement for an annual monitoring report for each respective coal facility as set forth in the May 1, 2017 letter submitted will be due April 30, 2019. The attached revised facility IMPs shall be conducted on a quarterly basis pursuant to 15A NCAC 02L .0110, until Corrective Action Plans are approved for the individual facilities or as directed otherwise by DEQ. The quarterly sampling events will be conducted in conjunction with planned compliance monitoring sampling events for three quarters during the calendar year, supplemented with an additional sampling event conducted at each facility in order to provide four rounds of North Carolina Department of Environmental Quality I Division of Water Resources JAFOGW Section 512 North Salisbury Street 11636 Mail Service Center I Raleigh, North Carolina 27699-1636 919.707.9129 monitoring data to evaluate seasonal fluctuations during a year-long timeframe. If sampling an individual groundwater location is problematic, please contact the appropriate Regional Office. In order to optimize the groundwater monitoring at each facility, DEQ will be removing the groundwater monitoring condition from the NPDES permits as they are reissued. Duke Energy shall continue to monitor the compliance wells separately under the individual NPDES permits until the NPDES permits are reissued with no groundwater monitoring condition. At that time, the compliance wells shall continue to be monitored per the attached revised IMPS under the authority of 15A NCAC 02L .0110. DEQ is currently participating in reviews to optimize the groundwater monitoring programs at the Duke Energy coal ash facilities. This review process will result in revisions to the current groundwater monitoring programs until corrective action is implemented at the respective facilities and may streamline the effort related to quarterly IMP changes. If you have any questions, please feel free to contact the appropriate Regional Office or Steve Lanter (Central Office), at (919) 707-3667. Sincerely, `Y Jon Ri ard, Section Chief Animal Feeding Operations and Groundwater Attachments: Revised Interim Monitoring Plans for the 14 coal ash facilities cc: WQROS Regional Offices WQROS Central File Copy Revised Allen Steam Station Interim Monitoring Plan — Groundwater Only Allen Steam Station Page 1 of 5 September 28, 2018 Sample for Wells to be Sampled I Radionuclides Regional Office Notes M AB -10D AB -10S Monitor cobalt and manganese concentrations X (increasing). AB -11D AB -12D AB -12S AB -13D X AB -13S X AB-14BR AB -14D AB -1R AB -2 AB -20D AB -20S AB-21BRL X Sample to be analyzed for total boron and sulfate AB -21D only. AB -21 S X AB -21 SL X AB -21 SS X Duke Energy proposed installation of bedrock and lower bedrock well to be installed near the AB -10 AB-22BRL location and will be utilized for delineation purposes for AB-22(meeting 8/30/2018). AB-22BR AB -22D AB -22S AB-23BRU Sample to be analyzed for total boron and sulfate only. AB -23S AB-24BR Sample to be analyzed for total boron and sulfate AB -24D only. A13 -24S Monitor arsenic and iron concentrations (increasing). AB-24SL Monitor boron and TDS concentrations (increasing and boron close to 2L). Sample to be analyzed for total boron and sulfate AB-25BR only. AB-25BRU Sample to be analyzed for total boron and sulfate only. Allen Steam Station Page 1 of 5 September 28, 2018 Wells to be Sampled Sample for Radionuclides [X� Regional Office Notes _ AB -25S X X AB-25SS AB-25SL X AB -26D AB -26S AB-27BR AB -27D AB -27S Monitor iron and manganese concentrations (increasing). AB -28D Elevated pH. Recommend additional development may be beneficial in attempt to improve water q ualit . AB -28S AB -29D Monitor boron concentrations (increasing). AB -29S AB-29SS AB-29SL Elevated pH. Recommend additional development may be beneficial in attempt to improve water ualit . AB -2D AB -30D AB -30S Monitor arsenic concentrations (increasing). AB -31S AB -32D Monitor boron and sulfate concentrations increasin . AB -32S AB -33D X Continues to exhibit water quality issues (elevated pH). Pending IMP reduction discussions. AB -33S X AB-33SS X AB -34D AB -34S Monitor sulfate and TDS concentrations (increasing). AB-35BR X AB -35D Sample to be analyzed for total boron and sulfate only. AB-35PWS X AB -35S X AB -36D AB -36S AB -37D AB -37S AB-38BR Allen Steam Station Page 2 of 5 September 28, 2018 Wells to be Sampled Sample for Radionuclides W Regional Office Notes _ AB -38D AB -38S AB-38SS AB -39D AB -39S AB-4BR X AB -4D X AB -4S X AB -5 AB -6A X AB -6R X Monitor total radium concentrations (increasing). AB -9D X Monitor iron due significant increase observed last sampling event (6/l/2018). AB -9S X BG-lDA X Note: BG-lD has been abandoned thus removed from the IMP. BG-lDA