Loading...
HomeMy WebLinkAbout20161199 Ver 2_Carvers DD Drawings April 2018_9/19/2018 11:54 PM© 2017 Microsoft Corporation © 2017 HERE © AND © 2017 Microsoft Corporation AYAAYAJMP01 OF 29 G-1 COVER SHEETNORTH CAROLINA DIVISION OF PARKS & RECREATION PREPARED BY SCHNABEL ENGINEERING SOUTH, P.C. KEY MAP LOCATION MAP SPRING LAKE, NORTH CAROLINA PROJECT NO. 17C21001.01 VICINITY MAP HARNETT COUNTY PROJECT SITE PROJECT SITE PREPARED FOR CARVERS CREEK STATE PARK LONG VALLEY FARM LAKE DAM REHABILITATION NC STATE CONSTRUCTION OFFICE (SCO) NO. 16-16560-01 © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646CUMBERLAND COUNTY LSSLKJMP02 OF 29 G-02 STANDARD ABBREVIATIONS,LEGENDS & SHEET INDEXABBREVIATIONS AB ANCHOR BOLTS ABC AGGREGATE BASE COURSE ADH ADHESIVE ALT ALTERNATIVE, ALTERNATE ANC ANCHOR BM BENCH MARK BOT BOTTOM BF BOTTOM FACE C-C CENTER TO CENTER CHK CHECK CG CENTER OF GRAVITY CJ CONSTRUCTION JOINT CMP CORRUGATED METAL PIPE CPA CONCRETE PLACEMENT AREA CTR CENTER, CENTERS CM/SEC CENTIMETERS PER SECOND CNTR CENTER CONC CONCRETE DBA DEFORMED BAR ANCHOR DEG DEGREES DET DETAIL DIA DIAMETER DIP DUCTILE IRON PIPE D/S DOWNSTREAM DWG DRAWING DWL DOWEL EA EACH EF EACH FACE EL ELEVATION EMB EMBEDMENT EQ EQUAL ES EQUAL SPACE EW EACH WAY EXP ANC EXPANSION ANCHOR FF FAR FACE FPS FEET PER SECOND FS FAR SIDE FUI FUTURE UNIT INTAKE GPM GALLONS PER MINUTE HDPE HIGH DENSITY POLYETHYLENE HK HOOK HORIZ HORIZONTAL HS HIGH STRENGTH HW HEADWATER HYDRO HYDROPHILIC ID INSIDE DIAMETER IN INCHES INJ INJECTION LB POUND LFT LEFT LG LONG, LENGTH MAX MAXIMUM MIN MINIMUM NF NEAR FACE NOM NOMINAL NS NEAR SIDE NTS NOT TO SCALE OC ON CENTER PL PLATE PT ANC POST TENSION ANCHOR PROJ PROJECT PVC POLYVINYL CHLORIDE PIPE R RADIUS RCP REINFORCED CONCRETE PIPE REINF REINFORCING, REINFORCED REF REFERENCE REQD REQUIRED RT RIGHT RHT RIGHT HAND THREAD SHT SHEET SIM SIMILAR SL STOP LOG SP SPACE SPEC SPECIFICATION SS STAINLESS STEEL STD STANDARD STL STEEL SYM SYMMETRICAL TEMP TEMPORARY TF TOP FACE TR TRASH RACK TS TUBE STEEL TYP TYPICAL TOS TOP OF STEEL TW TAILWATER UNO UNLESS NOTED OTHERWISE U/S UPSTREAM UV UNIFORMLY VARYING VERT VERTICAL VWPZ VIBRATING WIRE PIEZOMETER W/WITH W/O WITHOUT WP WORK POINT WS WATER STOP WSTUD WELDABLE STUD SS SS UEUNDERGROUND ELECTRIC LINE WATER LINE FENCE LINE ELECTRIC LINE TREE LINE W x E CONCRETE MONUMENT CM CHORD UNSURVEYED PROPERTY LINE SANITARY SEWER LINE BOUNDARY LINE CH RIGHT-OF-WAY TREE MANHOLE WELL R/W W MH SEWER MANHOLE S STORM MANHOLE D WATER METER WATER VALVE WATER MANHOLE FIRE HYDRANT W WV W SIGN ELECTRIC METER E ELECTRIC TRANSFORMER BOLLARD SEWER CLEAN OUT UTILITY POLE LIGHT POLE ELECTRIC MANHOLE E EXISTING REBAR NO POINT SET IRON REBAR SET EXISTING IRON PIN EIR NPS IRS EIP DBDEED BOOK PLAT BOOK PB SIGHT EASEMENT SE RCPREINFORCED CONC PIPE CORRUGATED METAL PIPE CPP CMP CURB AND GUTTER C&G CORRUGATED PLASTIC PIPE EXISTING FEATURES LEGEND ASPHALT GRAVEL RIPRAP CONCRETE WETLANDS ADDITIONAL INFORMATION PLAN / SECTION / DETAIL1 2 A-115 DRAWING SYMBOLS LEGEND SECTION INDICATOR SECTION NUMBER* DRAWING NUMBER ON WHICH SECTION APPEARS PLAN, SECTION OR DETAIL LABEL DIRECTION WHICH SECTION IS SHOWN PLAN, SECTION OR DETAIL NUMBER SCALE INDICATOR VERBAL SCALE** * SECTION AND ELEVATION INDICATORS ARE SIMILAR. SECTION AND ELEVATION NUMBERS ARE COMBINED AND SEQUENTIAL ON EACH DRAWING. ** VERBAL SCALE IS SHOWN FOR CONVENIENCE. ALL DRAWINGS SHOULD BE CHECKED TO INSURE THAT THE SCALE BAR ITSELF IS SHOWN AT ACTUAL SIZE. DRAWINGS NOT PLOTTED AT THEIR INTENDED SIZE (ANSI D 22" x 34") WILL NOT SCALE PROPERLY. 1.00"0.75"1.50" PLAN, SECTION OR DETAIL TITLE DETAIL INDICATOR 4 A-110 DETAIL NUMBER DRAWING NUMBER ON WHICH DETAIL APPEARS OPTIONAL ADDITIONAL INFORMATION 00 1'2' SCALE: 3/4"=1'0" 00 2'4' SCALE: 1/2"=1'0" 00 1' SCALE: 1-1/2"=1'0" 2' BORING SYMBOLS LEGEND B-1 SCHNABEL TEST BORING - 2017 © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646Sheet List Table Sheet Number Sheet Title G-01 COVER SHEET G-02 LEGENDS & SHEET INDEX G-03 SITE ACCESS AND STAGING AREAS C-01 EXISTING SITE PLAN C-02 STREAM DIVERSION, DEMOLITION, AND EXCAVATION PLAN - STAGE I C-03 STREAM DIVERSION, DEMOLITION, AND EXCAVATION PLAN - STAGE II C-04 EXISTING GRIST MILL SPILLWAY SELECTIVE DEMOLITION PLAN C-05 PROPOSED SITE PLAN C-06 EMBANKMENT SECTIONS AND SPILLWAY PROFILE S-01 SPILLWAY PLAN & PROFILE S-02 DROP BOX INLET S-03 SPILLWAY SECTION L2 & R2 S-04 SPILLWAY SECTION L2 & R2 S-05 SPILLWAY SECTION L2 & R2 S-06 SHEETPILE CUT-OFF WALL S-07 SPILLWAY SECTION L3 & R3 S-08 SPILLWAY SECTION L4 & R4 S-09 SPILLWAY SECTION L5 & R5 S-10 SPILLWAY BRIDGE & GUARDRAIL LAYOUT S-11 MISCELLANEOUS METALS S-12 STRUCTURAL NOTES & TYPICAL DETAILS B-01 SPILLWAY DRAINAGE PLAN AND PROFILE B-02 SPILLWAY UNDERSLAB AND SIDEWALL DRAIN SECTIONS AND DETAILS B-03 SHEETPILE CUTOFF AND DRAINAGE DETAILS B-04 INSTRUMENTATION PLAN E-01 STAGE I EROSION AND SEDIMENT CONTROL PLAN E-02 STAGE II EROSION AND SEDIMENT CONTROL PLAN E-03 EROSION AND SEDIMENT CONTROL DETAILS - SHEET 1 OF 2 E-04 EROSION AND SEDIMENT CONTROL DETAILS - SHEET 2 OF 2 © 2018 Microsoft Corporation © 2018 DigitalGlobe ©CNES (2018) Distribution Airbus DS © 2018 Microsoft Corporation © 2018 DigitalGlobe ©CNES (2018) Distribution Airbus DS © 2018 Microsoft Corporation © 2018 DigitalGlobe ©CNES (2018) Distribution Airbus DS © 2018 Microsoft Corporation © 2018 DigitalGlobe ©CNES (2018) Distribution Airbus DS NOTES 1.CONTRACTOR TO MAINTAIN SITE ACCESS ROADS DURING CONSTRUCTION. INCLUDING MAKING ANY NECESSARY IMPROVEMENTS REQUIRED FOR PERFORMANCE OF THE WORK. CONTRACTOR MUS RESTORE THE ROADS TO PRE-CONSTRUCTION CONDITIONS FOLLOWING COMPLETION OF THE DAM REHABILITATION WORK.LSSLKJP03 OF 29 G-03 SITE ACCESS AND STAGINGAREAS© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LONG VALLEY FARM LAKE LONG VALLEY RD LONG VALLEY RD E MA N C H E S T E R R D LONG VALLEY RDN BRAGG BLVD / HWY 24R A Y R D JDE S T CANOPY LNOVERHEAD POWER LINE EASEMENT N SITE ACCESS - OVERALL1 00 1000'2000' SCALE: 1"=1000' SITE ACCESS - NORTH2 00 200'400' SCALE: 1"=200' R A Y R D JDE S T CANOPY LNLIBERTY BAPTIST CHURCH ANDERSON CREEK SIGNS SITE ACCESS - SOUTH - POTENTIAL STAGING AREAS3 00 200'400' SCALE: 1"=200' LONG VALLEY RD SECONDARY STAGING AREA 1.0 ACRES PRIMARY STAGING AREA 2 ACRES CONSTRUCTION ENTRANCE FROM LONG VALLEY RD NORTH (PRIMARY) ACCESS ALONG DIRT ROADNORTH (PRIMARY) ACCESS ALONG DIRT ROAD (SEE NOTE 1) POTENTIAL STAGING AREAS SOUTH (SECONDARY) ACCESS ALONG LONG VALLEY RD (PARK ENTRANCE), SEE NOTE 1 PROJECT SITE LIMITS OF WORK PROJECT SITE LIMITS OF WORK SEE DETAIL 2 SEE DETAIL 3 OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUXXXX150160 160150160 160 158 162164166 1501 5 0 160 160 N© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646SLKSLKJMP04 OF 29 C-01 EXISTING SITE PLAN00 30'60' EXISTING SITE PLAN1 NOTES: 1.SITE FEATURES AND TOPOGRAPHIC SURVEY PERFORMED BY ALLIED ASSOCIATES, PA OF WINSTON-SALEM, NORTH CAROLINA IN JANUARY 2017. HORIZONTAL DATUM NAD83 AND VERTICAL DATUM NAVD88, US SURVEY FOOT. 2.WATER SURFACE ELEVATIONS SHOWN WERE OBTAINED AT THE TIME OF THE SURVEY. ACTUAL WATER SURFACE ELEVATIONS IN THE LAKE AND DOWNSTREAM WILL VARY. 3.WETLANDS SHOWN WERE DELINEATED BY MOGENSEN MITIGATION, INC. IN SEPTEMBER 2017. WETLANDS FLAGGING WERE SURVEYED BY ALLIED AND ASSOCIATES, PA FOLLOWING THE DELINEATION. 4.CONTRACTOR TO VERIFY ALL EXISTING FEATURES AND PROTECT EXISTING FEATURES TO REMAIN. PAVILION B-1 B-2 B-3 B-4 FOOT P A T H GRIST MILL PRIMARY SPILLWAY JUMP ING RUN CREEK LONG VALLEY FARM LAKE OVERHEAD UTILITY LOW POINT EL 188.5 UTILITY POLE (TYP)EXISTING ROAD BEDEXISTING BRIDGE ABUTMENT CU M B E R L A N D C O U N T Y HA R N E T T C O U N T Y B-6 B-5 OWNER: STATE OF NORTH CAROLINA PIN: 0503-74-8137 OWNER: STATE OF NORTH CAROLINA PIN: 0503-80-5253 OVERHEAD UTILITY LOW POINT EL 181.5 SHED FLOW 4-IN PVC INV EL 152.35 OTHER END UNLOCATED CONTROL POINT #2 REBAR AND CAP N 532365.3034 E 2007432.6649 ELEV NAVD 88 FLOWEMBANKMENT BREACH AUXILIARY SPILLWAY APPROXIMATE DEBRIS EXTENTS 54-IN RCP INV IN EL = 156.83 INV OUT EL = 156.72 54-IN CMP INV IN EL = 151.25 INV OUT EL = 151.62 54-IN RCP INV IN EL = 156.78 INV OUT EL = 156.60 CONCRETE RETAINING WALL TOP EL 165.5 CONCRETE RETAINING WALL TOW EL 165.5 LIMITS OF WORK AND LIMITS OF CLEARING AND GRUBBING AND/OR DEBRIS REMOVAL TOP OF DAM ELEVATION VARIES CONCRETE HEADWALL WETLAND DELINEATION LINE SEE NOTE 3 WETLAND DELINEATION LINE GATED LOW-LEVEL CONDUITS CONCRETE SLIDE GATES AND OPERATORS AT PAVILION EXISTING WOODEN FENCING AND GATES GATE OHUXXXXXXXXXX160 160 165 157 158 159 161 162 163 164 160160150151150149151160160 150 155155154154154154156156150150155155160160165155160 165 156 157 158 159 161 162 163 16 4 -2.0:1-2.0:1 12+0 0 13+0014+0015+00 16 + 0 017+0011+5 0 12+50 13+5014+5015+5016+5024+00 25+00 2 6 + 0 0 2 6 + 5 0 24+50 25+50 1 9 + 0 0 2 0 + 0 0 21+00 22+0023+001 9 + 5 0 2 0 + 5 0 21+50 22+50155 160 165 152153 154 156 157 158 159 161 162 163 164 18+0019+0020+0018+5019+50155 155 145 150 160 170 145 150 160 170 0100 -10 -20 -30 -40 -50 EARTH FILL COFFERDAM BASE TOP EL 155.0 130 140 150 160 170 180 130 140 150 160 170 180 0102030400 -10 -20 -30 -40 12.00'N© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LSSLKJP05 OF 29 C-02STREAM DIVERSION,DEMOLITION, ANDEXCAVATION PLAN - STAGE I00 20'40' STREAM DIVERSION, DEMOLITION, AND EXCAVATION PLAN - STAGE I1 FLOW EXISTING PAVILION FOOT P A T H EXISTING GRIST MILL EXISTING UPSTREAM WEIR WALL, LEFT SIDEWALL, AND WATER WHEEL TO REMAIN LONG VALLEY FARM LAKE CU M B E R L A N D C O U N T Y HA R N E T T C O U N T Y OWNER: STATE OF NORTH CAROLINA PIN: 0503-74-8137 OWNER: STATE OF NORTH CAROLINA PIN: 0503-80-5253 SPILLWAY CENTERLINE CONSTRUCTION SEQUENCE NOTES: 1.