Loading...
HomeMy WebLinkAbout20181291 Ver 1_Duplin Bridge 325 Courtesy Notification_9/24/2018 10:46 AMSTATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR Brad Shaver, NCDOT Coordinator Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 JAMES H. TROGDON, III SECRETARY September 21, 2018 Joanne Steenhuis, NCDOT Coardinator NC Department of Environmental Quality Division of Water Resources 127 Cardinal Drive Ext. Wilmington, NC 28405 Subject: Approval request for General Certification 4132 and Courtesy Notification for Section 404 Nationwide Permit 3 far proposed replacement of Bridge No. 325 over Branch of the Northeast Cape Fear River on SR 1004 (Rones Chapel Road) in Duplin County. WBS No. 17BP.3. R.76, TIP No. B-4501 Dear Ms. Steenhuis and Mr. Shaver: The North Carolina Department of Transportation (NCDOT) is proposing to replace Bridge No. 325 over a branch of the Northeast Cape Fear River on SR 1004 (Rones Chapel Rd.) in Duplin County. The existing 2 span - 60 ft. bridge will be replaced with single span - 70 ft. bridge. A preliminary jurisdictional determination (PJD) was acquired on this project on July 7, 2015 and the project was assigned Action Id No. SAW-2015-00991. Impacts associated with the project include 0.094 acres of permanent wetland impacts and 0.026 acres of temporary impacts. The pertnit drawings provide more details on the proposed impacts. Regulatory Approvals Section 401 Permit: The associated 401 General Certification 4132 will also apply to this project but will require written approval from DWR due to the proposed cumulative wetland impacts (permanent and temparary) equaling >0.1 acre. NCDOT will abide by all conditions listed in GC 4132, and will include a copy of the certiiications in the permit package and/or contract. Section 404 Permit: NCDOT is proposing to construct this project under the conditions of Nationwide 3. Based on the current design and impacts, notification requirements are not applicable for this project and written approval from the USACE is not required. NCDOT will abide by all conditions listed in NW 3, and will include a copy of the certifications in the permit package and/or contract. If you have any questions or need additional information, please feel free to contact me. MailingAddress: Telephone: (910341-2000 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (910) 675-0143 5501 BARBADOS BOULEVARD DNISION OF HIGHWAYS Customer Service: 1-877-368-4968 CASTLE HAYNE, NC 28429-5647 5501 BARBADOS BOULEVARD CASTLE HAYNE, NC 28429-5647 Website: www.ncdot.gov Sincerely, �Q.�t.rL ��iz�� Sean Farrell NCDOT Division 3 Environmental Specialist ec: Kristi Lynn Carpenter, Division of Water Resources Enclosures