was installed as replacement well. Monitor chromium concentrations. BG -IS X BG-2BRA2 X Note: BG-2BR has been abandoned thus removed from the IMP. BG-2BRA-2.was installed as replacement well. Continues to exhibit water quality issues (elevated pH). Additional development may be beneficial in attempt to improve water quality. BG -2D X BG -2S X BG -3D X BG -3S X BG-4BR X BG -4D X BG -4S X GWA-14DA Note: GWA-14D has been abandoned thus removed from the IMP. GWA-14DA was installed as replacement well. Elevated pH. Additional development may be beneficial in attempt to improve water quality. GWA-14S GWA-15D GWA-15S Allen Steam. Station Page 3 of 5 September 28, 2018 Sample for Wells to be Sampled Radionuclides Regional Office Notes _ GWA-16D GWA-16S GWA-17D X GWA-17S X GWA-18D GWA-18S GWA-19D Sample to be analyzed for total boron and sulfate only; however, if water quality comes into compliance, a full sample suite (per IMP) should be collected at this location. GWA-19S GWA-lBR X GWA-1D X GWA-1 S X GWA-21BR X GWA-21DA X Note: GWA-21D has been abandoned thus removed from the IMP. GWA-21 DA was installed as replacement well. GWA-21 S X GWA-22D GWA-22S GWA-23D Sample to be analyzed for total boron and sulfate only; however, if water quality comes into compliance, a full sample suite (per IMP) should be collected at this location. GWA-23S X GWA-24BR GWA-24D GWA-24SA Note: GWA-24S has been abandoned thus removed from the IMP. GWA-24SA was installed as replacement well. GWA-26D GWA-26S GWA-2D X GWA-2S X GWA-3BRA X Note: GWA-3BR has been abandoned thus removed from the IMP. GWA-3BRA was installed as replacement well. Additional development may be beneficial in attempt to imI trove water quality. GWA-3D X GWA-3S X Allen Steam Station Page 4 of 5 September 28, 2018 Sample for Wells to be Sampled Radionuclides GWA-4BR X Regional Office Notes Additional development may be beneficial in attempt to improve water quality. GWA-4D X GWA-4S X Hexavalent GWA-5BRA X Note: GWA-5BR has been abandoned thus removed from the IMP. GWA-5BRA was installed as replacement well. Duke Energy proposed installation of lower bedrock well for vertical delineation purposes. GWA-5D X GWA-5S X GWA-6BRA X Note: GWA-6BR has been abandoned thus removed from the IMP. GWA-6BRA was installed as replacement well. GWA-6DA X Note: GWA-6D has been abandoned thus removed from the IMP. GWA-6DA was installed as replacement well. GWA-6S X Combined GWA-7D X Monitor TDS concentrations (increasing). GWA-7S X GWA-8D Total Monitor TDS concentrations (increasing). GWA-8S Lead Potassium GWA-9BR X GW -9D X GWA-9S X Barium Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids Allen Steam Station Page 5 of 5 September 28, 2018 Revised Asheville Steam Electric Plant Interim Monitoring Plan — Groundwater OnIN Wells to be Sampled Sample for Radionuclides x) Regional Office Notes ABMW-11 BR AMW-1B X AMW-2A AMW-213 water level only AMW-3B X APZ-30 water level only AS-5BR redevelopment needed AS-5BRL redevelopment needed B-1 water level only B -IA water level only B-2 water level only CB -1 X CB -IBR water level only CB-1BRL water level only CB -1D X CB -2 CB -3R X CB -4 X CB -4B X CB -5 CB -6 CB -7 CB -8 X CB-8BR X CB -81) water level only CB -9 X CB-9BR X CB-9SL X CCR-100SL X CCR-100BR X CCR-100BRL X CCR-101BR X CCR -102D X CCR -102S X CCR-103BR CCR -103D CCR -104D X Asheville Steam Electric Plant Page 1 of 4 September 28, 2018 CCR-105BR CCR -105D X EXT -1 X EXT -2 EXT -A GW -1 X GW -IBR GW -1D GW -2 X GW -3 X GW -4 X GW -5 X MW -3D X MW-5BR MW -5D MW-6BR X MW -6D X MW -6S X MW-7BR water level only MW-8BR water level only MW -8S X MW-9BR X MW -9D X MW -9S X MW -10 X MW -11 MW -11D MW-13BR MW -13D MW-14BR MW -15A X MW-15BR water level only MW-15BRL X MW -15D X MW -16A X MW-16BR X MW-16BRL X MW-16BRLL X MW -16D X MW -17A X MW-17BRL X Asheville Steam Electric Plant Page 2 of 4 September 28, 2018 MW-18BR X Copper MW-18BRL X Thallium MW -18D X Hexavalent MW-19BR Sodium water level only MW -20A Chromium MW-20BR X Carbon MW-20BRL X MW -21D X Total MW-22BR X Iron MW -22D X Combined MW-23BR MW-23DL Uranium MW-23DU MW -24S X Total MW-25BR X Lead MW-25BRL X Suspended MW -25S MW-26BR X Solids MW-26BRL X Magnesium MW -26S Sulfide Vanadium P-102 water level only P-103 Beryllium Cobalt PZ-17BRL X Dissolved PZ -17D X PZ -17S X PZ -19 X PZ -22 X Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids Asheville Steam Electric Plant Page 3 of 4 September 28, 2018 Asheville Steam Electric Plant Page 4 of 4 September 28, 2018 Revised Belews Creek Steam Station Interim Monitoring Plan — Groundwater Only Wells to be Sampled Sample for Radionuclides Regional Office Notes AB-lBR AB -1D AB -1S AB -2D AB -2S AB -3D AB -3S AB-4BR Measure all field parameters plus water level, if