Loading...
HomeMy WebLinkAbout20181302 Ver 1_PCN Form Submission_9/25/2018 10:01 AMAction History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 9/25/2018 10:01:23 AM (Start Event) Accept by Carpenter,Kristi 9/26/2018 4:01:40 PM (DOT Initial Review) . The task was assigned to Carpenter,Kristi. The due date is: September 28, 2018 5:00 PM 9/25/2018 10:03 AM i i �� � ����� �ivislan af Water Resour�es Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* McDowell Is this project a public transportation project?* C Yes l' No lhis is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* f• Yes r No (NCDOT only) T.I.P. or state project number: U-5818 WBS # 44390.1.1 (for �ICDOT use only) 1a. Type(s) of approval sought from the Corps:* fJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E-PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply r% 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: For the record onlyfor Corps Permit: f Yes C' No C' Yes f' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? IF so, attach the acceptance letter from rritigation bank a- in-lieu fee program C Yes l" No Acceptance Letter Attachment C7ick the upload button or drag and drop files here to attach docurrent U-5818 McDowell DMS Mitigation Acceptance Letter.pdf 62.97KB F1LE lYFE MJST BE FDF 1f. Is the project located in any of NC's twenty coastal counties?'� f Yes �' No 1h. Is the project located in a designated trout watershed?* f Yes r No Link to trout information: http://wvwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact? * Roger D. Bryan 1b. PrimaryContact Email:* rdbryan@ncdot.gov 1c. PrimaryContact Phone:� (xxx)xxx-xxxx (828)251-6171 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NC Department of Transportation 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d. Address Street Address 55 Orange Street Address Line 2 C7ty Asheville Fbstal / Zip Code 28801 2e. Telephone Number: (xxx)xxx-xxxx (828)251-6171 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* rdbryan@ncdot.gov State / Rovince / Region NC Country US C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* SR 1001 (Sugar Hill Rd) from I-40 WB Ramps to 0.3 mi W of I-40 EB Ramps 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Marion 1d. Driving directions* IF it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. From Asheville, take I-40 east to Exit 81. 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) NA 2b. Propertysize: (in acres) 5.6 2c. Project Address SYreet Address Sugar Hill Road SR 1001 Address Line 2 Qty Marion Fbstal / Zip Code 2d. Site coordinates in decimal degrees State / Rovince / Region NC Country USA Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.64652 -82.03545 ex:34.208504 -77.796371 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* North Muddy Creek 3b. Water Resources Classification of nearest receiving water:* C Surface Water Lookup 3c. What river basin(s) is your project located in?* Catawba River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project is an improvement of an existing roadway facility, Sugar Hill Road, over I-40. Ebsting conditions in the project area include the roadway and bridge, adjacent forested areas along streams, and primarily business land use. The bridge and culverts were built in 1958. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrent U5818_Fig2_USGS(1).pdf 950.3KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrem Fle type mist be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 2915 4f. Explain the purpose of the proposed project:* The purpose of this project is to widen SR 1001 (Sugar Hill Road) to a three lane road. Pedestrian accessibility will also be provided along SR 1001. In addition, improving the horizontal curve radii for the I-40 EB on-off ramps and providing proper acceleration lane length for the I-40 EB and WB on-ramps will improve safety. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* This section of SR 1001 has two lanes e�sting. The proposed roadway will have three 12' lanes with curb & gutter and sidewalk on the east side of the road. The proposed typical section also includes curb & gutter on both sides with sidewalk. The ewsting bridge over I-40 will be replaced as well. In addition, the horizontal curve radii for the EB on-off ramps will be flattened, the EB acceleration lane onto I-40 will be lengthened and the WB acceleration lane onto I-40 will be lengthened. The roadway will be designed with a 50 mph design speed. Traffic will be maintained on-site during construction except for tie-ins for the ramps and SR 1190 (Worley Road). Standard construction equipment will be used to construct the project. 