HomeMy WebLinkAbout20181281 Ver 1_PCN Form Submission_9/19/2018 1:27 PMAction History (UTC-05:00) Eastern Time (US & Canada)
�brrrit by Anonymous User 9/19/2018 1:27:46 PM (Start Event)
Accept by Carpenter,Kristi 9/19/2018 4:01:40 PM (DOT Initial Review)
. The task was assigned to Carpenter,Kristi. The due date is: September 24, 2018 5:00 PM
9/19/2018 1:29 PM
�� �
6fvlslaa of Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
January 31, 2018 Ver 2.3
*
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are ans�red.
Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf
A. Processing Information
County (or Counties) where the project is located:*
New Hanover
Is this project a public transportation project?*
�' Yes C' No
This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project.
Is this a NCDOT Project?*
�' Yes C' No
(NCDOT only) T.I.P. or state project number:
WBS #
16.71001
(for NCDOT use only)
1a. Type(s) of approval sought from the Corps:*
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
fJ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
�J Nationwide Permit (NWP)
r Regional General Permit (RGP)
� Standard (IP)
This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits.
All required items that are not provided in the E-PCN and be added to the miscellaneous upload located at the bottom of this form.
Nationwide Permit (NWP) Number: 35 - Maintenance Dredging Existing Basins (Sect 10 Only)
Nationwide Permit (NWP) Number: 16 - Return Water from Upland
NWP Number Other:
List all MN nurrbers you are applying for not on the drop dow n list.
1c. Type(s) of approval sought from the DWR:*
check all that apply
N7 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express
r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
� Individual Permit
*
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
i For the record onlyfor Corps Permit:
f Yes C•' No
l" Yes C•' No
1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
If so, attach the acceptance letter from rritigation bank or in-lieu fee program
C' Yes �' No
1f. Is the project located in anyof NC's twentycoastal counties?*
C� Yes �' No
1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?*
C' Yes C' No C' Unknown
7h. Is the project located in a designated trout watershed?*
C' Yes G No
Link to trout information: http://�wwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx
B. Applicant Information
1a. Who is the Primary Contact?*
Catherine peele
1b. Primary Contact Email:*
cdpeele@ncdot.gov
1c. PrimaryContact Phone:*
(xxx)xxx-xxxx
(252)305-7288
1d. Who is applying for the permit?
r Owner rJ Applicant (other than owner) r AgenUConsultant
(Check all that apply)
2. Owner I nformation
2a. Name(s) on recorded deed:
USA Government - ARMY
2b. Deed book and page no.:
Book 6022 Page 1885
2c. Responsible party:
� (for Corporations)
2d.Address
Street Address
PO Box1890
Address Line 2
Qty
Wilmington
Fbstal / Zip Code
28402
2e. Telephone Number:
(xxx)xxx-xxxx
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
cdpeele@ncdot.gov
3. Applicant Information (if different from owner)
3a. Applicant is:
C' Agent
C•' Other Land user
If other please speciFy.
3b. Name:
Catherine Peele
3c. Business Name:
(if applicable)
NCDOT - Ferry Division
3d.Address
Street Address
159 Lucinda Lane
Address Line 2
��
Powells Point
Fbstal / Zip Code
27948
3e. Telephone Number:
(252)305-7288
(xxx)xxx-xxxx
3f. Fax Number:
(xxx)xxx-xxxx
3g. Email Address:*
cdpeele@ncdot.gov
State / R-ovince / I�gion
NC
Country
USA
State / Rovince / F�gion
NC
Country
USA
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Fort Fisher Dredging 2018
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/town:*
Kure Beach
1d. Driving directions*
If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions.
Leaving Kure Beach heading south on US-421 / Fort Fisher Blvd. Follow signs for the Fort Fisher Ferry. Turn right onto Fort Fisher Blvd S.
2. Project Identification
2a. Property Identification Number:
(tax PIN or parcel ID)
2b. Propertysize:
(in acres)
2c. Project Address
Street Address
Address Line 2
��
Fbstal / Zip Code
2d. Site coordinates in decimal degrees
State / Rovince / F�gion
Country
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as
appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude:* Longitude:*
33.961625 -77.940178
ex: 34.208504 -77.796371
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Cape Fear River
3b. Water Resources Classification of nearest receiving water:*
SC
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Cape Fear
RiverBasin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
This property is used by the North Carolina Ferry Division to transfer automobiles, tourists, locals, and goods to
and from Southport, NC to Fort Fisher, NC via ferry vessels.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
C7ickthe upload button or drag and drop files here to attach docurrent
NC_Kure Beach_TOPO.pdf
Fle type rrust be pdf
17.62MB
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
qick the upload button or drag and drop files here to attach docurrer�
Fle type rrust be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
0
4e. List the total estimated linear feet of all existing streams on the property:
(interrrittent and perennial)
0
4f. Explain the purpose of the proposed project:*
To perform maintenance dredging in the state maintained channel and basin and the Fort Fisher Ferry Terminal in
Fort Fisher, NC.The current channel and basin has serious shoaling on either side and is causing safety issues
for both the ferries and the travelers on board.