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONTROL OF WATER DURING THE ENTIRE CONSTRUCTION PROJECT. A MINIMUM 10-YEAR LEVEL OF PROTECTION SHALL BE PROVIDED. HOWEVER, THE CONTRACTOR MAY PROVIDE ADDITIONAL PROTECTION AT THEIR DISCRETION TO REDUCE THEIR RISK OF DAMAGE FROM FLOODING THAT MAY OCCUR DURING CONSTRUCTION. 2.THE FOLLOWING GENERAL SEQUENCE IS PROVIDED EXCLUSIVELY FOR THE PURPOSES OF OBTAINING DAM SAFETY AND EROSION AND SEDIMENT CONTROL PERMITS AND REPRESENTS ONE POSSIBLE ALTERNATIVE FOR CONTROL OF WATER. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING THEIR OWN CONTROL OF WATER PLAN AND SUBMITTING IT TO THE ENGINEER FOR REVIEW AND APPROVAL IN ACCORDANCE WITH THE SPECIFICATIONS. A.FLAG LIMITS OF WORK FOR REVIEW AND APPROVAL BY THE ENGINEER. B.ESTABLISH SITE ACCESS AND SECURITY, PROVIDE TEMPORARY FACILITIES, AND INSTALL STAGE I TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. C.PERFORM SITE CLEARING AND GRUBBING, AND DEBRIS REMOVAL. D.CONSTRUCT TEMPORARY COFFERDAMS UPSTREAM AND DOWNSTREAM OF THE NEW SPILLWAY. ROUTE BASE FLOWS AND STORM FLOWS THROUGH THE EXISTING, GATED LOW-LEVEL OUTLET CONDUITS AT THE PAVILION. E.EXCAVATE FOR THE NEW SPILLWAY, INSTALL THE NEW SHEET PILE CUTOFF WALL, AND CONSTRUCT THE NEW SPILLWAY AS SHOWN ON THE DRAWINGS. F.PERFORM SELECTIVE DEMOLITION OF THE EXISTING GRIST MILL SPILLWAY. G.COMPLETE THE EMBANKMENT GRADING ON THE LEFT SIDE OF THE NEW SPILLWAY, INCLUDING AROUND THE PORTIONS OF THE EXISTING SPILLWAY TO REMAIN. H.COMPLETE THE EMBANKMENT GRADING ON THE RIGHT SIDE OF THE NEW SPILLWAY UP TO ABOUT STA 12+70. I.INSTALL THE NE RESERVOIR DRAIN GATE. CONTINUED ON C-03 - STREAM DIVERSION, DEMOLITION, AND EXCAVATION PLAN - STAGE II 54-IN RCP INV IN EL = 156.83 INV OUT EL = 156.72 54-IN CMP INV IN EL = 151.25 INV OUT EL = 151.62 54-IN RCP INV IN EL = 156.78 INV OUT EL = 156.60 TEMPORARY UPSTREAM COFFERDAM EARTH FILL BASE TOP EL 155.0 TOP OF PORTADAM EL 165.0 TEMPORARY DOWNSTREAM COFFERDAM TOP EL 158.0 EMBANKMENT CREST CENTERLINE SPILLWAY EXCAVATION AUXILIARY SPILLWAY 2 C-02 00 20'40' UPSTREAM COFFERDAM SECTION2 EXISTING GROUND FLOW PORTADAM OR EQUIVALENT COFFERDAM TOP EL 165.0 SPILLWAY FOUNDATION EXCAVATION 00 20'40' DOWNSTREAM COFFERDAM SECTION3 FLOW EXISTING GROUND SPILLWAY FOUNDATION EXCAVATION EARTH FILL COFFERDAM TOP EL 158.0 DEMOLISH SHADED AREAS OF SPILLWAY TO A MINIMUM OF 2 FEET BELOW FINAL GRADE. DEMOLISH CENTER PIER AND METAL AND WOOD GATE APPURTENANCES (NOT SHOWN). TEMPORARILY STABILIZE THE REMAINING SECTIONS WITH CONTRACTOR-DESIGNED SUPPORT SYSTEM UNTIL EMBANKMENT FILL IS PLACED. SEE C-04 AND C-05 FOR DETAILS. 3 C-02 COORDINATE WITH OWNER TO REMOVE EXISTING WOODEN FENCING AND GATES WITHIN LIMITS OF WORK PRIOR TO BEGINNING WORK. OWNER TO REPLACE FENCING AND GATES AFTER CONSTRUCTION. EXISTING SHED COORDINATE WITH OWNER TO REMOVE EXISTING WOODEN FENCING AND GATES WITHIN LIMITS OF WORK PRIOR TO BEGINNING WORK. OWNER TO REPLACE FENCING AND GATES AFTER CONSTRUCTION. 155 160 FLOW150155160165 155160165156157158159161162163164166150155 160 165 156 157 158 159 161 162 16 3 164 155155 1451 5 0 155 145 150 155 160 160 165 165 166.00 29+0030+0030+2529+502 7 + 0 0 28+0028+7327+5 0 28+5018+0019+0018+5019+5011+0 0 12+0 0 13+0014+0015+00 16 + 0 017+0010+5 0 11+5 0 12+50 13+5014+5015+5016+50150155 155 160 160 165 165 160155165150155160165-2.0:1 -2.0:1-2.5:1-2.0:1-2.5:1-2.0:1-5.0:1-3.0:1-2.5:1-2.0:1ELEVATIONSTATION 130 140 150 160 170 180 190 200 210 220 130 140 150 160 170 180 190 200 210 220 29+00 29+10 29+20 29+30 29+40 29+50 29+60 29+70 29+80 29+90 30+00 30+10 30+2030+25 29+10 29+20 29+30 29+40 29+50 29+60 29+70 29+80 29+90 30+00 30+10 30+2030+25ELEVATION STATION 130 140 150 160 170 180 190 200 210 220 130 140 150 160 170 180 190 200 210 220 11+8011+9012+0012+1012+2012+3012+4012+5012+6012+7012+8012+9013+00 11+9012+0012+1012+2012+3012+4012+5012+6012+7012+8012+9013+00 N© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LSSLKJP06 OF 29 C-03STREAM DIVERSION,DEMOLITION, ANDEXCAVATION PLAN - STAGE II00 20'40' STREAM DIVERSION, DEMOLITION, AND EXCAVATION PLAN - STAGE II1 EXISTING PAVILION EXISTING GRIST MILL JUMPING RUN CREEK LONG VALLEY FARM LAKE CU M B E R L A N D C O U N T Y HA R N E T T C O U N T Y OWNER: STATE OF NORTH CAROLINA PIN: 0503-74-8137 OWNER: STATE OF NORTH CAROLINA PIN: 0503-80-5253 FLOW SPILLWAY CENTERLINEFLOW EXISTING GROUND 00 20'40' PIPE EXCAVATION AND DEMOLITION3 FLOW EXCAVATION GRADE AUXILIARY SPILLWAY DROP BOX INLET SPILLWAY SEE DWGS S-01 THROUGH S-12, AND B-01 THROUGH B-04LIMITS OF WORK AND CLEARING LIMITS OF WORK AND CLEARING PAVILION STAGE II COFFERDAM TOP EL 165.0 SEE DETAIL THIS SHEET EXCAVATE FOR AND REMOVE PIPES AS SHOWN ON DETAILS THIS SHEET. EXISTING GATE OPERATORS AND GATES AT PAVILION TO REMAIN. 00 20'40' PIPE EXCAVATION AND DEMOLITION2 1.00' MIN 1.00' MIN 1.00' MIN 1 1 1 1 PIPE EXCAVATION CONCRETE CAP REMAINING PORTIONS OF PIPES TO BE FILLED WITH CONCRETE OR GROUT 2.00' 3.00' 0.5 1 1.00' MIN 1.00' MIN PORTIONS OF REMAINING PIPES TO BE FILLED WITH CONCRETE OR GROUT CONCRETE CAP CONSTRUCTION SEQUENCE NOTES (CONTINUED): 2.THE FOLLOWING GENERAL SEQUENCE IS PROVIDED EXCLUSIVELY FOR THE PURPOSES OF OBTAINING DAM SAFETY AND EROSION AND SEDIMENT CONTROL PERMITS AND REPRESENTS ONE POSSIBLE ALTERNATIVE FOR CONTROL OF WATER. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING THEIR OWN CONTROL OF WATER PLAN AND SUBMITTING IT TO THE ENGINEER FOR REVIEW AND APPROVAL IN ACCORDANCE WITH THE SPECIFICATIONS. J.REMOVE THE TEMPORARY UPSTREAM AND DOWNSTREAM STAGE I COFFERDAMS, AND ROUTE FLOWS THROUGH THE RESERVOIR DRAIN GATE AT THE NEW SPILLWAY. K.INSTALL THE STAGE II TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. L.CONSTRUCT THE TEMPORARY COFFERDAM UPSTREAM OF THE EXISTING, GATED LOW-LEVEL OUTLET CONDUITS AT THE PAVILION. M.EXCAVATE AND REMOVE THE EXISTING, GATED LOW-LEVEL OUTLET CONDUITS AS SHOWN ON THE DRAWINGS. N.BACKFILL THE EXCAVATION, REMOVE THE STAGE II TEMPORARY UPSTREAM COFFERDAM, AND COMPLETE THE RIGHT EMBANKMENT GRADING. O.INSTALL THE SPILLWAY BRIDGE AND GUARDRAILS. P.REMOVE THE TEMPORARY UPSTREAM COFFERDAM. Q.TOPSOIL, MULCH, AND, SEED ALL DISTURBED AREAS. ONCE VEGETATION IS ESTABLISHED, REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. EXISTING GRADE EARTH FILL PHASE II COFFERDAM TOP EL 155.0 PORTADAM OR EQUIVALENT COFFERDAM TOP EL 165.0 2 C-03 2 C-03 3 C-03 3 C-03 FINAL GRADE 2 1 FINAL GRADE TOP OF DAM EL 166.0 RESERVOIR DRAIN GATE EXISTING SHED DEMOLISH RETAINING WALL TO A MINIMUM OF 2 FEET BELOW FINAL GRADE STAGE 2 EMBANKMENT GRADING LIMITS SEE C-05 FOR DETAILSAREA TO BE LEVELED TO EL 166.0 CONTRACTOR TO UNIFORMLY GRADE OUTLET CHANNEL WITHIN THESE LIMITS © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646ZAOZAOJP07 OF 29 C-04EXISTING GRIST MILLSPILLWAY SELECTIVEDEMOLITION PLANNOT TO SCALE SELECTIVE DEMOLITION SCHEMATIC PLAN1EXIST ING GR IST M ILL BU ILD ING DEMOLISH SHADED AREAS OF SPILLWAY (CENTER PIER/BUTTRESS AND RIGHT SIDEWALL) AND METAL OPERATING SYSTEM COMPONENTS FOR HISTORIC WOODEN SPILLWAY GATES. SEE NOTE 1 AND PHOTOS 1 THROUGH 3. 2 C-04 3 C-04 4 C-04 NOT TO SCALE PHOTO 12 NOT TO SCALE PHOTO 23 NOT TO SCALE PHOTO 34 NOT TO SCALE PHOTO 45 HATCHED AREAS TO BE DEMOLISHED DATE TAKEN: 10/30/2017 DATE TAKEN: 01/16/2017 YEAR TAKEN: 1937-1938DATE TAKEN: 10/30/2017 ESTIMATED EXTENTS OF BASE SLAB SEE NOTE 2 AND PHOTO 4 UPSTREAM WEIR WALL AND LEFT SIDEWALL TO REMAIN. SEE NOTE 3 FOR PROTECTION AND STABILIZATION REQUIREMENTS. NOTES: 1.CONTRACTOR TO DEMOLISH RIGHT SPILLWAY SIDEWALL, CENTER PIER / BUTTRESS, AND METAL OPERATING SYSTEM COMPONENTS FOR HISTORIC WOODEN GATES (GATES NO LONGER PRESENT), AND DISPOSE OF MATERIALS OFF-SITE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 2.EXTENT OF DAMAGE TO CONCRETE BASE SLAB AND AMOUNT OF BASE SLAB REMAINING IS UNKNOWN. CONTRACTOR SHALL ANTICIPATE COMPLETE REMOVAL OF THE BASE SLAB BETWEEN THE SPILLWAY SIDEWALLS. 