HomeMy WebLinkAbout20181252 Ver 1_Permit Drawings_labeled1_20180913�:
����h�ti>a}' North Carolina Department of Transportation �'"� t
� — �ti�IiT3'4Y_�f�� �, :�
,,. ..,,., Highway Stormwater Program - . �
STORMWATER MANAGEMENT PLAN �"''�
(Version 2.07; Released Octo6er 2016) FOR NCDOT PROJECTS
WBS Element: 50193.1.1 TIP No.: R-5735 County�ies): Cherokee Page 1 of 2
General Project Information
WBS Element: 50193.1.1 TIP Number: R-5735 Pro'ect T pe: Roadwa Widenin Date: 12/18/2017
NCDOT Contact: David McHen Contractor / Desi ner: MI En ineerin / Karen Hefner, PE
Address: 253 Webster Road Address: 1011 Schaub Drive
Sylva, NC 28779 Suite 100
Ralei h, NC 27606
Phone: 1-828-586-2141 Phone: 919-851-6606
Email: d mchen ncdot. ov Email: khefner mi-en ineers.com
Cit ITown: Mur h, NC Coun ies : Cherokee
River Basin s: Hiwassee CAMA Count ? No
Wetlands within Project Limits? Yes
Pro'ect Descri tion
Pro'ect Len th lin. miles or feet : 1.22 Surrounding Land Use: Business/Commercial
Pro osed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 11.8 ac. 11.4 ac.
Typical Cross Section Description: The proposed project will consist of 1@12', 1@14' EBL and 2@12' WBL with a 12' US 19/US 74/US 64/US 129 (-L-) is a 2@12' travel lanes in both directions with a
center turn lane for a portion of the project. The other portion consists of 1@12', 1@14' center turn lane of 12', with curb & gutter and some sidewalk. There is approximately
travel lanes (EBL) and a 12' left turn lane. The WBL will consist of 1@12', 1@14' with a 600' of shoulder section at the beginning of the project. Hiwassee StreeUUS 19 Bus. (-
variable width (16' to 20') monolithic island. -Y3- (new location) consists of 2@12' lanes Y5-) is 2@12.5' travel lanes in both directions, with sidewalk on the east side. Old
with a 12' right turn lane at intersection of -L-. -Y3A consists of 2@6' lanes with curb & Ranger Rd (SR1398) (-Y1-) is 2@10' travel lanes with curb & gutter.
gutter on one side. -Y4A- (new location) consists of 2@12' lanes with curb & gutter on
both sides.
Annual Avg Daily Traffic (veh/hr/day): Design/Future: 24,000 Year: 2040 Existing: 19,900 Year: 2020
General Project Narrative: Due to the large amount of existing development and the steep topography along the project corridor space is very limited to provide storm water treatment. Most of the existing
(Description of Minimization of Water roadway is curb and gutter with storm drainage networks that drain to a Unnamed Tributary (UT) to the Hiwassee River that runs parallel to the north side of the project. The UT
Quality Impacts) to the Hiwassee River is piped underneath businesses in various sized pipes for most of the project length. There have been numerous sink holes and failures where the UT to
the Hiwassee River has been piped. Therefore to relieve some of the Hydraulic pressure on these existing pipes, the majority of the roadway drainage is proposed to be
collected and piped along the project length and discharged into a energy dissipator basin Iocated on the west side of Hiwassee Street just North of Ranger Road. Space for
treatment is also limited along the South side of the project due to steep topography directly adjacent to project as well as commercial development. Some treatment will be
provided on the west end of the project by discharging drainage into a riprap lined ditch and through a small wetland area.
