HomeMy WebLinkAbout20181083 Ver 1_More Info Received_20180926LETTER OF TRANSMITTAL GWard Consulting Engineers, P.C. 4805 Green Road, Suite 100 Raleigh North, Carolina 27616-2848 y (919)870-0526 Fax: (919) 870-5359 Company: NC Dept of Environmental Quality SEP 2 B 2018 Raleigh Regional Office We are sending you: _Attached Under separate cover via the following: _Shop drawings _Prints _Plans _Samples _Specifications _Copy of letter _Change order _Other Description ����fr �►,1_�ill�-i�� These are Transmitted as checked below: Or, J(001 r„.�cto _For approval Approved as submitted _Resubmit_ copies for approval _For your use _Approved as noted _Submit _copies for distribution _As requested _Returned for corrections _Return _corrected prints For review & comment Other Goss, Stephanie From: Goss, Stephanie Sent: Wednesday, September 19, 2018 3:57 PM To: 'Sullivan, Roscoe L III CIV (US)';'Becky Ward' Subject: RE: [External] RE: [Non-DoD Source] RE: SAW -2018-01548 Wooten Meadow Park - Request for Information Becky, Also, on the buffer impacts exhibit sheet #1 and 2 the following is required: o The wetland, stream and riparian buffer impacts requested in this application need to be clearly shown and enumerated on the site plan. These impacts need to correspond to the impacts requested in the application. The labels on the site plan must match the impacts listed in the application. As the application and impact map currently stands, it is not possible to match up what is listed the application with the site plan. Please correct/modify the map in your response to this e-mail [15A NCAC 02H .0502(g)] Thanks in advance! Stephanie Z. Goss Environmental Senior Specialist Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 276o9 919-791-4256 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Haw and may be disclosed to third parties From: Goss, Stephanie Sent: Wednesday, September 19, 2018 3:41 PM To: 'Sullivan, Roscoe L III CIV (US)' <Roscoe.L.Sullivan@usace.army.mil>; Becky Ward <bward@wce-corp.com> Subject: RE: [External] RE: [Non-DoD Source] RE: SAW -2018-01548 Wooten Meadow Park - Request for Information Becky, Please send me a copy of the updated set of plans as well. I will need them to compete my review as well. Thanks! Stephanie Z. Goss Environmental Senior Specialist Division of Nater Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 276o9 919-791-4256 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Sullivan, Roscoe L III CIV (US) <Roscoe.L.Sullivan@usace.army.mil> Sent: Monday, September 17, 2018 4:21 PM To: Becky Ward <bward@wce-corp.com> Cc: Goss, Stephanie <stephanie.goss@ncdenr.Rov> Subject: [External] RE: [Non-DoD Source] RE: SAW -2018-01548 Wooten Meadow Park - Request for Information Hey Becky, It was a pleasure to speak to you earlier. As we discussed, I will need an updated set of plans with an LOD that matches the permit impact drawings. Also, after discussing this project with another regulator in my office, I think it would be best to use the following Nationwide Permits (NWPs) to cover the impacts proposed by this project: 1. NWP 18 for Minor Discharges to cover impacts W1, W2, and S2 and 2. NWP 13 for Bank Stabilization for impacts S1 and S3. Please let me know if you have any questions. Best, Ross Ross Sullivan, PWS, ISA Certified Arborist Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers - Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office #: 919-554-4884. Ext. 25 Email: roscoe.I.sullivan@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Becky Ward [mailto:bward@wce-corp.com] Sent: Wednesday, September 5, 2018 12:58 PM To: Sullivan, Roscoe L III CIV (US) <Roscoe.L.Sullivan@usace.armv.mil> Cc:'Goss, Stephanie' <Stephanie.Goss@ncdenr.gov> Subject: [Non-DoD Source] RE: SAW -2018-01548 Wooten Meadow Park - Request for Information Ross: I apologize for not getting back to you sooner. I had a few days off around the holidays. I have responded to your clarification questions with responses in blue that are attached to each question in blue lettering below. Please let me know if you need any additional information. Thanks, Becky L. Ward, P.E. Ward Consulting Engineers, P.C. 4805 Green Road, Suite 100 Raleigh, NC 27616-2848 Ph: 919-870-0526 email: bward@wce-corp.com -----Original Message ----- From: Sullivan, Roscoe L III CIV (US) [mailto:Roscoe.L.Sullivan@usace.army.milj Sent: Friday, August 31, 2018 4:15 PM To: bward@wce-corp.com Cc: Goss, Stephanie <Stephanie.Goss@ncdenrgov> Subject: SAW -2018-01548 Wooten Meadow Park - Request for Information Hey Becky, I am reviewing this project since Tasha is in Nashville, and I have a couple of what I think would be fairly quick and easy questions. Thank you for the PCN and attached information, dated 7/31/2018 and received 8/3/2018, for the above referenced project. I have'reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permits (NWPs) 13 and 27. Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the NWP or consider your application withdrawn and close the file: 1) The permit impact drawings (Buffer Impacts Exhibit sheets 1 and 2) submitted with the PCN application differ slightly from the construction drawings with regards to wetland impacts. In particular, on sheet L201 the LOD from the greenway appears to impact a portion of wetland near the southern loop of the proposed greenway trail, but on the permit impact drawings the LOD appears to have been tightened up some to avoid this impact. Can you confirm which plan is being implemented? We are coordinating the line work for the LOD between our firm and Site Collaborative who is the prime consultant for the project. The LOD was not updated on their plan. The LOD for the entire set of drawings will follow the buffer impact maps. We are currently working on some minor revisions to the plan set based on comments received through City of Raleigh review that does not affect the impacts that were quantified however it may be a few days before we can get you a revised set. Would you like us to send an updated set of drawings? 