3.CONTRACTOR IS RESPONSIBLE FOR TEMPORARILY PROTECTING AND STABILIZING THE EXISTING SPILLWAY COMPONENTS TO REMAIN AND THE EXISTING GRIST MILL AND WATER WHEEL. CONTRACTOR WILL BE REQUIRED TO PREPARE AND SUBMIT A PROTECTION AND STABILIZATION PLAN FOR APPROVAL BY THE ENGINEER PRIOR TO BEGINNING THE WORK. 4.PROPOSED EMBANKMENT GRADING NOT SHOWN FOR CLARITY. UPSTREAM WEIR WALL TO REMAIN SEE NOTE 3 UPSTREAM WEIR WALL AND LEFT SIDEWALL TO REMAIN. SEE NOTE 3 DEMOLISH CENTER PIER / BUTTRESS AND HISTORIC GATE SYSTEM COMPONENTS. SEE NOTE 1 CONCRETE BASE SLAB. SEE NOTE 2 DEMOLISH CENTER PIER/ BUTTRESS AND HISTORIC GATE SYSTEM COMPONENTS. SEE NOTE 1 XXXXXXXXX155 160150155160165155 160165156157158159161162163164166155 160 165 156 157 158 159 161 162 16 3 164 155155 1451 5 0 155 18+0019+0020+0018+5019+5011+0 0 12+0 0 13+0014+0015+00 16 + 0 017+0010+5 0 11+5 0 12+50 13+5014+5015+5016+50145 150 155 160 160 165 165 166.00 155 155 160 160 165 165 166.00-2.5:1-2.5:1-5.0:1-2.5:1-2.0:1-2.0:1-3.0:1-2 .5 :1 160 165 165 ELEVATIONSTATION 130 140 150 160 170 180 190 200 210 220 13+0014+0015+0016+0016+50 12+4012+5012+6012+7012+8012+9013+0013+1013+2013+3013+4013+5013+6013+7013+8013+9014+0014+1014+2014+3014+4014+5014+6014+7014+8014+9015+0015+1015+2015+3015+4015+5015+6015+7015+8015+9016+0016+1016+2016+3016+4016+50 130 140 150 160 170 180 190 200 210 220 10+5011+00 10+6010+7010+8010+9011+0011+1011+2011+3011+4011+5011+6011+7011+8011+90 N© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LSSLKJMP08 OF 29 C-05 PROPOSED SITE PLAN00 20'40' PROPOSED SITE PLAN1 PAVILION EXISTING GRIST MILL JUMPING RUN CREEK LONG VALLEY FARM LAKE CU M B E R L A N D C O U N T Y HA R N E T T C O U N T Y OWNER: STATE OF NORTH CAROLINA PIN: 0503-74-8137 OWNER: STATE OF NORTH CAROLINA PIN: 0503-80-5253 FLOWFLOW SPILLWAY CENTERLINE A C-06 B C-06 C C-06 D C-06 E C-06FLOW 30.0' 14.5' FINAL GRADE TOP OF DAM EL 166.0 EXISTING GROUND 00 20'40' EMBANKMENT CREST CENTERLINE PROFILE2 BOTTOM OF SHEETPILE CUTOFF WALL EL 135.0 TOP OF SHEETPILE CUTOFF WALL EL 162.5 41.0'34.0'34.0' EXCAVATION GRADE 2 C-05 2 C-05 AUXILIARY SPILLWAY TOP OF DAM EL 166.0 DROP BOX INLET SPILLWAY SEE DWGS S-01 THROUGH S-12, AND B-01 THROUGH B-04. LIMITS OF WORK AND CLEARING LIMITS OF WORK AND CLEARING RE-GRADE AREA AS SHOWN TO REPAIR EROSION SEE S-06 FOR SHEET PILE CUTOFF DETAILS FINAL GRADE TOP OF DAM EL 166.0 NORMAL POOL EL 161.0 RESERVOIR DRAIN GATE SPILLWAY CREST AT NORMAL POOL, EL 161.0 AREA TO BE LEVELED TO EL 166.0 CONTRACTOR TO UNIFORMLY GRADE OUTLET CHANNEL WITHIN THESE LIMITS 100 110 120 130 140 150 160 170 180 190 100 110 120 130 140 150 160 170 180 190 0 10 20 30 40 500-10-20-30-40-50 EXISTING GROUND 15.00'FINAL GRADENORMAL POOL EL 161.0 90 100 110 120 130 140 150 160 170 180 190 90 100 110 120 130 140 150 160 170 180 190 0 10 20 30 40 50 60 700-10-20-30-40-50 15.00' EXISTING GROUND FINAL GRADENORMAL POOL EL 161.0 STATION 130 140 150 160 170 180 190 200 130 140 150 160 170 180 190 200 18+00 19+00 19+80 18+10 18+20 18+30 18+40 18+50 18+60 18+70 18+80 18+90 19+00 19+10 19+20 19+30 19+40 19+50 19+60 19+70 19+80 BE CAREFUL THAT THE STRUCTURAL DRAWING 100 110 120 130 140 150 160 170 180 190 100 110 120 130 140 150 160 170 180 190 0 10 20 30 40 500-10-20-30-40-50 15.00' EXISTING GROUND FINAL GRADENORMAL POOL EL 161.0 90 100 110 120 130 140 150 160 170 180 190 90 100 110 120 130 140 150 160 170 180 190 0 10 20 30 40 50 60 700-10-20-30-40-50 15.00' EXISTING GROUND FINAL GRADE NORMAL POOL EL 161.0 © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LSSLKJMP09 OF 29 C-06 EMBANKMENT SECTIONS ANDSPILLWAY PROFILE00 20'40' SECTION 15+00B 00 20'40' SECTION 15+20A 00 20'40' SECTION 13+00E 00 20'40' SECTION 13+50D 00 20'40' SPILLWAY CENTERLINE PROFILEC 2.5 1 2.5 1 1 5 1 5 1 2 1 2 1 1 2 1 2 EXISTING GROUND DROP BOX INLET WEIR EL 161.0 SPILLWAY SIDEWALL OUTLET WINGWALL TOW EL 160.0 UNDERSLAB SEEPAGE COLLECTION SYSTEM SEE DWG B-01 STRAIGHT SHEETPILE CUTOFF SEE DWG S-06 SPILLWAY SLAB TOP OF SLAB EL 152.5 TOP OF DAM EL 166.0 (TYP) 1 3 EXISTING SPILLWAY LOCATION EXCAVATION GRADE 2 BRIDGE ABUTMENT SEE S-10 FOR DETAILS SEE DETAIL F ON THIS SHEET ACTUAL GROUND SURFACE IN THIS AREA MAY VARY FROM WHAT IS SHOWN. FOLLOWING DEWATERING, CONTRACTOR TO PREPARE FOUNDATION SURFACE AS DIRECTED BY THE ENGINEER SEE DWG C-04 FOR ADDITIONAL INFORMATION. FLOW FLOW FLOWFLOW FLOW 2.5 1 FILL WITH EARTHFILL TO RESTORE EXISTING GRADE GRADE BREAK EL 160.0 NOT TO SCALE RIPRAP APRON DETAILF 1 2 NCDOT CLASS I RIPRAP 6 INCHES BEDDING STONE WITH NON-WOVEN GEOTEXTILE ON BOTTOM 4.25' 0.50' APPROXIMATE GRIST MILL AND WATER WHEEL (TO REMAIN) © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP10 OF 29 S-01 SPILLWAY PLAN & PROFILE SPILLWAY PROFILE2 S-01 FLOW 00 4'8' SCALE: 3/16"=1'0" 22'-9" 22'-9" 45'-6" 83'-9" 6'-0"26'-3" 18'-0"16'-0"17'-6" 6'-6" 16'-3" 16'-3" 6'-6" CJ CJ CJ CJ 135° 1&3 S-03 1&4 S-02 2'-0" 4'-6" 2'-6" 2'-0" 1 1 3'-0" 8'-6" 26'-3" 1'-3"25'-0" 18'-0"16'-0"17'-6"5'-0" 2 S-01 6'-3" 19'-0" EL 161.0 EL 152.5 EL 148.0 EL 167.0 EL 160.0 1'-6" EL 152.0 45 DEG TURN IN WALL 3'-6" DRAIN PIPE, SEE DWG B-01. CL SPILLWAY CREST CUT-OFF WALL BEYOND FINAL GRADE PS INTERLOCK STRAIGHT SHEETPILE CUT-OFF SEE DETAIL 1 ON SHEET S-06 5'-0"3'-6" 10'-0" END SILL PS INTERLOCK STRAIGHT SHEETPILE 1'-0" PS INTERLOCK STRAIGHT SHEETPILE CUT-OFF (SEE DETAIL 1 ON SHEET S-06) BASE OF BATTERED WALL L1 L2 L3 L5 L2 L3 L4 L5 L4 L1 1'-6"1'-0" NOTE: SPILLWAY SIDEWALL SEEPAGE COLLECTION SYSTEM DOWNSTREAM OF CREST CUT-OFF WALL NOT SHOWN FOR CLARITY. 2.5 1 2 1 EL 152.5 EL 152.0 SLOPED SLOPED SLAB SLAB TOP OF SLAB EL 152.5 TOP OF SLAB EL 152.0 4'-6" 2'-6"2'-6" R1 R2 R3 R4 R5CRJCRJCRJCRJCRJCRJCRJCRJCJ CRJ (WALL) 1&3 S-08 32'-3" 0'-6" 24" X 30" SLUICE GATE NOTE: GUARDRAILS NOT SHOWN FOR CLARITY. SEE SHEET S-11. EL 165.0 EL 146.0 WINGWALL (PROJECTED VIEW) CL BRIDGE 8'-3"7'-9" 2'-3" 2'-3" WOOD STOPLOGS 0'-6" FLOW 00 4'8' SCALE: 3/16"=1'0" 8'-6"9'-6" 2'-6" TOP OF WALL SEE PLAN DETAIL 1 ON SHEET S-09 4'-3"8'-0"3'-9" SPILLWAY PLAN1 4 S-07 1 S-06 1 S-04 BRIDGE BEARING SEAT BRIDGE SEAT 1'-6" 3'-0" EL 145.5 EL 144.83 1 1 © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMPS-02 DROP BOX INLET45'-6" 6'-6"32'-6"6'-6" 1'-3"15'-0"15'-0"1'-3" CL SPILLWAY (SYMMETRICAL) 00 4'8' SCALE: 3/16"=1'0" 00 4'8' SCALE: 1/4"=1'0" 4'-6" 8'-6" EL 148.0 EL 152.5 00 4'8' SCALE: 3/16"=1'0" 00 4'8' SCALE: 1/4"=1'0" 6'-0"26'-3" 1'-3"25'-0" 32'-3" 4'-6" EL 148.0 EL 152.5 8'-6" EL 161.0EL 161.0 6'-0"26'-3" 6'-6" 1'-3" 15'-0" 1'-3" 6'-6" CL SPILLWAY (SYMMETRICAL) 1'-0" 3/4" SD @ 10" 6" WS 6" WS 0'-6" 0'-8" 1'-6"6" WS 6" WS 0'-10" 6" WS 3/4"Ø SD @ 10" 0'-10"0'-10" 6" WS 1'-0" 1'-0" TYP 3/4"Ø SD @ 12" OC MAX, TYP 6" WS @ CRJ 15'-0" 6" WS 6" WS 6" WS @ CRJ (BEYOND) 0'-712"0'-712" 6" WS @ CRJ (BEYOND) 0'-712" 1'-0" 1'-0" 6" WS #6@8" EF #5@8" EF 2'-0" LAP #6 DOWEL 2'-6" LAP T&B CJ0'-3 1/2" CLR 6" WS 6" WS (23) - #6@12" T&B (23) - #6@12" T&B (49) - #6@8" T&B (49) - #6@8" T&B #6@8" EF #5@8" EF 2'-0" LAP #6 DOWEL (49) - #6@8" T&B (46) - #6@12" T&B 0'-3" CLR 0'-3" CLR CJ CRJ CRJ 6" WS (52) - #6@8" (13) - #5@8" EF 2'-0" LAP (52) - #6@8" EF2'-0" LAP (50) - #6@8" (50) - #6@8"(13) - #5@8" EF 2'-0" LAP 2'-0" LAP L1 R1 2'-6" L1 & R1 SECTION1 S-01 L1 & R1 SECTION2 S-02 L1 & R1 SECTION4 S-01 00 4'8' SCALE: 1/4"=1'0" L1 & R1 SECTION5 S-02 0'-2" CLR 0'-2" CLR CRJ (WALL) CRJ (WALL) CRJ (WALL) SIDEWALL BEYOND 4'-0"4'-0" (13) - #5@8" CORNER BAR (13) - #5@8" CORNER BAR 0'-8"6" WS CJ 11 OF 29 2&5 S-02 L1 & R1 PLAN3 0'-412" SEE DRAWINGS S-04 AND S-05 © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP12 OF 29 S-03 SPILLWAY SECTIONL2 & R200 4'8' SCALE: 1/4"=1'0" L2 & R2 SECTION1 S-01 CL SPILLWAY 00 4'8' SCALE: 1/4"=1'0" L2 SECTION2 S-03 FLOW EL 167.0 1 1 EL 152.5 6" WS TYP 6" WS6" WS 3/4"Ø SD @ 12" FULL WIDTH OF SLAB TYP 6" WS @ CRJ (BEYOND) 00 4'8' SCALE: 1/4"=1'0" L2 & R2 SECTION3 S-01 1'-3"30'-0"2'-0" 0'-10" 3'-6"2'-0" (MIN)15'-0"15'-0"2'-0" (MIN)3'-6" 4'-6" VARIES 14'-6" TO 14'-818" 3/4"Ø SD @ 12" OC MAX 0'-8" 6" WS CJ 18'-0" 14'-6" 0'-8" TYP 2'-0" 2'-6" 2'-0" 1'-0" 4'-6" 14'-818"3/4"Ø SD @ 12" OC MAX 1'-0" 1'-0" 2'-0" (42) - #6@12" T&B 0'-3"0'-3" 0'-2" TYP 2'-4" LAP T&B (22) - #5@8" EF #6 DOWELS @ 6" EF 2'-0" LAP 0'-2" CLR EF (36) - #6@6" EF 0'-3 1/2" CLR 0'-3" CLR (36) - #6@6" T&B 6" WS 00 4'8' SCALE: 1/4"=1'0" L2 SECTION4 S-03 FLOW 3/4" CHAMFER, TYP (36) - #6@6" T&B #6 DOWEL NOT FULLY SHOWN (17) - #6@6" EF 0'-3" INSIDE FACE (IF) OUTSIDE FACE (OF) (42) - #5@12" (21) - #6@12" T&B (21) - #6@12" T&B (22) - #5@8" EF (42) - #5@12" WITH 90° STD HOOK (8) - #6 ES (3) - #6 ES 2'-0" 2'-0" 1'-73 4" 6'-6" 7'-0" 0'-71 2" #4 BENT BAR @12" (2) - #5@8" 1'-9" 1'-8" 20'-6" (L2)20'-6" (R2) 0'-3"0'-3" (22) - #5@8", EF 5'-7" 0'-10" 0'-4" CLR (36) - #6@6" T&B 4'-6"6" WS @ CRJ 1'-2" 1'-6" 1 1 1'-1" (19) - #5@8" #4 BENT BAR 8'-6" (VERTICAL WALL) 9'-6" (BATTERED WALL WITH CORBEL @ R2 ONLY) CRJ CRJ CRJ (19) - #6@6" EF WALL CORBEL WHERE SHOWN ON PLAN 2&4 S-03 3/4"Ø SD @ 10" OC MAX © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP13 OF 29 S-04 SPILLWAY SECTIONL2 & R2 R2 PLAN AT SEDIMENT BOX1 S-01 00 2'4' SCALE: 3/8"=1'0" SECTION VIEW4 S-04 00 2'4' SCALE: 1/2"=1'0" R2 SLUICE GATE ELEVATION3 S-04 FLOW FLOW 00 2'4' SCALE: 3/8"=1'0" 2 S-04 8'-3"4'-3" 1'-0" 3'-0"2'-6"3'-0" 3 S-04 R2 ELEVATION SEDIMENT BOX2 S-04 FLOW 00 2'4' SCALE: 3/8"=1'0" FINAL GRADE CRJ (WALL ONLY) 8'-6" (VERTICAL WALL) CREST CUT-OFF WALL 4'-3" CL SLUICE GATE CRJ (WALL) FINAL GRADE 0'-1012" VARIES EL 167.0 STEM GUIDE WALL BRACKET PEDESTAL OPERATOR STEM "F" TYPE WALL THIMBLE CRJ 8'-6"8'-3" 16'-9" 1 2 CL SLUICE GATE (SEE SPECIFICATION 35 20 16) 2'-0" 9'-6" (BATTERED WALL WITH CORBEL) 4 S-04 3'-0" 1'-0" EL 161.25 EL 152.5 EL 167.0 9'-6" (BATTERED WALL WITH CORBEL) CREST CUT-OFF WALL GUARDRAIL NOT SHOWN FOR CLAIRITY GUARDRAIL NOT SHOWN FOR CLAIRITY GUARDRAILS NOT SHOWN FOR CLARITY, SEE DRAWING S-10 FOR LAYOUT. 