4h. Please upload project drawings for the proposed project. Qick the upload button or drag and drop files here to attach docurrent U-5818_permit drawings_20180502.pdf 5.02MB Fle type rrust be pdF 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* f• Yes �' No �' Unknown Comme nts: PJD Request is attached 5b. If the Corps made a jurisdictional determination, what type of determination was made?* f Preliminary l" Approved �' Unknown Corps AID Number: 6carrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Greg Price Carolina Ecosystems, Inc. Rob Crowther f•' f�llA 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurcent U-5818 McDowell Signed PJD.pdf Fle type rrust be FDF 6. Project History 10.66MB 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * f Yes C No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* l" Yes l•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands �J Streams-tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * 3e. Stream 3f. Type of 3g. Stream 3h. Impact sqfe� type * Type * Jurisdiction * width * length * g� 1A& 16 P Culvert N�p label (e.g. Finad C7ossing F2rrranent (Fj or 1) Terrporary (lj g2 1A876 P Bank fvbp label (e.g. Finad CYossing F2rrranerit (Fj or Stabilization 1) Terrporary (� S3 2 P Culvert N�p label (e.g. Finad Qossing F2rrranem (Fj or 1) Terrporary (� S4 2 T Dewatering N�p label (e.g. Fd�ad Qossing F2rrranent (Fj or 1) Terrporary (lj S5 2 P Bank Nbp label (e.g. Fd�ad Qossing F�rrranerd (Fj or Stabilization 1) Terrporary (� S6 3 P Culvert fv�p label (e.g. Finad CYossing F2rrranent (Fj or 1) Terrporary (� g7 3 T Dewatering N�p label (e.g. Fd�ad Qossing F2rrranem (Fj or 1) Terrporary (� gg 3 P Bank Nbp label (e.g. Finad CYossing F�rrranem (Fj or Stabilization 1) Terrporary (� N MuddyCreek N MuddyCreek N MuddyCreek N MuddyCreek N MuddyCreek UT N M uddy Creek UT N Muddy Creek UT N M uddy Creek Perennial Both F2rennial (� or intermittent (If� Perennial Both F�rennial (Fff2) or imerrrittent (IfVn Perennial Both F�rennial (FH� or interrrittent (IfVn Perennial Both F2rennial (� or interrri[tent (If� Perennial Both F2rennial (Fff� or interrrittent (IfVn Perennial Both F�rennial (FH� or interrrittent (IIVn Perennial Both F2rennial (� or interrrittent (IfVn Perennial Both F2rennial (Fff2) or interrrittent ( IfVi) *" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 322 3i. Total temporary stream impacts: 70 3i. Total stream and tributary impacts: 392 3j. Comments: Site names refere to attached impact sheets. A total of 144 linear feet of permanent impact is due to culvert extension/construction (Site 1- 44 If, Site 2- 93 If, Site 3- 9 If). Bank stabilization totals 178 If (Site 1- 92 If, Site 2 - 64 If, Site 3- 31 If). E. Impact Justification and Mitigation 1. Avoidance and Minimization 8 Average (feet) 8 Average (feet) 70 Average (feet) 10 Average (feet) 70 Average (feet) 2 Average (feet) 2 Average (feet) 2 Average (feet) 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Due to the topography and presence of multiple streams, avoidance of impacts was not feasible for this project. However, impacts have been minimized to the greatest extent practicable and consist of three culvert extensions, a pipe e�ension, and associated rip-rap bank stabilization. Side slopes have been designed as steep as possible wfiile retaining stability in order to minimize impacts. Rip-rap bank stabilization has been designed to reduce outlet velocities and prevent downstream erosion. The inlet extension at Site 2 has been adjusted to improve stream flow alignment over ebsting conditions. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Sediment and erosion control measures will be implemented during construction and inspected on a regular basis. Ditches have been lined with rip-rap to reduce velocity of stormwater entering jurisdictional waters. Culvert extensions will be constructed in the dry using NCDOT Best Management Practices. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 42 3 (linearfeet) 3 6 92 7 Qinearfeet) 3 6 93 9 (linearfeet) 3 0 60 6 (linearfeet) 0 0 64 6 Qinearfeet) 4 0 9 7 (linearfeet) 8 70 2 (linearfeet) 0 22 4 Qinearfeet) 4 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? G Yes �' No 2c. If yes, mitigation is required by (check all that apply): r DWR �J Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank r! Payment to in-lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. r7 Yes 4b. Stream mitigation requested: (linear feet) 144 4c. If using stream mitigation, what is the stream temperature: cool 4d. Buffer mitigation requested (DWR only): (squarefeet) 4e. Riparian wetland mitigation requested: (acres) 4f. Non-riparian wetland mitigation requested: (acres) 4g. Coastal (tidal) wetland mitigation requested: (acres) 4h. Comments Compensatory mitigation is provided for 144 If of permanent stream impact due to culvert construction/extension. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section ."** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? f Yes C•' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: The project is within the Catawba River Basin but not adjacent to any main stem rivers or lakes. Therefore riparian buffers are not applicable to the surface waters on the project. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?'� C•' Yes f' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* l•' Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* C' Yes C•' No Comme nts: * The project falls under the Minimum Criteria established under Title 19A NCAC 02F.0101 as a class of activities where environmental documentation under NCEPA is not required. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (75A NCAC 2H .7300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (75A NCAC 2B .0200)?* l" Yes f' No 2b. Is this an after-the-fact permit application?* f Yes C•' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water qualit�/?* f Yes C•' No 3b. If you answered "no," provide a short narrative description. The project improves safety and traffic flow on and around the I-40 interchange, which is already developed. No widening is proposed beyond the immediate area of the I-40 interchange. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes r No C' N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * C Yes C' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* f Yes �' No 5d. Is another Federal agency involved?* C' Yes r No 5e. Is this a DOT project located within Division's 1-8?* f Yes C No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? C Yes C' No 5g. Does this project involve bridge maintenance or removal? C Yes r No C' Unknown 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. f• Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.arrny.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf If you answered "Yes" to 5g(1), did you discover any signs of bat use?* C' Yes C No C' Unknown *** If yes, please show the location of the bridge on the permit drawings/project plans. 5h. Does this project involve the construction/installation of a wind turbine(s)?* f Yes f• No 5i. Does this project involve (7) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f• Yes C' No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. C7ick the upload button or drag and drop files here to attach docurrent Fle rrust be F�F 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Biologists reviewed the site for federally listed species or their habitat. Project is not within a watershed with known NLEB maternity trees or hibernation sites. The bridge was inspected for presence or evidence of bats (none found - see photo attachment). Review of most recent NHP Element Occurrence data. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* l" Yes �' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* l' Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * The project was processed through the current Programmatic Agreement for NCDOT projects. 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent U-5818_Historic Architecture Form.pdf 5.31 MB U-5818_Archaeology.pdf 3.79MB Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* f Yes �' No 8c. What source(s) did you use to make the floodplain determination?* Current FEMA flood mapping Miscellaneous Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent U-5818_Site Photos.pdf 4.46MB U-5818_Bat Photos.pdf 6.75MB U-5818 Corps Cover Sheet.pdf 18.52KB U-5818_CoverLtr_Signed.pdf 135.84KB Fle rrust be FDF or IWQ Signature � By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Roger D. Bryan Signature r/�,F,l�� cY�. �l�t�fllt^ Date Submitted: 9/25/2018 Initial Review Is this project a public transportation project?* (?) f• Yes r No Change only rf needed. Has this project met the requirements for acceptance in to the review process? * f• Yes C' No BIMS # Assigned * 20181302 Version#* 1 Reviewing Office * Asheville Regional Office - (828) 296-4500 Select Project Reviewer* Kevin Barnett:eads\khbarnett Is a payment required for this project?* C' No payment required G' Fee received f Fee needed - send electronic notification