�
Surface Water Bod 1: Hiwassee River NCDWR Stream Index No.: 1- 50
NCDWR Surtace Water Classification for Water Body Prima Classi£cation: Class C
Su lemental Classification:
Other Stream Classification:
Impairments:
Aquatic T8E Species? Comments:
NRTR Stream ID: Buffer Rules in Effect: N!A
Pro'ect Includes Brid e Spannin Water Bod ? No Deck Drains Dischar e Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Dreins Dischar e Over Water Bod ? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�dl bvaY North Carolina Department of Trensportation ��
������-1.��" Highway Stormwater Program �'�.�
STORMWATER MANAGEMENT PLAN �y'�
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: TIP No.: R-5735 Count ies : Cherokee Pa e 2 of 2
Preformed Scour Holes and Energy Dissipators
Station 8 Coordinates Drainage Pipe/Structure BMP
Sheet (Road and Non Road Surface Energy Dissipator Area Conveyance Dimensions Q10 V10 Associated w/
No. Pro'ects Water Bod Type Ri ra T e ac Structure (in) cfs) (fps) Buffer Rules?
9 8+96 -Y5- Rt (1)Hiwassee Riprap Energy Class II 67.7 Pipe 66" RCP-IV 167.0 5.9 N/A
River Dissipator Basin
Additional Comments
* Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy
Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria.
See 5heet 1 A For I ndex of Sheets
See �heet 18 For Convenfional �,ymbols
BEGl11l TIP PROJECT R-5735
—L— POC Sta. 27 + 80. DO
.,
�
V
�
�
O
V
����� �� ��U1��llA �.�11�0�����
����5��� �IF 1�I����V�i��
CHERO�:EE C� U1�TY
LOCATI0IV: US 19/US 74/US 64/US 129. FROM END OF DIVIDED SECTIOIV
TO SR 1556 (MARTINS CREK ROAD)
TYPE OF WORK: GRADING, PAVI11lG, DRAl1VAGE, F� SIGIVALS
WETLAND AND SURFACE WATER IMPACTS PERMIT
i�
��
/32
�,�o
/a
/��
�� �
SITE 1 SITE �3A�
� °` 5 e
�, �� �1;
� - � _ � ,'-� ,,� , � �
=1 / ,� h � I( �- ,� dr►
l� �_
SITE 2 � �
NOTES:
1. PROJECT IS PARTIALLY LOCATED WITHIN THE MUNICIPAL
BOUNDARIES OF THE TOWN OF MURPHY.
2. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO
THE LIMITS ESTABLISHED BY METHOD
GRAPHIC SCALES DESIGN DATA
ADT 2020 = 19,900
50 25 0 50 100 ADT 2040 = 24,000
PLANS K = 9 %
D = 53 %
50 25 0 50 100 T— 7 %*
V = 4�50 MPF
PROFILE (HORIZONTAL) * TTST = 2% DUAL 5%
io 5 0 to 2o FUNC CLASS =
ARTERIAL
PROFILE (VERTICALI STATEWIDE TIER
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT R-5735 = 1216 MILES
LENGTH STRUCTURE TIP PROJECT R-5735 = 0.000 MILES
TOTAL LENGTH OF TIP PROJECT R-5735 = 1.216 MILES
� � / r
i � �� -
� � �—
-�� � �_
�� ,��� -
E111D TIP PRO
—L— POT Sta. 9�
SITE 4�
�
�
` � �. �/`�G
♦�.�y
��
�''o�
♦ti
`<�1''''s
♦
micnaei t�aKer tngineering, inc.
8000 Regency Pkwy
Suite 600
• • Cary NC 27518
INTERNATIONAL NCL�icense: F-1084
2072 STANDARD SPECIFICATIONS
RIGHT OF WAY DATE: TODD H. BUCKNER, PE
FEBRUARY 16. 2018 PRo�ecr sxcrNEea
LETTING DATE: TERRANCE A. HARRIS, PE
FEBRUARY 18, 2O�LO I'ROJECT DESIGN ENGlNEER
STATB STATC PROJCCT RCPfi0.8NCC NO.
���a R-5735
PROJ.NO. . w.PROJ. NO.
50193.1.1
PERMIT DRAWING
SHEET 3 OF 18
'ECT R-5735
+ 00.00
s��T �T��
NO. tlCET3
�
FSCR�I'ION
PE
/ - s
r� �
�
� SITE 5 9 �
�, � G
�
i �— �
��
��� � � ��
�1 �
, T=REwS
FIYDRAULICS ENGINEER
ROADWAY DESIGN
ENGINEER
P.E.
