Subject: Final NPDES Stormwater Permit
Permit No. NCS000315
AsIdand Distribution
Mecklenburg County
Dear Ms. Denison:
Dee Freeman
Secretary
In response to your renewal application for continued coverage under NPDES stormwater permit
NCS000315, the Division of Water Quality is forwarding herewith the subject state - NPDES permit. This
permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the
Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
October 15, 2007 (or as subsequently amended).
This final permit includes no major changes from the draft permit sent to you on February 6, 2009.
Your comments have been considered, and where appropriate, minor modifications to the permit have
been made.
Analytical monitoring is still required in this permit at allstormwater discharge outfalls. During the
renewal process, it was noted that facility activities include blending and repackaging along with
distribution of many types of organic solvents. Based on this description and the historical onsite
chemical releases at your site, the Division considers this facility to be engaged in industrial activity
associated with Standard Industrial Classification 28 which is captured by the NPDES program regulated
by 40 CFR 122.26. Failure to complete the monitoring as required is a violation of the permit and any
permit noncompliance constitutes a violation of the Clean Water Act. Reference Part III, Section A, Item 2
"Duty to Comply", Item 9 "Penalties for Tampering" and Item 10 'Penalties for Falsification of Reports" of
your permit for further information.
Please note that your facility drains to an area where there are threatened and endangered species. The
Carolina Heelsplitter, (Lasrnigona decorata) is an endangered species that has been identified near your
facility. Failure to abide by your storm -water permit may constitute violation of the Threatened and
Endangered Species Act.
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30)
days following receipt of this letter. This request must be in the form of a written petition, conforming to
Wetlands and Stormwater Branch
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 1e7One 1 1
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 lv 01'thCarolina
Phone: 919-807-63001 FAX: 919-807-6494 \ Customer Service: 1-877-623-6748 ��yrfy`�9
Internet: www.ncwaterquality.org at d y
An Eaual O000rtunity \ Affirmative Action Emolover
Ms. Linda Denison
Ashland Inc.
Permit No. NCS000315
Page 2
Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, Post Office Drawer 27447, Raleigh, North Carolina 27611-7447. Unless such demand is made,
this decision shall be final and binding.
Please take notice this permit is not transferable. Part III, B.2, addresses the requirements to be followed in
case of change in ownership or control of this discharge. This permit does not affect the legal
requirements to obtain other permits which may be required by the Division of Water Quality or permits
required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local
governmental permit that may be required.
If you have any questions or comments concerning this permit, contact Cory Larsen at (919) 807-6365 or
cory.larsenCncmail.net
cc: Mooresville Regional Office, Dee Browder
Mecklenburg County DEP
EPA Region IV, Mike Mitchell
Stormwater Permitting Unit
Central Files
Attachments
2
Sincer*JGINAI_ SIGNED BY
KEN PICKLE
for Coleen H. Sullins, Director
NCS000315
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALI'T'Y
PERMIT
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with.the provisions of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Ashland Inc.
is hereby authorized to discharge stormwater from a facility located at
Ashland Distribution Co.
3930 Glenwood Dr.
Charlotte, NC
Mecklenburg County
to receiving waters designated as the City of Charlotte Municipal Separate Storm Sewer System
(MS4) and Stewart's Creek, a class C stream in the Catawba River Basin, in accordance with the
discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III,
IV, V and VI hereof.
This permit shall become effective May 1, 2009.
This permit and the authorization to discharge shall expire at midnight on April 30, 2014.
Signed this day April 3, 2009. ORIGINAL SIGNED 8Y
KEN PICKLE:
for Coleen H. Sullins Director
Division of Water Quality
By the Authority of the Environmental Management Commission
Permit No. NCS000315
3. Signatory Requirements
4. Individual Permit Modification, Revocation and Reissuance, or
Termination
5. Permit Actions
Section C: Operation and Maintenance of Pollution Controls
1. Proper Operation and Maintenance
2. Need to Halt or Reduce Not a Defense
3. Bypassing of Stormwater Control Facilities
Section D: Monitoring and Records
1.
