HomeMy WebLinkAboutIMPs 4th Quarter 2018_20180928NORTH CAROLINA
Roy COOPED EnIr entaJQualay
c
MICHAEL S. PEGAN
50"W"),
LINDA CULPEPPER
lrtterbn llir+eaor
September 28, 2018
Paul Draovitch
Senior Vice President
Environmental, Health & Safety
Duke Energy
526 South Church Street
Mail Code EC3XP
Charlotte, North Carolina 28202
Subject: Revised Interim Monitoring Plans for 14 Duke Energy Facilities
4'' Quarter 2018
Dear Mr. Draovitch:
The North Carolina Department of Environmental Quality (DEQ) is providing the attached revised
Interim Monitoring Plans (IMPs) for the respective coal ash facilities. Per our agreement, DEQ
will be providing Duke Energy with updated IMPs quarterly until the individual facility Corrective
Action Plans are approved or as directed otherwise by DEQ, and Duke Energy will include and
begin sampling any newly installed groundwater assessment wells as part of the facility IMP which
DEQ will formally include in the subsequent IMPs.
The attached IMPs only contain references to groundwater monitoring locations. DEQ may elect
to require establishment of surface water monitoring program in the future related to the ongoing
IMPs or corrective action performance monitoring. The requirement for an annual monitoring
report for each respective coal facility as set forth in the May 1, 2017 letter submitted will be due
April 30, 2019.
The attached revised facility IMPs shall be conducted on a quarterly basis pursuant to 15A NCAC
02L .0110, until Corrective Action Plans are approved for the individual facilities or as directed
otherwise by DEQ. The quarterly sampling events will be conducted in conjunction with planned
compliance monitoring sampling events for three quarters during the calendar year, supplemented
with an additional sampling event conducted at each facility in order to provide four rounds of
North Carolina Department of Environmental Quality I Division of Water Resources JAFOGW Section
512 North Salisbury Street 11636 Mail Service Center I Raleigh, North Carolina 27699-1636
919.707.9129
monitoring data to evaluate seasonal fluctuations during a year-long timeframe. If sampling an
individual groundwater location is problematic, please contact the appropriate Regional Office.
In order to optimize the groundwater monitoring at each facility, DEQ will be removing the
groundwater monitoring condition from the NPDES permits as they are reissued. Duke Energy
shall continue to monitor the compliance wells separately under the individual NPDES permits
until the NPDES permits are reissued with no groundwater monitoring condition. At that time,
the compliance wells shall continue to be monitored per the attached revised IMPS under the
authority of 15A NCAC 02L .0110.
DEQ is currently participating in reviews to optimize the groundwater monitoring programs at the
Duke Energy coal ash facilities. This review process will result in revisions to the current
groundwater monitoring programs until corrective action is implemented at the respective facilities
and may streamline the effort related to quarterly IMP changes.
If you have any questions, please feel free to contact the appropriate Regional Office or Steve
Lanter (Central Office), at (919) 707-3667.
Sincerely,
`Y
Jon Ri ard, Section Chief
Animal Feeding Operations and Groundwater
Attachments: Revised Interim Monitoring Plans for the 14 coal ash facilities
cc: WQROS Regional Offices
WQROS Central File Copy
Revised Allen Steam Station Interim Monitoring Plan — Groundwater Only
Allen Steam Station Page 1 of 5 September 28, 2018
Sample for
Wells to be Sampled
I Radionuclides
Regional Office Notes
M
AB -10D
AB -10S
Monitor cobalt and manganese concentrations
X
(increasing).
AB -11D
AB -12D
AB -12S
AB -13D
X
AB -13S
X
AB-14BR
AB -14D
AB -1R
AB -2
AB -20D
AB -20S
AB-21BRL
X
Sample to be analyzed for total boron and sulfate
AB -21D
only.
AB -21 S
X
AB -21 SL
X
AB -21 SS
X
Duke Energy proposed installation of bedrock and
lower bedrock well to be installed near the AB -10
AB-22BRL
location and will be utilized for delineation
purposes for AB-22(meeting 8/30/2018).
AB-22BR
AB -22D
AB -22S
AB-23BRU
Sample to be analyzed for total boron and sulfate
only.
AB -23S
AB-24BR
Sample to be analyzed for total boron and sulfate
AB -24D
only.
A13 -24S
Monitor arsenic and iron concentrations
(increasing).
AB-24SL
Monitor boron and TDS concentrations (increasing
and boron close to 2L).
Sample to be analyzed for total boron and sulfate
AB-25BR
only.
AB-25BRU
Sample to be analyzed for total boron and sulfate
only.
Allen Steam Station Page 1 of 5 September 28, 2018
Wells to be Sampled
Sample for
Radionuclides
[X�
Regional Office Notes
_
AB -25S
X
X
AB-25SS
AB-25SL
X
AB -26D
AB -26S
AB-27BR
AB -27D
AB -27S
Monitor iron and manganese concentrations
(increasing).
AB -28D
Elevated pH. Recommend additional development
may be beneficial in attempt to improve water
q ualit .
AB -28S
AB -29D
Monitor boron concentrations (increasing).
AB -29S
AB-29SS
AB-29SL
Elevated pH. Recommend additional development
may be beneficial in attempt to improve water
ualit .
AB -2D
AB -30D
AB -30S
Monitor arsenic concentrations (increasing).
AB -31S
AB -32D
Monitor boron and sulfate concentrations
increasin .
AB -32S
AB -33D
X
Continues to exhibit water quality issues (elevated
pH). Pending IMP reduction discussions.
AB -33S
X
AB-33SS
X
AB -34D
AB -34S
Monitor sulfate and TDS concentrations
(increasing).
AB-35BR
X
AB -35D
Sample to be analyzed for total boron and sulfate
only.
AB-35PWS
X
AB -35S
X
AB -36D
AB -36S
AB -37D
AB -37S
AB-38BR
Allen Steam Station Page 2 of 5 September 28, 2018
Wells to be Sampled
Sample for
Radionuclides
W
Regional Office Notes
_
AB -38D
AB -38S
AB-38SS
AB -39D
AB -39S
AB-4BR
X
AB -4D
X
AB -4S
X
AB -5
AB -6A
X
AB -6R
X
Monitor total radium concentrations (increasing).
AB -9D
X
Monitor iron due significant increase observed last
sampling event (6/l/2018).
AB -9S
X
BG-lDA
X
Note: BG-lD has been abandoned thus removed
from the IMP. BG-lDA was installed as
replacement well.
Monitor chromium concentrations.
BG -IS
X
BG-2BRA2
X
Note: BG-2BR has been abandoned thus removed
from the IMP. BG-2BRA-2.was installed as
replacement well.