6" WS 1'-6" CORBEL SPECIFICATION FOR WOOD STOP LOGS: 1.MATERIAL: SOUTHERN PINE PRESSURE-TREATED DIMENSION LUMBER OR APPROVED EQUAL 2.SIZE/GRADE: 2X8 NOMINAL (1-1/2 X 7-1/4). GRADE NO.1 OR BETTER 3.DESIGN STRENGTH: ALLOWABLE BENDING STRESS Fb = 1250 PSI (MINIMUM) 4.SURFACING: S4S (SURFACED ALL FOUR SIDES) TONGUE & GROOVE 5.AWPA OR ICC-ES END USE CATEGORY DESIGNATION: UC4C (SAWN SHEETING - FRESH WATER CONTINUOUS EXPOSURE/IMMERSION) 6.MINIMUM PRESERVATIVE RETENTION REQUIREMENTS COMPLYING WITH USE CATEGORY: A.0.31 PCF - COPPER AZOLE (CA) B.0.60 PCF - COPPER QUAT (ACQ, MCQ) 7.FIELD-CUT ENDS, NOTCHES AND DRILLED HOLES OF PRESERVATIVE TREATED WOOD SHALL BE TREATED IN ACCORDANCE WITH AWPA STANDARD M4. 8.AWPA OR ICC-ES EVALUATION REPORT OF PROPOSED LUMBER PRODUCT TO BE APPROVED BY ENGINEER. 9.REFERENCES: A.SOUTHERN FOREST PRODUCTS ASSOCIATION (SFPA) - MARINE CONSTRUCTION GUIDE B.AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) - 2014 BOOK OF STANDARDS C.SOUTHERN PIPE INSPECTION BUREAU (SPIB) - STANDARD GRADING RULES FOR SOUTHERN PINE LUMBER 3'-3"3'-3"1'-0"1'-0" 5'-9"2'-0" 1'-0" WALL BRACKET 00 1'2' SCALE: 1"=1'0" DETAIL PLAN VIEW5 S-04 1'-112" 2'-6" 1'-112" 1'-0" 0'-31 4" 0'-31 4" 4'-9" STOPLOG SLOT 0'-2" 3'-0" LONG WOOD STOPLOGS (SEE DETAIL 6) 00 1'2' SCALE: 1"=1'0" STOP LOG DETAIL6 S-04 3'-0" 0'-6"2'-0"0'-6"0'-212" 5/8" DIA. X 8" LG. 316 SS THREADED ROD WITH NUT & WASHER EACH SIDE OF STOP LOG. 0'-21 2" 0'-8" 0'-11 2" BLOCKOUT FOR FLUSH BOTTOM GATE CLOSURE. FILL WITH NON-SHRINK GROUT AFTER INSTALLATION. SLAB BLOCKOUT, (NOTE 1) NOTES: 1.CONTRACTOR SHALL CUT TOP MAT OF SLAB REINFORCING BARS AS REQUIRED FOR BLOCKOUT IN SLAB. ALL BARS CUT SHALL BE REPLACED WITH REINFORCING MAT POSITIONED 2-INCHES CLEAR BELOW BOTTOM OF SLAB BLOCKOUT. EXTEND ALL BARS EACH WAY A MINIMUM OF 2'-6" PAST LIMITS OF CUT BARS. 2.EXTEND 6" WATERSTOP AT BASE OF STEM WALL TO FACE OF F-THIMBLE EACH SIDE. 2'-6" CL SLUICE GATE (OPENING IN WALL BEYOND) 4'-3"4'-3" REBAR MAT 2'-6" 2'-0" (SIDEWALL) 1'-0" (SIDEWALL) 5 S-04 BRIDGE ABUTMENT 4'-3" 3'-0"1'-3" 2'-8" DEEP CORBEL 4'-3" 2'-3" EL 161.25 STAFF GAUGE SEE B-04 FOR DETAILS 2'-0" TO CL 1'-0" (5) - #5@8", EF (8) - #5@8", EF 0'-8"© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP14 OF 29 S-05 SPILLWAY SECTIONL2 & R22'-0" MIN. SEE OTHER DETAILS FOR SLAB REINFORCEMENT 00 2'4' SCALE: 3/8"=1'0" R2 SECTION3 S-05 (22) - #5@8", EF (17) - #6@6", EF 0'-2" CLR, TYP 2'-0" LAP (13) - #5@8" EF (BENT BARS @ FILL SIDE FACE) #6@6" EF 00 1'2' SCALE: 3/4"=1'0" R2 PLAN1 S-05 FLOW (16) - #6@6" (OF) WITH 90° HOOK (27) - #6@6" (OF) WITH 90° HOOK (25) - #6@6" (IF) #6 DOWELS 2 S-05 3 S-05 00 2'4' SCALE: 3/8"=1'0" R2 ELEVATION5 S-05 OPEN CRJ #5@8" EF #5@8" EF ADD (2) - #5 X 6'-6" EF 2'-0" TYP ADD #5 X 3'-0" CORNER BARS, EF SEE NOTE 1 NOTE: 1.#5 REBAR DOWEL @ 8" EF. EMBED 6" MINIMUM INTO SIDEWALL WITH EPOXY ADHESIVE AND LAP 1'-6" MINIMUM WITH HORIZONTAL WALL REINFORCEMENT. AT CONTRACTOR'S OPTION AND WITH PRIOR APPROVAL BY ENGINEER, PROVIDE CAST-IN-PLACE DOWELS WITH STANDARD 90 DEGREE HOOK TO FULLY DEVELOP REBAR DOWELS. 5 S-05 #6@6" EF#5@8" EF #5@8" BENT BAR, LAP 1'-6" WOOD STOPLOGS (1) - #5 SLOPED, EF (1) - #5 SLOPED, EF 2'-0" LAP 2'-0" MIN. #6@6", EF#6@6", EF (7) - #5@8" EF 00 2'4' SCALE: 3/8"=1'0" FLOW 0'-6" #6 DOWELS R2 ELEVATION2 S-05 SLUICE GATE OPENING IN WALL 00 2'4' SCALE: 3/8"=1'0" R2 SECTION4 S-05 4 S-05 VARIES 0'-6" (2) - #6 VERT, EF #5 X 1'-6" LONG REBAR DOWEL @ 8" EF, EMBED 6" INTO SIDEWALL WITH EPOXY ADHESIVE. WOOD STOPLOGS 0'-8" TYP 2'-0" TYP 0'-3" (2) - #6 VERT BARS, EF CRJ #5@8" 6" WS NOTE NOTE: CONTRACTOR DO NOT CUT OR ELIMINATE ANY ADDITIONAL REBAR OR DOWELS THAN AS SHOWN IN DETAIL. SHIFT ANY REMAINING REINFORCEMENT OVER TO AVOID CONFLICT WITH GATE BLOCKOUT IF REQUIRED. (16) - #6@6" (IF) PROVIDE 90° STD. HOOKED DOWEL ALONG OUTSIDE FACE (OF) OF WALL 0'-6" EMBED 1'-6" LAP 0'-6" EMBED (NOTE 1) 2'-6" SLUICE GATE CRJ (WALL ONLY) CJ © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP15 OF 29 S-06 SHEETPILE CUT-OFF WALLBOTTOM OF SHEETPILE EL 135.0 EL 167.0 ASSUMED EXCAVATION LIMITS 1V:2H SLOPE TOP OF CREST EL 166.0 PS 27.5 INTERLOCK STRAIGHT SHEETPILE PS INTERLOCK STRAIGHT SHEETPILE TOP OF SHEETPILE EL 162.5 1'-3" 2'-0" MIN 15'-0"15'-0" 41'-0" 2'-0" CL SPILLWAY 2'-0" MIN CREST CUT-OFF WALL (EL 165.0) 5'-6"30'-0"5'-6" BOTTOM OF TURNED DOWN SLAB TOP OF SLAB EL VARIES 4'-6" 3'-0" 00 4'8' SCALE: 3/16"=1'0" L3 & R3 SECTION (AT SHEETPILE CUT-OFF WALL)1 S-01 55'-2" 00 4'8' SCALE: 1/4"=1'0" L3 & R3 SECTION2 S-06 CL SPILLWAY WS (BEYOND) 1'-3"30'-0"1'-3" 10" TYP VARIES 14'-818" TO 14'-10" 3/4"Ø SD @ 12" OC MAX 0'-8" 6" WS CJ6" WS INSIDE FACE (IF) OUTSIDE FACE (OF) 3'-6"2'-0" (MIN)15'-0"15'-0"2'-0" (MIN)3'-6" 41'-0" 00 4'8' SCALE: 1/4"=1'0" L3 & R3 SECTION3 S-06 FLOW EL 167.0 1 1 6" WS TYP 6" WS 6" WS SIDEWALL 3/4"Ø SD @ 12" FULL WIDTH OF SLAB TYP 16'-0" 14'-818" 0'-8" TYP 2'-0" 3'-0" 3'-0" 1'-6" 14'-10"3/4"Ø SD @ 12" OC MAX 1'-0" 1'-0" 1'-6" 7'-6" 1'-0" 2'-6" 0'-9" CREST CUT-OFF WALL (EL 165.0) 0'-6" POLYSTYRENE (EPS) 0'-6" CLR0'-6" CLR 55'-2" 110'-4" 4'-6" EL 167.0 (UNO) CONSTRUCT WALL CORBELS AS SHOWN ON PLAN. SEE DETAILS ON SHEET S-07 FOR CORBEL PROFILES AND REINFORCMENT. 4'-3"8'-0"3'-9" BRIDGE SEAT 5 S-07 1'-6"1'-0" 6" WS, TYP 6 B-03 3 S-06 SEE B-03 FOR SHEETPILE TERMINATION DETAILS 0'-712" 1'-6" SUPPORT SHELF © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP16 OF 29 S-07 SPILLWAY SECTIONL3 & R300 4'8' SCALE: 1/4"=1'0" L3 & R3 SECTION1 S-07 00 2'4' SCALE: 3/8"=1'0" L3 & R3 SECTION2 S-07 FLOW 0'-3" TYP 0'-3" TYP 2'-4" LAP T&B #6 DOWELS @ 6" EF 2'-0" LAP (32) - #6@6" EF 0'- 3 12" CLR 0'-3" CLR (32) - #6@6" TOP (30) - #6@6" BOTT (21) - #6@12" T&B (22) - #5@8" EF (22) - #5@8" EF (32) - #6@6" EF 0'-3" CLR (42) - #5X8'-4"@12" (42) - #5@12" BENT BAR #6 DOWEL NOT FULLY SHOWN (21) - #6@12" T&B 00 2'4' SCALE: 3/8"=1'0" L3 & R3 CREST CUT-OFF WALL3 S-07 (4) - #6 @ 12" EF (9) - #5 DOWEL @ 1'-4" EF EMBED 8" MINIMUM INTO SIDEWALL WITH EPOXY ADHESIVE. LAP 1-6" MIN. (NOTE 1) (32) - #6@6" TOP (30) - #6@6" BOTT 0'-2" CLR TYP SEE DETAILS 1 & 2 FOR SIDEWALL & BASE SLAB REINFORCEMENT (18) - #5@8" UV, EF 2'-0" LAP (4) - #6@12" EF SECTION ELEVATION NOTES: 1. AT CONTRACTOR'S OPTION, PROVIDE CAST-IN-PLACE DOWELS WITH STD 90° HOOK TO FULLY DEVELOP DOWELS INTO SIDEWALL. 2. CONTRACTOR TO PROVIDE 6" WATERSTOP TO SEAL INTERFACE BETWEEN CREST CUT-OFF WALL, SIDEWALL AND BASE SLAB. 3. SHEETPILE CUT-OFF WALL NOT SHOWN FOR CLARITY. 6" WS @ SIDEWALL INTERFACE 6" WS #6 STRAIGHT DOWEL 0'-4" 2'-0"0'-3" 0'-6" 0'-4" CLR (42) - #4@12" U-BAR W/ (4) - #4 3'-3" 2'-6" (42) - #5@12" BENT BAR WITH 90° HOOK EACH END 5'-3" 0'-10" 0'-3" CLR0'-3" CLR (3) - #6 ES (3) - #6 (6) - #6 ES 0'-8" 0'-7" (32) - #6@6" (30) - #6@6" (42) - #6@12" T&B 8'-0" BRIDGE ABUTMENT (NOTE 1) 1'-3" CORBEL (NOTE 2) 1'-3" CORBEL (NOTE 2) NOTES: 1.CONTRACTOR VERIFY REQUIRED LENGTH OF BRIDGE BEARING SEAT WITH BRIDGE MANUFACTURER. MODIFY REINFORCEMENT TO SUIT. 2.PROVIDE 1'-3" WIDE X 2'-8" DEEP WALL CORBEL AT EACH END OF BRIDGE ABUTMENT. SEE DETAIL 5. 00 1'2' SCALE: 3/4"=1'0" BRIDGE ABUTMENT - PLAN4 S-07 CL BRIDGE 4'-0"4'-0" 1'-8" 1'-2" (NOTE 1) 1'-0"1'-0" 2'-0" 1 1 1'-4" NOTE 3 0'-1112" 2'-012" 1'-8" NOTES: 1.CONTRACTOR VERIFY REQUIRED WIDTH AND BEARING DEPTH OF BRIDGE SEAT WITH BRIDGE MANUFACTURER. MODIFY REINFORCEMENT ACCORDINGLY. 2.ANCHOR SIZE, QUANTITY, LOCATION AND EMBEDMENT REQUIREMENTS TO BE DETERMINED BY BRIDGE MANUFACTURER. 