INC�AB]PL�°Il"]E �]LAN�
W NOT USC POR R/W ACOUISiTION
DOCUMENT NOT CONSIUERED FINAL
UNLESS ALL SIGNATURES COMPLETED
N
0
�
�
\\ 49' E S 39°00'll" E
56.�y� 27.19�
N 2�.i 4
S 27.�6,11"E
Z ,f
ss 3
�6`'i. 9,
�� ,
HACKNE�C3�OL� 590NPANY
SOUTHERN CENTERS,LLC
O OB N32 PG 305
�
��
�i I
�
�
W
2
� ��
� /
/
N 5�0 g=oP�
O Alnf
O ��0�—
.�
O— MqINTq�N
M � - �
�( N r �
�-
h
J
� C W 8" CMP �
Z
J FLUSH C
4TA�T33r+
"� ��� 01
Q� P
O
h
�S c
M7� eUS
DI
— �
�
ae��� � ym
� ,1
h � _ 'L
o,d ��: �_
� J
�z`�' CMP �c
R A�
�� DI
�o Fiw 5j6 �J
z ` � _
_ � - . �.
_ �\
U . REM CE X TII
'► � FROM STA 29+p
� ` �
C X�
� �� � �D
� r
�
A1ARVu1 RAPER
OB !73 PG 135
OB 855 PG 157
S z%°93'll^
—26.r1- E
SITE 1 � SITE 2
�DENOTES IMPACTS IN
SURFACE WATER
� DENOTES FILL IN
W ETLAN D
DETAIL A
SPEQAL L4TERAL BASE DITCH
1 �'+m m sca�e�
Nal�rol � � `Fill
Groun 1;� �e< a
D P° s
G.o�.nlia� g
Min. D= 1.SF.
Mox.d= 2.OFt.
Type of Liner= CL I Rip-Rap 8= 4.OR.
=ROM STA. 40+00 TO STA. 41+00 -L- Ll
S 32.4211 E
\ `\ \
�'\ � � \
�,� s
6
� �4�,� r29s- \
fBj9(+��'' \ � BM"3 CLEV=1666.83'
:r '� O ���BL- STA. 32+3�.51?;.13' LT.
9�,� � h.'�.��� ��NAIL IN SASE OF PP
� � � \�`
, I \\
S \ �
��'
�P I s s° �
/ n
�TAIly �: / ` n_ - \
2q, CMP `
�' S
_ —[�/r, � �\ �� I i
� t�
, FOR DIT H) py
\L RT � O
DRAIN GE SYSTEM
+ 50
EXiSTING fl/rv
BST
\ IS F
�GR MT� 8US
� �
&LLY J.COOK
OB ly2 PC 53�
\ �
�f �
V4R BS7
5m.= n+oo -�- u
p= 45ds
V= d.96fps
a- i.ar
0 061
Liner=CL I RIP RAP
SITE 1
aa• � w
� ���5p �V _ G � O
/�P \ �
FL SH UT FILL SLOPES n MF I--
ST 34 50 - 35+50 -L- RT � S 8 - Ll�y
�� B57 f c \ � ��� 2G/
e„s eiPO
I R O EPLACE EXISTING �RP.INAGE �_
FR�M A 29-�00 TO 46+50 Exisrirvc aiw
� �
F � ' � I I
$ iS F /�
y I GR I i' I IS F 5�� BST- N RE OVCREPL4CCSEXIS G�(S a
� _ FR M STA 29+00 T na+
� � IS F �GR�
� I MT -
� L eUs � � I -�.R�pITM 4NN $N �
��I I I oB M9�aG I6 �`'/
50' 0' S0' 100' i50'
GRAPHIC SCALE
N
�
0
2�
DETAIL D
TOE PROTECTION
I Nai io Scolo�
F\o a�
Ne�ural -� .1.\f,�S\oPe
Gro�nd y
�-1 d
d= 7.OF.