Continues to exhibit water quality issues (elevated
pH). Additional development may be beneficial in
attempt to improve water quality.
BG -2D
X
BG -2S
X
BG -3D
X
BG -3S
X
BG-4BR
X
BG -4D
X
BG -4S
X
GWA-14DA
Note: GWA-14D has been abandoned thus removed
from the IMP. GWA-14DA was installed as
replacement well.
Elevated pH. Additional development may be
beneficial in attempt to improve water quality.
GWA-14S
GWA-15D
GWA-15S
Allen Steam. Station Page 3 of 5 September 28, 2018
Sample for
Wells to be Sampled Radionuclides
Regional Office Notes
_
GWA-16D
GWA-16S
GWA-17D
X
GWA-17S
X
GWA-18D
GWA-18S
GWA-19D
Sample to be analyzed for total boron and sulfate
only; however, if water quality comes into
compliance, a full sample suite (per IMP) should be
collected at this location.
GWA-19S
GWA-lBR
X
GWA-1D
X
GWA-1 S
X
GWA-21BR
X
GWA-21DA
X
Note: GWA-21D has been abandoned thus removed
from the IMP. GWA-21 DA was installed as
replacement well.
GWA-21 S
X
GWA-22D
GWA-22S
GWA-23D
Sample to be analyzed for total boron and sulfate
only; however, if water quality comes into
compliance, a full sample suite (per IMP) should be
collected at this location.
GWA-23S
X
GWA-24BR
GWA-24D
GWA-24SA
Note: GWA-24S has been abandoned thus removed
from the IMP. GWA-24SA was installed as
replacement well.
GWA-26D
GWA-26S
GWA-2D
X
GWA-2S
X
GWA-3BRA
X
Note: GWA-3BR has been abandoned thus removed
from the IMP. GWA-3BRA was installed as
replacement well.
Additional development may be beneficial in
attempt to imI trove water quality.
GWA-3D
X
GWA-3S
X
Allen Steam Station Page 4 of 5 September 28, 2018
Sample for
Wells to be Sampled Radionuclides
GWA-4BR X
Regional Office Notes
Additional development may be beneficial in
attempt to improve water quality.
GWA-4D
X
GWA-4S
X
Hexavalent
GWA-5BRA
X
Note: GWA-5BR has been abandoned thus removed
from the IMP. GWA-5BRA was installed as
replacement well.
Duke Energy proposed installation of lower bedrock
well for vertical delineation purposes.
GWA-5D
X
GWA-5S
X
GWA-6BRA
X
Note: GWA-6BR has been abandoned thus removed
from the IMP. GWA-6BRA was installed as
replacement well.
GWA-6DA
X
Note: GWA-6D has been abandoned thus removed
from the IMP. GWA-6DA was installed as
replacement well.
GWA-6S
X
Combined
GWA-7D
X
Monitor TDS concentrations (increasing).
GWA-7S
X
GWA-8D
Total
Monitor TDS concentrations (increasing).
GWA-8S
Lead
Potassium
GWA-9BR
X
GW -9D
X
GWA-9S
X
Barium
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Allen Steam Station Page 5 of 5 September 28, 2018
Revised Asheville Steam Electric Plant Interim Monitoring Plan — Groundwater OnIN
Wells to be
Sampled
Sample for
Radionuclides
x)
Regional Office Notes
ABMW-11 BR
AMW-1B
X
AMW-2A
AMW-213
water level only
AMW-3B
X
APZ-30
water level only
AS-5BR
redevelopment needed
AS-5BRL
redevelopment needed
B-1
water level only
B -IA
water level only
B-2
water level only
CB -1
X
CB -IBR
water level only
CB-1BRL
water level only
CB -1D
X
CB -2
CB -3R
X
CB -4
X
CB -4B
X
CB -5
CB -6
CB -7
CB -8
X
CB-8BR
X
CB -81)
water level only
CB -9
X
CB-9BR
X
CB-9SL
X
CCR-100SL
X
CCR-100BR
X
CCR-100BRL
X
CCR-101BR
X
CCR -102D
X
CCR -102S
X
CCR-103BR
CCR -103D
CCR -104D
X
Asheville Steam Electric Plant Page 1 of 4 September 28, 2018
CCR-105BR
CCR -105D
X
EXT -1
X
EXT -2
EXT -A
GW -1
X
GW -IBR
GW -1D
GW -2
X
GW -3
X
GW -4
X
GW -5
X
MW -3D
X
MW-5BR
MW -5D
MW-6BR
X
MW -6D
X
MW -6S
X
MW-7BR
water level only
MW-8BR
water level only
MW -8S
X
MW-9BR
X
MW -9D
X
MW -9S
X
MW -10
X
MW -11
MW -11D
MW-13BR
MW -13D
MW-14BR
MW -15A
X
MW-15BR
water level only
MW-15BRL
X
MW -15D
X
MW -16A
X
MW-16BR
X
MW-16BRL
X
MW-16BRLL
X
MW -16D
X
MW -17A
X
MW-17BRL
X
Asheville Steam Electric Plant Page 2 of 4 September 28, 2018
MW-18BR
X
Copper
MW-18BRL
X
Thallium
MW -18D
X
Hexavalent
MW-19BR
Sodium
water level only
MW -20A
Chromium
MW-20BR
X
Carbon
MW-20BRL
X
MW -21D
X
Total
MW-22BR
X
Iron
MW -22D
X
Combined
MW-23BR
MW-23DL
Uranium
MW-23DU
MW -24S
X
Total
MW-25BR
X
Lead
MW-25BRL
X
Suspended
MW -25S
MW-26BR
X
Solids
MW-26BRL
X
Magnesium
MW -26S
Sulfide
Vanadium
P-102
water level only
P-103
Beryllium Cobalt
PZ-17BRL
X
Dissolved
PZ -17D
X
PZ -17S
X
PZ -19
X
PZ -22
X
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Asheville Steam Electric Plant Page 3 of 4 September 28, 2018
Asheville Steam Electric Plant Page 4 of 4 September 28, 2018
Revised Belews Creek Steam Station Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
Regional Office Notes
AB-lBR
AB -1D
AB -1S
AB -2D
AB -2S
AB -3D
AB -3S
AB-4BR
Measure all field parameters plus water level, if pH is still high, do
not sample for lab analyses
AB-4BRD
AB -4D
AB -4S
AB-4SL
Measure all field parameters plus water level, if pH is still high, do
not sample for lab analyses
AB-4SAP
AB -5D
AB -5S
AB-5SL
AB -6D
AB -6S
AB-6SL
AB -7D
AB -7S
AB -8D
AB -8S
AB-8SL
AB-9BR
AB-913RD
Measure all field parameters plus water level, if pH is still high, do
not sample for lab analyses
AB -9D
AB -9S
BG -1D
BG -1 S
X
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
BG-2BRA
BG -2D
X
BG -2S
X
Belews Creek Steam Station Page 1 of 4 September 28, 2018
BG -3D
BG -3S
GWA-1 ODA
GWA-10S
GWA-11D
GWA-11 S
GWA-12BR
GWA-12D
GWA-12S
GWA-16BR
Measure all field parameters plus water level, if pH is still high, do
