HomeMy WebLinkAbout20021139 Ver 2_Comments to the USACE_20180921NORTH CAROLINA ROY COOPER Environmental Quality Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim otrectar September 21, 2018 DWR# 20021139 v2 Forsyth County Bryan Roden -Reynolds U.S. Army Corps of Engineers Charlotte Regulatory Field Office 151 Patton Ave, Room 208 Asheville, North Carolina 28801-5006 Subject Project: Smith Reynolds Airport Project Corps Action ID# SAW -2017-01312 Dear Mr. Roden -Reynolds: On behalf of the NC Division of Water Resources, we respectfully request that you consider the following comments within your review of the 404 Individual Permit request for the above referenced property: 1. Based on information provided in the application, as well as current aerial imagery, it appears that construction may have begun on this project. If the project has begun, the applicant should be informed that activities already conducted will not be considered in review of this project. 2. The Purpose and Need for the Runway 15-33 Obstruction Removal portion of this project does not clearly detail why the applicant cannot make sufficient use of their property without impacts to the wetlands or with a reduced impact to wetlands. The applicant has not provided an on-site alternative analysis that includes clearing trees with no impacts, or with temporary impacts and restoration, to jurisdictional waters. North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 DWR #20021139v2 DWR Comments to USACE Page 2 of 2 3. The applicant has not provided a detailed on-site Alternatives Analysis or a detailed avoidance and minimization plan for the New MRO Facilities with Auto Parking and Apron Expansion portion of the proposed project. The applicant has not provided detailed information supporting the proposed project size (number of hangers, number of parking spaces, size of apron, etc.) or an on-site alternatives analysis that discusses the use of uplands within the existing property limits. 4. The applicant has not provided a detailed Purpose and Need or an avoidance and minimization analysis for the proposed permanent Haul Road. The applicant has not provided sufficient information to document the need for permanent impacts from the Haul Road. 5. The applicant has not provided a detailed Purpose and Need or an avoidance and minimization analysis for impacts resulting from the proposed temporary sediment and erosion control and/or permanent stormwater control measures. Sediment and Erosion Control measures are only temporary in nature and therefore these impacts should be considered temporary if they are found to be justified. The North Carolina DEQ Stormwater Design Manual includes many options for permanent stormwater control measures available for consideration by the applicant. 6. The Division has requested additional technical information from the applicant and requests that the USACE also consider the attached letter during the review of the application. Thank you for your considering the Division's comments during your review of this Individual Permit. If you have any questions, please contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov. Sinc�erjelly,, ` � _ a e Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: Clement Riddle, ClearWater Environmental (via email) Andrea Leslie, NCWRC (via email) Byron Hamstead, USFWS (via email) DWR ARO DWR — Wetlands and Buffer Permitting Branch Filename: 021139v2Sm ith ReynoldsAi rportProject( Forsyth)_404_Comments