HomeMy WebLinkAbout20181281 Ver 1_CAMA 561 SP-FF_9/19/2018 1:27 PMPermit Class
RENEWAL 1
Maintenance 5
STATE OF N�RTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commisszon
��l�it
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-ll 8
X Excavation and/or filling pursuant to NCGS ll 3-229
Permit Nurnber
S51
Issued to N.C. Department of Trausportation,159 Lucinda Lane, Powells Point, NC 27966
Authorizing develapment in Brunswick/New Hanover Counry at Cape Fear River at NCDOT Ferry Basin
as rec�uested in the permittee's letter dated
This permit, issued on _ 6/30/14 _, is subject to compliance vvith t�e application (where consistent
with the pertnit}, all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1}
2)
3)
4)
In order to protect juvenile shrimp and finfish populatians, no excavation or filling sha11 be allowed
between April 1 and September 30 of any year.
All excavated materials shall be confined on high ground behind adequate dikes or other retaining
structures to prevent spillover of solids into any marsh or surrounding waters.
The disposal area effluent sha11 be contained by pipe, trough, or similar device to a point at or
below the normal low watex mark to prevent gully erosion and resultant unnecessary siltation.
The texaninal end of the pipeline shall be postioned at or greater than 50' fram any part of the dike
and a maxin�um distance from spillways to allow adequate settlement of suspended solids.
(See attached sheet for Additional Conditions}
This permit action may be appealed by the permittee or
other qualiiied persons within twenty (20} days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Depariment
personnei when the project is inspected for compliance.
Any m.aintenance work or project modification not covered
hereunder requires further Di�ision approval.
All work must cease when the permit expires on
Apri130, 2019
In issuing this permit, the State of North Carolina agrees
that your ��roject is consistant with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman ofthe Coastal Resources Commission.
��-�- �,y,,� _
:;, v-Braxton C. Davis, Director
Division of Coastal Management
This perinit and its conditions are hereby accepted.
.
iu L ,In,..
Signature of Permittee
N.C. Department of Transportation Permit # 561
P�ge 2 of 2
ADDITI4NAL CONDYTIONS
Maintenance Clause
5} The Divisian of Coastal Management (DCM) shall be notified in writing at least two (2) weeks in
advance of any maintenance work authorized by this pernut, and such natification shall include:
A. The number of the original dredge and fill permit.
B. A staternent that no dimensional changes are proposed.
C. A copy of the original permit plans with cross-hatching indicating the a�rea to be maintained,
the area to be used for spoil disposal, and the estimated amount o�material to be removed.
D. The date of plat revision and the permittee's signature shown an.ew on the original plan.
NOTE: The location, design, and holding capacity of the spoil disposal site shall be approved hy a
representative of DCM prior to the initiation of any maintenat�ce dredging activzties.
6) This renewal �nust be attached to the original of Permit No. S61 as well as all subsequent
modifications and renewals, and a11 docu�rz�ents sha11 be readily available on site when a Di�crision
repxesentati�e inspects the project �or compliance.
7} All conditions and stipulations of the active permit remain in force under this renewal unless altered
herein.
