HomeMy WebLinkAbout20181229 Ver 1 _Drawings and tree information _20180920FW- POND
END OF LAKE BED
TOP ERODED ESCARPMENT — —
�w
is
z O
1 <O
m�
w
TOE OF BANK
BANK HEIGHT DETERMINATION
FOR SHORELINE STABIIITATION ACTIVITIES MAY1y
I kill pond/
Isks
(At hill i•nnd/ Nmmd Wain lard)
1 ClSffry)
I �olti
'100 �.k- k{0 rt
D,y stuck ( �a
tib tt\fid V
Wn,\.\
Lk F * bet Mal till
,)Ft abWc Wk
3F+ rtof"a-PbVIv
1111110 "I'M will, MM
Please approa mately sketch the following Information on thin plan Ipmwde dimensions lar edl
Item, such as 1011 a 10010'
3. NI proposed vegetation clearing
p, toulbn of tip rap kir till to be placed above the f kill Pond/ Normal Water level ei<vauon
3. location of rip rap or Idl lu be plated below the I kill Pun J/ Not mal Water level elevation
q, Location of any proposed fV kicmres such as buihhngs, relammg walls, docks, etc.
5, Location of any eacavalion or dredging below the t kill Pond/ Normal Water level elevation
6, Loudon of construction auaa corridors
��
W
3
M
t'O4r
DRY
. _ S1'
� _Q SToi1E
'Wr4pFAM-11 MW
TOP ERODED E3C+�YEHT
j
EPC OF LAKE BED -- 1* TOE OF BMy,
4ANK HEIGHT DETERMINATION
FOR SHOREUNE STABILITATION ACTMTIES
MAY, ?9%
Strickland, Bev
From: Hubert Bryson <brysonstrucking@yahoo.com>
Sent: Thursday, September 20, 2018 7:48 PM
To: Mitchell, Robert K
Subject: [External] Magee/Antonio drawings and tree information
Attachments: mageeljpg; magee2jpg; magee3jpg
illill 11111111111111111 111111 Jill 111111111 11111 1111111111 11111 Jill III �111 iiiii III
I.III
There are 2 trees above 3 inches in diameter that will need to be removed.
Thanks
Hubert Bryson
brysonstrucking(slyahoo.com
828-743-3304