Loading...
HomeMy WebLinkAboutExcerpts of EPA Q&A DocumentNPDES Storm Water Program Question and Answer Document Volume 11 Z�e P o% f� Li l �? o� rE ° 0a, l �x/ 0l0Y1d7�i'o-'3. ! r./�l'isG1�c� /°l "}, 1� PW :3/�r i#/ cd,1l 7'0 a� stUer uov �raa�'1� O6Oal The 7417&',-) iz�7EPA U.S. Environmental Protection Agency _----- Office of Wastewater Enforcement and Compliance Permits Division 401 M Street, SW Washington, DC 20460 July 1993 4 TABLE OF CONTENTS Page 1. General Applicability ..................................... 1 II. Definition of Storm Water Discharge Associated With Industrial Activity. 6 Category (i): .......................................... 6 Category (iii): ........... ............................. 6 Category (iv): ......................................... 8 Category (v): ......................................... 8 Category (viii): ............ " ........................... 9 Category (x): ................:......................... 10 Category (xi): .................................... .... 14 III. individual Permits ........... .......................... 15 IV. EPA General Permits .................................... 17 V. Group Applications ................... ................. 26 VI. Sampling .......................................... 26 VII. Municipal Permit Applications .. ................. 29 VIII. The Intermodal Surface Transportation Efficiency Act of 1991 (Transportation Act) .......... 31 IX. 9th Circuit U.S. Court of Appeals Decision ..................... 32 X. Phase ll ............................................. 32 X1. List of Storm Water Contacts ............................... 35 XII. State NPDES Program Status ........................... . 53 XIII. Regulatory Definitions ............ .................:= :-. 54 XIV. Industrial Classification of Auxiliary Establishments ............... 56 Category (iv): Hazardous waste treatment -,--storage or disposal facilities. 20. If the primary SIC code of a facility is not covered under the regulations, but there is a hazardous waste treatment, storage or disposal facility (TSDF) on site, is the TSDF subject to storm water permitting requirements? A. Yes. If the hazardous waste TSDF is or should be operating under interim status or a permit under Subtitle C of the Resource Conservation and Recovery Act (RURA), regardless of -the facility's primary activity, the storm water discharges from that portion of the site are subject to the narrative definition of storm water discharges associated with industrial activity under category (iv). Even if a facility's SIC code is not included in the regulations, any activity.describ ed by one of the narrative categories of "industrial activity" that is occurring on -the site would be regulated under the storm water program SSG ca�`�°���%�' ,: (lt,J(�rr)(vr,? v,r,�(X,} 46cf,-122,26(6)(14) Category (v): Landfills, land application sites and open dumps that receive industrial waste. 21. At what point does an inactive, closed, or capped landfill cease being an . industrial activity? A. An inactive, closed or'capped landfill is no longer subject to storm water permit application requirements when the permitting authority determines the land use has been altered such that there is no exposure of significant materials to storm water at the site. For example, if an impervious surface (such as a parking lot or shopping center) now covers the closed landfill, the permitting authority, could determine that storm water discharges from the area are no longer associated with the previous landfill. activity. These determinations must be made by the permitting authority on'a--Can-by- case basis. 22. If construction of cells at a landfill disturbs greater than five acres of land; is coverage under EPA's construction general permits required? A. No. EPA considers construction of new cells to be routine landfill operations that are covered by the landfill's industrial storm water general permit. However, the storm water pollution. prevention plan for the landfill must incorporate best management practices (BMPs) that address sediment and erosion control. Where a new landfill is being constructed 8 `