not sample for lab analyses
GWA-16DA
GWA-16S
GWA-17D
GWA-17S
GWA-18D
GWA-18SA
GWA-19BR
GWA-19D
GWA-19SA
GWA-lBR
X
Measure all field parameters plus water level, if pH is still high, do
not sample for lab analyses
GWA-1D
X
GWA-1 S
X
GWA-20BR
GWA-20D
GWA-20SA
GWA-21D
GWA-21 S
GWA-22D
GWA-22S
GWA-23D
GWA-23 S
GWA-24BR
GWA-24D
X
GWA-24S
X
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
GWA-25BR
X
GWA-26BR
X
GWA-26D
X
GWA-26S
X
Belews Creek Steam Station Page 2 of 4 September 28, 2018
GWA-27BR
GWA-27D
GWA-27S
GWA-2D
GWA-2S
GWA-30D
X
Measure all field parameters plus water level, if pH is still high, do
not sample for lab analyses
GWA-30S
X
GWA-31 D
GWA-31 S
GWA-32D
GWA-32S
GWA-3D
GWA-3S
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
GWA-6D
X
GWA-6S
X
GWA-7D
X
GWA-7SA
X
GWA-8D
X
GWA-8S
X
GWA-9BR
GWA-9D
GWA-9S
MW-104BRA
MW -104D
MW -104S
MW-200BR
MW -200D
x
MW -200S
MW-201BR
MW -201D
MW-202BR
MW -202D
MW -202S
MW-203BR
MW -203D
MW -203S
MW -204D
MW -204S
Belews Creek Steam Station Page 3 of 4 September 28, 2018
MW -3 X
EX -OB -1
EX -OB -2
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Hexavalent
Total Organic
Alkalinity
Cadmium
Chromium
Molybdenum
Sodium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Belews Creek Steam Station Page 4 of 4 September 28, 2018
Revised Buck Combined Cycle Station Interim Monitoring Plan — Groundwater Only
Wells to be
Sample for
Sampled
Radionuclides
Regional Office Notes
(X)
AB -1D
AB -1 OBR
Monitor barium, boron, sulfate and vanadium
(increasing).
Monitor TDS concentrations (increasing).
AB -1 OBRL
Water quality continues to be an issue (elevated pH
indicative of grout contamination). Recommend
additional development prior to next sampling event.
AB -10D
Monitor boron concentrations (increasing).
AB -10S
Monitor chromium concentrations (significant
increase last sampling event).
AB-2BR
Sample to be analyzed for total boron and sulfate
only.
AB -2D
X
AB -2S
X
AB-2SL
X
A13 -3D
Monitor manganese concentrations (increasing).
A13 -3S
Monitor arsenic, barium, iron, and manganese
concentrations (increasing).
Water quality continues to be an issue (elevated pH).
AB-4BRL
Recommend additional development prior to next
sampling event.
AB-4BRU
AB -4S
Monitor arsenic and manganese concentrations
(increasing).
Monitor iron and manganese concentrations
AB-4SL
(significantly increased during last event compared to
historical data).
Volume has been insufficient to collect sample since
AB-SBRU
X
2015. Continue to monitor water level during each
sampling event and if volume is sufficient for
sampling then collect the sample accordingly.
AB-5S
X
Monitor boron and iron concentrations (increasing).
AB-5SL
X
AB-6BRU
AB-7BRU
AB -7S
MRO is aware of the labeling inconsistency.
AB-8BRU
Please label the well correctly in the field to avoid
future discrepancies and sample accordingly.
AB -8S
Monitor arsenic and boron concentrations
(increasing).
Buck Combined Cycle Station Page 1 of 5 September 28, 2018
Wells to be
Sample for
Sampled
Radionuclides
Regional Office Notes
Note: AB-9BR has been abandoned thus removed
from the IMP. AB-9BRA was installed as
AB-9BRA
X
replacement well.
Monitor total radium concentrations (increasing).
Note: AB-9BRU has been abandoned thus removed
AB-9BRUA
X
from the IMP. AB-9BRUA was installed as
replacement well.
Water quality continues to be an issue (turbidity).
AB -9S
X
Recommend additional development prior to next
sampling event.
AS -113
Monitor boron concentrations (increasing).
AS -1S
Monitor nickel concentrations (increasing).
AS -2D
AS -3D
AS -3S
Monitor iron and manganese concentrations
(significantly increased during last sampling event).
Note: BG -IBR has been abandoned thus removed
BG-1BRA
X
from the IMP. BG-1BRA was installed as
replacement well.
BG -1 S
X
Note: BG -11) has been abandoned thus removed from
the IMP. BG-lDA was installed as replacement well.
BG -IDA
X
Water quality still an issue (appears to be grout
contaminated). Recommend additional development
prior to next sampling event.
BG -2D
X
BG -2S
X
BG-3BRU
X
Monitor total radium concentrations (increasing).
BG -3S
X
GWA-10D
GWA-10S
GWA-11D
GWA-11 S
GWA-12BRU
X
GWA-12S
X
GWA-13D
Monitor iron and TDS concentrations (increasing).
GWA-13SR
Volume has been insufficient to collect sample.
GWA-14BR
X
Continue to monitor water level during each sampling
event and if volume is sufficient for sampling then
collect the sample accordingly.
Buck Combined Cycle Station Page 2 of 5 September 28, 2018
Wells to be
Sampled
Sample for
Radionuclides
l
Regional Office Notes
_
GWA-14D
Sample to be analyzed for total boron and sulfate
only.
GWA-14S
X
GWA-15BR
X
Water quality continues to be an issue (elevated pH).
Recommend additional development prior to next
sampling event.
GWA-15D
X
Monitor total radium concentrations (increasing).
GWA-15S
X
GWA-16BR
X
GWA-16D
X
GWA-16S
X
GWA-17S
GWA-18DA
X
Note: GWA-18D has been abandoned thus removed
from the IMP. GWA-18DA was installed as
replacement well.
Per meeting on 8/30/2018, MRO and Duke Energy
agreed to redevelop well prior to next sampling event.
We will review results of next sampling event to
determine if reinstallation is necessary.
