Loading...
HomeMy WebLinkAbout20180792 Ver 2_Permit Drawings_20180921WETLAND PERMIT IMPACT SUMMARY W ETLAN D I M PACTS S U R FAC E W ATE R I M PACTS Hand Existing Existing Permanent Permanent Temp. Temp. Excavation Excavation Mechanized Clearing Permanent Permanent Temp. Temp. Channel Channel Natural Sheet Site Station Structure Fill In Fill In Fill In Fill In in in Clearing in SW SW SW SW Impacts Impacts Stream No. No. (From/To) Size / Type Wetlands Wetlands Wetlands Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts impacts impacts Permanent Temp. Design (ac) (sq ft) (ac) (sq ft) (ac) (sq ft) (ac) (ac) (ac) (sq ft) (ac) (sq ft) (ft) (ft) (ft) 5 -L- 16+70 to 17+40 1@ 70', 24" CSU 1 -L- 14+95 to 16+77 (LT) Wetland Fill 0.0095 414.00 Hand Clearing 0.051 Additional Hand Clearing 0.058 2 -L- 15+70 to 16+80 (RT) Wetland Fill 0.0108 469.00 Hand Clearing 0.012 Rip Rap @ Pipe Outlet 0.0010 45.00 3 -L- 17+28 to 19+25 (LT) Wetland Fill 0.0032 138.00 Hand Clearing 0.016 Additional Hand Clearing 0.057 4 -L- 17+31 to 19+52 (RT) Wetland Fill 0.0142 618.00 Hand Clearing 0.026 Rip Rap @ Pipe Outlet 0.0010 45.00 SHEET TOTAL: 0.040 1729.00 . 0.220