6= 3.OFt. �'—G�o�eMlle
Type of Liner- CL I R�{rRap
FROM STA. 37+50 TO STA_ d0+00 -t- LT
38+78.88 g
CHARLIE J. MIGFIE$
OB 229 PG M6
p8 Tj6 PC 97
OB T36 PG 19B
�_ O /
TDE
SEE DEfAIL D
TOE PROTEC710N�
WitL I RIP RAP
STA 37+50 -40i-00 -L- LT
SEE DETAIL A
SPECIAL LP,TERAL BASE DITCH
WiCL I RIP RAP
sTn ao+oa - ai+ao -�- i
NW Q
RCP ExISTINC RiW
5)�
6S7 E%1$iIN6 qil
'�6°37'23° IS F 6�5
a.66'
� E��FL H OUT ILL SLOPES
I � 57 47+ 47+�50 N-L�-, RT
� V'1...., r.l '�..
�
I � � ' � � `_,I$�sroNe Hw
I I , 00� �/ ' w1ARVIN RAPER
❑ � ��j � OBN�PGi&�
/ �,�/ IS F B�� � ys & �
y� / r
o �'g
; o�raE� �. HicNHr��u� w i`'� �_.
5 �J_
- OB M&PG 1008 '�
� SUSAN JACOBSEN \ � _
d �� OB �N PC 808
Q 7i
O P� �0
�IRLBURT-,qMI50N E�P 5 �'�
FREND$HIP HOUSE.INC.
OB M89 PG i79 �
^�"'�
- >>ti�°�'
�
'
mEIP /
"� ea z",3°^ w
•'�� N �� 432�=�
� r- ' . ��^ ��` _ '
'
� v \
DUE�
�S BLK BUS
HOME MaoE
_ CONL. DITC�H
�a
f
\ PROJECT REFERENCE NO. SHEET NO.
R-5735 5
WJd SHEET NO.
� ROADWAY DESIGN HYDRP.ULICS
� ENGINEER ENGINEER
c�S Ewszwc
°�\ �Q� � _
., a IIvc�I�Il�]L� E 1PL.�NS
\�� �� � �\P DO NOT USE POR / W ACQUISITION
�\ Sy / /��/ E'A,-
\\ / BY� Zo�� I I
FCP �� I �
� i
s%,o�
,�.��-
, .. ? �� ��
�
-
- � IRS� Z �
� I
- �2 � oi � /
m �� I /
�� �
sza --I � �
� X I� / �} �
�S e B57
JI �M � IS BK D
f�..� ?`� . "_
ALBER�CO G4RC�A-AGULAR
DB �52� PG 7��
DETAIL I
STANDARD BASE DITCH
�Hmro scnL9
Naivrol Nolurol
Groun �� �� roun
d �
Geoi�eii�—� g Min. D= 2.OFt.
Max. d= 1.OF.
�Wne� e I� � 6.0' B= 3.Oft.
T e of Lincr= CL B Ri Ra
FROM $TA. A5+62 -L- RT
� � ��
�� \� � �� PERMIT DRAWING
' �� � � ` SHEET _5_ OF _18_
� � � �
� \ x\ �
�y �
N �°' s \
� \\�
\ \
�\\ \ `' �,U
\ �� �� �� �
�
� y4 � \ �
� y � \ \ ' \
i`� \
� `� \�_ � � . �
4 � ��� �
\� ��� �
� �� ��� \\
� � �� ��
� � � �� � �� �
� \�
� �
R� N \ \
�' `�„�,V.1^,�' PiPesSySrfM >, \ W
eow eQ� Pc iii"E " � � _
E�P �i ; � N
`�h'"�"'� c � ci W
s / � W
N 09913�4'4 W f / � �%!