GWA-18S
X
GWA-19D
X
GWA-19S
X
GWA-1D
X
GWA-1S
X
Monitor chromium concentrations (increasing).
GWA-20D
X
GWA-20S
X
Monitor cobalt, iron, and manganese concentrations
(significantly increased during last sampling event as
compared to historical data).
GWA-22D
X
GWA-2BRA
X
Note: GWA-2BR has been abandoned thus removed
from the I1VIP. GWA-2BRA was installed as
replacement well.
GWA-2BRU
X
Monitor total radium concentrations (increasing).
GWA-2S
X
GWA-3BR
X
GWA-3BRU
X
Monitor total radium concentrations (increasing).
GWA-3S
X
GWA-4D
X
GWA-4S
X
Monitor TDS concentrations (increasing).
GWA-SBRU
X
Monitor boron concentrations (increasing).
GWA-5 S
X
GWA-6BR
X
Buck Combined Cycle Station Page 3 of 5 September 28, 2018
Wells to be
Sample for
Sampled
Radionuclides
Regional Office Notes
Monitor sulfate and TDS concentrations (increasing).
This location warrants delineation. In meeting on
GWA-6BRL
X
8/30/2018, MRO and Duke Energy discussed
installation of a new bedrock well (closer to the
GWA-12 cluster) for purposes of horizontal and
vertical delineation. Please update MRO on status.
GWA-6BRU
X
Volume has been insufficient to collect sample since
GWA-6S
X
2016. Continue to monitor water level during each
sampling event and if volume is sufficient for
sampling then collect the sample accordingly.
GWA-7D
X
GWA-7S
X
GWA-8D
Note: GWA-9BR has been abandoned thus removed
from the IMP. GWA-9BRA was installed as
replacement well.
GWA-9BRA
X
Water quality continues to be an issue (elevated pH).
Recommend additional development prior to next
sampling event.
GWA-9D
X
Monitor manganese concentrations (increasing).
GWA-9S
X
Monitor manganese concentrations (increasing).
MW -10D
MW-11BR
X
MW-11BRL
X
Monitor manganese concentrations (increasing).
Water quality continues to be an issue (turbidity).
MW -11D
X
Recommend additional development prior to next
sampling event.
MW -11S
X
MW -12D
Water quality continues to be an issue (turbidity).
MW -12S
Recommend additional development prior to next
sam ling event.
MW -13D
MW -1D
MW -1S
Monitor boron concentrations (increasing).
MW -3D
X
MW -3S
X
MW -4D
Monitor boron concentrations (increasing).
MW -4S
MW -51)
Monitor boron concentrations (increasing).
MW -5S
Buck Combined Cycle Station Page 4 of 5 September 28, 2018
Wells to be
Sample for
Copper
Sampled
Radionuclides
Regional Office Notes
Alkalinity
X
Hexavalent
MW-6BR
X
Total Organic
MW-6D
X
Chromium
MW-6S
X
Monitor manganese concentrations (increasing).
MW-7D
MW-7S
Total
Antimony
Calcium
Note: MW-8BR has been abandoned thus removed
Nickel
Strontium
from the IMP. MW-8BRA was installed as
replacement well.
MW-8BRA
X
Monitor sulfate and TDS concentrations (increasing).
Per meeting on 8/30/2018, MRO and Duke Energy
Total
agreed to redevelop well prior to next sampling event.
Chloride
Lead
We will review results of next sampling event to
Sulfate
Suspended
determine if reinstallation is necess
MW-8D
X
MW-8S
X
Barium
MW-9D
X
Radium 226
MW-9S
X
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Buck Combined Cycle Station Page 5 of 5 September 28, 2018
Revised Casae Fear Steam Electric Plant Interim Monitoring Plan — Groundwater Onl%
Wells to be Sample for
Sampled Radionuclides
(X)
ABMW-1 X
Regional Office Notes
ABMW-lBR
X
ABMW-1 S
X
ABMW-2SL
ABMW-2SU
_
ABMW-3
X
ABMW-3BR
ABMW-3 SR
X
ABMW-4
X
ABMW-4S
X
ABMW-5BR
ABMW-5S
BGMW-4
X
BGTMW-4
X
CMW-01
X
CMW-02
CMW-03
X
CMW-5R
CMW-06
X
CMW-07
X
CMW-08
X
CTMW-01
X
CTMW-02
CTMW-07
CTMW-08
X
MW -10
X
MW-10BR
X
MW-10BRL
MW -10D
MW -11
X
MW -12
X
MW-12BR
MW -13
MW-15BR
X
MW-15SL
X
MW-15SU
X
MW-16BR
X
Cape Fear Steam Electric Plant Page 1 of 3 September 28, 2018
MW -16S
X
MW-17BR
MW-17SL
X
MW-17SU
X
MW -18S
X
MW -19S
MW-20BR
MW -20S
MW-21BR
MW -21 SL
X
MW -21 SU
X
MW-22BR
MW -22S
MW-23BR
MW -23D
X
MW -23S
X
MW-24BR
X
MW -24S
X
MW-5BRR
MW-6BR
X
MW -9
X
MW-9BR
X
PZ -1
PZ -10
PZ -2
PZ -3D
PZ -3S
PZ -4
PZ -5
X
PZ -6
PZ -7
PZ -8
Cape Fear Steam Electric Plant Page 2 of 3 September 28, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese Radium 228
Dissolved
Zinc
Solids
Cape Fear Steam Electric Plant Page 3 of 3 September 28, 2018
Revised James E. Rogers Enerzy Complex Interim Monitoring Plan — Groundwater Onl
Wells to be
Sampled
Sample for
Radionuclides
(X)
Regional Office Notes
AB-1BROR
Replaced AB -IBRO due to casing damage
AB -1D
AB -IS
AB-2BRO
AB -2D
AB -2S
AB-3BRUA
AB -3I
AB -3S
X
AB -3 SLA
X
AB-4BR
AB -4D
AB -4S
X
AB-4SL
X
AB-5BR
AB-5BRU
AB -5S
X
AB -613R
AB -6D
AB -6S
X
AS -1D
AS -1 SB
AS -213R
AS -2D
X
AS -2S
X
AS-3BRU
AS -4D
AS -4S
AS-5BR
AS-5BRU
AS -5S
AS-6BRA