4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The NCDOT — Ferry Division will have upcoming dredging operations at the Fort Fisher Ferry Terminal. Shoaling
in the channel and basin have become a concern for the ferries traveling back and forth and also a concern for
the traveling public's safety. The ferries need a clear and wide channel to safely make the multiple daily trips back
and forth from Fort Fisher to Southport. Our most recent survey of this area was done on September 4, 2018 and
shows that 171,451 cubic yards needs to be removed from the channel to meet the current permitted depth of 14
feet. All work will be completed by the NCDOT Ferry Division Marine Maintenance crew who operates the state
owned hydraulic pipeline "Dredge Manteo". All material removed from the Fort Fisher basin and channel will be
pumped into the adjacent spoil site. NCDOT utilizes this upland spoil site under a license (License No. DACA21-3-
13-4099) granted by the Department of Army — Savannah District — Corps of Engineers. A capacity survey of this
spoil site was recently completed by the NCDOT Locations and Surveys Unit. They determined there was 199,749
cubic yards of space available for material. Due to sturgeon and turtle moratoriums dredging activities will not
begin until November 15th, 2018. Equipment that will be used during the project includes the Dredge Manteo,
tugs, small barges, and an excavator for spoil site activities.
4h. Please upload project drawings for the proposed project.
aick the upload button or drag and drop files here to attach docurrent
Ft. FISHER_LS_SSG_180904.pdf 3.31 MB
Fle type rrust be pdf
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
C' Yes C•' No f Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
C' Preliminary c' Approved C' Unknown C•' N/A
Corps AID Number:
6carrple: SAV�2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5d1. Jurisdictional determination upload
aick the upload button or drag and drop files here to attach docurrer�
Fle type rrust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
C�' Yes �' No �' Unknown
6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
CAMA Major Permit 561 Expires 04/30/2019
Requesting CORP Permit
Project History Upload
C7ick the upload button or drag and drop files here to attach docurrent
CAMA 561 SP-FF.pdf 1.05MB
Fle type rrust be f�F
7. Future Project Plans
7a. Is this a phased project?*
C' Yes �' No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre-construction notification.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands r Streams-tributaries r Buffers
r Open Waters r Pond Construction
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
All work will be completed within the permitted time frame to avoid any potential impacts to wildlife. Spoil site NTU
levels will be monitored in accordance to the Ferry Division Environmental Management System (EMS).
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:*
All equipment will be checked on a daily basis for any possible leaks, dredge pipe will be secured along with all
tugs and barges in an area as to not impact the surroundings. Spoil site spill gate will be properly maintained and
measured to avoid impacts.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C' Yes C•' No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
"* Recent changes to the stormwater rules have required updates to this section ."*
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
C' Yes �' No
For a list of options to meet the diffuse flow requirements, click here.
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
C' Yes C•' No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? *
C� Yes
C' No
To look up low density requirement click here 15A NCAC 02H .1003(2).
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
C� Yes �' No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?*
C' Yes G No
Comme nts: *
Is not required
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
C' Yes �' No
2b. Is this an after-the-fact permit application?*
C' Yes �' No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water qualit�i?*
C' Yes C•' No
3b. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project? *
C' Yes r No C' f�/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
Sa. Will this project occur in or near an area with federally protected species or habitat?*
C•' Yes C' No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
C' Yes C•' No
5d. Is another Federal agency involved?*
C' Yes C� No
5e. Is this a DOT project located within Division's 1-8?*
C� Yes C' No
�' Unknown
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Conversations with USACE Representatives, Fish and Wildlife Maps
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
�' Yes �' No
Are there submerged aquatic vegetation (SA� around the project vicinity?*
C' Yes C� No !' Unknown
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA EFH Mapper and online documentation
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
i Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?*
C' Yes C•' No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
http://gis.ncdcr.gov/hpoweb/
7c. Historic or Prehistoric Information Upload
C7ick the upload button or drag and drop files here to attach docurrent
Fle rrust be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
C•' Yes C' No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?*
https://msc. fema. gov/po rta I/search
Miscellaneous
Miscellaneous attachments not previously requested.
C7ick the upload button or drag and drop files here to attach docurrent
DACA21-3-13-4099 Supplemental Agreement No1 20171114 (signed).pdf 402.55KB
Ft. FISHER_LS_SSG_180904.pdf 3.31 MB
Fle rrust be FDF or VWQ
Signature
rJ By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Catherine Peele
Signature
Sign
Date Submitted:
9/19/2018
Initial Review
Is this project a public transportation project? *(')
C�' Yes C' No
Change only if needed.
Has this project met the requirements for acceptance in to the review process?*
G Yes
C' No
BIMS # Assigned*
20181281
Version#*
1
Reviewing Office*
Wilmington Regional Office - (910) 796-7215
Select Project Reviewer*
Joanne Steenhuis:eads\jhsteenhuis
Is a payment required for this project?*
C' No payment required
C� Fee received
f Fee needed - send electronic notification