3.EXTEND VERTICAL LEG OF BAR 1'-0" TO ACCOMODATE CORBELS AT EACH END OF BRIDGE ABUTMENT.. EL 166.0 ANCHOR BOLT (NOTE 2) SHOP OR FIELD BEND #6 VERTICAL BAR TO SUIT OR PROVIDE #4 BENT BAR WITH 1'-2" LAP SPLICE. (5) - #4 BATTERED SIDEWALL BEYOND WITH 1'-3" WIDE X 2'-8" DEEP CORBEL AT EACH END OF BRIDGE ABUTMENT (NOTE 3). #4 @ 6" BENT BAR 00 1'2' SCALE: 3/4"=1'0" BRIDGE ABUTMENT - SECTION5 S-07 4'-3"3'-9" 1'-0" CREST CUT-OFF WALL 1'-0" EL 167.0 CRJ CRJTERMINATE #6 BARS SEE DETAIL 5. #4@6" BENT BARS BATTERED WALL FULL HEIGTH DISCONTINUE LONGITUDINAL BARS WHERE NECESSARY. EL 166.0EL 167.0 #4 BENT BAR @12" (2) - #5@8" 1'-9" 1'-8" 1'-2" 1'-1" (19) - #5@8" #4 BENT BAR #4 BARS, EF SEE DETAIL 5 THIS SHEET 2'-0" 1'-8" 0'-8" #4@6" BENT BAR © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP17 OF 29 S-08 SPILLWAY SECTIONL4 & R400 4'8' SCALE: 1/4"=1'0" L4 & R4 SECTION1 S-01 00 4'8' SCALE: 1/4"=1'0" L4 & R4 SECTION2 S-08 FLOW 00 4'8' SCALE: 1/4"=1'0" L4 & R4 SECTION3 S-01 00 4'8' SCALE: 1/4"=1'0" L4 & R4 SECTION4 S-08 FLOW CL SPILLWAY (SYMMETRICAL)WS (BEYOND) 1'-3"30'-0"1'-3" 0'-9" TYP VARIES 14'-10" TO 8'-0" 3/4"Ø SD @ 12" OC MAX 0'-8" 6" WS CJ6" WS 3/4" CHAMFER, TYP INSIDE FACE (IF) OUTSIDE FACE (OF) 4'-3"16'-3"16'-3"4'-3" 41'-0" (42) - #6@12" T&B 0'-3"0'-3" 2'-4" LAP T&B #6 DOWELS @ 6" EF 2'-0" LAP 0'-2" CLR, TYP (35) - #6@6" EF 0'-3 1/2" CLR (35) - #6@6" T&B (35) - #6@6" T&B (21) - #5@8" EF 0'-3" CLR(21) - #6@12" T&B (21) - #6@12" T&B EL 167.0 6" WS TYP 6" WS SIDEWALL 17'-6" 14'-10" 0'-8" TYP 1'-0" 8'-0"3/4"Ø SD @ 12" OC MAX 1'-0" 1'-0" 1'-6"2'-6" 1'-0" 0'-9" EL 160.0 6" WS (35) - #6@6" UV, EF #6 DOWEL NOT FULLY SHOWN (1) - #5 SLOPED, EF (9) - #5@8" UV, EF 0'-8" (12) - #5@8" EF 1'-3" 0'-3" (35) - #6@6" T&B 3/4"Ø SD @ 12" FULL WIDTH OF SLAB TYP (1) - #5 SLOPED, EF 0'-3"0'-3" 2 S-08 3/4"Ø SD @ 12" OC MAX 3/4"Ø SD @ 12" FULL WIDTH OF SLAB TYP 0'-6" 5'-5"5'-0"4'-8"4'-2"0'-10" 0'-10"© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP18 OF 29 S-09 SPILLWAY SECTIONL5 & R500 2'4' SCALE: 3/8"=1'0" L5 & R5 SECTION3 S-09 00 4'8' SCALE: 1/4"=1'0" L5 & R5 PLAN1 S-09 6'-3" 8'-6" 0'-9" 2'-0" 20'-6" L5 L4 3 S-09 19'-0" 4'-0"1'-0"3'-6" 1 1 1'-6" 2'-6" 1'-6" 1'-0" 1'-0" 0'-8" 1'-0" 0'-9" 45° TURN IN WALL 6" WS TYP EL 160.0 5'-0" EL 152.0 5'-0" 10'-0" 00 4'8' SCALE: 1/4"=1'0" L5 & R5 PLAN2 S-09 (17) - #6@6" TOP (10) - #6@12 BOT (UV) (11) - #6@12" T&B VARIES 1'-0" (15) - #6@12" T&B (8) - #6@12" T&B (UV) 1'-0" (8) - #6@12" T&B VARIES (1) - #6 T&B 1'-0" LAP 2'-4" WITH R5 REBAR T&B OCJ 0'-3" (1) - #6 T&B (1) - #6 T&B 5 S-09 00 2'4' SCALE: 3/8"=1'0" L5 & R5 SECTION5 S-09 00 2'4' SCALE: 3/8"=1'0" L5 & R5 SECTION4 S-09 3'-6" EL 146.0 (12) - #5@8" EF #6@12" EF #6 DOWEL 2'-0" LAP (23) - #6@12" (24) - #6@12" 2'-6" 3'-9" (17) - #6@6" (UV) #6@12" T&B (10) - #4 U-BARS@12"0'-2" TYP (4) - #4 (10) - #6@12" (UV) 8'-6" 8'-6" (32) - #5@12" CJ CRJ 1'-3" 135° 0'-6" (32) - #5@12" (33) - #5@12" LAP 2'-4" (33) - #5@12" (3)- #5@12", EF (3) - #5@12" EF (IN TURNED DOWN SLAB) (32) - #5@12" (33) - #5@12" (3)- #5@12", EF #6@12" T&B #6@12" T&B (3) - #5@12"EF (IN TURN DOWN) 19'-0" (END OF WALL) 00 1'2' SCALE: 3/4"=1'0" L5 & R5 PLAN CORNER DETAIL6 S-09 0'-4" 0'-3" CLR (12) - #5@8" BENT BAR (12) - #5@8" (12) - #5@8" 135° (12) - #5@8" X 16'-0" EF LAP 1'-6" CRJ 3/4"Ø SD @ 12" OC MAX © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646RLJRLJJMP19 OF 29 S-10 SPILLWAY BRIDGE &GUARDRAIL LAYOUT BRIDGE - ELEVATION VIEW2 S-10 FLOW 00 4'8' SCALE: 1/4"=1'0" 30'-0" 5'-0"5'-0"5'-0"5'-0" EJ 1'-0" (LOOP END) 1'-0" (LOOP END) 4'-6"5'-0"5'-0"4'-9" EJ 6'-0" 6'-0" TOP MOUNTED GUARDRAIL (PUBLIC-ACCESS AREA) 1'-0" (LOOP END) 4'-6"5'-0"5'-0" EJ 6'-0" 6'-0" 4'-9" EJ EJ 45° TURN IN RAIL 45° TURN IN RAIL 5'-0" 5'-0"5'-0"5'-0"5'-0"5'-0" 1'-0" EJ 4'-3"4'-3" SIDE MOUNTED GUARDRAIL WITH PICKETS. (NO PUBLIC-ACCESS AREA AND OCCUPANT LOAD LESS THAN 50) TOP MOUNTED GUARDRAIL (PUBLIC-ACCESS AREA) TOP MOUNTED GUARDRAIL (PUBLIC-ACCESS AREA) 1'-3" 2'-6"5'-9" SELF-CLOSING GATE SAFETY CHAINS AT GATE ACCESS PLAN - GUARDRAIL LAYOUT1 S-10 00 4'8' SCALE: 3/16"=1'0" 34'-0" CAMBERED TOP CHORD CAMBERED BOTTOM CHORD VERTICALMID DIAGONAL END DIAGONAL (DOUBLE MITERED TYP EACH END) FLOOR BEAM END VERTICAL BAY SPACING & QUANTITY WILL VARY EL 166.0 NOTES: 1.LAYOUT OF GUARDRAILS IS FOR GENERAL CONCEPT. GUARDRAIL MANUFACTURER TO MODIFY LAYOUT AND SPACING BETWEEN POSTS AS REQUIRED TO OPTIMIZE MANUFACTURE AND INSTALLATION. REFER TO DRAWING S-11 FOR TYPICAL GUARDRAIL DETAILS. 2.CONTRACTOR TO CONFIRM ADEQUATE CLEARANCE FOR OPERATION OF GATE OPERATOR HAND WHEEL. 30'-0" BRIDGE - SECTION3 S-10 00 1'2' SCALE: 3/4"=1'0" TOP CHORD DIAGONAL BOTTOM CHORD FLOOR BEAM BRACE DIAGONAL SAFETY RAIL PIPE HANDRAIL 3'-0" TYP IPE WOOD DECK PLANK SELF TAPPING SCREW STRINGER 6'-0" CLEAR VERTICAL4" MAX TYP 4'-6" MIN. BRIDGE STRUCTURE, SEE OTHER DETAILS 3 S-10 2 S-10 8'-0" 5 S-07 2'-0" NOTE BRIDGE DESIGN, MANUFACTURE, AND INSTALLATION IS THE RESPONSIBILITY OF THE CONTRACTOR. SEE SPECIFICATION 34 80 00 FOR REQUIREMENTS. NOTE 2 © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646MISCELLANEOUS METALSS-11 20 OF 29RLJRLJJMPSEE SPLICE LOCK DETAIL SEE EXPANSION JOINT SPLICE DETAIL ALUMINUM TOEBOARD WHERE REQUIRED BY OSHA OR WHERE SPECIFIED ON DRAWNGS LOOP END CORNER RETURN SIDE MOUNTED CONNECTION SEE TYPICAL DETAILS TOP MOUNTED CONNECTION SEE TYPICAL DETAILS #TE-1 CORNER ELL 00 1'2' SCALE: 1"=1'0" TYPICAL PUBLIC - ACCESS GUARDRAIL1 (GUARDRAILS SHALL BE TOP MOUNTED OR SIDE MOUNTED AS SHOWN ON PLANS) NOTE 9 00 1'2' SCALE: 1"=1'0" TYPICAL FACTORY-INDUSTRIAL GUARDRAIL2 1'-0"6'-0"1'-0" 3'-6" NOTE 5 NOTE 5 1'-9" 1'-9" 3'-6" ALUMINUM TOEBOARD WHERE REQUIRED BY OSHA OR WHERE SPECIFIED ON DRAWNGS LOOP END CORNER RETURN SIDE MOUNTED CONNECTION SEE TYPICAL DETAILS TOP MOUNTED CONNECTION SEE TYPICAL DETAILS MAX. SPACING BETWEEN POSTS SEE EXPANSION JOINT SPLICE DETAIL #TE-1 CORNER ELL NOTE 91'-0"6'-0"1'-0" MAX. SPACING BETWEEN POSTS (GUARDRAILS SHALL BE TOP MOUNTED OR SIDE MOUNTED AS SHOWN ON PLANS) SEE SPLICE LOCK DETAIL 00 4"8" SCALE: 3"=1'0" TYPICAL SIDE MOUNTED DETAIL3 0'-13 8" 0'-3" MIN. GENERAL NOTES: TYPE 1 & 2 GUARDRAIL 1.GUARDRAILS AND HANDRAILS SHALL BE THE PRODUCT OF A COMPANY NORMALLY ENGAGED IN THE MANUFACTURE OF PIPE RAILING. RAILING SHALL BE SHOP ASSEMBLED IN LENGTHS NOT TO EXCEED 24 FEET FOR FIELD ERECTION. 2.GUARDRAILS SHALL BE MADE OF PIPES JOINED TOGETHER WITH COMPONENT FITTINGS. SAMPLES OF ALL COMPONENTS, BASES, TOE PLATE AND PIPE SHALL BE SUBMITTED FOR APPROVAL AT THE REQUEST OF THE ENGINEER. COMPONENTS THAT ARE POP-RIVETED OR GLUED AT THE JOINTS WILL NOT BE ACCEPTABLE. ALL COMPONENTS MUST BE MECHANICALLY FASTENED WITH STAINLESS STEEL HARDWARE. GUARDRAIL AND COMPONENTS SHALL BE TUFRAIL, AS MANUFACTURED BY THOMPSON FABRICATING, LLC (BIRMINGHAM, ALABAMA) OR AN APPROVED EQUAL. 3.RAILINGS FOR GUARDRAILS SHALL BE 1 1/2" SCHEDULE 40 ALUMINUM PIPE ALLOY 6105-T5, ASTM-B-429 OR ASTM-B-221. POSTS FOR GUARDRAILS IN AREAS ACCESSIBLE TO THE GENERAL PUBLIC SHALL BE 1 1/2" SCHEDULE 80 ALUMINUM PIPE OF THE SAME ALLOY. POSTS FOR GUARDRAILS NOT ACCESSIBLE TO THE GENERAL PUBLIC AND WITH OCCUPANT LOAD NOT GREATER THAN 50 SHALL BE 1 1/2" SCHEDULE 40 ALUMINUM PIPE OF THE SAME ALLOY. POST SPACING SHALL BE A MAXIMUM OF 6'-0". 4.GUARDRAILS SHALL BE DESIGNED TO WITHSTAND A 200 LB CONCENTRATED LOAD APPLIED IN ANY DIRECTION AND AT ANY POINT ON THE TOP RAIL. GUARDRAILS FOR AREAS ACCESSIBLE TO THE GENERAL PUBLIC SHALL ALSO BE DESIGNED TO WITHSTAND A UNIFORM LOAD OF 50 LB/FT APPLIED HORIZONTALLY TO THE TOP RAIL. GUARDRAILS FOR AREAS NOT ACCESSIBLE TO THE GENERAL PUBLIC AND WITH OCCUPANT LOAD NOT GREATER THAN 50 SHALL ALSO BE DESIGNED TO WITHSTAND A UNIFORM LOAD OF 20 LB/FT APPLIED HORIZONTALLY TO THE TOP RAIL. UNIFORM LOADS ARE NOT TO BE APPLIED SIMULTANEOUSLY WITH CONCENTRATED LOADS. 5.WHERE SPECIFIED ON CONTRACT DRAWINGS, PICKETS AND INTERMEDIATE RAILINGS SHALL BE PROVIDED SUCH THAT A 4-INCH DIAMETER SPHERE CANNOT PASS THROUGH ANY OPENING UP TO A HEIGHT OF 34 INCHES. FROM A HEIGHT OF 34 INCHES TO 42 INCHES ABOVE THE ADJACENT WALKING SURFACE, A SPHERE 8 INCHES IN DIAMETER SHALL NOT PASS. THE TRIANGULAR OPENINGS FORMED BY THE RISER, TREAD AND BOTTOM RAIL AT THE OPEN SIDE OF A STAIRWAY SHALL BE OF A SIZE SUCH THAT A SPHERE OF 6 INCHES IN DIAMETER CANNOT PASS THROUGH THE OPENING. 6.PICKETS AND INTERMEDIATE RAILINGS SHALL BE DESIGNED TO WITHSTAND A HORIZONTALLY APPLIED NORMAL LOAD OF 50 LB ON AN AREA NOT TO EXCEED ONE SQUARE FOOT INCLUDING OPENINGS AND SPACE BETWEEN RAILS. 7.THE MANUFACTURER SHALL SUBMIT CALCULATIONS FOR APPROVAL OF THE ENGINEER. TESTING OF BASE CASTINGS OR BASE EXTRUSIONS BY AN INDEPENDENT LAB OR MANUFACTURER'S LAB (IF MANUFACTURER'S LAB MEETS THE REQUIREMENTS OF THE ALUMINUM ASSOCIATION) WILL BE AN ACCEPTABLE SUBSTITUTE FOR CALCULATIONS. CALCULATIONS WILL BE REQUIRED FOR APPROVAL OF ALL OTHER DESIGN ASPECTS. 8.POSTS SHALL NOT INTERRUPT THE CONTINUATION OF THE TOP RAIL AT ANY POINT ALONG THE RAILING, INCLUDING CORNERS AND END TERMINATIONS (OSHA 1910.23). THE TOP SURFACE OF THE TOP RAILING SHALL BE SMOOTH AND SHALL NOT BE INTERRUPTED BY PROJECTED FITTINGS. 9.THE MID-RAIL AT A CORNER RETURN SHALL BE ABLE TO WITHSTAND A 200 LB LOAD WITHOUT LOOSENING. THE MANUFACTURER IS TO DETERMINE THIS DIMENSION FOR THEIR SYSTEM AND PROVIDE PHYSICAL LABORATORY TESTS TO CONFIRM COMPLIANCE. 10.CONCRETE ANCHORS SHALL BE STAINLESS STEEL TYPE 303 OR 304 WEDGE ANCHORS AND SHALL BE FURNISHED BY THE GUARDRAIL MANUFACTURER. THE ANCHOR DESIGN SHALL INCLUDE THE APPROPRIATE REDUCTION FACTORS FOR SPACING AND EDGE DISTANCES IN ACCORDANCE WITH THE MANUFACTURER'S PUBLISHED DATA. 11.TOE PLATE SHALL CONFORM TO OSHA STANDARDS. TOE PLATE SHALL BE A MINIMUM OF 4" HIGH AND SHALL BE BE AN EXTRUSION THAT ATTACHES TO THE POSTS WITH CLAMPS THAT WILL ALLOW FOR EXPANSION AND CONTRACTION BETWEEN POSTS. TOE PLATES SHALL BE SET 1/4" ABOVE THE WALKING SURFACE. TOE PLATES SHALL BE PROVIDED ON HANDRAILS AS REQUIRED BY OSHA AND/OR AS SHOWN ON DRAWINGS. TOE PLATES SHALL BE SHIPPED LOOSE IN STOCK LENGTHS FOR FIELD INSTALLATION. 