pH is still high, do not sample for lab analyses AB-4BRD AB -4D AB -4S AB-4SL Measure all field parameters plus water level, if pH is still high, do not sample for lab analyses AB-4SAP AB -5D AB -5S AB-5SL AB -6D AB -6S AB-6SL AB -7D AB -7S AB -8D AB -8S AB-8SL AB-9BR AB-913RD Measure all field parameters plus water level, if pH is still high, do not sample for lab analyses AB -9D AB -9S BG -1D BG -1 S X Measure water level if not dry; collect all filed parameters if possible; if there is some water but not enough water for all samples, please collect samples for boron, sulfate, chloride, TDS only. BG-2BRA BG -2D X BG -2S X Belews Creek Steam Station Page 1 of 4 September 28, 2018 BG -3D BG -3S GWA-1 ODA GWA-10S GWA-11D GWA-11 S GWA-12BR GWA-12D GWA-12S GWA-16BR Measure all field parameters plus water level, if pH is still high, do not sample for lab analyses GWA-16DA GWA-16S GWA-17D GWA-17S GWA-18D GWA-18SA GWA-19BR GWA-19D GWA-19SA GWA-lBR X Measure all field parameters plus water level, if pH is still high, do not sample for lab analyses GWA-1D X GWA-1 S X GWA-20BR GWA-20D GWA-20SA GWA-21D GWA-21 S GWA-22D GWA-22S GWA-23D GWA-23 S GWA-24BR GWA-24D X GWA-24S X Measure water level if not dry; collect all filed parameters if possible; if there is some water but not enough water for all samples, please collect samples for boron, sulfate, chloride, TDS only. GWA-25BR X GWA-26BR X GWA-26D X GWA-26S X Belews Creek Steam Station Page 2 of 4 September 28, 2018 GWA-27BR GWA-27D GWA-27S GWA-2D GWA-2S GWA-30D X Measure all field parameters plus water level, if pH is still high, do not sample for lab analyses GWA-30S X GWA-31 D GWA-31 S GWA-32D GWA-32S GWA-3D GWA-3S Measure water level if not dry; collect all filed parameters if possible; if there is some water but not enough water for all samples, please collect samples for boron, sulfate, chloride, TDS only. GWA-6D X GWA-6S X GWA-7D X GWA-7SA X GWA-8D X GWA-8S X GWA-9BR GWA-9D GWA-9S MW-104BRA MW -104D MW -104S MW-200BR MW -200D x MW -200S MW-201BR MW -201D MW-202BR MW -202D MW -202S MW-203BR MW -203D MW -203S MW -204D MW -204S Belews Creek Steam Station Page 3 of 4 September 28, 2018 MW -3 X EX -OB -1 EX -OB -2 Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Hexavalent Total Organic Alkalinity Cadmium Chromium Molybdenum Sodium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids Belews Creek Steam Station Page 4 of 4 September 28, 2018 Revised Buck Combined Cycle Station Interim Monitoring Plan — Groundwater Only Wells to be Sample for Sampled Radionuclides Regional Office Notes (X) AB -1D AB -1 OBR Monitor barium, boron, sulfate and vanadium (increasing). Monitor TDS concentrations (increasing). AB -1 OBRL Water quality continues to be an issue (elevated pH indicative of grout contamination). Recommend additional development prior to next sampling event. AB -10D Monitor boron concentrations (increasing). AB -10S Monitor chromium concentrations (significant increase last sampling event). AB-2BR Sample to be analyzed for total boron and sulfate only. AB -2D X AB -2S X AB-2SL X A13 -3D Monitor manganese concentrations (increasing). A13 -3S Monitor arsenic, barium, iron, and manganese concentrations (increasing). Water quality continues to be an issue (elevated pH). AB-4BRL Recommend additional development prior to next sampling event. AB-4BRU AB -4S Monitor arsenic and manganese concentrations (increasing). Monitor iron and manganese concentrations AB-4SL (significantly increased during last event compared to historical data). Volume has been insufficient to collect sample since AB-SBRU X 2015. Continue to monitor water level during each sampling event and if volume is sufficient for sampling then collect the sample accordingly. AB-5S X Monitor boron and iron concentrations (increasing). AB-5SL X AB-6BRU AB-7BRU AB -7S MRO is aware of the labeling inconsistency. AB-8BRU Please label the well correctly in the field to avoid future discrepancies and sample accordingly. AB -8S Monitor arsenic and boron concentrations (increasing). Buck Combined Cycle Station Page 1 of 5 September 28, 2018 Wells to be Sample for Sampled Radionuclides Regional Office Notes Note: AB-9BR has been abandoned thus removed from the IMP. AB-9BRA was installed as AB-9BRA X replacement well. Monitor total radium concentrations (increasing). Note: AB-9BRU has been abandoned thus removed AB-9BRUA X from the IMP. AB-9BRUA was installed as replacement well. Water quality continues to be an issue (turbidity). AB -9S X Recommend additional development prior to next sampling event. AS -113 Monitor boron concentrations (increasing). AS -1S Monitor nickel concentrations (increasing). AS -2D AS -3D AS -3S Monitor iron and manganese concentrations (significantly increased