Loading...
HomeMy WebLinkAboutNCS000040 Outfall Relocation - 2016H RUDTTE PIPE and FOUNDRY COMPANY P.O. Box 35430 • Telephone 704/332-2647 OHARI OTTF, NORTH CAROI INA 2€3235 Foundry Fax No. 332-4581 August 24, 2016 Bethany Georgoulias X NCDENR - Stormwater Permitting Program 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 807-6372 RE: Charlotte Pipe and Foundry Company Permit # NCS000040 NPDES Stormwater Permit Renewal SWO06 Oulfall Relocation Of; 2 6 2016 DENR-LAND QUALITY STCRW ATER PERMITTING Charlotte Pipe and Foundry Company (Charlotte Pipe) is submitting this request to relocate Stormwater Outfall SWO06 from a location within our fence line to a location (SW006A) just outside our fence line. This request is being made as raw material storage and drop lot parking were required to be moved due to the sale of property across the railroad tracks (along the southeastern property line) to NCDOT. The aforementioned activities have been moved to drainage Area I along our northern property line. By relocating sampling point SWO06 to SW006A, Charlotte Pipe will capture flow from both the existing SWO06 sampling location (it is direct piped to the new location) and from the new material storage area. The existing (SWO06) and proposed (SW006A) sample locations are less than 100 -foot apart and have been highlighted on the attached drawing for reference. If you have any questions or need any additional information, please contact Jenny Pappalardo at (704) 348-5513 or David Waggoner at (704) 348-5408. Sincerely, David G. Waggoner Charlotte Pipe and Foundry Company Quality -Environmental Manager