AS -6D
AS -6S
AS-7BRA
AS -7D
AS -7S
X
James E. Rogers Energy Complex Page 1 of 6 September 28, 2018
AS-8D
AS-8S
BG 1-BRA
BG-1D
X
BG-1S
X
BG-2D
Water level only
CCPMW-1D
X
CCPMW-1 S
X
CCPMW-2D
Water level only
CCPMW-2S
Water level only
CCPMW-3D
Water level only
CCPMW-3S
Water level only
CCPMW-4
Water level only
CCPMW-5
Water level only
CCPMW-6D
Water level only
CCPMW-6S
Water level only
Water level only
CCPTW-1D
CCPTW-1 S
Water level only
CCPTW-2
Water level only
CLMW-1
X
CLMW-2
CLMW-3D
X
CLMW-3S
X
CLMW-5D
CLMW-5S
CLMW-6
CLP-1
Water level only
CLP-2
Water level only
CLP-3
Water level only
CLP-4
Water level only
GWA-10D
GWA-10S
GWA-11BRU
X
GWA-11 S
X
GWA-12BRU
GWA-12S
GWA-13BR
GWA-14BR
GWA-14D
GWA-14S
GWA-1BRU
James E. Rogers Energy Complex Page 2 of 6 September 28, 2018
GWA-20BR
X
GWA-20D
X
GWA-20S
X
GWA-21 BR
X
GWA-21 BRU
X
GWA-21 S
X
GWA-22BRU
GWA-22S
X
GWA-23D
GWA-24BR
GWA-24D
GWA-24S
GWA-25 S
GWA-25D
Water level only
GWA-26S
GWA-26D
Water level only
GWA-27BR
X
GWA-27D-A
X
GWA-28BR
GWA-28BRU
GWA-28S
GWA-29BRA
GWA-29D
X
GWA-2BR
X
GWA-2BRU
X
GWA-2S
X
GWA-30BR
GWA-30BRU
Water level only
GWA-30S
GWA-31 BR-A
GWA-31D
GWA-32D
GWA-32BR
Water level only
GWA-33BR
GWA-33D
GWA-33S
GWA-34S
GWA-35D
GWA-35S
GWA-36D
X
GWA-36S
X
James E. Rogers Energy Complex Page 3 of 6 September 28, 2018
GWA-37D
GWA-37S
GWA-38D
GWA-38S
GWA-39S
Water level only
GWA-3D
X
GWA-40S
Water level only
GWA-42S
Water level only
GWA-43D
GWA-43 S
GWA-44BR
GWA-44D
GWA-44S
GWA-45D
Water level only
GWA-45 S
GWA-46D
GWA-47D
GWA-48BR
GWA-4BR
Water level only
GWA-4D
X
GWA-4S
X
GWA-51D
GWA-54D
GWA-54BRO
GWA-54S
GWA-56D
GWA-56S
GWA-5BRU
GWA-5 S
GWA-6S
GWA-6D
Water level only
MW-10D
MW-10S
MW-11BRO
Redevelop. Sample for boron only.
MW-11DA
MW-11 S
X
MW-20D
MW-20DR
MW-21BR
MW-21D
MW-22BR
James E. Rogers Energy Complex Page 4 of 6 September 28, 2018
MW-22DR
MW -23D
MW-23DR
MW -23S
MW -24D
X
MW-24DR
X
MW-25DR
MW -2D -A
MW -30D
X
MW-30DA
X
MW -30S
X
MW-32BR
X
MW -32D
X
MW -32S
X
MW -34S
MW-34BRU
MW-36BRU
MW -36S
MW-38BR
X
MW -38D
X
MW -38S
X
MW-40BRU
MW -40S
MW-42DA
MW -42S
MW -8D
MW -8S
X
U54D
U5-1 S
U5-2BR
U5 -2D
X
U5 -2S -SL -A
X
U5-4BRA
U5 -4D
U5 -4S
U5-5BR
U5 -5D
X
U5 -6D
U5 -6S
U5-8BR
U5 -8D
James E. Rogers Energy Complex Page 5 of 6 September 28, 2018
U5 -8S
Boron
Copper
CCR12-S
Selenium
Thallium
CCR -12D
Cadmium
Hexavalent
CCR -13D
Sodium
Total Organic
CCR -15D
Chromium
Iron
CCR -EB -1S
Carbon
Total Combined
CCR -IB -11)
Calcium
Nickel
CCR -IB -3S
CCR -IB -3D
CCR -U5 -4S
Sample 1" Quarter 2018 only
CCR -U5 -4D
Chloride
Sample 1St Quarter 2018 only
CCR -7S
Sulfate
CCR -7D
AB-3-MA15
Pump test well.
AB-3-LA15
ChromiumMagnesium
Pump test well.
AB-4-UA15
Sulfide
Pump test well.
AB-4-LA15
Pump test well.
CCR -7S
Total Dissolved
CCR -7D
Cobalt
Manganese
CCR -8D
Zinc
CCR -U5 -3D
CCR -U5 -3S
Solids
CCR-U5-4BR
AS7I
IB -6S
IB -6D
IB -7S
IB -7D
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Iron
Carbon
Total Combined
Antimony
Calcium
Nickel
Strontium
Uranium
Total Suspended
Arsenic
Chloride
Lead
Potassium
Sulfate
Solids
Barium
ChromiumMagnesium
Radium 226
Sulfide
Vanadium
Total Dissolved
Beryllium
Cobalt
Manganese
Radium 228
Zinc
Solids
James E. Rogers Energy Complex Page 6 of 6 September 28, 2018
Revised Dan River Combined C cle Station Interim Monitorin Plan — Groundwater Onl
Wells to be Sampled
Sample for
Radionuclides
(X)
Regional Office Notes
BG -IDA
X
_
Measure water level if not dry; collect all filed
parameters if possible; if there is some water but
not enough water for all samples, please collect
samples for boron, sulfate, chloride, TDS only.
BG -10D
X
BG -10S
X
BG-10BR
X
BG -5D
BG -5S
GWA-10D
GWA-12D
GWA-12S
GWA-14D
GWA-14S
GWA-15D
GWA-16D
GWA-16S
GWA-17D
GWA-20D
GWA-20S
GWA-4D
GWA-4S
GWA-513R
GWA-SBRD
GWA-6D
X
GWA-6S
X
GWA-7D
GWA-7S
GWA-8BR
GWA-8D
GWA-8S
GWA-9D
X
X
X
X
X
GWA-9S
MW -12
MW -12D
MW -21D
MW -21S
MW-22BR
Dan River Combined Cycle Station Page 1 of 2 September 28, 2018
MW -22D
X
Copper
MW -22S
X
Thallium
MW-23BR
Cadmium
Hexavalent
MW -23D
Sodium
Total Organic
MW-317BR
Chromium
MW-317BRL
Minimum Parameters to be Analvzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Dan River Combined Cycle Station Page 2 of 2 September 28, 2018
Revised H. F. Lee Energy Complex Interim Monitoring Plan — Groundwater Only
Wells to be Sample for
Sampled Radionuclides
M
ABMW-1 _
ABMW-1 S X
Regional Office Notes
AMW-11BC
AMW-11 S
X
AMW-12BC
AMW-12S
AMW-13BC
AMW-13S
AMW-14BC
AMW-14S
AMW-15BC
AMW-15S
AMW-16BC
AMW-17BC
AMW-17S
AMW-18S
X
AMW-6RBC
AMW-913C
AMW-19S
AMW-19BC
AMW-20S
AMW-20BC
AMW-21 S
AMW-21BC
AMW-22S .