Representative Sampling
2.
Recording Results
3.
Flow Measurements
4.
Test Procedures
5.
Representative Outfall
6.
Records Retention
7.
Inspection and Entry
Section E: Reporting Requirements
1.
Discharge Monitoring Reports
.2.
Submitting Reports
3.
Availability of Reports .
4.
Non-Stormwater Discharges
5.
Planned Changes
6.
Anticipated Noncompliance
7.
Bypass
8.
Twenty-four Hour Reporting
9.
Other Noncompliance
10.
Other Information
PART IV LIMITATIONS REOPENER
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
PART VI DEFINITIONS
ii
SIJ+ CT1ON C: LOCATION MAP Permit No. NCS000315
►�11
NOP Scale 120,000
Ashland
Ashland Distribution Co.
Latitude: 350 15' 2.08" N
Longitude: 800 53' 11,18" W
County: Mecklenburg
Receivi ng Stream: Stewarts Creek
Stream Class: C
Sub -basin: 03-08-04 (Catawba River Basin)
Part I Page 2 of 2
Facility Location
Permit No. NCS000315
(e) Certification that the storinwater outfalls have been evaluated for the presence of
- non-stormwater discharges. The certification statement will be signed in
accordance with the requirements found in Part III, Standard Conditions, Section
B, Paragraph 5. The permittee shall re -certify annually that the stormwater
outfalls have been evaluated for the presence of non-stormwater discharges.
2. Stormwater Management Plan. The stormwater management plan shall contain a
narrative description of the materials management practices employed which control or
minimize the exposure of significant materials to stormwater, including structural and
nonstructural measures. The stormwater management plan, at a minimum, shall
incorporate the following:
(a) Feasibility Study. A review of the technical and economic feasibility of changing
the methods of operations and/or storage practices to eliminate or reduce exposure
of materials and processes to stormwater. Wherever practical, the permittee shall
prevent exposure of all storage areas, material handling operations, and
manufacturing or fueling operations.. In areas where elimination of exposure is
not practical, the stormwater management plan shall document the feasibility of
diverting the stormwater runoff away from areas of potential contamination.
(b) Secondary Containment Requirements and Records. Secondary containment is
required for: bulk storage of liquid materials; storage in any amount of Section
313 of Title III of the Superfund Amendments and Reauthorization Act (SARA)
water priority chemicals; and storage in any amount of hazardous substances, in
order to prevent leaks and spills from contaminating stormwater. runoff. A table
or summary of all such tanks and stored materials and their associated secondary.
containment areas shall be maintained. If the secondary containment devices are
connected directly to stormwater conveyance systems, the connection shall be
controlled by manually activated valves or other similar devices (which shall be
secured closed with a locking mechanism), and any stormwater that accumulates
in the containment area shall be at a minimum visually observed for color, foam,
outfall staining, visible sheens and dry weather flow, prior to release of the
accumulated stormwater. Accumulated stormwater shall be released if found to
be uncontaminated by the material stored within the containment area. Records
documenting the individual making the observation, the description of the
accumulated stormwater, and the date and time of the release shall be kept for a
period of five years.
(c) BMP Summary. A listing of site structural and non-structural Best Management
Practices (BMP) shall be provided. The installation and implementation of BMPs
shall be based on the assessment of the potential for sources to contribute
significant quantities of pollutants to stormwater discharges and data collected
through monitoring of stormwater discharges. The BMP Summary shall include a
written record of the specific rationale for installation and implementation of the
selected site BMPs. The BMP Summary shall be reviewed and updated annually.
Part II Page 2 of 10
Permit No. NCS000315
effectiveness of the BMPs listed in the BMP Summary of the Stormwater Management
Plan.
The Director may notify the permittee when the Plan does not meet one or more of the
minimum requirements of the permit. Within 30 days of such notice, the permittee shall
submit a time schedule to the Director for modifying the Plan to meet -minimum
requirements. The permittee shall provide certification in writing (in accordance with
Part III, Standard Conditions, Section B, Paragraph 5) to the Director that the changes
have been made.