during last sampling event). Note: BG -IBR has been abandoned thus removed BG-1BRA X from the IMP. BG-1BRA was installed as replacement well. BG -1 S X Note: BG -11) has been abandoned thus removed from the IMP. BG-lDA was installed as replacement well. BG -IDA X Water quality still an issue (appears to be grout contaminated). Recommend additional development prior to next sampling event. BG -2D X BG -2S X BG-3BRU X Monitor total radium concentrations (increasing). BG -3S X GWA-10D GWA-10S GWA-11D GWA-11 S GWA-12BRU X GWA-12S X GWA-13D Monitor iron and TDS concentrations (increasing). GWA-13SR Volume has been insufficient to collect sample. GWA-14BR X Continue to monitor water level during each sampling event and if volume is sufficient for sampling then collect the sample accordingly. Buck Combined Cycle Station Page 2 of 5 September 28, 2018 Wells to be Sampled Sample for Radionuclides l Regional Office Notes _ GWA-14D Sample to be analyzed for total boron and sulfate only. GWA-14S X GWA-15BR X Water quality continues to be an issue (elevated pH). Recommend additional development prior to next sampling event. GWA-15D X Monitor total radium concentrations (increasing). GWA-15S X GWA-16BR X GWA-16D X GWA-16S X GWA-17S GWA-18DA X Note: GWA-18D has been abandoned thus removed from the IMP. GWA-18DA was installed as replacement well. Per meeting on 8/30/2018, MRO and Duke Energy agreed to redevelop well prior to next sampling event. We will review results of next sampling event to determine if reinstallation is necessary. GWA-18S X GWA-19D X GWA-19S X GWA-1D X GWA-1S X Monitor chromium concentrations (increasing). GWA-20D X GWA-20S X Monitor cobalt, iron, and manganese concentrations (significantly increased during last sampling event as compared to historical data). GWA-22D X GWA-2BRA X Note: GWA-2BR has been abandoned thus removed from the I1VIP. GWA-2BRA was installed as replacement well. GWA-2BRU X Monitor total radium concentrations (increasing). GWA-2S X GWA-3BR X GWA-3BRU X Monitor total radium concentrations (increasing). GWA-3S X GWA-4D X GWA-4S X Monitor TDS concentrations (increasing). GWA-SBRU X Monitor boron concentrations (increasing). GWA-5 S X GWA-6BR X Buck Combined Cycle Station Page 3 of 5 September 28, 2018 Wells to be Sample for Sampled Radionuclides Regional Office Notes Monitor sulfate and TDS concentrations (increasing). This location warrants delineation. In meeting on GWA-6BRL X 8/30/2018, MRO and Duke Energy discussed installation of a new bedrock well (closer to the GWA-12 cluster) for purposes of horizontal and vertical delineation. Please update MRO on status. GWA-6BRU X Volume has been insufficient to collect sample since GWA-6S X 2016. Continue to monitor water level during each sampling event and if volume is sufficient for sampling then collect the sample accordingly. GWA-7D X GWA-7S X GWA-8D Note: GWA-9BR has been abandoned thus removed from the IMP. GWA-9BRA was installed as replacement well. GWA-9BRA X Water quality continues to be an issue (elevated pH). Recommend additional development prior to next sampling event. GWA-9D X Monitor manganese concentrations (increasing). GWA-9S X Monitor manganese concentrations (increasing). MW -10D MW-11BR X MW-11BRL X Monitor manganese concentrations (increasing). Water quality continues to be an issue (turbidity). MW -11D X Recommend additional development prior to next sampling event. MW -11S X MW -12D Water quality continues to be an issue (turbidity). MW -12S Recommend additional development prior to next sam ling event. MW -13D MW -1D MW -1S Monitor boron concentrations (increasing). MW -3D X MW -3S X MW -4D Monitor boron concentrations (increasing). MW -4S MW -51) Monitor boron concentrations (increasing). MW -5S Buck Combined Cycle Station Page 4 of 5 September 28, 2018 Wells to be Sample for Copper Sampled Radionuclides Regional Office Notes Alkalinity X Hexavalent MW-6BR X Total Organic MW-6D X Chromium MW-6S X Monitor manganese concentrations (increasing). MW-7D MW-7S Total Antimony Calcium Note: MW-8BR has been abandoned thus removed Nickel Strontium from the IMP. MW-8BRA was installed as replacement well. MW-8BRA X Monitor sulfate and TDS concentrations (increasing). Per meeting on 8/30/2018, MRO and Duke Energy Total agreed to redevelop well prior to next sampling event. Chloride Lead We will review results of next sampling event to Sulfate Suspended determine if reinstallation is necess MW-8D X MW-8S X Barium MW-9D X Radium 226 MW-9S X Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids Buck Combined Cycle Station Page 5 of 5 September 28, 2018 Revised Casae Fear Steam Electric Plant Interim Monitoring Plan — Groundwater Onl% Wells to be Sample for Sampled Radionuclides (X) ABMW-1 X Regional