Loading...
HomeMy WebLinkAbout20181281 Ver 1_Fort Fisher Dredging Notification_20180924Carpenter,Kristi From: Lane, Stephen Sent: Monday, September 24, 2018 2:06 PM To: Peele, Catherine D Cc: 'brad.eshaver@usace.army.mil'; Steenhuis, Joanne; Brittingham, Cathy Subject: RE: NCDOT - Ferry Division - Fort Fisher Dredging Notification H i Cat, The Division of Coastal Management has no objections to the currently proposed dredging at the Fort Fisher Ferry Terminal as detailed in your September 19, 2018 email to me. Please let me know if I may be of any further assistance. Thanks, Stephen From: Peele, Catherine D Sent: Wednesday, September 19, 2018 12:40 PM To: Lane, Stephen <stephen.lane@ncdenr.gov> Cc:'brad.e.shaver@usace.army.mil' <brad.e.shaver@usace.army.mil>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Subject: NCDOT - Ferry Division - Fort Fisher Dredging Notification Mr. Lane, The NCDOT— Ferry Division is notifying you of our upcoming dredging operations at the Fort Fisher Ferry Terminal. Shoaling in the channel and basin have become a concern for the ferries traveling back and forth and also a concern for the traveling public's safety. The ferries need a clear and wide channel to safely make the multiple daily trips back and forth from Fort Fisher to Southport. Our most recent survey of this area was done on September 4, 2018 and shows that 171,451 cubic yards needs to be removed from the channel to meet the current permitted depth of 14 feet. All work will be completed by the NCDOT Ferry Division Marine Maintenance crew who operates the state owned hydraulic pipeline "Dredge Manteo". All material removed from the Fort Fisher basin and channel will be pumped into the adjacent spoil site. NCDOT utilizes this upland spoil site under a license (License No. DACA21-3-13-4099) granted by the Department of Army — Savannah District — Corps of Engineers. A capacity survey of this spoil site was recently completed by the NCDOT Locations and Surveys Unit. They determined there was 199,749 cubic yards of space available for material. Due to sturgeon and turtle moratoriums dredging activities will not begin until November 15t", 2018. Per conditions of CAMA Major Permit #561 we are informing you of the following information: A) Original dredge and fill permit— CAMA Major #561 B) No dimensional changes are proposed C) Please see attached plans and surveys D) Please see attached plans and surveys. An E-PCN will be submitted for the Department of Water Quality and USACE. If you need any additional information please let me know. Thank you, Catherine Peele Environmental Specialist Ferry Division 252 305 7288 mobile 252 621 6251 office cdpeele .ncdot.qov 159 Lucinda Drive Powells Point, NC 27966 I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,