8. Facility Inspections. Inspections of the facility and all stormwater systems shall occur as
part of the Preventative Maintenance and Good Housekeeping Program at a minimum on
a semi-annual schedule, once during the first half of the year (January to June), and once
during the second half (July to December), with at least 60 days separating inspection
dates (unless performed more frequently than semi-annually). These facility inspections
are different from, and in addition to, the stormwater discharge characteristic monitoring
required in Part II B and C of this permit.
9. Implementation. The permittee shall implement the Plan. Implementation of the Plan
shall include documentation of all monitoring, measurements, inspections, maintenance
activities, and training provided to employees, including the log of the sampling data and
of actions taken to implement BMPs associated with the industrial activities, including
vehicle maintenance activities. Such documentation shall be kept on-site for a period of
five years and made available to the Director or the Director's authorized representative
immediately upon request.
Part II Page 4 of 10
Permit No. NCS000315
The permittee shall complete the minimum ten analytical samplings in accordance with the
schedule specified below in Table 2. A minimum of 60 days must separate Period 1 and
Period 2 sample dates unless monthly monitoring has been instituted under a Tier Two
response.
i axle L. lvlonitoring Schedule
Year 1 —Period 1
1
May 1, 2009
October 31, 2009
Year 1 — Period 2
2
November 30, 2009
April 30, 2009
Year 2 — Period 1
3
May 1, 2010
October 31, 2010
Year 2 — Period 2
4
November 30, 2010
April 30, 2010
Year 3 — Period 1
5
May 1, 2011
October 31, 2011
Year 3 — Period 2
6
November 30, 2011.
April 30, 2011
Year 4 — Period 1
7
May 1, 2012
October 31, 2012
Year 4 — Period 2
8
November 30, 2012
April 30, 2012
Year 5 — Period 1
9
May 1, 2013
October 31, 2013
Year 5 — Period 2
10
November 30, 2013
April 30, 2014
1 Maintain semi-annual monitoring during permit renewal process. The applicant must continue semi-annual
monitoring until the renewed permit is issued.
2 If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No
Flow" within 30 days of the end of the six-month sampling period.
The permittee shall report the analytical results from the first sample with valid results within the
monitoring period. The permittee shall compare monitoring results to the benchmark values in
Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for
the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values
require the permittee to increase monitoring, increase management actions, increase record keeping,
and/or install stormwater Best Management Practices (BMPs) in a tiered program. See below the
descriptions of Tier One and Tier Two,
Part II Page 6 of 10
Permit No. NCS000315
If: During the term of this permit, the first valid sampling results are above the benchmark values,
or outside of the benchmark range, for any specific parameter at a specific discharge outfall two
times in a row (consecutive);
Then: The permittee shall:
1. Repeat all the required actions outlined above in Tier One.
2. Immediately institute monthly monitoring for all parameters at every outfall where a
sampling result exceeded the benchmark value for two consecutive samples. Monthly
(analytical and qualitative) monitoring shall continue until three consecutive sample results
are below the benchmark values, or within the benchmark range, for all parameters at that
outfall.
3. If no discharge occurs during the sampling period, the permittee is required to submit a
monthly monitoring report indicating "No Flow."
4. Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan.
During the term of this permit, if the valid sampling results required for the permit monitoring
periods exceed the benchmark value; or are outside the benchmark range, for any specific
parameter at any specific outfall on more than four occasions, the permittee shall notify the DWQ
Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results.
DWQ may, but is not limited to:
• require that the permittee increase or decrease the monitoring frequency for the remainder
of the permit;
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control measures; or
• require that the permittee implement site modifications to qualify for the No Exposure
Exclusion.
This site discharges indirectly to impaired waters experiencing problems with Turbidity, Lead
and Fecal Coliform. If a Total Maximum Daily Load (TMDL) is approved for this segment of
Stewart's Creek, the permittee maybe required to monitor for the pollutant(s) of concern in the
future and submit results to the Division of Water Quality. The Division will consider the
monitoring results in determining whether additional BMPs are needed to control the pollutant(s)
of concern to the maximum extent practicable.