2) The project was submitted as a request for a NWP 13 and 27. However, some of the impacts are for a greenway trail (impact W1), which would be better permitted under a NWP 14 for linear transportation projects. Therefore, I plan review the impacts associated with the greenway trail under a NWP 14. Please let me know if you disagree with this approach. I have no objections with your recommendation for the NWP 14 permit. 3) Can you confirm which impacts are for the NWP 13 and which are for the NWP 27? It appears to me that impacts W2 and S2 are for the restoration activities (NWP 27) and impacts S1 and S3 are for bank stabilization (NWP 13). Restoration activities(NWP 27) include W2, S2. I was thinking that S1 would be included in the restoration activities as we would not need the stabilization if we were not creating the overflow channel to the wetland and the new stream outlet if you agree. Bank stabilization NWP13 would be S3. Please feel free to give me a call with any questions Sincerely, Ross Ross Sullivan, PWS, ISA Certified Arborist Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers- Wilmington District Wake Forest, North Carolina 27587 Office #: 919-554-4884. Ext. 25 Email: roscoe.l.suilivan@usace.armv.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp:Hcorpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. Goss, Stephanie From: Sullivan, Roscoe LEI CIV (US) <Roscoe.L.SUIlivan@usace.army.mil> Sent: Monday, September 17, 2018 4:21 PM To: Becky Ward Cc: Goss, Stephanie Subject: [External] RE: [Non-DoD Source] RE: SAW -2018-01548 Wooten Meadow Park - Request for Information Hey Becky, It was a pleasure to speak to you earlier. As we discussed, I will need an updated set of plans with an LOD that matches the permit impact drawings. Also, after discussing this project with another regulator in my office, I think it would be best to use the following Nationwide Permits (NWPs) to cover the impacts proposed by this project: 1. NWP 18 for Minor Discharges to cover impacts W1, W2, and S2 and 2. NWP 13 for Bank Stabilization for impacts S1 and S3. Please let me know if you have any questions. Best, Ross Ross Sullivan, PWS, ISA Certified Arborist Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers- Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office #: 919-554-4884. Ext. 25 Email: roscoe.l.sullivan@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Becky Ward [mailto:bward@wce-corp.com] Sent: Wednesday, September 5, 2018 12:58 PM To: Sullivan, Roscoe L III CIV (US) <Roscoe. L.Sullivan @usace.army.mil> Cc: 'Goss, Stephanie' <Stephanie.Goss@ncdenr.gov> Subject: [Non-DoD Source] RE: SAW -2018-01548 Wooten Meadow Park - Request for Information Ross: I apologize for not getting back to you sooner. I had a few days off around the holidays. I have responded to your clarification questions with responses in blue that are attached to each question in blue lettering below. Please let me know if you need any additional information. Thanks, Becky L. Ward, P.E. Ward Consulting Engineers, P.C. 4805 Green Road, Suite 100 Raleigh, NC 27616-2848 Ph: 919-870-0526 email: bward@wce-corp.com -----Original Message ----- From: Sullivan, Roscoe L III CIV (US) [mailto:Roscoe.L.Sullivan@usace.army.mil] Sent: Friday, August 31, 2018 4:15 PM To: bward@wce-corp.com Cc: Goss, Stephanie <Stephanie.Goss@ncdenr.gov> Subject: SAW -2018-01548 Wooten Meadow Park - Request for Information Hey Becky, I am reviewing this project since Tasha is in Nashville, and I have a couple of what I think would be fairly quick and easy questions. Thank you for the PCN and attached information, dated 7/31/2018 and received 8/3/2018, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permits (NWPs) 13 and 27. Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the NWP or consider your application withdrawn and close the file: 1) The permit impact drawings (Buffer Impacts Exhibit sheets 1 and 2) submitted with the PCN application differ slightly from the construction drawings with regards to wetland impacts. In particular, on sheet L201 the LOD from the greenway appears to impact a portion of wetland near the southern loop of the proposed greenway trail, but on the permit impact drawings the LOD appears to have been tightened up some to avoid this impact. Can you confirm which plan is being implemented? We are coordinating the line work for the LOD between our firm and Site Collaborative who is the prime consultant for the project. The LOD was not updated on their plan. The LOD for the entire set of drawings will follow the buffer impact maps. We are currently working on some minor revisions to the plan set based on comments received through City of Raleigh review that does not affect the impacts that were quantified however it may be a few days before we,can get you a revised set. Would you like us to send an updated set of drawings? 2) The project was submitted as a request for a NWP 13 and 27. However, some of the impacts are for a greenway trail (impact W1), which would be better permitted under a NWP 14 for linear transportation projects. Therefore, I plan review the impacts associated with the greenway trail under a NWP 14. Please let me know if you disagree with this approach. I have no objections with your recommendation for the NWP 14 permit. 3) Can you confirm which impacts are for the NWP 13 and which are for the NWP 27? It appears to me that impacts W2 and S2 are for the restoration activities (NWP 27) and impacts Sl and S3 are for bank stabilization (NWP 13). Restoration activities (NWP 27) include W2, S2. i was thinking that S1 would be included in the restoration activities as we would not need the stabilization if we were not creating the overflow channel to the wetland and the new stream outlet if you agree. Bank stabilization NWP13 would be S3. Please feel free to give me a call with any questions Sincerely, Ross Ross Sullivan, PWS, ISA Certified Arborist Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers - Wilmington District Wake Forest, North Carolina 27587 Office M 919-554-4884. Ext. 25 Email: roscoe.l.sullivan@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey.