HomeMy WebLinkAboutNCS000040 Outfall Relocation - 2016H RUDTTE
PIPE and FOUNDRY COMPANY
P.O. Box 35430 • Telephone 704/332-2647
OHARI OTTF, NORTH CAROI INA 2€3235
Foundry Fax No. 332-4581
August 24, 2016
Bethany Georgoulias
X NCDENR - Stormwater Permitting Program
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 807-6372
RE: Charlotte Pipe and Foundry Company
Permit # NCS000040
NPDES Stormwater Permit Renewal
SWO06 Oulfall Relocation
Of; 2 6 2016
DENR-LAND QUALITY
STCRW ATER PERMITTING
Charlotte Pipe and Foundry Company (Charlotte Pipe) is submitting this
request to relocate Stormwater Outfall SWO06 from a location within our
fence line to a location (SW006A) just outside our fence line. This request is
being made as raw material storage and drop lot parking were required to be
moved due to the sale of property across the railroad tracks (along the
southeastern property line) to NCDOT.
The aforementioned activities have been moved to drainage Area I along our
northern property line. By relocating sampling point SWO06 to SW006A,
Charlotte Pipe will capture flow from both the existing SWO06 sampling
location (it is direct piped to the new location) and from the new material
storage area. The existing (SWO06) and proposed (SW006A) sample locations
are less than 100 -foot apart and have been highlighted on the attached
drawing for reference.
If you have any questions or need any additional information, please contact
Jenny Pappalardo at (704) 348-5513 or David Waggoner at (704) 348-5408.
Sincerely,
David G. Waggoner
Charlotte Pipe and Foundry Company
Quality -Environmental Manager