Part II Page 8 of 10
Permit No. NCS000315
SECTION D: ON-SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS
Facilities which have any vehicle maintenance activity occurring on-site which uses more than 55
gallons of new motor oil per month when averaged over the calendar year shall perform
analytical monitoring as specified below in Table 5. This monitoring shall be performed at all
stormwater discharge outfalls which discharge stormwater runoff from vehicle maintenance
areas, and in accordance with the schedule presented in Table. 2 (Section B). All analytical
monitoring shall be performed during a representative storm event.
Table 5. Analytical Monitoring Requirements for On -Site Vehicle Maintenance
Discharge Characteristics
"j
UmtsMeasurement
Fre uenc' 1
Sample ,�=
T `e?
Sample
Location3..
pH
standard
semi-annual
Grab
SDO
Oil and Grease
mg/l
semi-annual
Grab
SDO
Total Suspended Solids
mg/1
semi-annual
Grab
SDO
Total Rainfall4
inches
semi-annual
Rain gauge
-
New Motor Oil Usage
U....4«..4..
gallons/month
semi-annual
Estimate
-
1 v Measurement Frequency:' Twice per year during a representative storm event, for each year until either another
permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle
the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
permittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting
cycle.
2 If the stormwater runoff is controlled by a stormwater detention pond a grab sample of the discharge from the
pond shall be collected within the first 30 minutes of discharge from the pond.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges
stormwater runoff from area(s) where vehicle maintenance activities occur.
4 For each sampled representative storm event the total precipitation must be recorded. An on-site or local rain
gauge reading must be recorded.
Monitoring results shall be compared to the benchmark values in Table 6. The benchmark
values in Table 6 are not permit limits but should be used as guidelines for the permittee's
Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the
permittee to increase monitoring, increase management actions, increase record keeping, and/or
install stormwater Best Management Practices (BMPs), as provided in Part II Section B.
avae U. nencnmarx values for vehicle Maintenance Analytical Mon!
DischargeCharacferistics Units Beiichuiark
pH standard 6 - 9
Oil and Grease mg/L 30
Total Suspended Solids -7— mg/L 100
Part II Page 10 of 10
toring
Permit No. NCS000315
$10,000 per day for each day during which the violation continues, with the maximum amount of
any Class II penalty not to exceed $125,000.
3. Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this
individual permit which has a reasonable likelihood of adversely affecting human health or the environment.
4. Civil and Criminal Liability
Except as provided in Part III, Section C of this permit regarding bypassing of stormwater control facilities,
nothing in this individual permit shall be construed to relieve the permittee from any responsibilities,
liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3,143-215.6A, 143-215.613, 143-
215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may be
temporarily suspended.
5. Oil and Hazardous Substance Liability
Nothing in this individual permit shall be construed to preclude the institution of any legal action or relieve
- the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to
under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321.
6. Property Rights
The issuance of this individual permit does not convey any property rights in either real or personal
property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of
personal rights, nor any infringement of Federal, State or local laws or regulations.
Severability
The provisions of this individual permit are severable, and if any provision of this individual permit, or the
application of any provision of this individual permit to any circumstances, is held invalid, the application
of such provision to other circumstances, and the remainder of this individual permit, shall not be affected
thereby.
Dutv to Provide Information
The permittee shall furnish to the Director, within a reasonable time, any information which the Director
may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the
permit issued pursuant to this individual permit or to determine compliance with this individual permit. The
permittee shall also furnish to the Director upon request, .copies of records required to be kept by this
individual permit.
Penalties for Tamnerin
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate,
any monitoring device or method required to be maintained under this individual permit shall, upon
conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more
than two years per violation, or by both. If a conviction of a person is for a violation committed after a first
conviction of such person under this paragraph, punishment is a fine of not more that $20,000 per day of
violation, or by imprisonment of not more than 4 years, or both.
