Loading...
HomeMy WebLinkAbout20051497 Ver 5_PCN Form Submission_9/18/2018 12:13 PMAction History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/18/2018 12:13:56 PM (Start Event) Accept by Montalvo, Sheri A 9/21/2018 2:25:20 PM (Non DOT Initial Review) The task was assigned to Montalvo, Sheri A. The due date is: September 21, 2018 5:00 PM 9/18/2018 12:15 PM DWR Division of water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.govMaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Mecklenburg Is this project a public transportation project?* f Yes f• No This is any publicly funded by nunicipal,state or federal funds road, rail, airport transportation project. 1a. Type (s) of approval sought from the Corps:* V Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* IJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 27 - Restoration NWP Number Other: List all IWV nurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply IJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express F Non -404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: O Yes O No For the record only for Corps Permit: O Yes O No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program f Yes C No 1f. Is the project located in anyof NC's twentycoastal counties?* r Yes r No 1h. Is the project located in a designated trout watershed?* f Yes f• No Link to trout information: http://vmw.saw.usace.army.mil/Missions/Regulatory-Permit-ProgranVAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Erin Shanaberger 1b. Primary Contact Email:* erin.shanaberger@charlottenc.gov 1c. Primary Contact Phone:* (XXX)XXX-XXXX (704)562-2691 1d. Who is applying for the permit? ❑ Owner V Applicant (other than owner) r- Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: See Table 1. 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d. Address Street Address Address Line 2 City Fbstal / Zip Code 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: (XXX)XXX-XXXX 2g. Email Address:* erin.shanaberger@charlottenc.gov 3. Applicant Information (if different from owner) 3a. Applicant is: f Agent r Other Local Government If other please specify. 3b. Name: State / Province / Fbgion Country Erin Shanaberger 3c. Business Name: (if applicable) City of Charlotte Storm Water Services 3d. Address Street Address 600 E. 4th Street Address Line 2 Cty Charlotte Postal / Zip Code 28202 3e. Telephone Number: (704)562-2691 (XXX)XXX-XXXX 3f. Fax Number: (xxx)xxx-xxxx 3g. Email Address:* erin.shanaberger@charlottenc.gov .................. State / Province / Pagion NC Country US C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* McAlpine Creek Stream Restoration repairs 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town:* Charlotte 1d. Driving directions* ff it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. Leaving uptown Charlotte, take Randolph Rd south to the intersection with Sardis Rd. Turn left on Sardis Rd; turn right to stay on Sardis Rd Just after crossing the bridge over McAlpine Creek, turn right onto Wilby drive and stay right as it turns into Mountainview Drive; there is a gravel entrance near 700 Mountainview Drive. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) See table 1. 2b. Property size: (in acres) 2c. Project Address Street Address 700 Mountainview Drive Address Line 2 City State/ Rovince / (Region Charlotte NC Rbstal / Zip Code Country 28270 US 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.129550 -80.772373 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* McAlpine Creek 3b. Water Resources Classification of nearest receiving water:* Class C Surface Water Lookup 3c. What river basin(s) is your project located in?* Catawba River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* This project is a compensatory mitigation project for the City of Charlotte Umbrella Stream and Wetland Mitigation Bank. The project was originally completed in 2012, with repairs occurring in 2014 and 2017 to different areas. There are 3 streams within the project area and a protected buffer. There are single family and multi -family residences and multiple utility easements in the vicinity. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) nick the upload button or drag and drop files here to attach document 2018-03-29 McAlpine topo map.pdf 582.31 KB File type mist be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) nick the upload button or drag and drop files here to attach document 2018-03-29 McAlpine Soils map.pdf 1.6MB File type must be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 2900 4f. Explain the purpose of the proposed project:* The purpose of the proposed project is to repair approxmately 700 linear feet of stream restoration between 2 different tributaries. Failing structures will be replaced or repaired such that they function as originally intended. The intent is to perform repairs with minimal disturbance to buffer vegetation; however, vegetation of appropriate size will be re-established after repairs are completed. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: Small equipment such as a mini excavator and hand work will be used to complete the repairs. Repairs will involve removing and resetting boulders and logs for in -stream structures and adding or repairing constructed riffles. Work will be conducted in the dry through the use of coffer dams and a pump around operation. 