Loading...
HomeMy WebLinkAboutAgri Supply - AddInfoRequest2 - Agri-Supply with Commentes ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. TOBY VINSON, JR. Interim Director August 2, 2018 Clint Lawrence, PE, PLS Lawrence Associates, PA 106 W. Jefferson Street Monroe, NC 28112 Subject: Request for Additional Information Stormwater Permit No. SW3180502 Agri-Supply – Indian Trail, NC Union County Dear Mr. Lawrence, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on May 15, 2018 and additional information on July 19, 2018. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide the stage-storage information for the wet pond. 2. Repeat Comment: The sediment storage depth in the main pool must be in addition to the design depth. The average depth of the main pool must be 3-8 feet. Note that the average depth is not the total depth – it is calculated using one of the two formulas on Page 8 of the wet pond chapter in the design manual. Once the calculations show the depth of the main pool is sufficient, 6” of storage for sediment must be added. 3. Repeat Comment: General MDC 4 requires inlets to SCMs to be protected from erosion resulting from stormwater discharges and outlets to be designed so that they do not cause erosion immediately downslope of the discharge point during the peak flow from the 10- year storm as shown by engineering calculations. a. Please provide engineering calculations showing that the rip rap aprons are sufficiently sized and stormwater discharges will not cause erosion at the inlets or outlet from the SCM. 4. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW_Project_Submittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 1, 2018, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW3180502 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey.Anen@ncdenr.gov or (919) 807-6378. Sincerely, Corey Anen Environmental Engineer Stormwater Program cc: Mooresville Regional Office Jimmy Coward – Agri-Supply