Part III Page 2 of 8
Permit No. NCS000315
responsibility, or an individual or position having overall responsibility for environmental
matters for the company. (A duly authorized representative may thus be either a named
individual or any individual occupying a named position.); and
(3) The written authorization is submitted to the Director.
C. Any person signing a document under paragraphs a. or b. of this section shall make the following
certification:
"I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
4. Individual Permit Modification, Revocation and Reissuance or Termination
The issuance of this individual permit does not prohibit the Director from reopening and modifying the
individual permit, revoking and reissuing the individual permit, or terminating the individual permit as
allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122
and 123; Title 15A of the North Carolina Administrative Code, Subchapter 2II .0100; and North Carolina
General Statute 143-215.1 et al.
Permit Actions
The permit may be modified, revoked and reissued, or terminated for cause. The notification of planned
changes or anticipated noncompliance does not stay any individual permit condition.
SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS
Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of treatment and
control (and related appurtenances) which are installed or used by the.permittee to achieve compliance with
the conditions of this individual permit. Proper operation and maintenance also includes adequate
laboratory controls and appropriate quality assurance procedures. This provision requires the operation of
back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation
is necessary to achieve compliance with the conditions of this individual permit.
2. Need to Halt or Reduce Not a Defense
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the condition of this individual permit.
Bypassing of Stormwater Control Facilities
Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless:
a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and
Part III Page 4 of 8
Permit No. NCS000315
To meet the intent of the monitoring required by this individual permit, all test procedures must produce
minimum detection and reporting levels and all data generated must be reported down to the minimum
- -detection or lower reporting level of the procedure. - -
Representative Outfall
If a facility has multiple discharge locations with substantially identical stormwater discharges that are
required to be sampled, the permittee may petition the Director for representative outfall status. If it is
established that the stormwater discharges are substantially identical and the permittee is granted
representative outfall status, then sampling requirements may be performed at a reduced number of outfalls.
6. Records Retention
Visual monitoring shall be documented and records maintained at the facility along with the Stormwater
Pollution Prevention Plan. Copies of analytical monitoring results shall also be maintained on-site. The
permittee shall retain records of all monitoring information, including all calibration and maintenance
records and all original strip chart recordings for continuous monitoring instrumentation, and copies of all
reports required by this individual permit for a period of at least 5 years from the date of the sample,
measurement, report or application. This period may be extended by request of the Director at any time.
Inspection and Entry
The permittee shall allow the Diiector, of ail authori/-ed representative (including an authorized contractor
acting as a representative of the Director), or in the case of a facility which discharges through a municipal
separate storm sewer system, an authorized representative of a municipal operator or the separate storm
sewer system receiving the discharge, upon the presentation of credentials and other documents as may be
required by law, to;
a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted,
or where records must be kept under the conditions of this individual permit;
b. Have access to and copy, at reasonable times, any, records that must be kept under the conditions of
this individual permit;
C. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment),
practices, or operations regulated or required under this individual permit; and
d. Sample or monitor at reasonable times, for the purposes of assuring individual permit compliance
or as otherwise authorized by the Clean Water Act, any substances or parameters at any location.
SECTION E: REPORTING REQUIREMENTS
Discharge Monitoring Deports
Samples analyzed in accordance with the terms of this permit shall be submitted to the Division on
Discharge Monitoring Report (DMR) forms provided by the Director. Submittals shall be delivered to the
Division no later than 30 days from the date the facility receives the sampling results from the laboratory.
When no discharge has occurred from the facility during the report period, the permittee is required to
submit a discharge monitoring report within 30 days of the end of the six-month sampling period, giving all
required information and indicating "NO FLOW" as per NCAC T15A 02B .0506.
Part III Page 6 of 8
Permit No. NCS000315
the time the permittee became aware of the circumstances. A written submission shall also be provided
within 5 days of the time the permittee becomes aware of the circumstances.
The written submission shall contain a description of the noncompliance, and its causes; the period of
noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the
anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance.
The Director may waive the written report on a case-by-case basis if the oral report has been received
within 24 hours.