Office Notes ABMW-lBR X ABMW-1 S X ABMW-2SL ABMW-2SU _ ABMW-3 X ABMW-3BR ABMW-3 SR X ABMW-4 X ABMW-4S X ABMW-5BR ABMW-5S BGMW-4 X BGTMW-4 X CMW-01 X CMW-02 CMW-03 X CMW-5R CMW-06 X CMW-07 X CMW-08 X CTMW-01 X CTMW-02 CTMW-07 CTMW-08 X MW -10 X MW-10BR X MW-10BRL MW -10D MW -11 X MW -12 X MW-12BR MW -13 MW-15BR X MW-15SL X MW-15SU X MW-16BR X Cape Fear Steam Electric Plant Page 1 of 3 September 28, 2018 MW -16S X MW-17BR MW-17SL X MW-17SU X MW -18S X MW -19S MW-20BR MW -20S MW-21BR MW -21 SL X MW -21 SU X MW-22BR MW -22S MW-23BR MW -23D X MW -23S X MW-24BR X MW -24S X MW-5BRR MW-6BR X MW -9 X MW-9BR X PZ -1 PZ -10 PZ -2 PZ -3D PZ -3S PZ -4 PZ -5 X PZ -6 PZ -7 PZ -8 Cape Fear Steam Electric Plant Page 2 of 3 September 28, 2018 Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids Cape Fear Steam Electric Plant Page 3 of 3 September 28, 2018 Revised James E. Rogers Enerzy Complex Interim Monitoring Plan — Groundwater Onl Wells to be Sampled Sample for Radionuclides (X) Regional Office Notes AB-1BROR Replaced AB -IBRO due to casing damage AB -1D AB -IS AB-2BRO AB -2D AB -2S AB-3BRUA AB -3I AB -3S X AB -3 SLA X AB-4BR AB -4D AB -4S X AB-4SL X AB-5BR AB-5BRU AB -5S X AB -613R AB -6D AB -6S X AS -1D AS -1 SB AS -213R AS -2D X AS -2S X AS-3BRU AS -4D AS -4S AS-5BR AS-5BRU AS -5S AS-6BRA AS -6D AS -6S AS-7BRA AS -7D AS -7S X James E. Rogers Energy Complex Page 1 of 6 September 28, 2018 AS-8D AS-8S BG 1-BRA BG-1D X BG-1S X BG-2D Water level only CCPMW-1D X CCPMW-1 S X CCPMW-2D Water level only CCPMW-2S Water level only CCPMW-3D Water level only CCPMW-3S Water level only CCPMW-4 Water level only CCPMW-5 Water level only CCPMW-6D Water level only CCPMW-6S Water level only Water level only CCPTW-1D CCPTW-1 S Water level only CCPTW-2 Water level only CLMW-1 X CLMW-2 CLMW-3D X CLMW-3S X CLMW-5D CLMW-5S CLMW-6 CLP-1 Water level only CLP-2 Water level only CLP-3 Water level only CLP-4 Water level only GWA-10D GWA-10S GWA-11BRU X GWA-11 S X GWA-12BRU GWA-12S GWA-13BR GWA-14BR GWA-14D GWA-14S GWA-1BRU James E. Rogers Energy Complex Page 2 of 6 September 28, 2018 GWA-20BR X GWA-20D X GWA-20S X GWA-21 BR X GWA-21 BRU X GWA-21 S X GWA-22BRU GWA-22S X GWA-23D GWA-24BR GWA-24D GWA-24S GWA-25 S GWA-25D Water level only GWA-26S GWA-26D Water level only GWA-27BR X GWA-27D-A X GWA-28BR GWA-28BRU GWA-28S GWA-29BRA GWA-29D X GWA-2BR X GWA-2BRU X GWA-2S X GWA-30BR GWA-30BRU Water level only GWA-30S GWA-31 BR-A GWA-31D GWA-32D GWA-32BR Water level only GWA-33BR GWA-33D GWA-33S GWA-34S GWA-35D GWA-35S GWA-36D X GWA-36S X James E. Rogers Energy Complex Page 3 of 6 September 28, 2018 GWA-37D GWA-37S GWA-38D GWA-38S GWA-39S Water level only GWA-3D X GWA-40S Water level only GWA-42S Water level only GWA-43D GWA-43 S GWA-44BR GWA-44D GWA-44S GWA-45D Water level only GWA-45 S GWA-46D GWA-47D GWA-48BR GWA-4BR Water level only GWA-4D X GWA-4S X GWA-51D GWA-54D GWA-54BRO GWA-54S GWA-56D GWA-56S GWA-5BRU GWA-5 S GWA-6S GWA-6D Water level only MW-10D MW-10S MW-11BRO Redevelop. Sample for boron only. MW-11DA MW-11 S X MW-20D MW-20DR MW-21BR MW-21D MW-22BR James E. Rogers Energy Complex Page 4 of 6 September 28, 2018 MW-22DR MW -23D MW-23DR MW -23S MW -24D X MW-24DR X MW-25DR MW -2D -A MW -30D X MW-30DA X MW -30S X MW-32BR X MW -32D X MW -32S X MW -34S MW-34BRU MW-36BRU MW -36S MW-38BR X MW -38D X MW -38S X MW-40BRU MW -40S MW-42DA MW -42S MW -8D MW -8S X U54D U5-1 S U5-2BR U5 -2D X U5 -2S -SL -A X U5-4BRA U5 -4D U5 -4S U5-5BR U5 -5D X U5 -6D U5 -6S U5-8BR U5 -8D James E. Rogers Energy Complex Page 5 of 6 September 28, 2018 U5 -8S Boron Copper CCR12-S Selenium Thallium CCR -12D Cadmium Hexavalent CCR -13D Sodium Total Organic CCR -15D Chromium Iron CCR -EB -1S Carbon Total Combined CCR -IB -11) Calcium Nickel CCR -IB -3S CCR -IB -3D CCR -U5 -4S Sample 1" Quarter 2018 only CCR -U5 -4D Chloride Sample 1St Quarter 2018 only CCR -7S Sulfate CCR -7D AB-3-MA15 Pump test well. AB-3-LA15 ChromiumMagnesium Pump test well. AB-4-UA15 Sulfide Pump test well. AB-4-LA15 Pump test well. CCR -7S Total Dissolved CCR -7D Cobalt Manganese CCR -8D Zinc CCR -U5 -3D CCR -U5 -3S Solids CCR-U5-4BR AS7I IB -6S IB -6D IB -7S IB -7D Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Iron Carbon Total Combined Antimony Calcium Nickel Strontium Uranium Total Suspended Arsenic Chloride Lead Potassium Sulfate Solids Barium ChromiumMagnesium Radium 226 Sulfide Vanadium Total Dissolved Beryllium Cobalt Manganese Radium 228 Zinc Solids James E. Rogers Energy Complex Page 6 of 6 September 28, 2018 Revised Dan River Combined C cle Station Interim Monitorin Plan — Groundwater Onl Wells to be Sampled Sample for Radionuclides (X) Regional Office Notes BG -IDA X _ Measure water level if not dry; collect all filed parameters if possible; if there is some water