S `i � 1 ��
A=0.09ac t C O
io=oso � m� asT 0
�o =
S O
� --
5�z _ _ — � o
_= ss �
� 2 Q
,B �H 3,� ��►. J W S'S � SITE 2
.��� - 36' CM � J
�•� 53' 35' 4 I
F EI
��� � sxismaG Riw '
S� W
E%IStIMG P/W �F � � � I � �
is a�rc aus , i ml J
� �
EMOVEREPIA ISTING DRP.INAG SYSTEM
;� 0 TO 46 �r 50 DETAIL I I �
S 3' BASE DITQ-I I
B RIPZ RAP �
lo BST J 5 BLK 8 � 6g5+ RI I I
J z' I��'� ��' I I I `
��{ LP \� ol I o I L
S �z" BRK. W4L� ��AYL ��� MI I I I
� co,y� ° ,_ coNc
27 -
EVANARIA MURPHY,LLC
OB Q8i PG 862
BM' ELEV=1529.72 �
- L- ST 43+11.03 229.47' RT.
N'4'SO�sr E AIL IPJ ASE OF 10" POPLAR
I —
�C7
BC MAC�i1G, LLC
DB R93 PC W�
FOR -L- PROFILE SEE SHEET 10
$HEET NO.
X-�2
$HEET NO.
X-13
SITE
2 E1�LA
(1�T�
PROJECT REFERENCE NO. 1 SHEET NO.
N
O
W
�
SITE 3
PROJECT REFERENCE NO. SHEET NO.
R-5735 6
WJd SHEET NO.
ROADWAY DESIGN HYDRP.ULICS
ENGINEER ENGINEER
St�EpHERD OF THE MOUNT4W5
CHURCM.d'1C..ET AL 50' 0' S0' i00' i50'
�s��"° R," ��EEo� � ww v�c sie — INC�I�Il�]L� E 1PL.�NS
GRAPHIC SCALE oo Nar vse ron rw wc�au�srrrox
� — 6R 8' DIP SS � ry�11
Ex1 TiNL ft/w tpEEO -�—� --� 6.01' EIF 4�
9S ����2 EIP Q
--" I �P
— � �DENOTES TEMPORARY . �
IMPACTS IN SURFACE WATER y
� PERMIT DRAWING
�DENOTES IMPACTS IN _y�q— ppT 5►a.6+25A0 �� HEET _10_ OF _18_
SURFACE WATER
"'r� e�S —YIA— PC Sto. 6+66A2 ` � Ex,s.,N�
\ \ Rip
\\� _
_ � S�DNN 3 \ \� R/W 0
w S m M.
��m m P� p!�$$1 NORSTI BM"I_ ELEV=1b12.75'
e�' � T� p� pg -BYIA- STA. 5+00.00
� : 5 61"21'41.5g" 2f�4.41'
� SHy ppE�` \ NAIL IN EASE GF 34" OAK
� � .l MAR -'. 5 qi"14'OB' W
� �' �../ 5 42"3� 5a W 81.01, �
4� / j_.. Qa.9-
EOU. LLC /''0 5 a\.z3'O8' w
pB 90p PG 20� QR
\ • c�i F\P 123.
MARVN RAPER � . ��„� a�°z3'0a F
OB 13�g PG 510 �[l P . �oo.3g' gM°5 ELEV=15a9.61'
RUTX fi1B$ON �5' �� � -BL- STA. 59+81.13 24.7P LT.
I^ OB 1i89 PG 99 N 4� � ��,��,\;,� NAIL IN BASE OF PPr7� =Ly�
V I G � � y9 68' �,�� q r � ..
l� $T $10. 53+72.63 q p�9, ns' E N nr �300 �P � � ��� oaj� � � � ` " � �s � I�
W SNEaHEao oF t� �auNrau�s -L- POC 46+20.46 =\ � N 59 � GCS \ o ��
W ceu+c�. wc.. ET�AI CS Sta. 52+37.63 4,° E 5Z. TA"" m�P � ,--
-Y2- POT 16f23.45 �� Qz°"g' IN e� 1 \ / o �
N�r�^"��`*- i� �5i8 5 nt se Qs" eo.�s' NESTERN CNEROKEE � _ . ��tFSR T `�� W
E� ia.75 � PROPERTIES.LLC �I ��,-.� . � W
s z°�o•as• w 08 i5W PG 25�
N 56'22'43' E � 4'S 4"W L 5 54°53'93' W 111.62' 2�.6?' S 54°53'43" W 5 52°Ofi'43" W 86.85' �IN � ,p�\'�� ���� � �� "'�
5_�__7"_?