AMW-22BC
AMW-23 S
AMW-23BC
BGMW-10
BGMW-9
BW -1
CCR -100S
X
CMW-10
CMW-5
CMW-6R
CMW-7
CMW-8
H. F. Lee Energy Complex Page 1 of 3 September 28, 2018
CTMW-1
CW-1
CW-2
CW-3
CW-4
DMW-1
DMW-2
DMW-3
IABMW-1
IABMW-1 S
X
I_ABMW-2S
IABMW-3
IABMW-3S
X
IMW-04BC
IMW-05BC
IMW-1BC
IMW-1 S
X
IMW-2BC
IMW-3BC
IMW-3S
X
IMW-4S
X
IMW-5S
X
LLMW-1
LLMW-1 S
LLMW-2
LLMW-2S
MW-1
MW-2
MW-3
X
SMW-3
SMW-4
SMW-5
IMW-6S
IMW-7S
H. F. Lee Energy Complex Page 2 of 3 September 28, 2018
Minimum Parameters to be Analyzed
Aluminum Boron Copper Mercury
Alkalinity Cadmium Hexavalent Molybdenum
Antimony
Calcium
Arsenic
Chloride
Chromium
Barium
Beryllium
Cobalt
Chromium
Iron Nickel
Lead
Manganese
Potassium
Radium 226
Radium 228
Selenium
Sodium
Strontium
Sulfate
Sulfide
Total
Dissolved
Solids
Thallium
Total Organic
Carbon
Total
Combined
Uranium
Total
Suspended
Solids
Vanadium
Zinc
H. F. Lee Energy Complex Page 3 of 3 September 28, 2018
Revised Marshall Steam Station Interim Monitorin Plan — Groundwater Onl
Wells to be Sampled
Sample for
Radionuclides
N
Regional Office Notes
AB-10BR
AB -10D
AB -10S
AB -1 OSL
Monitor boron concentrations (increasing).
AB=11D
AB -11S
AB-12BR
X
AB -12D
X
AB -12S
X
Monitor boron concentrations (increasing).
AB-12SL
X
AB -13D
AB -13S
AB -14D
Monitor boron concentrations (increasing).
AB-14DU
AB -14S
AB-15BR
AB -15D
AB -15S
AB-15SL
AB -16D
AB-16DU
AB -16S
AB -17D
AB -17S
Monitor boron, iron, manganese, sulfate, and TDS
concentrations (increasing).
AB -18D
AB-18DU
AB -18S
AB-1BRLL
X
AB-1BRL
X
Monitor boron and total radium concentrations
(increasing).
Duke proposed additional well installation for
delineation purposes.
AB -113R
X
Monitor boron, iron, manganese, TDS, and total
radium concentrations (increasing).
AB -1D
X
Monitor boron, TDS, and total radium
concentrations (increasing).
AB -1S
X
Monitor total radium concentrations (increasing).
Marshall Steam Station Page 1 of 5 September 28, 2018
Wells to be Sampled
�: It
AB -20S
Sample for
Radionuclides Regional Office Notes
(X)
Monitor boron concentrations (increasing).
Atf-L l ll
AB -21 S
Monitor arsenic, boron, chloride, and TDS
concentrations (increasing),
AB -2D
X
Monitor total radium concentrations (increasing).
AB -2S
X
Monitor total radium concentrations (increasing).
AB -3D
AB -3S
AB -4D
AB -4S
Monitor selenium concentrations (significant
increase last event compared to historical data).
AB-4SL
AB-5BR
X
Monitor sulfate and TDS concentrations
(increasing).
AB -5D
X
AB-5DU
X
AB -5S
X
AB-613RL
Monitor TDS concentrations (increasing).
AB-6BRA
AB -6D
Note: AB-6BR has been abandoned and thus
removed from the IMP. AB-6BRA was installed
as replacement well.
Water quality remains an issue (elevated pH).
Recommend additional well development prior to
next sampling event.
AB -6S
AB -7D
AB-7DU
AB -7S
AB -8D
AB-8DU
AB -8S
AB-9BR
AB -9D
AB -9S
AL-lBR
AL -ID
X
X
Monitor boron and TDS concentrations
(increasing). -
Marshall Steam Station Page 2 of 5 September 28, 2018
Marshall Steam Station Page 3 of 5 September 28, 2018
Sample for
Wells to be Sampled
Radionuclides
Regional Office Notes
A)
AL -IS
X
AL-2BR
Monitor boron, chromium, sulfate, and TDS
concentrations (increasing).
AL-2BRL
Duke proposed additional well installation for
AL-2BRLL
delineation purposes.
AL -2D
AL -2S
_
Water quality remains an issue (elevated pH).
AL-3BR
Recommend additional well development prior to
next sampling event.
Monitor boron and chromium concentrations
AL -3D
increasin
AL -3S
Elevated pH. Recommend additional well
AL-4BRL
development prior to next sampling event.
Monitor boron, sulfate and TDS concentrations
AL-4BR
(increasing).
AL -4D
Note: BG-lBR has been abandoned and thus
BG-1BRA
X
removed from the IMP. BG-1BRA was installed
as replacement well.
BG -1D
X
BG -1S
X
BG-2BR
X
BG -2S
X
BG-3BR
X
BG -3D
X
BG -3S
X
GWA-lBR
X
GWA-1D
X
X
GWA-1 S
Note: GWA-2D has been abandoned and thus
removed from the IMP. GWA-2DA was installed
GWA-2DA
as replacement well.
Need to discuss potential replacement.
GWA-2S
GWA-3D
GWA-3 S
Marshall Steam Station Page 3 of 5 September 28, 2018
Wells to be Sampled
Sample for
Radionuclides
Regional Office Notes
GWA-4D
GWA-4S
GWA-51)
GWA-5S
GWA-61)
X
GWA-6S
X
GWA-7D
GWA-7S
GWA-8D
GWA-8S
Monitor chromium concentrations (increasing).
GWA-9BR
GWA-10D
GWA-10S
Monitor boron concentrations (slight increase).
GWA-11BR
X
GWA-111)
X
GWA-11 S
X
Sample to be analyzed for total boron and sulfate
only.
