Loading...
HomeMy WebLinkAbout20150998 Ver 3_Approval Letter_20180924NOR FH CAROLINA ROY COOPER EnWronmenfal Quality (;('womry MICHAEL S. R.EGAN sr-actury LINDA CULPEPPER fpl tep t'rp D4 V r", ror September 24, 2018 DWR # 20150998 v3 New Hanover County Duke Energy Progress LLC Attn: Bill Forster 249 Sutton Lake Road Wilmington, NC 28403 Subject: Approval of Individual 401 Water Quality Certification with Additional Conditions L. V. Sutton Steam Station — Emergency Weir Construction Dear Mr. Forster: Attached hereto is a copy of Certification No. WQC004173 issued to Mr. Bill Forster and Duke Energy Progress LLC, dated September 24, 2018. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations, This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at htt;//www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission, E Q'I 01MI G� D(*w! J=p:! r,� Quaf ly cd %A -- i vis 5i2 Nwil, Slr(J 1617 Ww S,ricc curl�i Ral!gjh. N -111,h C�;rvli i 2,,1699 !(-;17 9 '�19.70T9000 Duke Energy Progress LLC DWR #20150998 v3 WQC004173 September 24, 2018 Page 2 of 7 Mailing address for the OAH: If sending via US Postal Service: if sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500, Contact Karen Higgins at 919-707-3630 or karen.higgins@ncdenr.gov if you have any questions or concerns. Sincerely, Linda Culpepper, Interim Director Division of Water Resources cc: Stephen Cahoon, Duke (via email) Henry Wicker, USACE Wilmington District (via email) Scott McLendon, USACE Wilmington District (via email) Todd Bowers, EPA, (via email) DWR WiRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 150998v3SuttonDamEmergencyRepair(NewHanover)_401_!C Duke Energy Progress LLC DWR #20150998 v3 WQC004173 September 24, 2018 Page 3 of 7 CERTIFICATION # WQC004173 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15A NCAC 02H .0500, to Mr. Bill Forster and Duke Energy Progress LLC, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on September 24, 2018, and by Public Notice issued' by the U. S. Army Corps of Engineers and received by the Division on September 11, 2018. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H al)506(b)] Type of Impact Amount Approved (units) Open Water Intake Canal 650 (cubic yards) This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. Any modifications to the project require notification to DWR and may require an application submittal to DWR with the appropriate fee. [15A NCAC 02H .0501 and .0502] 3. Pursuant to 143-215.3D(e), a X240 application fee is required. Please remit a check to DEQ- DWR within thirty (30) calendar days of the date of this certification and mail to the below address: If sending via US Postal Service Karen Higgins DWR-4031 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Karen Higgins DWR —401 & Buffer Permitting Branch 512 N. Salisbury Street, Suite 942-E Raleigh, NC 27604 Duke Energy Progress LLC DWR #20150998 0 WQC004173 September 24, 2018 Page 4 of 7 4. After the approved emergency work is completed, submit the following information to D using the following link-, https://edocs.deg. nc.gov/Forms/Suppl emental-Information- Form, a. Description of completed work, including any required restoration or mitigation activities; b. Number of acres of waters of the United States impacted, including wetlands impacts; c. As -built drawings; and d. Any other information provided to the U.S. Army Corps of Engineers. 5. The permittee shall adhere to Title 15A NCAC 02B .0211 Fresh Surface Water Quality Standards for Class C Waters (21) Turbidity: the turbidity in the receiving water shall not exceed 50 NTUs in streams not designated as trout waters; for lakes anti'••, reservoirs not designated as trout waters, the turbidity shall not exceed 25 NTUs; if turbidity exceeds these levels due to natural background conditions, the existing turbidity level shall not be increased. Compliance with this turbidity standard can be met when land management activities employ Best Management Practices (BMPs) recommended by the Designated Nonpoint Source Agency; BMPs shall be in full compliance with all specifications governing the proper design, installation, operation and maintenance of such BMPs. 6. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the impacts (including temporary impacts) as authorized under this Certification, [15A NCAC 02H,0501 and .0502] 7. All construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). 8. Sediment and erosion control measures shall not be placed in wetlands or waters except within the footprint of temporary or permanent impacts authorized under this Certification, [15A NCAC 02H .0501 and .0502) 9. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. [15A NCAC 02B 02011 10. An NPDES Construction Stormwater Permit (NCGO10000) is required for construction projects that disturb one (1) or more acres of land. The NCGO10000 Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. if the project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and! maintenance, self-monitoring, record keeping and reporting requirements is required. [15A NCAC 02H .0506(b)(5) and (c)(5)] Doke Energy Progress LLC DVVR#201SD998v3 VVQ[O04173 September 24'ZQ18 Page 5of7 12.kfconcrete isused during construction, then all necessary measures shall betaken toprevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to, waters ofthe state. [I5A N[ACD213.U2O0l 12. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, urother toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters tVthe rnaxinlurn extent practic@ble. Fueling, lubrication and general equipment maintenance shall not take place within 50 feet of @ vv@1erbndy or wetlands to prevent contamination byfuels and oils. [15A NCAC82H .05,86/bl(3) and /c\/3\ and 15A NCAC 02B a0211 (12)] 13. In accordance with 143-215.85(b)the applicant shall report any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 108 feet of surface waters; and any petroleum spill less than 25gallons that cannot becleaned upwithin 24hours. l4.The permittee shall report tothe Wilmington Regional Offlceat(919)796-7215(afterhDU/s and onweekends call 88O-858-8368)any noncompliance with this certification, any violation ofstream orwetland standards [I5AN[ACO2B.QJO8]including but not limited tn sediment impacts [15A NCACO213 .0200]. Information shall be provided orally within 24 hours (or the next business day ifaweekend grholiday) from the time the applicant became aware ofthe circumstances. Awritten submission shall also beprovided within 5 b,uaineSsdays 0{the time the applicant becomes aware ofthe circumstances. The written submission shall contain a description nfthe DonicoDlp|iance,and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance iSexpected t0continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case-by-case basis. 15. If activities must occur during periods Ofhigh biological activity (i.e. sea turtle nesting, fish spawning, or bin] nesting), then biological monitoring may be required at the request of other state orfederal agencies and coordinated with these activities. 16. All moratoriums on construction activities established by the N[ Wildlife Resource's Commission /VVR[\, US Fish and Wildlife Service (U5FVVS)NC Division of Marine Fisheries (DMF), or National Marine Fisheries Service (NMFS) to lessen impacts on trout, anadn3rn0u5 fish, larva |/post-|arw8|fishes and crustaceans, orother aquatic species ofconcern shall be implemented. Exceptions to this condition require written approval by the resource agency responsible for the given moratorium Duke Energy Progress LLC nVxR#2QI5D99Dv3 VVQCO84173 September 24,2O18 Page 6of7 17. Mr. Bill Forster and Duke Energy Progress LLC shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 3O3(d)ofthe Clean Water Act) and any other appropriate requirements ofState and Federal law. K15AN[A[02B.0200l }fthe Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal |avv is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification, Before modifying the Certification, the Div|s,ion shall notify Mr. Bill Forster and Duke Energy Progress LLC and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H 0�03 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504. Any new orrevised conditions shall beprovided Mr. Bill Forster and Duke Energy Progress LLC inwriting, shall bgprovided tothe U.S.Army Corps ofEngineers for reference im any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions 0fthe 4O4Permit for the project. 18. Upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return a certificate of completion (available nmthe OWRwebsite . [I5ANCAC 19.Ifthe property 0rproject is sold ortransferred, the new Permittee shall be givenacopyof this Certification (and written authorization if applicable) and is responsible for complying with all conditions. [I5AN[AC 02H.O5O1and .O5O2] 2Q.This Certification does not relieve the applicant ofthe responsibility to obtain all other required Federal, State, orLocal approvals before proceeding with the project, induding those required by, but not limited toSediment and Erosion Control, NOn-Discharge,Water Supply Watershed, and Trout Buffer regulations. 21. This Certification neither grants nor affirms any property right, license, nrprivilege inany waters, orany right ofuse inany waters. This Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and this Certification does not create any prescriptive right or any right oFpriority regarding any usage of water. This Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Certification, to possess any prescriptive or other right of priority with respect to any other consumptive user regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. Duke Energy Progress LLC DWR #20150998 0 WQC004173 September 24, 2018 Page 7 of 7 22. This certification grants permission to the director, an authorized representative of the Director, or DER staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)] 23. Non-compliance with or violation of the conditions herein set forth by a specific project may result in revocation of this General Certification for the project and may also result in criminal and/or civil penalties. This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H 0506] This the 2411 day of September 2018 Linda Culpepper, Interim Director Division of Water Resources LC1koh WQC004173