but not enough water for all samples, please collect samples for boron, sulfate, chloride, TDS only. BG -10D X BG -10S X BG-10BR X BG -5D BG -5S GWA-10D GWA-12D GWA-12S GWA-14D GWA-14S GWA-15D GWA-16D GWA-16S GWA-17D GWA-20D GWA-20S GWA-4D GWA-4S GWA-513R GWA-SBRD GWA-6D X GWA-6S X GWA-7D GWA-7S GWA-8BR GWA-8D GWA-8S GWA-9D X X X X X GWA-9S MW -12 MW -12D MW -21D MW -21S MW-22BR Dan River Combined Cycle Station Page 1 of 2 September 28, 2018 MW -22D X Copper MW -22S X Thallium MW-23BR Cadmium Hexavalent MW -23D Sodium Total Organic MW-317BR Chromium MW-317BRL Minimum Parameters to be Analvzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids Dan River Combined Cycle Station Page 2 of 2 September 28, 2018 Revised H. F. Lee Energy Complex Interim Monitoring Plan — Groundwater Only Wells to be Sample for Sampled Radionuclides M ABMW-1 _ ABMW-1 S X Regional Office Notes AMW-11BC AMW-11 S X AMW-12BC AMW-12S AMW-13BC AMW-13S AMW-14BC AMW-14S AMW-15BC AMW-15S AMW-16BC AMW-17BC AMW-17S AMW-18S X AMW-6RBC AMW-913C AMW-19S AMW-19BC AMW-20S AMW-20BC AMW-21 S AMW-21BC AMW-22S . AMW-22BC AMW-23 S AMW-23BC BGMW-10 BGMW-9 BW -1 CCR -100S X CMW-10 CMW-5 CMW-6R CMW-7 CMW-8 H. F. Lee Energy Complex Page 1 of 3 September 28, 2018 CTMW-1 CW-1 CW-2 CW-3 CW-4 DMW-1 DMW-2 DMW-3 IABMW-1 IABMW-1 S X I_ABMW-2S IABMW-3 IABMW-3S X IMW-04BC IMW-05BC IMW-1BC IMW-1 S X IMW-2BC IMW-3BC IMW-3S X IMW-4S X IMW-5S X LLMW-1 LLMW-1 S LLMW-2 LLMW-2S MW-1 MW-2 MW-3 X SMW-3 SMW-4 SMW-5 IMW-6S IMW-7S H. F. Lee Energy Complex Page 2 of 3 September 28, 2018 Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Alkalinity Cadmium Hexavalent Molybdenum Antimony Calcium Arsenic Chloride Chromium Barium Beryllium Cobalt Chromium Iron Nickel Lead Manganese Potassium Radium 226 Radium 228 Selenium Sodium Strontium Sulfate Sulfide Total Dissolved Solids Thallium Total Organic Carbon Total Combined Uranium Total Suspended Solids Vanadium Zinc H. F. Lee Energy Complex Page 3 of 3 September 28, 2018 Revised Marshall Steam Station Interim Monitorin Plan — Groundwater Onl Wells to be Sampled Sample for Radionuclides N Regional Office Notes AB-10BR AB -10D AB -10S AB -1 OSL Monitor boron concentrations (increasing). AB=11D AB -11S AB-12BR X AB -12D X AB -12S X Monitor boron concentrations (increasing). AB-12SL X AB -13D AB -13S AB -14D Monitor boron concentrations (increasing). AB-14DU AB -14S AB-15BR AB -15D AB -15S AB-15SL AB -16D AB-16DU AB -16S AB -17D AB -17S Monitor boron, iron, manganese, sulfate, and TDS concentrations (increasing). AB -18D AB-18DU AB -18S AB-1BRLL X AB-1BRL X Monitor boron and total radium concentrations (increasing). Duke proposed additional well installation for delineation purposes. AB -113R X Monitor boron, iron, manganese, TDS, and total radium concentrations (increasing). AB -1D X Monitor boron, TDS, and total radium concentrations (increasing). AB -1S X Monitor total radium concentrations (increasing). Marshall Steam Station Page 1 of 5 September 28, 2018 Wells to be Sampled �: It AB -20S Sample for Radionuclides Regional Office Notes (X) Monitor boron concentrations (increasing). Atf-L l ll AB -21 S Monitor arsenic, boron, chloride, and TDS concentrations (increasing), AB -2D X Monitor total radium concentrations (increasing). AB -2S X Monitor total radium concentrations (increasing). AB -3D AB -3S AB -4D AB -4S Monitor selenium concentrations (significant increase last event compared to historical data). AB-4SL AB-5BR X Monitor sulfate and TDS concentrations (increasing). AB -5D X AB-5DU X AB -5S X AB-613RL Monitor TDS concentrations (increasing). AB-6BRA AB -6D Note: AB-6BR has been abandoned and thus removed from the IMP. AB-6BRA was installed as replacement well. Water quality remains an issue (elevated pH). Recommend additional well development prior to next sampling event. AB -6S AB -7D AB-7DU AB -7S AB -8D AB-8DU AB -8S AB-9BR AB -9D AB -9S AL-lBR AL -ID X X Monitor boron and TDS concentrations (increasing). - Marshall Steam Station Page 2 of 5 September 28, 2018 Marshall Steam Station Page 3 of 5 September 28, 2018 Sample for Wells to be Sampled Radionuclides Regional Office Notes A) AL -IS X AL-2BR Monitor boron, chromium, sulfate, and TDS concentrations (increasing). AL-2BRL Duke proposed additional well installation for AL-2BRLL delineation purposes. AL -2D AL -2S _ Water quality remains an issue (elevated pH). AL-3BR Recommend additional well development prior to next sampling event. Monitor boron and chromium concentrations AL -3D increasin AL -3S Elevated pH. Recommend additional well AL-4BRL development prior to next sampling event. Monitor boron, sulfate and TDS concentrations AL-4BR (increasing). AL -4D Note: BG-lBR has been abandoned and thus BG-1BRA X removed from the IMP. BG-1BRA