Sample to be analyzed for total boron and sulfate
onl .
GWA-12BR
X
GWA-12D
GWA-12S
X
GWA-13DA
GWA-13S
GWA-14D
GWA-14S
GWA-15S
X
Monitor boron concentrations (increasing).
GWA-15D
X
MS -8
MS -10
X
MS -11
MS -13
MW -1
MW -10D
X
MW -10S
X
MW -11D
MW -1 lS
MW -12D
MW -12S
MW -13D
Marshall Steam Station Page 4 of 5 September 28, 2018
Sample for
Wells to be Sampled Radionuclides
- — MW -13S
MW-14BR X
Regional Office Notes
Monitor boron and TDS concentrations
(increasing).
MW -14D
X
Monitor cobalt concentrations (increasing).
Monitor chromium, iron, and TDS concentrations
(increashW.
MW -14S
X
MW -2
Hexavalent
Molybdenum
MW -3
Total Organic
MW -4
X
MW -4D
X
MW -5
MW -61)
X
Monitor boron concentrations (increasing).
MW -6S
X
Nickel
MW -7
Combined
Water level only
MW -71)
X
Monitor boron concentrations (increasing).
MW -7S
X
Monitor TDS concentrations (increasing).
MW -8D
X
.MW -8S
X
Monitor TDS concentrations (increasing).
MW -9D
X
Monitor boron concentrations (increasing).
MW -9S
X
Monitor TDS concentrations (increasing).
OB -1 (Dry Ash Basin)
Monitor iron concentrations (significant increase).
OB -1 (Dry Ash Landfill)
Water level only
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium Cobalt
Manganese Radium 228 Dissolved
Zinc
_
Solids
Marshall Steam Station Page 5 of 5 September 28, 2018
Revised Ma. o Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Sample for
Wells to be Sampled Radionuclides
(X)
Regional Office Notes
ABMW-1 X
ABMW-2
ABMW-2BR
ABMW-2BRL
ABMW-3
ABMW-3S
ABMW-4X
X
Well was replaced due to storm runoff damage.
ABMW-4 was abandoned.
ABMW-4BR
ABMW-4D
BG -1
X
BG -2
X
CW -1
CW -1D
CW -2
X
CW -2D
X
CW -3
CW -4
CW -5
CW -6
X
MW-l0BR
X
MW-11BR
water level only
MW -12D
X
MW -12S
X
MW-13BR
MW-14BR
MW-15BR
water level only
MW-16BR
X
MW -16D
X
MW -16S
MW -18D
MW-18BR
MW -19D
MW-19BR
MW -2
MW -3
X
MW-3BR
Mayo Steam Electric Plant Page 1 of 2 September 28, 2018
MW -4
Boron
Copper
MW-5BR
Selenium
Thallium
MW-8BR
Cadmium
Hexavalent
MW-9BR
Sodium
water level only
MW-9BRL
Chromium
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
BariumChromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Mayo Steam Electric Plant Page 2 of 2 September 28, 2018
Revised L.V. Sutton Enemy Complex Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
-
AW -1C
AW -2C
AW -2D
AW -3C
AW -4C
Sample for
Radionuclides Regional Office Notes
(x)
X
X
AW -5C
AW -5D
AW -6R -D
AW -6R -E
AW -7R -D
AW -08C
AW -09C
AW -09D
MW -05C
X
MW-05CD
X
MW -05D
X
MW -05R -E
MW -7C
MW -8
X
MW -8B
X
MW -8D
X
MW -8E
X
MW -11
MW -12R
MW -16D
MW -19
MW -20
MW -20D
MW -21C
MW -22B
MW -22C
MW -23B
MW -23C
MW -23D
X
MW -23E
X
MW -24R -B
MW -24R -C
MW -27B
MW -27C
X
L.V. Sutton Energy Complex Page 1 of 2 September 28, 2018
MW -28B
Boron
MW -28C
Mercury
MW -31R -C
X
MW -32C
X
MW -33C
X
MW -36C
X
MW -37B
X
MW -37C
X
MW-37CD
X
MW -37D
X
MW -37E
X
MW -38B
MW -38C
X
MW -38D
X
MW -39B
Lead
MW -39C
X
MW -39D
X
MW -40B
MW -40C
MW -40D
Barium
MW -41B
X
MW -41C
X
MW -41D
X
MW -41E
Manganese
SMW-01 C
Total DissolvedSolids
SMW-02C
SMW-03C
SMW-04C
SMW-5C
SMW-06C
SMW-06D
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Nickel
Strontium
Carbon
Total CombinedUranium
Antimony
Calcium
Iron
Arsenic
Chloride
Lead
Potassium
Sulfate
Total Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Beryllium
Cobalt
Manganese
Radium 228
Total DissolvedSolids
Zinc
L.V. Sutton Energy Complex Page 2 of 2 September 28, 2018
Revised Riverbend Steam Station Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
_
AB -1D
Sample for
Radionuclides
(X)
Regional Office Notes
Measure all field parameters plus water level, if pH still high,
not sample for lab analyses.
AB -1S
Not sample. Please evaluate whether the well needs to be redeveloped
or replaced.
AB -2D
AB -2S
AB -8D
AB -8S
BG-1DA
BG -1 S
BG-2BR
BG -2D
BG -2S
BG -3D
BG -3S
BG-4BR
X
Not Sample. Please evaluate whether this well should be replaced
because the well has not been sampled since 5/23/2017 due to high pH
BG -4D
X
BG -4S
X
BG-5BR
BG -5D
GWA-10BRU
Field parameters plus water level, if pH still high, not sample for lab
analvses.
GWA-10S
GWA-11D
GWA-11 S
GWA-12D
X
GWA-12S
X
GWA-13D
GWA-13S
GWA-14D
GWA-14S
GWA-15D
GWA-15S
X
GWA-1BRU
_
GWA-1 S
GWA-20BR
GWA-20DA
Riverbend Steam Station Page 1 of 3 September 28, 2018
GWA-20S
GWA-21BR
GWA-21D
GWA-21 S
GWA-22BR-A
X
GWA-22D
X
GWA-22S
X
GWA-23BR
Not Sample if pH is still high, but. please evaluate whether this well
should be replaced.
