Loading...
HomeMy WebLinkAbout20170314 Ver 2_Approval Letter_20180913Water Resources ENVIRONMENTAL QUALITY September 13, 2018 Leyland Twin Lakes, LLC Attn: Howard Kaufman 233 Route 17 - Tuxedo Park, Ny 10987 ROY COOPER Governor MICHAEL REGAN secretary LINDA CULPEPPER Interim Director DWR #17-0314 v2 Wake County Subject: AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN, RIPARIAN BUFFER PROTECTION RULES (15A,NCAC 02B.0233) WITH ADDITIONAL CONDITIONS Overture Twin Lakes Dear Mr. Kaufman: You have our approval for the.impacts'listed below for the purpose described in your application received by.the Division of Water Resources (Division) on July31, 2018. Please note that you should get any other federal; state or local permits before proceeding with your - project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations This approval requires you to comply with the following conditions: 1. The following impacts are hereby approved provided that all -of the other specific and general conditions of the Buffer Rules are met. No other impacts are approved, including incidental impacts [15A NCAC 02B. 0233(8)]. Type of Impact Amount Approved (Units) Permanent Amount Approved (Units) Temporary Buffers — Zone 1 131: Stormwater outfall 801 (square feet) 0 (square feet) Buffers - Zone 2 131:'Stormwater outfall 764 (square feet) 0 (square feet) Division of Water Resources, Raleigh Regional Office, Water Quatity Operations Section http://portal.nedenr.org/web/wq/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 Overture Twin Lakes DWR #17-0314 v2 BUFFER APPROVAL Page 2 of 4 .2: Stormwater Management Plan (SMP) Approval from Local Community Required The stormwater management plan (SMP) must be approved by the Town of Cary and meet the requirements of this Certification. The SMP may not be modified without prior written authorization from the Town of Cary. [15A NCAC 02H .0506(b)(3)] 3. The permittee shall report to the Raleigh Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including but -not limited to sediment: impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .0200] Information shall be provided orally within 24 hours (or the - next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the, time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, -and its causes; the period of noncompliance; including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance.is expected to continue; and steps taken or,planedjto reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may,wa;ive the written submission requirement on a case-by-case basis. ' 4. No Waste, Spoil, Solids, or Fill of Any Kind' No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction activities, including the design, installation; operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur [15A NCAC-02H..0501 and .0502]. 5. Protective Fencing All wetlands, streams, surface.waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (example- orange fabric fencing) prior to any land disturbing activities and must be maintained on the propertyuntil the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 6. This approval is for the purpose and design described in your application. The'plans and specifications for this project are incorporated by reference as part of the Buffer Authorization. If you change your project, you must notify the Division and you may; be required to submit a new.application package with the appropriate fee. If the property is sold, ther new owner must be given a copy of this'approval letter and is responsible for complying with all conditions. 7. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51 Overture Twin Lakes DWR #17-0314 v2 BUFFER APPROVAL Page 3 of 4 This Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute .150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ntoah.com/ or by calling the OAH Clerk's Office at (919)431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original.and one (1) copy along with any applicable OAH filing fee, is received in the OAH during normal office hours (Monday through- Friday hrough Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-31004 provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via the US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh; NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service_Cen'ter Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWQ: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DWR-401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699=1617 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NC DWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 Overture Twin Lakes DWR #17-0314 v2 BUFFER APPROVAL Page 4 of 4 This letter completes the review of the Division under the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0233. Please contact Stephanie Goss at 919-791-4256 or stephanie,goss@ncdenU,,ov if you have any questions or concerns. Sincer ly, Danny Smit Supervisor, Water Quality Regional Operations Section cc: DWR RRO 401/Buffer Authorization file DWR 401 & Buffer Permitting Unit file Kelly Roth via e-mail at roth@mcadamsco.com