12.OPENINGS IN THE RAILING SHALL BE GUARDED BY A SELF-CLOSING GATE (OSHA 1910.23). SAFETY CHAINS SHALL NOT BE USED UNLESS SPECIFICALLY SHOWN ON THE DRAWINGS. 13.FINISH SHALL BE ALUMINUM ASSOCIATION M10-C22-A41 (215-R1). THE PIPE SHALL BE PLASTIC-WRAPPED. THE PLASTIC WRAP IS TO BE REMOVED AFTER ERECTION. 14.ALUMINUM SURFACES IN CONTACT WITH CONCRETE, GROUT OR DISSIMILAR METALS WILL BE PROTECTED WITH A COAT OF BITUMINOUS PAINT, MYLAR ISOLATORS OR OTHER APPROVED MATERIAL. 15.THE GENERAL LAYOUT INCLUDING POST SPACINGS OF THE GUARDRAIL SYSTEMS SHOWN ON CONTRACT DRAWINGS MAY BE MODIFIED DURING PREPARATION OF SHOP DRAWINGS BY THE MANUFACTURE SUBJECT TO FINAL APPROVAL BY THE ENGINEER. BASED ON ANCHOR SELECTION BY THE MANUFACTURER, CONCRETE ANCHOR DIAMETER, EDGE DISTANCES AND EMBEDMENT DEPTH SHALL BE DETERMINED BY THE MANUFACTURER. 16.REFER TO ALUMINIUM RAILING SPECIFICATION 05 52 00 OF THE CONTRACT DOCUMENTS FOR ADDITIONAL INFORMATION INCLUDING DESIGN DATA, SHOP DRAWING AND PRODUCT DATA SUBMITTAL REQUIREMENTS. (2) - PIECE EXTRUDED ALUMINUM SIDE MOUNTED BRACKET WITH (4) - S.S. EXPANSION ANCHORS. (3-1/2" MIN. EMBEDMENT) 0'-4" MIN. 00 4"8" SCALE: 3"=1'0" TYPICAL TOP MOUNTED DETAIL4 CAST ALUMINUM BASE FLANGE W/ (4) - S.S. EXPANSION ANCHORS. (3" MIN. EMBEDMENT) 0'-3" MIN. 0'-312" MIN. NOTE: LOCATE GUARDRAIL AT CENTERLINE OF WALL UNLESS OTHERWISE SPECIFIED OTHERWISE ON PLANS EQUALEQUAL 00 2"4" SCALE: 6"=1'0" EXPANSION SPLICE AND SPLICE LOCK DETAIL5 0'-5" 0'-212"0'-2" 0'-012" TUBE 1 9 16" Ø WITH 0.219" WALL 0'-112" 12" Ø HOLE IN UNDERSIDE OF RAIL FOR 3 8" Ø S.S. SET SCREW 3 8" Ø S.S. SET SCREW, TYP NOT USED 24-IN WIDE STRIP NONWOVEN GEOTEXTILE (WHERE WALL IS BACKFILLED WITH SOIL) SEALANT WHERE WALL IS BACKFILLED WITH SOIL ROUGHENED JOINT 1/4-IN AMPLITUDE WATERSTOP 6-IN RIBBED PVC WITH CENTER BULB (UON) BACKFILLED FACE OF WALLEXPOSED FACE OF WALL CARRY ALL VERTICAL STEEL THROUGH JOINT LAP SPLICE REINFORCEMENT AS SPECIFIED PAINT ENTIRE FACE WITH BOND BREAKER DO NOT CARRY HORIZONTAL STEEL THROUGH JOINT AS SPECIFIED ON DRAWINGS WATERSTOP 6-IN RIBBED PVC WITH CENTER BULB (UON) 3/4-IN SMOOTH SLIP DOWEL @ 12-IN OC MAX (UON) AS SPECIFIED ON DRAWINGS 24-IN NON-WOVEN GEOTEXTILE WHERE SLAB IS BACKFILLED WITH SOIL SEALANT WHERE SLAB IS BACKFILLED WITH SOIL WATERSTOP 6-IN RIBBED PVC WITH CENTER BULB (UON) 2" TYP ENTIRE FACE PAINTED WITH BOND BREAKER DO NOT CARRY HORIZONTAL STEEL THROUGH JOINT 24-IN WIDE STRIP NON-WOVEN GEOTEXTILE WHERE WALL IS BACKFILLED WITH SOIL SEALANT WHERE WALL IS BACKFILLED WITH SOIL 3/4-IN CHAMFER 3/4-IN SMOOTH SLIP DOWEL @ 12-IN OC MAX (UON) AS SPECIFIED ON DRAWINGS 2" TYP AS SPECIFIED ON DRAWINGS INSIDE FACE OF SIDEWALLS PRIMER BOND BREAK TAPE SEALANT JOINT 1/4" Ldh D Z Q D T=AsFy T=AsFy AS SPECIFIED ON DRAWINGS BOTTOM OF FOOTING AS SHOWN ON DRAWINGS FOOTING / SLAB, ROUGHENED JOINT 1/4-IN AMPLITUDE 24-IN WIDE STRIP NON-WOVEN GEOTEXTILE (WHERE CONCRETE IS BACKFILLED WITH SOIL) WATERSTOP 6-IN RIBBED PVC WITH CENTERBULB CLEAR COVER AS SPECIFIED ON DRAWINGS 1/2-IN CLEAR MIN 3-IN CLEAR COVER LAP SPLICE AT LEAST 5 DAYS SHALL ELAPSE BETWEEN CASTING OF ADJOINING MEMEBERS REINFORCEMENT IS CONTINUOUS THROUGH JOINT AND MAY BE SPLICED ON EITHER SIDE OF JOINT WATERSTOP 6-IN RIBBED PVC WITH CENTER BULB (UON) NOT TO SCALE SEALANT DETAIL4 NOT TO SCALE CONTRACTION JOINT (CRJ) IN WALLS - PLAN3NOT TO SCALE CONTRACTION JOINT (CRJ) IN SLABS - SECTION2NOT TO SCALE HORIZONTAL CONSTRUCTION JOINT (CJ) IN WALLS1 NOT TO SCALE PVC WATERSTOP8 1/2-IN ID AND 1-IN OD MINIMUM REINF. BAR LAP SPLICE LENGTH (IN) BAR SIZE TOP OTHER #3 14 12 #4 19 14 #5 23 18 #6 28 21 #7 40 31 #8 46 35 #9 57 44 #10 70 54 #11 84 65 MINIMUM REINF. BAR DEVELOPMENT LENGTH (IN) BAR SIZE TOP OTHER #3 12 12 #4 14 12 #5 18 14 #6 21 17 #7 31 24 #8 35 27 #9 44 34 #10 54 42 #11 65 50 NOTES: 1.TABULATED VALUES ARE BASED ON UNCOATED GRADE 60 REBAR AND CONCRETE WITH SPECIFIED COMPRESSIVE STRENGTH AND 2" MINIMUM COVER. 2.TENSION DEVELOPMENT LENGTHS AND TENSION LAP SPLICE LENGTHS ARE CALCULATED IN ACCORDANCE WITH ACI 12.2.3 AND 12.15, RESPECTIVELY. 3.LAP SPLICE LENGTHS ARE MULTIPLES OF TENSION DEVELOPMENT LENGTHS; CLASS A=1.0*ld AND CLASS B=1.3*ld (ACI 12.15.1). 4.BAR CENTER-TO-CENTER SPACING WAS ASSUMED TO BE GREATER THAN TWICE THE CONCRETE COVER PLUS ONE BAR DIAMETER, SO THAT "c" WAS GOVERNED BY CONCRETE COVER RATHER THAN BY BAR SPACING. THEREFORE TABULATED VALUES ARE NOT APPLICABLE FOR CENTER-TO-CENTER BAR SPACING LESS THAN 6". 5.TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12 INCHES OF CONCRETE CAST BELOW THE BARS. * SIDE COVER MUST BE > 2-IN * END COVER MUST BE > 2-IN MINIMUM END HOOK DEVELOPMENT LENGTH (IN)* BAR SIZE Ldh Q Z D #3 6 4.5 2.5 2.25 #4 7 6 2.5 3 #5 8 7.5 2.5 3.75 #6 10 9 3 4.5 #7 11 10.5 3.5 5.25 #8 13 12 4 6 #9 15 13.5 4.5 9.5 #10 16 15.5 5.5 11 #11 18 17 6 12 STANDARD DEVELOPMENT, LAP SPLICE AND HOOK LENGTHS10 GENERAL NOTES FOR STRUCTURAL CONCRETE: 1.EXCEPT WHERE OTHERWISE SPECIFIED, THESE GENERAL NOTES SHALL APPLY TO THE CONCRETE STRUCTURES. 2.STRUCTURAL CONCRETE SHALL BE PREPARED, PLACED, AND CURED IN ACCORDANCE WITH THE REQUIREMENTS ADOPTED BY THE AMERICAN CONCRETE INSTITUTE (ACI) AND LOCAL CODES. STRUCTURAL CONCRETE SHALL CONFORM TO THE CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES, ACI 350-06. 3.STRUCTURAL DESIGN IS BASED UPON CONCRETE WITH A COMPRESSIVE STRENGTH OF 4500 PSI AT 28 DAYS AND REINFORCEMENT WITH A MINIMUM YIELD STRENGTH OF 60,000 PSI. 4.CONCRETE TESTING SHALL BE IN COMPLIANCE WITH THE FOLLOWING ASTM STANDARDS: C31, C39, C138, C143, C172, C173, AND C231. 5.FOR REINFORCING STEEL: a.UNLESS SPECIFIED ON DRAWINGS, MINIMUM DEVELOPMENT (EMBEDMENT) AND LAPPED SPLICE LENGTH, SEE TABLES THIS DRAWING. b.ALL VERTICAL REINFORCEMENT SHALL BE CONTINUED IN ITS DEVELOPMENT (EMBEDMENT) LENGTH INTO THE BASE OF ADJOINING SECTION. c.REINFORCEMENT SHALL BE DRILLED AND EPOXY GROUTED INTO THE CONCRETE IN ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS ONLY AT LOCATIONS SHOWN ON THE DRAWINGS. DOWELS SHALL BE INSTALLED IN CLEAN, DRY HOLES. d.REINFORCEMENT SHALL HAVE A MINIMUM LENGTH OF 20'-0" BETWEEN SPLICES UNLESS OTHERWISE SHOWN. e.SPLICES SHALL NOT CROSS CONSTRUCTION JOINT OR CONTRACTION JOINT. 6.FOR DOWEL BARS: a.DOWEL BARS SHALL BE 2-FT LONG AND 3/4-IN DIAMETER PLAIN SMOOTH STEEL IN ACCORDANCE WITH ASTM 615 GRADE 60. b.PROVIDE TWO COMPONENT SPEED DOWEL SYSTEM TO ASSURE PROPER FIELD POSITIONING AND ALIGNMENT AT SPECIFIED WALL AND SLAB CONTRACTION JOINTS. c.DOWELS SHALL BE KEPT IN STRAIGHT ALIGNMENT, IN THE ORIENTATION SHOWN, DURING AND SUBSEQUENT TO CONCRETE PLACEMENT. d.DOWELS SHALL BE PLACED NO CLOSER THAN 12 INCHES FROM THE INTERSECTION OF ANY JOINTS. 7.FOR CHAMFERS: a.CHAMFER ALL EXPOSED CORNERS 3/4-IN UNLESS OTHERWISE SHOWN OR DESIGNATED. 8.CUT OR BEND STEEL REINFORCING BARS AS NECESSARY TO INSTALL DRAIN PIPES. REFER TO TYPICAL PIPE OUTLET DETAIL THIS SHEET. 9.JOINTS a.CONSTRUCTION JOINTS, IDENTIFIED CJ, SHALL BE PROVIDED AS SHOWN ON PLANS. CONTRACTOR OPTION TO ELIMINATE CONSTRUCTION JOINTS MUST BE APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION. b.WHERE INDICATED, CONSTRUCTION JOINTS SHALL HAVE ADEQUATE ROUGHNESS TO ENSURE TRANSFER OF SHEAR ACROSS CONSTRUCTION JOINT IN ACCORDANCE WITH ACI 318 (2008) PARAGRAPH 11.6.9. c.ADDITIONAL CONSTRUCTION JOINTS OR RELOCATION OF CONSTRUCTION JOINTS MAY BE USED SUBJECT TO APPROVAL BY THE ENGINEER. d.6-IN WATERSTOPS REQUIRED ON ALL CONCRETE CONTRACTION JOINTS AND CONSTRUCTION JOINTS UNLESS OTHERWISE SHOWN. 10.ABBREVIATIONSe BF = BOTTOM FACE BOT = BOTTOM CJ = CONSTRUCTION JOINT CL = CENTERLINE CLR = CLEAR CONT = CONTINUOUS CRJ = CONTRACTION JOINT CTR = CENTER OR CENTERS EF = EACH FACE EJ = EXPANSION JOINT EL = ELEVATION ES = EQUALLY SPACED, EACH SIDE 11.EMBEDDED MATERIALS BEFORE PLACING CONCRETE, CARE SHALL BE TAKEN THAT ALL EMBEDDED ITEMS ARE IN POSITION AND SECURELY FASTENED IN PLACE. ANCHOR BOLT LOCATION AND SETTING ARE SHOWN ON THE MISCELLANEOUS METAL, AND CONCRETE DRAWINGS. CONDUITS AND GROUNDING CABLES ARE SHOWN ON THE MANUFACTURER'S DRAWINGS. ALUMINUM EMBEDMENTS OF ANY KIND ARE NOT PERMITTED. ALL PROJECTING WATERSTOPS SHALL BE SUPPORTED AND PROTECTED FROM DAMAGE AND EXPOSURE. 12.ALL PVC WATERSTOPS SHALL BE INSTALLED SO AS TO FORM A CONTINUOUS WATERTIGHT DIAPHRAGM IN THE JOINT, INCLUDING AT ALL SPLICES AND CHANGES IN ORIENTATION. WATERSTOP SHALL END 6 INCHES BELOW TOP OF WALLS, UNLESS OTHERWISE NOTED. 