Loading...
HomeMy WebLinkAboutNCS000040_CMSWS Inspection Report - Charlotte Pipe and Foundry_20150504Charfoffe-Afecheniwrg STORM NATER Services 700 North Tryon Street Charlotte, NC 28202 Facility Inspection Fax: 7 0 4.3 3 6.4 3 9 1 Facility Name: Charlotte Pipe & Foundry Company Inspection ID: 18536 Contact: Jenny Pappalardo, Environmental Engineer Permit #: NCS000040 Inspector: Ron Eubanks Receiving Stream: IRWIN Inspection Date: 05/04/2015 Entry Time: 9:30 am Exit Time: 12:00 pm SIC #: F_ SUMMARY Facility Description: The Charlotte Pipe and Foundry facility is located at 1335 South Clarkson Street on approximately 45 acres of property. The facility manufactures cast iron piping and cast iron piping joints & fittings. File Review/History: Stormwater inspections have been previously conducted by Charlotte -Mecklenburg Storm Water Services at Charlotte Pipe and Foundry Company on April 19, 2002, April 5, 2006, and May 3, 2010. Inspection Summary: During the recent inspection, Charlotte Pipe and Foundry Company was observed to be in compliance with the Charlotte Storm Water Pollution Control Ordinance. Please refer to the report for comments and recommendations regarding the inspection. INSPECTIONDETAILS Site Inspection Deficiency I Comment Stormwater system (catch basins, No Stormwater runoff from the property drains by sheet flow into inlets, outfalls, etc.) a series of catch basins and discharges from the property via five (5) outfalls. The stormwater drainage systems appeared to be in good condition; no significant pollution issues were observed. Erosion issues No No stormwater erosion issues were observed on the property during the inspection. Structural stormwater BMPs Recommendation The structural stormwater best management practices (BMPs) at the site include inlet protection in some of the catch basins on the property. The waste aggregates have also been recently relocated indoors on the property to prevent contact with stormwater runoff. Routine parking lot sweeping and catch basin inlet cleaning activities are recommended to reduce the amount of sediment in stormwater runoff from the property. Illicit discharges/connections No No illicit discharge or connections were observed on the property during the inspection. Aboveground storage tank(s) - list No The aboveground storage tanks (ASTs) on the property tank sizes & contents include: one (1) 10,000 -gallon gasoline AST, one (1) 10,000 -gallon diesel fuel AST, one (1) 15,000 -gallon hot asphalt AST, and one (1) 500 -gallon used oil AST. Each of the ASTs are located within secondary containment with a locked drain valve. Underground storage tank(s) - fill N/A port area; list tank sizes & contents Outdoor material storage area(s) No Some raw materials and finished product are stored outdoors on paved and gravel areas of the property. No significant stormwater pollution issues were observed in the outdoor material storage areas. Outdoor processing area(s) N/A • obTo report pollution or drainage problems call: 311 http://stormwater.charmeck.org C[IARLOTTL 0. 5/21/2015 4:52:31PM Page 1 of 3 Site Inspection Deficiency Comment Loading/unloading area(s) No There are several loading/unloading areas on the property. No significant stormwater pollution issues were observed in the loading/unloading areas. Vehicle/equipment area(s) - fueling, Recommendation Facility vehicles and equipment are fueled onsite from the fuel washing, storage, etc. dispenser pumps located adjacent to the gasoline and diesel fuel ASTs. Facility vehicles and equipment are also washed on the property in a wash bay. The wash bay drains into an oil/ water separator which is connected to the sanitary sewer system. Since there are storm water inlets located down gradient from the fueling area, stormwater inlet protection BMPs are recommended. Oil/water separator and/or No There is an oil/water separator located on the property for the pretreatment vehicle wash bay. Charlotte Pipe and Foundry Company also has a Pretreatment Permit (#0665) with Charlotte Water (formerly Charlotte -Mecklenburg Utilities). Waste storage/disposal area - Recommendation There are municipal waste, scrap metal recycling, and wood dumpsters, scrap metal bins, etc. pallet recycling dumpsters located on the property. Each of the observed dumpsters appeared to be in good condition; however, the scrap metal recycling dumpster were uncovered. It is recommended that the dumpsters be covered to prevent stormwater accumulation. Food service area(s) No There is a grease trap located on the property; the grease trap is cleaned annually. Indoor material storage area(s) No Various chemicals and paint are stored indoors on the property. Indoor processing area(s) No Floor drains No The floor drains on the property are connected to the pretreatment system which discharges to the sanitary sewer. Spill response equipment No Spill kits are located at the garage, oil house, and loading/unloading areas on the property. Stormwater Pollution Plan Observed Comment Does the facility have a stormwater Yes pollution prevention plan? General location (USGS) map Yes Narrative description of practices Yes Detailed site map Yes List of significant spills (past 3 years) Yes A spill from the hot dip asphalt area was properly reported on January 13, 2014. Non-stormwater discharge Yes evaluation of outfall(s) Feasibility study Yes All necessary secondary Yes containment provided Collected water evaluated and Yes documented prior to release BMP Summary Yes Spill prevention and response plan Yes Preventative maintenance and good Yes housekeeping plan Facility provides and documents Yes Employee training was conducted in December 2014. employee training List of responsible parties Yes Reviewed and updated annually Yes Stormwater facility inspection -Fes program conducted semi-annually Qualitative/Analytical Monitoring Observed Comment • To report pollution or drainage problems call: 311 http://stormwater.charmeck.org C[IARLOTTE 5/21/2015 4:52:31PM Page 2 of 3 Qualitative/Analytical Monitoring Observed Comment Qualitative monitoring conducted Yes The most recent qualitative monitoring was conducted on semi-annually December 16, 2014 and April 14, 2015. Analytical monitoring conducted Yes The most recent analytical monitoring was conducted on semi-annually December 16, 2014 and April 14, 2015. Due to recent benchmark exceedences, monthly monitoring is being conducted at stormwater outfall #4. Analytical monitoring from vehicle Yes maintenance Permit and Outfalls Observed Comment Copy of permit and certificate of Yes Charlotte Pipe and Foundry Company has an Individual coverage onsite NPDES Stormwater Permit (NCS000040). All outfalls observed Yes No stormwater pollution issues were observed at the outfalls. Number of Outfalls Observed 5 Representative outfall status N/A documented by NCDWQ Annual no-exposure self N/A re-certification documented Additional Findings Observed Comment Observation(s) Observation(s) Observation(s) Phase II Permit Requirements Observed Comment Wastes removed from the MS4 N/A properly disposed Public transportation (roadway) N/A projects constructed within the last year Curb miles and parking lots swept N/A documented Catch basin and storm drain pipe N/A cleaning documented Records of pesticide/herbicide N/A applicator licenses maintained for staff and contractors If pesticide treatment areas N/A exceeded, was permit application submitted? Pesticide limitations in Goose Creek N/A Watershed followed • ob C[IARLOTTE To report pollution or drainage problems call: 311 http://stormwater.charmeck.org 5/21/2015 4:52:31PM Page 3 of 3