GWA-23DA
GWA-23S
GWA-2BR
X
GWA-2BRU
X
GWA-2S
X
GWA-3BR
GWA-3D
GWA-3SA
GWA-4BR
GWA-4D
X
GWA-4S
X
GWA-5D
GWA-5S
GWA-6D
X
GWA-6S
X
GWA-7BR
GWA-7D
GWA-7S
GWA-8D
X
GWA-8S
X
GWA-9BR
X
GWA-9D
X
GWA-9S
X
MW -10
X
MW-11DR
MW -11 SR
MW -13
MW -14
X
MW -15
MW-15BR
MW-15DA
MW -1D
MW -1S
Riverbend Steam Station Page 2 of 3 September 28, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium Sulfate
Suspended
Solids
Barium Chromium
Magnesium
Radium 226
Sulfide
Vanadium_
Total
Beryllium Cobalt
Manganese
Radium 228
Dissolved
Zinc
- .- _
Solids
Riverbend Steam Station Page 3 of 3 September 28, 2018
Revised Roxboro Steam Electric Plant Interim Monitorin Plan — Groundwater Onl
Wells to be
Sampled
Sample for
Radionuclides
(X)
Regional Office Notes
ABMW-1
X
water level only
ABMW-lBR
X
X
ABMW-2
water level only
ABMW-2BR
X
ABMW-3
ABMW-3BR
ABMW-3BRL
Abandoned as part of the WW redirect (leachate
work)
Abandoned as part of the WW redirect (leachate
work
ABMW-5
X
ABMW-5D
X
ABMW-6
ABMW-6BR
ABMW-7
water level only
ABMW-7BR
ABMW-7BRL
BG -1
X
BG-lBR
X
BG-1BRL
water level only
BG-1BRLR
X
BG-2BR
X
CCR -113D
Recently installed well. for CCR program adds a
down clint data point
CCR- 113BR
Recently installed well for CCR program adds a
down adient data point
CW -1
CW -2
X
CW -2D
X
CW -3
CW -3D
CW -4
CW -5
X
GMW-10
GMW-11
GMW-6
X
GMW-7
Roxboro Steam Electric Plant Page 1 of 3 September 28, 2018
GMW-8R
Well replaced, GWM-8 was abandoned
GMW-9
MW-lBR
MW-2BR
MW-3BR
X
MW-4BR
MW-4BRL
water level only
MW-5BR
X
MW -5D
X
MW-6BR
X
MW -6D
X
MW-7BR
MW-8BR
MW-9BR
X
MW-10BR
X
MW -1 lBR
X
MW -11D
X
MW-12BR
MW-13BR
X
MW-14BR
X
MW-15BR
X
MW -15D
X
MW-16BR
X
MW-17BR
X
MW-18BR
X
MW -18D
X
MW-19BRL
X
MW -2
X
MW-20BRL
MW-21BRLR
Replaced, MW-21BRLR was abandoned
MW-22BR
MW -22D
MW-23BR _
MW-23BRR
MW-24BR
MW-25BR
water level only
MW-26BR
MW-27BR
MW-28BR
MW-29BR
MW-30BR
Roxboro Steam Electric Plant Page 2 of 3 September 28, 2018
MW-31BR
Boron
Copper
MW-32BR
Selenium
Thallium
MW-33BR
Cadmium
Hexavalent
GPMW-1 S
Sodium
Total Organic
GPMW-1D
Chromium
GPMW-IBR
Carbon
GPMW-2D
GPMW-2BR
Total
GPMW-3D
Calcium
Iron
GPMW-3BR
Strontium
Combined
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Vanadium
Barium
Chromium
Magnesium
Radium 226
Sulfide
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
_
Solids
Roxboro Steam Electric Plant Page 3 of 3 September 28, 2018
Revised L.V. Sutton Enemy Complex Interim Monitoring Plan — Groundwater Only
Sample for
Wells to be Sampled Radionuclides
A)
AW -1C
AW -2C
Regional Office Notes
AW -2D
AW -3C X
AW -4C X
AW -5C
AW -5D
AW -6R -D
AW -6R -E
AW -7R -D
AW -08C
AW -09C
AW -09D
MW -05C X
MW-05CD X
MW -05D X
MW -05R -E
MW -7C
MW -8 X
MW -8B X
MW -8D X
MW -8E X
MW -11
MW -12R
MW -16D
MW -19
MW -20
MW -20D
MW -21C
MW -22B
MW -22C
MW -23B
MW -23C
MW -23D X
MW -23E X
MW -24R -B
MW -24R -C
MW -27B
MW -27C X
L.V. Sutton Energy Complex Page 1 of 2 September 28, 2018
MW -28B
Boron
Cadmium
MW -28C
Mercury
MW -31 R -C
X
MW -32C
X
MW -33C
X
MW -36C
X
MW -37B
X
MW -37C
X
MW-37CD
X
MW -37D
X
MW -37E
X
MW -38B
MW -38C
X
MW -38D
X
MW -39B
MW -39C
X
MW -39D
X
MW40B
MW -40C
MW -40D
Solids
MW -41B
X
MW -41C
X
MW -41D
X
MW -41E
Radium 228
SMW-01 C
SMW-02C
SMW-03C
SMW-04C
SMW-5C
SMW-06C _
SMW-06D
Minimum Parameters to be Analyzed
Aluminum
Boron
Cadmium
Copper
Hexavalent
Mercury
Selenium Thallium
Sodium Total Organic
Alkalinity
Molybdenum
Chromium
Carbon
Antimony
Calcium
Iron
Nickel
Strontium Total Combined
Uranium
Arsenic
Chloride
Lead
Potassium
Sulfate Total Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide Vanadium
Beryllium Cobalt
Manganese
Radium 228
Total Dissolved Zinc
Solids
L.V. Sutton Energy Complex Page 2 of 2 September 28, 2018
Revised W. H. Weathersnoon Power Plant Interim MonitorinE Plan — Groundwater Only
Wells to be
Sampled
Sample for Radionuclides
Regional Office Notes
AW -01D
AW -01I
AW -01S
AW -02D
AW -02S
AW -03D
AW -03I
AW -03S
BW -01
BW -02S
X
BW -03D
X
BW -03I
X
BW -03S
X
BW -4D
X
BW -4I
X
BW4S
X
CCR -101 -BG
CAMA
X
CW -01
CW -02
CW -03
X
MW -01
X
MW -02
X
MW -03
X
MW -04
X
MW -05
X
MW -06
X
MW -07
X
MW -33D
MW -33I
MW -33S
MW -41D
MW -41I
MW -52
X
MW -53D
MW -53I
MW -54D
MW -55D
X
W. H. Weatherspoon Power Plant Page 1 of 2 September 28, 2018
MW -55I X
PW -1 (DEP 2)
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Hexavalent
Chromium
Mercury
Molybdenum
Selenium
Sodium
Thallium
Total Organic
Carbon
Alkalinity
Cadmium
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium Cobalt Manganese Radium 228
Dissolved
Zinc
Solids
W. H. Weatherspoon Power Plant Page 2 of 2 September 28, 2018