was installed as replacement well. BG -1D X BG -1S X BG-2BR X BG -2S X BG-3BR X BG -3D X BG -3S X GWA-lBR X GWA-1D X X GWA-1 S Note: GWA-2D has been abandoned and thus removed from the IMP. GWA-2DA was installed GWA-2DA as replacement well. Need to discuss potential replacement. GWA-2S GWA-3D GWA-3 S Marshall Steam Station Page 3 of 5 September 28, 2018 Wells to be Sampled Sample for Radionuclides Regional Office Notes GWA-4D GWA-4S GWA-51) GWA-5S GWA-61) X GWA-6S X GWA-7D GWA-7S GWA-8D GWA-8S Monitor chromium concentrations (increasing). GWA-9BR GWA-10D GWA-10S Monitor boron concentrations (slight increase). GWA-11BR X GWA-111) X GWA-11 S X Sample to be analyzed for total boron and sulfate only. Sample to be analyzed for total boron and sulfate onl . GWA-12BR X GWA-12D GWA-12S X GWA-13DA GWA-13S GWA-14D GWA-14S GWA-15S X Monitor boron concentrations (increasing). GWA-15D X MS -8 MS -10 X MS -11 MS -13 MW -1 MW -10D X MW -10S X MW -11D MW -1 lS MW -12D MW -12S MW -13D Marshall Steam Station Page 4 of 5 September 28, 2018 Sample for Wells to be Sampled Radionuclides - — MW -13S MW-14BR X Regional Office Notes Monitor boron and TDS concentrations (increasing). MW -14D X Monitor cobalt concentrations (increasing). Monitor chromium, iron, and TDS concentrations (increashW. MW -14S X MW -2 Hexavalent Molybdenum MW -3 Total Organic MW -4 X MW -4D X MW -5 MW -61) X Monitor boron concentrations (increasing). MW -6S X Nickel MW -7 Combined Water level only MW -71) X Monitor boron concentrations (increasing). MW -7S X Monitor TDS concentrations (increasing). MW -8D X .MW -8S X Monitor TDS concentrations (increasing). MW -9D X Monitor boron concentrations (increasing). MW -9S X Monitor TDS concentrations (increasing). OB -1 (Dry Ash Basin) Monitor iron concentrations (significant increase). OB -1 (Dry Ash Landfill) Water level only Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc _ Solids Marshall Steam Station Page 5 of 5 September 28, 2018 Revised Ma. o Steam Electric Plant Interim Monitoring Plan — Groundwater Only Sample for Wells to be Sampled Radionuclides (X) Regional Office Notes ABMW-1 X ABMW-2 ABMW-2BR ABMW-2BRL ABMW-3 ABMW-3S ABMW-4X X Well was replaced due to storm runoff damage. ABMW-4 was abandoned. ABMW-4BR ABMW-4D BG -1 X BG -2 X CW -1 CW -1D CW -2 X CW -2D X CW -3 CW -4 CW -5 CW -6 X MW-l0BR X MW-11BR water level only MW -12D X MW -12S X MW-13BR MW-14BR MW-15BR water level only MW-16BR X MW -16D X MW -16S MW -18D MW-18BR MW -19D MW-19BR MW -2 MW -3 X MW-3BR Mayo Steam Electric Plant Page 1 of 2 September 28, 2018 MW -4 Boron Copper MW-5BR Selenium Thallium MW-8BR Cadmium Hexavalent MW-9BR Sodium water level only MW-9BRL Chromium Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids BariumChromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids Mayo Steam Electric Plant Page 2 of 2 September 28, 2018 Revised L.V. Sutton Enemy Complex Interim Monitoring Plan — Groundwater Only Wells to be Sampled - AW -1C AW -2C AW -2D AW -3C AW -4C Sample for Radionuclides Regional Office Notes (x) X X AW -5C AW -5D AW -6R -D AW -6R -E AW -7R -D AW -08C AW -09C AW -09D MW -05C X MW-05CD X MW -05D X MW -05R -E MW -7C MW -8 X MW -8B X MW -8D X MW -8E X MW -11 MW -12R MW -16D MW -19 MW -20 MW -20D MW -21C MW -22B MW -22C MW -23B MW -23C MW -23D X MW -23E X MW -24R -B MW -24R -C MW -27B MW -27C X L.V. Sutton Energy Complex Page 1 of 2 September 28, 2018 MW -28B Boron MW -28C Mercury MW -31R -C X MW -32C X MW -33C X MW -36C X MW -37B X MW -37C X MW-37CD X MW -37D X MW -37E X MW -38B MW -38C X MW -38D X MW -39B Lead MW -39C X MW -39D X MW -40B MW -40C MW -40D Barium MW -41B X MW -41C X MW -41D X MW -41E Manganese SMW-01 C Total DissolvedSolids SMW-02C SMW-03C SMW-04C SMW-5C SMW-06C SMW-06D Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Nickel Strontium Carbon Total CombinedUranium Antimony Calcium Iron Arsenic Chloride Lead Potassium Sulfate Total Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Beryllium Cobalt Manganese Radium 228 Total DissolvedSolids Zinc L.V. Sutton Energy Complex Page 2 of 2 September 28, 2018 Revised Riverbend Steam Station Interim Monitoring Plan — Groundwater Only Wells to be Sampled _ AB -1D Sample for Radionuclides (X) Regional Office Notes Measure all field parameters plus water level, if pH still high, not sample for lab analyses. AB -1S Not sample. Please evaluate whether the well needs to be redeveloped or replaced. AB -2D AB -2S AB -8D AB -8S BG-1DA BG -1 S BG-2BR BG -2D BG -2S BG -3D BG -3S BG-4BR X Not Sample. Please evaluate whether this well should be replaced because the well has not been sampled since 5/23/2017 due to high pH BG -4D X BG -4S X BG-5BR BG -5D GWA-10BRU Field parameters plus water level, if pH still high, not sample for lab