13.NON-WOVEN GEOTEXTILE CALLED OUT ON THIS SHEET REFERS TO NON-WOVEN, POLYETHYLENE FIBER GEOTEXTILE. NON-WOVEN GEOTEXTILE SHALL BE PLACED ON SOIL SIDE OF EVERY CONTRACTION JOINT AND CONSTRUCTION JOINT. NON-WOVEN GEOTEXTILE SHALL EXTEND 1-FT MINIMUM ON EITHER SIDE OF JOINT. DEVELOPMENT AND LAP SPLICE LENGTHS FOR REINFORCEMENT IN 4500 PSI CONCRETE EW = EACH WAY FF = FAR FACE FS = FAR SIDE FTG = FOOTING GALV = GALVANIZED GR = GRADE HORIZ = HORIZONTAL HW = HEADWATER MIN = MINIMUM NF = NEAR FACE NS = NEAR SIDE OC = ON CENTER OCJ = OPTIONAL CONSTRUCTION JOINT SIKA GREENSTREAK #717 OR APPROVED EQUAL HEAD PRESSURE = 125 FT NOT TO SCALE CONSTRUCTION JOINT (CJ) AT WALL BASE - SECTION5 OH = OPPOSITE HAND SD = SMOOTH DOWEL SPA = SPACE OR SPACES SS = STAINLESS STEEL T&B = TOP AND BOTTOM TF = TOP FACE TW = TAILWATER TYP = TYPICAL UON = UNLESS OTHERWISE NOTED UV = UNIFORMLY VARYING VERT = VERTICAL WP = WORKING POINT WS = WATER STOP © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646STRUCTURAL NOTES &TYPICAL DETAILSS-12 21 OF 29RLJRLJJMPNOT TO SCALE PIPE OUTLET REINFORCEMENT7 AVOID CUTTING MAIN BARS FOR 6" PVC PIPE DRAIN PENETRATIONS. ADJUST SPACING OF MAIN BARS BY 1-INCH MAXIMUM TO CLEAR PIPE. TOP OF FOOTING SEE NOTE PROVIDE BENT BARS IF NECESSARY 2'-0" TYP NOTE: FOR PIPE OPENINGS LARGER THAN 6" DIAMETER, ADD VERTICAL AND HORIZONTAL BARS TO COMPENSATE FOR CUT BARS OF MAIN REINFORCEMENT AND ADD DIAGONAL BARS AS SHOWN EACH FACE OF WALL. 0'-6" 0'-018"0'-03 8" NOT TO SCALE PVC WATERSTOP9 SIKA GREENSTREAK #783 OR APPROVED EQUAL HEAD PRESSURE = 125 FT 0'-6" 0'-018"0'-03 8"0'-01 4" NOT TO SCALE CONSTRUCTION JOINT (CJ) IN SLAB6 USE CENTERBULB WATERSTOP UNLESS APPROVED OTHERWISE BY ENGINEER. © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #03664600 4'8' SCALE: 1/4"=1'0" 1 B-02 2 B-02 3 B-01 2 B-01 UNDERSLAB DRAIN FILL LIMITS CLEANOUT SEE TYPICAL DETAIL 2 ON DWG B-03 UNDERSLAB DRAIN 6"Ø SCHEDULE 40 PERFORATED PVC PIPE 2'-0" 24.0000 SIDEWALL FILTER SAND LIMITS SEE DETAILS 2 AND 4 ON DWG B-02 1'-0" 1'-0" 1'-0" 0'-9" 1'-0" 0'-2" INVERT EL 152.5 DRAIN OUTLET SEE DETAIL 1 ON DWG B-03 INVERT EL 152.5 DRAIN OUTLET SEE DETAIL 1 ON DWG B-03 SIDEWALL DRAIN 6"Ø SCHEDULE 40 PERFORATED PVC PIPE 33.5 LINEAR FEET SIDEWALL DRAIN 6"Ø SCHEDULE 40 PERFORATED PVC PIPE 33.5 LINEAR FEET 1'-0116" 1'-0" 3'-6" 3'-6" SIDEWALL DRAIN FILL LIMITS SEE DETAILS 2 AND 4 ON DWG B-02 SIDEWALL DRAIN FILL LIMITS SEE DETAILS 2 AND 4 ON DWG B-02 1 1 1 1 2'-6" 2'-6" 33'-6" INVERT EL 154 1'-6" 1 2.5 TOP OF WALL EL 167.0 TOP OF EMBANKMENT EL 166.0 FILTER SAND 12- INCHES DRAIN FILL 12-INCHES FILTER SAND 00 1'2' SCALE: 3/4"=1'0" 00 4'8' SCALE: 1/4"=1'0" 00 4'8' SCALE: 1/4"=1'0" UNDERSLAB DRAINAGE PROFILE2 B-01 SIDEWALL DRAINAGE PROFILE3 B-01 SPILLWAY DRAINAGE PLAN1 UNDERSLAB DRAIN Ø6" SCHEDULE 40 PERFORATED PIPE 29 LINEAR FEET NOTES: 1.DIMENSIONS AND REINFORCEMENT OF THE SPILLWAY STRUCTURE ARE PROVIDED ON THE S-SERIES DRAWINGS 2.SEE DWG S-06 FOR SHEETPILE CUTOFF EXTENTS AND DETAILS 3 THROUGH 6 ON DWG B-03 FOR SHEETPILE CUTOFF DETAILS LSSLKJP22 OF 29 B-01 SPILLWAYDRAINAGE PLANAND PROFILESIDEWALL DRAIN FILL LIMITS SEE DETAILS 2 AND 4 ON DWG B-02 CLEANOUT SEE DETAIL 2 ON DWG B-03 CREST CUT-OFF WALL (EL 165.5) FLOW FLOW FLOW SHEETPILE TERMINATION SHOWN ON DWG B-03 CLEANOUT SEE TYPICAL DETAIL 2 ON DWG B-03 SHEETPILE TERMINATION SHOWN ON DWG B-03 SOLID PVC 45° ELBOW SOLID PVC 45° ELBOW TOP OF SIDEWALL (EL 167.0) SHEETPILE CAP SEE DETAIL 6 ON DWG B-03 SHEETPILE CAP SEE DETAIL 6 ON DWG B-03 1 S-06 4 B-03 0'-6" 1'-0" 0'-41 4" FINAL GRADE FINAL GRADE © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LSSLKJP23 OF 29 B-02 SPILLWAY UNDERSLAB ANDSIDEWALL DRAIN SECTIONSAND DETAILS00 2'4' SCALE: 3/8"=1'0" 00 2'4' SCALE: 3/8"=1'0" 00 2'4' SCALE: 1/2"=1'0" 00 2'4' SCALE: 1/2"=1'0"UNDERSLAB DRAINAGE SECTION1 B-01 SIDEWALL DRAINAGE SECTION2 B-01 BATTERED SIDEWALL DRAINAGE3 VERTICAL SIDEWALL DRAINAGE4 0'-6" 0'-6" 1'-6" 1'-0" 2'-0" 0'-6" 6.0000 6"Ø SCHEDULE 40 PERFORATED PVC 1'-6" 0'-6" 0'-6" 2'-6" 6.0000 1'-3" 1'-0" 2'-0" 6"Ø SCHEDULE 40 PERFORATED PVC EL 154.0 EL 148.5 EL 147.0 EL 164.0 5'-1012" 31'-0" 7'-112" 2'-0" 0'-9" 0'-6" 1'-0" 2'-3"2'-3" 1'-5"1'-5" 36'-6" 1 1 1'-0" 1'-0" PIPE INVERT EL 154.0 33'-8116"1'-5"1'-5"2'-3"2'-3" EL. 147.75 1 1 FINAL GRADE FINAL GRADE FINAL GRADE CLEANOUT SEE TYPICAL DETAIL 2 ON DWG B-03 FINAL GRADE PIPE OUTLET SEE DETAIL 1 ON DWG B-03 SYMMETRICAL SYMMETRICAL 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 7'-9" ELEVATION VARIES (SHOWN EL 163.0) 1'-0" FILTER SAND DRAIN FILL DRAIN FILL FILTER SAND VERTICAL SIDEWALL WATERSTOP HORIZONTAL SLAB WATERSTOP VERTICAL SIDEWALL WATERSTOP HORIZONTAL SLAB WATERSTOP 6"Ø SCHEDULE 40 SOLID WALL PVC PIPE 29'-0" UNDERSLAB DRAIN 6"Ø SCHEDULE 40 PERFORATED PVC PIPE 6"Ø SCHEDULE 40 SOLID WALL PVC PIPE SEE DETAIL 3 ON THIS SHEET FOR SIDEWALL DRAIN DIMENSIONS SEE DETAIL 4 ON THIS SHEET FOR SIDEWALL DRAIN DIMENSIONS FILTER SAND DRAIN FILL FILTER SAND DRAIN FILL © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LSSLKJP24 OF 29 B-03 SHEETPILE CUTOFFAND DRAINAGEDETAILS00 1'2' SCALE: 1"=1'0" TYPICAL CLEANOUT DETAIL2 NOT TO SCALE DRAIN OUTLET DETAIL1 FLOW CHECKMATE INLINE CHECK VALVE INSIDE DRAIN OUTLET PIPE STUB WITH EXPANSION RING. PRE-INSTALL CHECK VALVE FROM UPSTREAM SIDE PRIOR TO PLACEMENT OF PIPE STUB. EXPANSION RING MIN 1'-6" 6"Ø SCHEDULE 40 SOLID WALL PVC PIPE (LENGTH VARIES) FILTER SAND 1-FT RADIUS AROUND CLEANOUT TO A DEPTH OF 1-FT0'-6" PROTECTIVE ENCLOSURE WITH GASKETED BOLT-ON LIDFINAL GRADE 6"Ø SCHEDULE 40 PERFORATED PVC OR 6""Ø SCHEDULE 40 SOLID WALL PVC 6"Ø SCHEDULE 40 LONG SWEEP 90° PVC ELBOW UPSTREAM VIEW SHEETPILE TERMINATION5 00 1' SCALE: 1-1/2"=1'0" 2' UNDER SPILLWAY SHEETPILE CAP PROFILE6 0'-6" 0'-6" 1'-0" 0'-01 4" 0'-6" 00 2'4' SCALE: 3/8"=1'0" 00 2'4' SCALE: 3/8"=1'0" SHEETPILE TERMINATION DETAIL PLAN3 7'-6" 3'-0" 4'-0" 3'-0" 1'-0" SIDEWALL DRAINAGE 3'-0" 0'-6" SPILLWAY SIDEWALL TOP OF SIDEWALL DRAINAGE (EL 164.0) EMBANKMENT FINAL GRADE SHEETPILE CUTOFF TOP OF SIDEWALL (EL 167.0) CREST CUT-OFF WALL (EL 165.0) EL. 164.0 TOP OF HEEL SEE DETAIL 6 ON DWG B-03 EXPANDED POLYSTYRENE (EPS) 1 8" EPDM SHEET WATERSTOP TOP OF SIDEWALL (EL 167.0) CREST CUT-OFF WALL (EL 165.0) SHEETPILE CUTOFF (TOP EL 162.5) UPSTREAM CLAY BARRIER DOWNSTREAM SAND DRAIN DOWNSTREAM FILTER SANDUPSTREAM CLAY BARRIER UPSTREAM CLAY BARRIER DOWNSTREAM FILTER SAND TOP OF HEEL FLOW FLOW SHEETPILE CUTOFF 0'-6" SHEETPILE TERMINATION DETAIL PROFILE4 B-01 L3 TURNED DOWN SLAB L3 TURNED DOWN SLAB L3 TURNED DOWN SLABTOP OFHEEL0'-6"1'-6" EL. 162.5 3 8" FIBER EXPANSION JOINT FILLER (EJF) SHEETPILE CUTOFF STRUCTURAL CONCRETE 1 1 EXTEND CLAY BARRIER 3' BELOW SLAB SHEETPILE CUTOFF (BELOW SLAB) DISTANCE BETWEEN SHEETPILE CUTOFF AND CREST CUTOFF WALL 0'-1" SMPSMPSMPSMP19+0018+50 14+0014+50TOP OF WALL CONCRETEBERNTSEN CD2BBRONZE SURVEY MARKERNOT TO SCALESTRUCTURE MONITORING POINT DETAIL33.50"0.25"3.00"45°1'-0"(TYP)0'-038"0'-234"NOT TO SCALESTAFF GAUGE DETAILS218 x 14-INCH DIAMETERHOLES. INSTALLBRASS OR ALUMINUMGROMMETS FOR A #8SIZE SCREW1.20"1.50"0'-038"3.00"4.00"ELEVATIONNUMBERSCENTERED ONAPPROPRIATEINDICATORS1.RESERVOIR STAFF GAGE SHALL BE LOCATED AT STA18+60.6 (SPILLWAY CENTERLINE ALIGNMENT) AND SHALLEXTEND FROM EL 158.0 TO EL 166.0.2.INTERPRET DIMENSIONS AND TOLERANCES PER ANSIY14.5M, 19823.MARKINGS TO BE PEI-28 BLACK ON WHITE BACKGROUND.4.ALL DIMENSIONS AFTER ENAMELING.5.SEE S-04 FOR STAFF GAUGE ELEVATION VIEW.6.THE STAFF GAGE MATERIAL SHALL BE 16 GAUGE (0.062INCHES) ENAMELING IRON, WITH A PORCELAIN ENAMELBAKED ON FINISH.7.USE MANUFACTURER RECOMMENDED FASTENERS FORHYDRAULIC APPLICATIONS.NOTES:N© Schnabel Engineering 2017 All Rights Reserved LICENCE NUMBER C-2599 11A Oak Branch Drive / Greensboro, NC / 27407 T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.com LONG VALLEY FARM LAKE DAM REHABILITATION CARVERS CREEK STATE PARK SPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01DATE: APRIL 2018DRAWING NO.SHEETDESIGNED BY:DRAWN BY:CHECKED BY: DESCRIPTION DATEREV. JONATHAN M. PITTMAN, PE DATE: NORTH CAROLINA PROFESSIONAL ENGINEER #036646 LS SLK JP 25 OF 29B-04INSTRUMENTATION PLAN0010'20'SCALE: 1"=10'INSTRUMENTATION PLAN1FLOWSTRUCTURE MONITORING POINTSMP-1, SEE DETAIL 3 THIS SHEETSMP-2SMP-3SMP-4STAFF GAUGE LOCATIONSEE DETAIL 2 AND NOTES THIS SHEET OHUOHUOHUOHUOHUOHUOHUOHUOHU160 160 165 157158159 161 162 163 164 160160150151150149151160160 150 155155 155 154154 155 160 165 156 157 158 159 161 162 163 16 4 -2.0:1-2.0:1 24+00 25+00 2 6 + 0 0 2 6 + 5 0 24+50 25+50 1 9 + 0 0 2 0 + 0 0 21+00 22+0023+001 9 + 5 0 2 0 + 5 0 21+50 22+50155 160 165 152153154 156157158 159 161162163164 18+0019+0020+0018+5019+50155 155 10+0 0 11+0 0 12+0 0 13+0014+0015+00 16 + 0 017+0010+5 0 11+5 0 12+50 13+5014+5015+5016+50150150155155160160165N© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LSAYAJP26 OF 29 E-01 STAGE I EROSION ANDSEDIMENT CONTROL PLAN00 30'60' STAGE I EROSION AND SEDIMENT CONTROL PLAN1 FLOW EXISTING PAVILION EXISTING GRIST MILL OLD PRIMARY SPILLWAY SEE NOTE 3 LONG VALLEY FARM LAKE CU M B E R L A N D C O U N T Y HA R N E T T C O U N T Y OWNER: STATE OF NORTH CAROLINA PIN: 0503-74-8137 OWNER: STATE OF NORTH CAROLINA PIN: 0503-80-5253 SPILLWAY CENTERLINE TEMPORARY UPSTREAM COFFERDAM EARTH FILL BASE TOP EL 155.0 TOP OF PORTADAM EL 165.0 TEMPORARY DOWNSTREAM COFFERDAM TOP EL 158.0 EMBANKMENT CREST CENTERLINE SPILLWAY EXCAVATION SEE NOTE 3 AUXILIARY SPILLWAY 355 LF SILT FENCE 410 LF SILT FENCE 165 LF SILT FENCE206 LF SILT FENCE LEFT SIDE FINAL GRADING EXTENTS SEE C-05 - PROPOSED SITE PLAN SEE NOTE 1 MU PS STONE OUTLETS FOR SEDIMENT FENCE 76 LF TURBIDITY CURTAIN TS 6.10 TEMPORARY SEEDING 6.11 PERMANENT SEEDING 6.05 TOPSOILING PS 6.15 RIPRAP RR 6.06 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 6.62 SEDIMENT FENCE 6.80 CONSTRUCTION ROAD STABILIZATIONCRS 6.84 DUST CONTROL DC EROSION AND SEDIMENT CONTROL LEGEND SEDIMENT BAG MU 6.14 MULCHING CONCRETE WASH OUT 6.30 TEMPORARY DIVERSION GRASS-LINED CHANNELS (((((((( SEDIMENT FENCE OUTLET CW 202 LF SILT FENCE 205 LF SILT FENCE 71 LF SILT FENCE AREA TO BE LEVELED TO EL 166.0 NOTES: 1.TOPSOIL (TO), MULCH (MU), AND PERMANENT SEEDING (PS) SHALL BE PLACED ON AREAS OF EXCAVATION AND FILL PLACEMENT ONCE FINAL GRADE IS ACHIEVED. 