HomeMy WebLinkAbout20180792 Ver 2_Permit Drawings_20180921WETLAND PERMIT IMPACT SUMMARY
W ETLAN D I M PACTS S U R FAC E W ATE R I M PACTS
Hand Existing Existing
Permanent Permanent Temp. Temp. Excavation Excavation Mechanized Clearing Permanent Permanent Temp. Temp. Channel Channel Natural
Sheet Site Station Structure Fill In Fill In Fill In Fill In in in Clearing in SW SW SW SW Impacts Impacts Stream
No. No. (From/To) Size / Type Wetlands Wetlands Wetlands Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts impacts impacts Permanent Temp. Design
(ac) (sq ft) (ac) (sq ft) (ac) (sq ft) (ac) (ac) (ac) (sq ft) (ac) (sq ft) (ft) (ft) (ft)
5 -L- 16+70 to 17+40 1@ 70', 24" CSU
1 -L- 14+95 to 16+77 (LT) Wetland Fill 0.0095 414.00
Hand Clearing 0.051
Additional Hand Clearing 0.058
2 -L- 15+70 to 16+80 (RT) Wetland Fill 0.0108 469.00
Hand Clearing 0.012
Rip Rap @ Pipe Outlet 0.0010 45.00
3 -L- 17+28 to 19+25 (LT) Wetland Fill 0.0032 138.00
Hand Clearing 0.016
Additional Hand Clearing 0.057
4 -L- 17+31 to 19+52 (RT) Wetland Fill 0.0142 618.00
Hand Clearing 0.026
Rip Rap @ Pipe Outlet 0.0010 45.00
SHEET TOTAL: 0.040 1729.00 .
0.220