analvses. GWA-10S GWA-11D GWA-11 S GWA-12D X GWA-12S X GWA-13D GWA-13S GWA-14D GWA-14S GWA-15D GWA-15S X GWA-1BRU _ GWA-1 S GWA-20BR GWA-20DA Riverbend Steam Station Page 1 of 3 September 28, 2018 GWA-20S GWA-21BR GWA-21D GWA-21 S GWA-22BR-A X GWA-22D X GWA-22S X GWA-23BR Not Sample if pH is still high, but. please evaluate whether this well should be replaced. GWA-23DA GWA-23S GWA-2BR X GWA-2BRU X GWA-2S X GWA-3BR GWA-3D GWA-3SA GWA-4BR GWA-4D X GWA-4S X GWA-5D GWA-5S GWA-6D X GWA-6S X GWA-7BR GWA-7D GWA-7S GWA-8D X GWA-8S X GWA-9BR X GWA-9D X GWA-9S X MW -10 X MW-11DR MW -11 SR MW -13 MW -14 X MW -15 MW-15BR MW-15DA MW -1D MW -1S Riverbend Steam Station Page 2 of 3 September 28, 2018 Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium_ Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc - .- _ Solids Riverbend Steam Station Page 3 of 3 September 28, 2018 Revised Roxboro Steam Electric Plant Interim Monitorin Plan — Groundwater Onl Wells to be Sampled Sample for Radionuclides (X) Regional Office Notes ABMW-1 X water level only ABMW-lBR X X ABMW-2 water level only ABMW-2BR X ABMW-3 ABMW-3BR ABMW-3BRL Abandoned as part of the WW redirect (leachate work) Abandoned as part of the WW redirect (leachate work ABMW-5 X ABMW-5D X ABMW-6 ABMW-6BR ABMW-7 water level only ABMW-7BR ABMW-7BRL BG -1 X BG-lBR X BG-1BRL water level only BG-1BRLR X BG-2BR X CCR -113D Recently installed well. for CCR program adds a down clint data point CCR- 113BR Recently installed well for CCR program adds a down adient data point CW -1 CW -2 X CW -2D X CW -3 CW -3D CW -4 CW -5 X GMW-10 GMW-11 GMW-6 X GMW-7 Roxboro Steam Electric Plant Page 1 of 3 September 28, 2018 GMW-8R Well replaced, GWM-8 was abandoned GMW-9 MW-lBR MW-2BR MW-3BR X MW-4BR MW-4BRL water level only MW-5BR X MW -5D X MW-6BR X MW -6D X MW-7BR MW-8BR MW-9BR X MW-10BR X MW -1 lBR X MW -11D X MW-12BR MW-13BR X MW-14BR X MW-15BR X MW -15D X MW-16BR X MW-17BR X MW-18BR X MW -18D X MW-19BRL X MW -2 X MW-20BRL MW-21BRLR Replaced, MW-21BRLR was abandoned MW-22BR MW -22D MW-23BR _ MW-23BRR MW-24BR MW-25BR water level only MW-26BR MW-27BR MW-28BR MW-29BR MW-30BR Roxboro Steam Electric Plant Page 2 of 3 September 28, 2018 MW-31BR Boron Copper MW-32BR Selenium Thallium MW-33BR Cadmium Hexavalent GPMW-1 S Sodium Total Organic GPMW-1D Chromium GPMW-IBR Carbon GPMW-2D GPMW-2BR Total GPMW-3D Calcium Iron GPMW-3BR Strontium Combined Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Vanadium Barium Chromium Magnesium Radium 226 Sulfide Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc _ Solids Roxboro Steam Electric Plant Page 3 of 3 September 28, 2018 Revised L.V. Sutton Enemy Complex Interim Monitoring Plan — Groundwater Only Sample for Wells to be Sampled Radionuclides A) AW -1C AW -2C Regional Office Notes AW -2D AW -3C X AW -4C X AW -5C AW -5D AW -6R -D AW -6R -E AW -7R -D AW -08C AW -09C AW -09D MW -05C X MW-05CD X MW -05D X MW -05R -E MW -7C MW -8 X MW -8B X MW -8D X MW -8E X MW -11 MW -12R MW -16D MW -19 MW -20 MW -20D MW -21C MW -22B MW -22C MW -23B MW -23C MW -23D X MW -23E X MW -24R -B MW -24R -C MW -27B MW -27C X L.V. Sutton Energy Complex Page 1 of 2 September 28, 2018 MW -28B Boron Cadmium MW -28C Mercury MW -31 R -C X MW -32C X MW -33C X MW -36C X MW -37B X MW -37C X MW-37CD X MW -37D X MW -37E X MW -38B MW -38C X MW -38D X MW -39B MW -39C X MW -39D X MW40B MW -40C MW -40D Solids MW -41B X MW -41C X MW -41D X MW -41E Radium 228 SMW-01 C SMW-02C SMW-03C SMW-04C SMW-5C SMW-06C _ SMW-06D Minimum Parameters to be Analyzed Aluminum Boron Cadmium Copper Hexavalent Mercury Selenium Thallium Sodium Total Organic Alkalinity Molybdenum Chromium Carbon Antimony Calcium Iron Nickel Strontium Total Combined Uranium Arsenic Chloride Lead Potassium Sulfate Total Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Beryllium Cobalt Manganese Radium 228 Total Dissolved Zinc Solids L.V. Sutton Energy Complex Page 2 of 2 September 28, 2018 Revised W. H. Weathersnoon Power Plant Interim MonitorinE Plan — Groundwater Only Wells to be Sampled Sample for Radionuclides Regional Office Notes AW -01D AW -01I AW -01S AW -02D AW -02S AW -03D AW -03I AW -03S BW -01 BW -02S X BW -03D X BW -03I X BW -03S X BW -4D X BW -4I X BW4S X CCR -101 -BG CAMA X CW -01 CW -02 CW -03 X MW -01 X MW -02 X MW -03 X MW -04 X MW -05 X MW -06 X MW -07 X MW -33D MW -33I MW -33S MW -41D MW -41I MW -52 X MW -53D MW -53I MW -54D MW -55D X W. H. Weatherspoon Power Plant Page 1 of 2 September 28, 2018 MW -55I X PW -1 (DEP 2) Minimum Parameters to be Analyzed Aluminum Boron Copper Hexavalent Chromium Mercury Molybdenum Selenium Sodium Thallium Total Organic Carbon Alkalinity Cadmium Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids W. H. Weatherspoon Power Plant Page 2 of 2 September 28, 2018