2.AREAS THAT ARE PRIMARILY LIMITED TO CLEARING AND GRUBBING, SUCH AS THE AUXILIARY SPILLWAY, SHALL GENERALLY ONLY RECEIVE MULCH (MU) AND PERMANENT SEEDING (PS). TOPSOIL SHALL BE PLACED OVER ANY AREAS WHERE THE EXISTING VEGETATIVE COVER IS DAMAGED. 3.FILTER BAGS SHALL BE UTILIZED IN THE NEW SPILLWAY EXCAVATION, OLD PRIMARY SPILLWAY EXCAVATION, AND OTHER LOW-LYING AREAS TO CONTROL SEDIMENT-LADEN RUNOFF. 54 LF TURBIDITY CURTAIN PS MU OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHU160 160160150151150150149151160155 155 155154154 155 160 156 157 158 159 161 162 18+0019+0020+0018+5019+5010+0 0 11+0 0 12+0 0 13+0014+0015+00 16 + 0 017+0010+5 0 11+5 0 12+50 13+5014+5015+5016+50155 160 165 N© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646LSAYAJP27 OF 29 E-02 STAGE II EROSION ANDSEDIMENT CONTROL PLAN00 30'60' STAGE II EROSION AND SEDIMENT CONTROL PLAN1 FLOW EXISTING PAVILION EXISTING GRIST MILL OLD PRIMARY SPILLWAY LONG VALLEY FARM LAKE CU M B E R L A N D C O U N T Y HA R N E T T C O U N T Y OWNER: STATE OF NORTH CAROLINA PIN: 0503-74-8137 OWNER: STATE OF NORTH CAROLINA PIN: 0503-80-5253 SPILLWAY CENTERLINE EMBANKMENT CREST CENTERLINE AUXILIARY SPILLWAY 355 LF SILT FENCE 402 LF SILT FENCE 165 LF SILT FENCE143 LF SILT FENCE EXCAVATION FOR EXISTING, GATED LOW-LEVEL CONDUITS. SEE C-03 - STREAM DIVERSION, DEMOLITION, AND EXCAVATION PLAN - STAGE II RIGHT SIDE FINAL GRADING EXTENTS SEE C-05 - PROPOSED SITE PLANSTONE OUTLETS FOR SEDIMENT FENCE SEE NOTE 4 110 LF TURBIDITY CURTAIN 158 LF SILT FENCE CONSTRUCTION ENTRANCE OFF PAGE SEE STAGING AREA DRAWING (SHEET G-03) TO PS MU SEE NOTE 1 54 LF TURBIDITY CURTAIN NOTES: 1.TOPSOIL (TO), MULCH (MU), AND PERMANENT SEEDING (PS) SHALL BE PLACED ON AREAS OF EXCAVATION AND FILL PLACEMENT ONCE FINAL GRADE IS ACHIEVED. 2.AREAS THAT ARE PRIMARILY LIMITED TO CLEARING AND GRUBBING, SUCH AS THE AUXILIARY SPILLWAY, SHALL GENERALLY ONLY RECEIVE MULCH (MU) AND PERMANENT SEEDING (PS). TOPSOIL SHALL BE PLACED OVER ANY AREAS WHERE THE EXISTING VEGETATIVE COVER IS DAMAGED. 3.FILTER BAGS SHALL BE UTILIZED IN THE NEW SPILLWAY EXCAVATION, OLD PRIMARY SPILLWAY EXCAVATION, AND OTHER LOW-LYING AREAS TO CONTROL SEDIMENT-LADEN RUNOFF. 4.ACTUAL LOCATION OF STONE OUTLETS IN SEDIMENT FENCE TO BE DETERMINED IN THE FIELD BY THE CONTRACTOR. 5.SEE DWG C-03 FOR STAGE II CONSTRUCTION SEQUENCE. 133 LF SILT FENCE CONSTRUCTION ENTRANCE OFF PAGE SEE STAGING AREA DRAWING (SHEET G-03) TEMPORARY STAGE II COFFERDAM - SEE DWG C-03 FOR DETAILS © Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646NOT TO SCALE TEMPORARY SEDIMENT FENCE DETAIL2NOT TO SCALE CONSTRUCTION ENTRANCE1 NOT TO SCALE TEMPORARY SEEDING SCHEDULE4NOT TO SCALE PERMANENT SEEDING SCHEDULE3 TSPS LSAYAJP28 OF 29 E-03 EROSION AND SEDIMENTCONTROL DETAILS - SHEET 1OF 2 EXISTING GRADE EXISTING GROUND SLOPE 1.0' COMPACTED EARTH BERM 2 1 2 1 TEMPORARY DIVERSION BERM NOTES: 1.SEED AND MULCH DIVERSION BERM IMMEDIATELY AFTER CONSTRUCTION. 2.INSPECT DIVERSION BERM AND OUTLETS ONCE A WEEK AND AFTER EVERY RAINFALL. REPAIR AS NEEDED. 3.WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE BERM TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. 2' MIN. STANDARD CONSTRUCTION DETAIL #26 Pumped Water Filter Bag PLAN VIEW DISCHARGE HOSE PUMP ELEVATION VIEW WELL VEGETATED, GRASSY AREA FILTER BAG WELL VEGETATED AREA INTAKE HOSE CLAMPS DISCHARGE HOSE CLAMPS WELL VEGETATED, GRASSY AREA FILTER BAG INTAKE HOSE PUMP PLAN VIEW PROFILE VIEW 14" TIE ROPE 5 8" POLYPROPYLENE ROPE FLOATATION ALL SEAMS HEAT SEALED 14" CHAINNYLON REINFORCED VINYL DEPTH AS NEEDED FOLDS FOR COMPACT STORAGE ECONOMY FABRICS AVAILABLE 18OZ 300LB/IN STANDARD 1.BARRIERS SHOULD BE A BRIGHT COLOR (YELLOW OR "INTERNATIONAL" ORANGE ARE RECOMMENDED) THAT WILL ATTRACT THE ATTENTION OF NEAR BY BOATERS. 2.THE CURTAIN FABRIC MUST MEET THE MINIMUM REQUIREMENTS NOTED BELLOW: PHYSICAL PROPERTIES OF TURBIDITY CURTAIN FABRIC PHYSICAL PROPERTIES REQUIREMENTS THICKNESS, MILS 45 WEIGHT/OZ./SQ.YD. TYPE III 22 GRAB TENSILE STRENGTH, LBS 300 UV INHIBITOR MUST BE INCLUDED 3.THE SEAMS IN THE FABRIC SHALL BE EITHER VULCANIZED WELDED OR SEWN, AND SHALL DEVELOP THE FULL STRENGTH OF THE FABRIC. 4.FLOTATION DEVICES SHALL BE FLEXIBLE, BUOYANT UNITS CONTAINED IN AN INDIVIDUAL FLOATATION SLEEVE OR COLLAR ATTACHED TO THE CURTAIN. BUOYANCY PROVIDED BY THE FLOATATION UNITS SHALL BE SUFFICIENT TO SUPPORT THE WEIGHT OF THE CURTAIN AND MAINTAIN A FREEBOARD OF AT LEAST 3-INCHES ABOVE WATER SURFACE LEVEL. 5.LOAD LINES MUST BE FABRICATED INTO THE BOTTOM OFF ALL FLOATING TURBIDITY CURTAINS. THE SUPPLEMENTAL (BOTTOM) LOAD LINE SHALL CONSIST OF A CHAIN INCORPORATED INTO THE BOTTOM HEM OF THE CURTAIN OF SUFFICIENT WEIGHT TO SERVE AS BALLAST TO HOLD THE CURTAIN IN A VERTICAL POSITION. ADDITIONAL ANCHORAGE SHALL BE PROVIDED AS NECESSARY. THE LOAD LINES SHALL HAVE SUITABLE CONNECTION DEVICES WHICH DEVELOP THE FULL BREAKING STRENGTH FOR CONNECTING TO LOAD LINE IN ADJACENT SECTIONS. 6.EXTERNAL ANCHORS MAY CONSIST OF WOOD OR METAL STAKES (2-X4-INCH OR 2 12-INCH MINIMUM DIAMETER WOOD OR 1.33 POUNDS/ LINEAR FOOT STEEL). MAINTENANCE: 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE TURBIDITY CURTAIN FOR THE DURATION OF THE PROJECT IN ORDER TO ENSURE THE CONTINUOUS PROTECTION OF THE WATERCOURSE. 2.SHOULD REPAIRS TO GEOTEXTILE FABRIC BE NECESSARY, REPAIR KITS AVAILABLE FROM THE MANUFACTURER AND SHALL BE USED; MANUFACTURER'S INSTRUCTIONS SHALL BE FOLLOWED TO ENSURE THE ADEQUACY OF THE REPAIR. 3.WHEN THE CURTAIN IS NO LONGER REQUIRED AS DETERMINED BY THE ENGINEER THE CURTAIN AND RELATED COMPONENTS SHALL BE REMOVED IN SUCH A MANNER AS TO MINIMIZE TURBIDITY. REMAINING SEDIMENT SHALL BE SUFFICIENTLY SETTLED BEFORE REMOVING THE CURTAIN.© Schnabel Engineering 2017 All Rights ReservedLICENCE NUMBER C-259911A Oak Branch Drive / Greensboro, NC / 27407T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.comLONG VALLEY FARM LAKE DAM REHABILITATIONCARVERS CREEK STATE PARKSPRING LAKE, NORTH CAROLINAPROJECT: 17C21001.01 DATE: APRIL 2018 DRAWING NO. SHEETDESIGNED BY:DRAWN BY:CHECKED BY:DESCRIPTIONDATEREV.JONATHAN M. PITTMAN, PEDATE:NORTH CAROLINA PROFESSIONAL ENGINEER #036646GROUND STABILIZATION TIMELINE REQUIREMENTS SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10-FT OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS IS ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7-DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) THIS CHART WAS INTERPRETED FROM STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT - NCG 010000. PERSON(S) RESPONSIBLE FOR EROSION CONTROL WILL REFER TO GENERAL PERMIT - NCG 01000. NOT TO SCALE TEMPORARY DIVERSION BERM DETAIL4 TD NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF-INSPECTION PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF-INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF-INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131. THE SELF-INSPECTION REPORT FORM IS AVAILABLE FROM HTTPS://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL-LAND-RESOURCES/EROSION-SEDIMENT-CONTROL/FORMS IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (910) 433-3300. NOT TO SCALE GROUND STABILIZATION REQUIREMENTS5 NOT TO SCALE SEDIMENT FILTER BAG DETAIL2 FILTER BAG NOTES: 1.USE FILTER BAGS AS NECESSARY TO TREAT WATER PUMPED FROM EXCAVATION. 2.PLACE FILTER BAGS IN WELL VEGETATED AREAS UPSTREAM OF ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES. SEDIMENT FENCE OUTLET MAINTENANCE NOTES: 1.INSPECT SEDIMENT FENCE OUTLETS WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. 2.CLEAN OUT SEDIMENT, STRAW, LIMBS OR OTHER DEBRIS THAT COULD CLOG THE SEDIMENT FENCE OUTLET WHEN HALF OF THE SEDIMENT FENCE OUTLET IS COVERED. 3.REPLACE STONE AS NEEDED TO ENSURE DEWATERING. NOT TO SCALE SEDIMENT FENCE OUTLET DETAIL1 CLASS A RIPRAP POST SEDIMENT FENCE 2'-0" NCDOT NO. 57 STONE 1'-6" MIN. 2 2 11 LSAYAJP29 OF 29 E-04 EROSION AND SEDIMENTCONTROL DETAILS - SHEET 2OF 2NTS TURBIDITY CURTAIN DETAIL3