Loading...
HomeMy WebLinkAboutNC0036242_Compliance Evaluation Inspection_20180913 ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary LINDA CULPEPPER RECEIVED/DENR/DWR Interim Director September 13, 2018 SEP 2 5 2018 Mr. Jadd Brewer Water Resources Permitting Section Water Quality Utilities, Inc. P.O. Box 1167 Banner Elk, NC 28604-1167 SUBJECT: Compliance Evaluation Inspection Woodland Hills Apartments WWTP NPDES Permit No. NC0036242 Watauga County Dear Mr. Brewer, On September 11, 2018, Kelli Park of this office met with Josh Cagle to perform a Compliance Evaluation Inspection on the Woodland Hills Apartments wastewater treatment system. This type of inspection consists of two basic parts: an in-office file review and an on-site inspection of the treatment facility. The attached Environmental Protection Agency inspection form notes the areas that were evaluated for this inspection. The findings and observations are outlined below: I. Permit The NPDES permit became effective December 1, 2017,and expires on September 30, 2022. II. Self-Monitoring Program A review of the monthly discharge monitoring reports (DMR) for the period January 2017 through August 2018 showed that the facility was in compliance with all permit limits other than a daily maximum violation on September 20, 2017 for fecal coliform. This violation has already been addressed via a separate correspondence. Grab samples are taken from the contact chamber after dechlorination. This is due to the effluent flowing directly into a storm drain before being discharged into the receiving stream. SDE Q NORTH CAROLINA �/� Depamrm W 9aYmmal WaYy� North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27103 336.776.9800 Woodland Hills Apartments,September 11,2018 • Ill. Records/Reports The permit on site has expired, and a new permit has been issued. Please print a hard copy of the current permit and put it on site immediately. The visitation log is located on site and adequately shows visitation times and plant conditions. Chain of custody forms are in good order. All required monitoring was performed per the frequencies specified in the NPDES permit. Miss Park noted no data transcription discrepancies from bench sheets to DMRs. in her documentation review. Water Quality Labs maintains the documentation. IV. Flow Measurement The instantaneous flow is measured by collecting influent in a bucket for a minute of time. The effluent depth in the bucket is then measured, and the flow rate is manually calculated. V. Operations and Maintenance The wastewater treatment plant appeared to be well maintained and operated. The ORC and backup ORC are sufficiently qualified to be running the plant. VI. Facility Site Review The facility is located near the Apple Cart headquarters on the NC105 Bypass. It is close to the road and enclosed in a small, brown, concrete building. All components of the 0.0067 million gallons per day facility appeared to be functioning properly. Influent flows through a paper chamber before flowing into the plant. The paper chamber is pumped twice a year by Triple T Pumping. The aeration basin had a light brown color and a good earthy odor. All blowers were functioning properly and there were no dead spots. The dissolved oxygen is maintained around 2 milligrams per liter. The aeration basin is cycled 15 minutes on and 45 minutes off. Lime is added periodically to the aeration basin. The secondary clarifier looked clean and was discharging clear effluent. Effluent is disinfected by chlorine tablets placed in the weirs, and then dechlorination tablets are used in an underground contact chamber before the effluent leaves the plant. There is a clear path to where the effluent pipe discharges into the receiving stream. The sides and diffusers of the aeration basin had dried solids on them from day to day splashing from the aeration and the return pipe. The plant would benefit from being cleaned every so often. This can be done easily by spraying them down with a water source and a standard hose. Please note that if Mr. Cagle does this that all liberated solids must be captured and returned to the head of the plant for treatment. • 2 Woodland Hills Apartments,September 11,2018 VII. Effluent/Receiving Waters The effluent from the facility was clear the day of inspection. Effluent was being discharged into Brushy Fork Creek, class C waters, in the Watauga River basin. VIII. Sludge Maintenance and Handling Sludge in the clarifier was reported to be about 2 feet at the time of inspection and pumped about twice a year due to low flow in the plant. Triple T Plumbing pumps the sludge. Records are reported to be maintained by Triple T Pumping. Sludge records need to be maintained on site starting immediately. IX. Conclusions Please notify Miss Park when the current permit is placed on site. Mr. Cagle's efforts to comply with the permit are appreciated. If you have any questions regarding the inspection or this report, please contact Kelli Park or me at (336) 776-9800. Sincerely, ;_,0_<,_V. Lo c i Sherri V. Knight, P.E. Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: BIMS EPA Water Compliance Inspection Report cc: Central Files WSRO NPD_ES Unit • 3 United States Environmental Protection Agency Form Approved. EPA Washington,D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A National Data System Coding(i.e.,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 E 3 I NC0036242 111 12 I 18/09/11 117 18I i 19 12 i 201 21111111 1111111111111111111111111 11111111111 156 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved 671 1 70 1 I 71 1 1 72 1 N 1 731 1 174 751 I I I 1 1 1 180 Section B Facility Data Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10 30AM 18/09/11 17/12/01 Woodland Hills Apartments WWTP Exit Time/Date Permit Expiration Date NCSR 1107 11 OOAM 18/09/11 22/09/30 Boone NC 28607 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data /// Joshua Kenneth Cagle/ORC/828-898-6277/ Name,Address of Responsible Official/Title/Phone and Fax Number Contacted Heather Sofield,355 Industrial Park Dr Boone NC 28607/1626-268-0994/8262623887 No Section C Areas Evaluated Dunng Inspection(Check only those areas evaluated) II Permit • Flow Measurement • Operations&Maintenance • Records/Reports II Self-Monitoring Program IN Facility Site Review NI Effluent/Receiving Waters Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Kell'A Park WSRO WQ//336-776-9689/ 9 / a g 1 1 9 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date 1:,1, i l �Vg� q/'Y/ � EPA Form 3560-3(Rev 9-94)Previous editions are obsolete Page# 1 NPDES yr/mo/day Inspection Type 1 31 NC0036242 11 121 18/09/11 117 18 Lcj Section D-Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) Page# 2 5 J Permit: NC0036242 Owner-Facility: Woodland Hills Apartments VVWTP Inspection Date: 09/11/2018 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping'? • 000 Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable 00110 Solids, pH, DO, Sludge Judge, and other that are applicable'? Comment: Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 00 • 0 application'? Is the facility as described in the permit'? • 000 #Are there any special conditions for the permit'? ❑ E ❑ ❑ Is access to the plant site restricted to the general public'? M ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ,i 000 Comment' Record Keeping Yes No NA NE Are records kept and maintained as required by the permit'? • 000 Is all required information readily available,complete and current? • 000 Are all records maintained for 3 years(lab reg required 5 years)? • 000 Are analytical results consistent with data reported on DMRs? • 000 Is the chain-of-custody complete'? • 000 Dates,times and location of sampling II Name of individual performing the sampling • Results of analysis and calibration II Dates of analysis III Name of person performing analyses II Transported COCs NI Are DMRs complete do they include all permit parameters'? • 000 Has the facility submitted its annual compliance report to users and DWQ? 00110 (If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ E ❑ on each shift'? Is the ORC visitation log available and current? M ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification'? U ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification'? • 000 Is a copy of the current NPDES permit available on site'? 0 • 00 Page# 3 ti Permit: NC0036242 Owner-Facility: Woodland HMIs Apartments WWTP Inspection Date: 09/11/2018 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Facility has copy of previous year's Annual Report on file for review? ❑ 0110 Comment Permit on site is expired.The new permit needs to be printed and put on site. Aeration Basins Yes No NA NE Mode of operation Ext.Air Type of aeration system Diffused ' Is the basin free of dead spots? U 0 0 0 Are surface aerators and mixers operational'? 0 0 U 0 Are the diffusers operational'? U 0 0 0 Is the foam the proper color for the treatment process'? El 0 0 0 Does the foam cover less than 25%of the basin's surface'? U 0 0 0 Is the DO level acceptable'? U 0 0 0 Is the DO level acceptable?(1 0 to 3.0 mg/I) El 0 0 0 Comment. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater's El 0 0 0 Is the site free of excessive buildup of solids in center well of circular clarifier? 0 0 • 0 Are weirs level's • 0 -❑ 0 Is the site free of weir blockage'? U 0 0 0 Is the site free of evidence of short-circuiting'? • ❑- 0 0 Is scum removal adequate'? U 0 0 0 Is the site free of excessive floating sludge'? U 0 0 0 Is the drive unit operational'? 0 0 II 0 Is the return rate acceptable(low turbulence)? - • U 0 0 0 Is the overflow clear of excessive solids/pin floc'? • ❑ ❑ ❑ Is the sludge blanket level acceptable'?(Approximately 1/4 of the sidewall depth) M ❑ ❑ ❑ Corn ment: Disinfection-Tablet Yes No NA NE Are tablet chlorinators operational'? • DOD Are the tablets the proper size and type'? IM ❑ ❑ ❑ Number of tubes in use'? 1 Page# 4 T Permit: NC0036242 Owner-Facility: Woodland Hills Apartments WWTP Inspection Date: 09/11/2018 Inspection Type: Compliance Evaluation Disinfection-Tablet Yes No NA NE Is the level of chlorine residual acceptable? ❑ 0 0 • Is the contact chamber free of growth, or sludge buildup'? • 0 0 0 Is there chlorine residual prior to de-chlorination? 0 0 0 • Comment. De-chlorination Yes No NA NE Type of system? Tablet Is the feed ratio proportional to chlorine amount(1 to 1)9 • ❑ 0 0 Is storage appropriate for cylinders'? • ❑ 0 ❑ #Is de-chlorination substance stored away from chlorine containers'? • 0 0 0 Comment- Are ommentAre the tablets the proper size and type'? • 0 0 0 Are tablet de-chlorinators operational'? • 0 0 0 Number of tubes in use'? 1 Comment Page# 5