4h. Please upload project drawings for the proposed project. Click the upload button or drag and drop files here to attach document SR -2 Repairs -Plans 20180917.pdf 14.49MB File type nest be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Unknown f N/A Corps AID Number: Bcample: SAWt-2017-99999 SAW- 2009-01376 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5dl. Jurisdictional determination upload Click the upload button or drag and drop files here to attach docurrent 2009-08-21 McAlpine Original permit approval.pdf 82.51 KB File type must be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? r Yes f No r Unknown 6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW -0000-00000). SAW- 2009-01376 DWR-05-1797 (multiple versions) Project History Upload Click the upload button or drag and drop files here to attach document McAlpine Permit Package_PCN.pdf 4.81 MB 2014-11-04_McAlpine SR3 Repair_ PCN_Final.pdf 2.79MB File type must be PDF 7. Future Project Plans 7a. Is this a phased project?* f Yes C No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): F Wetlands fJ Streams -tributaries F Buffers r Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact *3d. Stream name type * S1 Restoration T Other SR2 lvt3p label (e.g. Poad Crossing Fernenent (F' or 1) Temporary (T) 3e. Stream 3f. Type of 3g. Stream 3h. Impact sgfei Type* Jurisdiction* width* length* Perennial Both 5 850 4 Perennial (F1EP� or Average (linear feet) intermttent (INT) (feet) S2 Restoration T Other SR3 Perennial Both lvbp label (e.g. Finad Crossing Permanent (P) or Perennial (FBP� or 1) Tenporary (T) intermittent (INT) S3 Restoration T Other SR2 Perennial Both lvep label (e.g. Fbad Crossing Ferrrarent (F' or Perennial (M$ or 1) Terrporary (T) internittent (INT) All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 0 3i. Total temporarystream impacts: 940 3i. Total stream and tributary impacts: 940 3j. Comments: Impacts will be interspersed throughout the total length, the entire length of stream will not be re -built, but focus on individual structures. 2 temporary stream crossings may be needed on SR2 in order to access repair areas with least amount of disturbance to buffer vegetation. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Instead of re -building an entire length of stream on SR2, specific structures that were not functioning as designed were evaluated and re -designed. This will allow minimal disturbance to the stream channel and buffer vegetation. Vegetation to be replanted will be of a size representative of the remainder of the restoration site. 4 60 Average (linear feet) (feet) 5 30 Average (linear feet) (feet) 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Work will be conducted in the dry. Only spot repairs will be constructed at individual structures to minimally disturb the buffer vegetation. Construction access will use existing utility easements. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: This project consists of repairs to an existing compensatory mitigation project and will produce no net loss of stream. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: No protected buffer. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? f Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* r Yes f No To look up low density requirement click here 15A NCAC 02H.1003(2). G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* f Yes r No Comments: * not applicable. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)?* t' Yes r No 2b. Is this an after -the -fact permit application?* f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Compensatory mitigation projects include conservation easements that prohibit adjacent development and improve water quality. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? f Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* f Yes r No 5d. Is another Federal agency involved?* f Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8?* r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP GIS data. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Essential Fish Habitat Mapper (online) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NCSHPO GIS data. 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach docurent File rust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM No. 37119CO228E/ 37119CO248E Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurent File rust be FDF or ME Signature V By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Erin Shanaberger Signature fes. J�ta6c,�rrJt. Date Submitted: 9/18/2018 Initial Review Is this project a public transportation project? r Yes r No Change only if needed. Has this project met the requirements for acceptance in to the review process?* r Yes f No BIMS # Assigned* 20051497 Version#* Reviewing Office* Mooresville Regional Office - (704) 663-1699 Select Project Reviewer* Alan Johnson:eads\adjohnson1 Is a payment required for this project?* f No payment required f Fee received r Fee needed - send electronic notification What amout is owed?* f $240.00 r $570.00