Loading...
HomeMy WebLinkAbout20090474 Ver 1_More Info Received_20090623C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ? Buffers ® Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non404, other) (acres) Tem ora T W1 ®P ? T Roadway fill, Tidal Freshwater ? Yes ® Corps 0.003 riprap Marsh ® No ? DWQ (142 sq.ft.) W2 ® P ? T Roadway fill, Tidal Freshwater ? Yes ® Corps 0.005 riprap Marsh ® No ? DWQ (218 sq.ft.) . W3 ® P ? T Roadway fill, Tidal Freshwater ? Yes ® Corps 0.001 riprap Marsh ® No ? DWQ (4 sq.ft.) W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.008 (364 sq. ft.) 2h. Comments: B-4594, Bridge No. 44: Impacts are for fill placement at new bridge end bent locations and are necessary for guard rail installation. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) St ® P E3 T Fill (rip-rap) UT to Jones Bay ® PER ?INT ® Corps ®DWQ 25 18 S2 ® P ? T Fill (rip-rap) UT to Jones Bay ® PER ? INT ® Corps ® DWQ 25 38 ? PER ? Corps S3 ? P ? T ? INT ? DWQ ? PER ? Corps S4 ? P ? T ? INT ? DWQ ? PER ? Corps S5 ? P ? T ? INT ? DWQ [I PER ? Corps El P ? T S6 ? INT ? DWQ 3h. Total stream and tributary impacts 56 3i. Comments: Impacts occur from rip-rap placed as fill along the toe of slope at north side of bridge, along jurisdictional lateral ditches that are tributaries to the UT to Jones Bay. Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version