9. Other Noncompliance
The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time
monitoring reports are submitted.
10. Other Information
Where the permittee becomes aware that it failed to submit any relevant facts in an application for an
individual permit or in any report to the Director, it shall promptly submit such facts or information.
Part III Page 8 of 8
Permit No. NCS000315
6. Bulk Storage of Liquid Products
Liquid raw materials, manufactured products, waste materials or by-products with a single above ground
storage container having a capacity of greater than 660 gallons or with multiple above ground storage
containers located in close proximity to each other having a total combined storage capacity of greater than
1,320 gallons.
7. Clean Water Act
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33
USC 1251, et. seq.
8. Division or DWO
The Division of Water Quality, Department of Environment and Natural Resources.
9. Director
The Director of the Division of Water Quality, the permit issuing authority.
10. EMC
The North Carolina Environmental Management Commission.
11. Grab Sample
An individual sample collected instantaneously. Grab samples that will be directly analyzed or qualitatively
monitored must be taken within the first 30 minutes of discharge.
12. Hazardous Substance
Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act.
13. Landfill
A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land
treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or
a surface storage facility.
14. Municipal Separate Storm Sewer System
A stormwater collection system within an incorporated area of local self-government such as a city or town.
15. No Exposure
A condition of no exposure means that all industrial materials and activities are protected by a storm
resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff.
Industrial materials or activities include, but are not limited to, material handling equipment or activities,
industrial machinery, raw materials, intermediate products, by-products, final products, or waste products.
DWQ may grant a No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a
facility complies with the terms and conditions described in 40 CFR § 122.26(g).
16. Overburden
Any material of any nature, consolidated or unconsolidated, that overlies a mineral deposit, excluding
topsoil or similar naturally -occurring surface materials that are not disturbed by mining operations.
17. Permittee
The owner or operator issued a permit pursuant to this individual permit.
18. Point Source Discharge of Stormwater
Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe, ditch,
channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters
of the state.
Part VI Page 2 of 4 Pages
Permit No. NCS000315
26. Significant Spills
Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities
under section 311 of the Clean Water Act (Ref: 40 CFR 110.10 and CFR 117.21) or section 102 of
CERCLA (Ref: 40 CFR 302.4).
27. Stormwater Runoff
The flow of water which results from precipitation and which occurs immediately following rainfall or as a
result of snowmelt.
28. Stormwater Associated with Industrial Activi
The discharge from any point source which is used for collecting and conveying stormwater and which is
directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities
considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14).
The term does not include discharges from facilities or activities excluded from the NPDES program.
29. Stormwater Pollution Prevention Plan
A comprehensive site-specific plan which details measures and practices to reduce stormwater pollution and
is based on an"evaluation of the pollution potential of the site.
30. Ten Year Design Storm
The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten
years. Design storm information can be found in the State of North Carolina Erosion and Sediment Control
Planning and Design Manual.
31. Total Flow
The flow corresponding to the time period over which the entire storm event occurs. Total flow shall be
either; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the
amount of built -upon (impervious) area, and the total amount of rainfall, or (c) estimated by the
measurement of flow at 20 minute intervals during the rainfall event.
32. Total Maximum Daily Load (TMDL)
A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet
water quality standards, and an allocation of that amount to the pollutant's sources. A TMDL is a detailed
water quality assessment that provides the scientific foundation for an implementation plan. The
implementation plan outlines the steps necessary to reduce pollutant loads in a certain body of water to
restore and maintain water quality standards in all seasons. The Clean Water Act, Section 303, establishes
the water quality standards and TMDL programs.
33. Toxic Pollutant
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act.
34. Vehicle Maintenance Activity
Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or
airport deicing operations.
35. Visible Sedimentation
Solid particulate matter, both mineral and organic, that has been or is being transported by water, air,
gravity, or ice from its site of origin which can be seen with the unaided eye. -
36. 25 -year, 24 hour storm event
The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25
years.
Part VI Page 4 of 4 Pages