U,/ ,w,,,,,.,,,., `-' ----w-= 6s.00• ,�- CARLTON VAN H
ba.�s' io.�s� WH CAPITAL.LLC�1
l z4�.,8 _ 4.5� ��� ,s , � �
w s�NK ,yo�t cuv Po���� �,� DB i286 PG�_I �.� OB �66 PG �5
W S ANK 1 4
(/) �lL pF qr R_ r_ON � --_— --�I �QI � � � I IS F ftU5 42" GMF-6�p � / 1� W
Q Sg � � 66" 6L WAL CP �� �' �- �I ➢ I S BLY BUS I S BLK BLIS tz 2 GZ^ CM� ;� Q �'O � I � W
I �N � EUGEIE FARLEY 1 � /�R esT —
O � � IS BLK BST I� OB Q�IQ W�' ,SI'j � �
� OB q75 FG 35� i ry` � � �� s sr i iunoN I
O 5� f 6u5 � ��
esr NEN HAPPY GARDEN CwqESE � I — I gsr o , �. m oEck ♦ � ! I isc�°��, ro ��5 � TS
� I N�s� � N/ a RESTAURANT OF MURPHY, INC, I I- LIM TFERS. LLC � �_� h I� � � � � O
� OB �l89 PG 72 I N _ � s s�y
� � � � � � �� _ _ _ _--� � esi � OB !I! PG 787 I �� �� ���� I� � � � c � � � ) / �
CP �-- L7 ' � y PkOPANE 2 � /
5 • �p 60.00' LT + -- N 18" CMF CMP _ I TANK S F GR � GR --�� S� �
�' 4 � @1� F%9i 7871' LT 65.08' LT :� I J 6�' S r^ o 7�.
^S xisrwc ai w '�' POS' ,c`° /a i 1 j� — I S F BlJS BST � I r Q GS I S 23, 60' RQP gq T
� c P U E 24 BST n/ n� /� �oN c D� . � w -- 1" - J I r .- o.a o' - E x i r w c a i w
�ApPRu p - BS COLLAWEXTEND � � /�, I 60. ' LT I O�
Q X. � - p W/15" RCP � � L 65. 0' LT � W � � � 636
� ON - 10�.i V� y � \ I - � 00 - �— 25' , � ��P / PRO�A RAIL - �
(/) ' __�`' _ G� �' � "C& I o — � ONC v � S � ExisTwc aiw kAMP �
- � -� — -I c�I � F� y BST
n? '.i: _ � U E � b eST 6 � ' F f"'—_' i F 622 ��-� , C F REU Tl ^ �
� v e „ � �� 3t3 [ � F 675 F.� J CB b17 � - 62 � _ - - as `�x - � . 2'�"�86 �
� _ � � 9 � � - - - �I C - _ _ - - P. �_6„ C&G C - p - - - " -� I2' DIP;o =� 6" C&G Ce V:
s � C � 6' C&G — 623 ��� "
w N Vc OTCB 613 m � BSf6 6 n_ - - � - Q U 12'C&� -- I
� � b' AIN EXIST.60� — �-- �' � AM=A"uED� ��6.�&�f�`G Q- _ � J
2 _ _ ---
_ L_¢ _ �� P � I N RED� I LA REMOVE 18"CMP12. DIP � 618 8 D �^IAGE SYSTEM N o �
� ___.� �P` , REM VE STR - �
J � � �
� � � esr � �.� � q - ^ -
2 5, ` 1O b IAL P o 0 606 P_�y PROP. 2'-6" C8G 608 _ 0 ' �
V i � 2�7 MP 6 I 58' \ �o" �� \l0. TIE C&G T GETHER � p o _ . . .. . .. .. `v""rti.. 627 � E 16 J
� CB
� � I ' - _ . - - 2GI .. � � P 5 SIDEWA ^
� RETAOVEREPL4CE H�T exisn� - - ,. , „ -� • _ - . PRO .
_ � CB
37 P _ _ — - .. D � I LK N 6 0 9 T
� REMO = A . . 35' L TER - -� - - - - - € - - - - - 45' INC. J�
� � GR I �� BST r^ �. gsT�tp�- ST � � COLL4WE TEND � ( P�) + � �C'� ExisnN, aiw U
�S � OFP c�P cwsrwc aiw o�..n�.� �n nir _R, ' I�EWA C� .
I Wp I �_ � q F9 .l � / SEE DETAIL E /
/ �_�'-DErk I � f:% / � ~
� � 3 S S \ �— �g2b,��__ RETAIN J � Ex¢rwc aiw PECIAL BACK OF CURB NT DITCH �
-� STA 53+50 - 57+00 -L- RT �
` � S IS MT L B( 1 S � I w S C �t.
�
IS F BU� GR �,l
� / I I } /
\ � / r✓ -
_ L � DAVID AIICHAEI TURflN ..
OB i3T2 PC N
�I'_ I IS MiL BUS _
'�"'''r��-^-,_„-� s � esr
4 39 . `t.�!��U�. -�- /
1 ��� _ _-- y �
� �t1ntiK ---- 43(�Ny
� �rv-�a.�fU.l`:�?iN�i'��tr�- J
�V,,� �`' �� DETAIL E
�-�"'�,.-�_,�.,�,�y� a''p SPECIAL BACK OF CURB CUT DITCH �e�'
� �; (NOT TO SCALE�
p �p N 52°2^c'�6't
MARTiiA McHAN �' � � GRO=ND ;
pg ilBT PG 633 �
OB 1087 PG 165 ? I 1 p'� �
/
/ o-aso� .�-�oNc muN � �
/
7 // /,�
� / �
FOR —L— PROFILE SEE SHEET 11
z
0
N
�
�
SITE 3 E1�lLARGEME1�lT
/'
i
i
i
ILI
1�TS
ZATI O N
i
i
� i � � \
/
/
R�P �
�
,
,
,
�__-------
�� RAI L
n
�
�
;
�
�
.
PROJECT REFERENCE NO. SHEET NO.
R-5735 6
WJd SHEET NO.
ROADWAY DESIGN HYDRP.ULICS
ENGINEER ENGINEER
INC�I�Il�]L� E 1PL.�NS
DO NOT USE POR / W ACQUISITION
PERMIT DRAWING
SHEET 11 OF 18
SITE 4 E1�LARGEMEI�T
PROJECT REFERENCE NO. SHEET NO.
R-5735 7
WJd SHEET NO.
ROADWAY DESIGN HYDRP.ULICS
ENGINEER ENGINEER
INC�I�Il�]L� E 1PL.�NS
DO NOT USE POR / W ACQUISITION
PERMIT DRAWING
SHEET 15 OF 18
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPA T URFA E WATER IMPA T
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 38+90/41+65 -L- LT Roadwa Fill Slo e 0.09
2 45+70 -L- RT 36" CSP < 0.01 < 0.01 25 9
3 59+50 -L- LT 5' x 4' RCBC/60" RCP < 0.01 < 0.01 15 11
3 59+50 -L- LT Bank Stabilization < 0.01 < 0.01 8
3A 11+32 -Y3- RT 72" RCP < 0.01 25
4 72+75l72+85 -L- RT 30" RCP < 0.01 < 0.01 20
5 8+60 -Y5- RT 66" RCP/Ener Dissa ator < 0.01 24
TOTALS"`: 0.09 0.02 0.01 92 45 0
`Rounded totals are sum of actual impacts
NOTES:
Revised 2016 �9 09