HomeMy WebLinkAboutNCG160083_Rescission On Hold_20170731FWA FOR AGENCY USE ONLY
• Division of Energy, Mineral & Land Resources Date Received
�f Land Quality Section/Stormwater Permitting Program Year I Month T Day
RCDENRNational Pollutant Discharge Elimination System
NOR C ROu DERca ww OF
E—Ro—EM — NIuU RE9 RCE
RESCISSION REQUEST FORM
Please fill out and return this form if you no longer need to maintain your NPDES stormwater permit.
1) Enter the permit number to which this request applies:
Individual Permit (or) Certificate of Coverage
N I C I S I I I I I I I N I C I G/ IS 10 0
2) Owner/Facility Information: * Final correspondence will be mailed to the address noted below
Owner/Facility Name Z"4' L'o t/STieycT/o f/ AA71_7, GIS P1,4_A/j
Facility Contact
Street Address
City
County
Telephone No.
GREW 7:>Ath_7
MkTI�YEk/S State /VC ZIP Code d -8/O-;-
/KECK(E/i/,8d�� E-mail Address d4JtA✓I_' dO WECa✓s '�dn1
C -LY 7A$1 //6/ Fax:
3) Reason for rescission request (This is required information. Attach separate sheet if necessary):
® Facility closed or is closing on . All industrial activities have ceased such that no discharges of
stormwater are contaminated by exposure to industrial activities or materials.
❑ Facility sold to
on . If the facility will continue operations under the new owner it
may be more appropriate to request an ownership change to reissue to permit to the new owner.
❑ Other:
4) Certification:
I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the
subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief
such information is true, complete and accurate.
>\
Signature Date i ad /
-� G' �l nom' /�,✓11��2^
Print or type name of person signing bove Title
Please return this completed rescission request form to: NPDES Permit Coverage RescissionCC�` /n
Stormwater Permitting Program C V V
1612 Mail Service Center
Raleigh, North Carolina 27699-1612 1114 3 1261
DENRlAND QUALITY
1612 Mail Service Center, Raleigh, North Carolina 27699-1612 STORMWATER PERMITTINO
Phone: 919-807-63001 FAX: 919-807-6492
An Equal Opportunity 1 Affirmative Action Employer
Alexander, Laura
From: Khan, Zahid
Sent: Monday, August 28, 2017 2:21 PM
To: Alexander, Laura
Subject: RE: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
Laura,
My mistake I meant to say We cannOt rescind permit at this time. Sorry for inconvenience. Thanks
From: Alexander, Laura
Sent: Monday, August 28, 2017 2:14 PM
To: Khan, Zahid <zahid.khan@ncdenr.gov>
Subject: RE: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
Okay I will rescind the permit and send you a copy of the letter I send out. Thank you.
From: Khan, Zahid
Sent: Monday, August 28, 2017 9:19 AM
To: Alexander, Laura <laura.alexander@ncdenr.gov>
Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
La u ra,
It appears that we can rescind this permit right now. Please see Chad Broadway comments for Lane's Matthews plant
and have communicated his findings to Martin Marietta personnel (the lease holder for the plant) and Lane's
Environmental Coordinator. From my understanding, Richard Broughton (Martin Marietta) is planning to contact me or
James to discuss options for transferring the permit to relieve Lane of ongoing responsibility while process -related
materials are removed. I believe we can send refusal to them and let them pick other options. Thanks
Zahid
From: Broadway, Chad [mailto:Chad.Broadway@mecklenburecountync.sov]
Sent: Monday, August 28, 2017 8:55 AM
To: Khan, Zahid <zahid.khan@ncdenr.eov>
Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
Correspondence to MM is at the bottom, the below message was to Lane.
Chad Broadway, Environmental Specialist
Charlotte -Mecklenburg Storm Water Services
Mecklenburg County Water Quality Program
2145 Suttle Avenue
Charlotte, NC 28208
704-280-1497 (mobile)
chad.broadway@mecklenburecountync.eov
A Consider the environment before printing this email or the attachment.
1
Alexander, Laura
From: Khan, Zahid
Sent: Monday, August 28, 2017 9:19 AM
To: Alexander, Laura
Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
Attachments: SKM_C224e17080910042.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
X
Laura, (� !�
It appears that we card scind this permit right now. Please see Chad Broadway comments for Lane's Matthews plant
and have communic ed h findings to Martin Marietta personnel (the lease holder for the plant) and Lane's
Environmental Coor inator. From my understanding, Richard Broughton (Martin Marietta) is planning to contact me or
James to discuss options for transferring the permit to relieve Lane of ongoing responsibility while process -related
materials are removed. I believe we can send refusal to them and let them pick other options. Thanks
Zahid
From: Broadway, Chad [mailto:Chad.Broadway@mecklenburgcountync.gov]
Sent: Monday, August 28, 2017 8:55 AM
To: Khan, Zahid <zahid.khan@ncdenr.gov>
Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
Correspondence to MM is at the bottom, the below message was to Lane.
Chad Broadway, Environmental Specialist
Charlotte -Mecklenburg Storm Water Services
Mecklenburg County Water Quality Program
2145 Suttle Avenue
Charlotte, NC 28208
704-280-1497 (mobile)
shad.broadwav@mecklenburecountync.gov
A Consider the environment before printing this email or the attachment.
From: Broadway, Chad
Sent: Monday, August 21, 2017 12:17 PM
To:'gwdavis@laneconstruct.com' <gwdavis@laneconstruct.com>
Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
Greg,
Please find below the email that I sent to Martin Marietta personnel regarding the current request to rescind coverage
of NPDES Permit NCG160083. I reached out to Martin Marietta first to confirm the status of the property moving
forward. As I mentioned during our phone conversation, one the three scenarios will need to be completed to close out
the permit: 1) Removal of process -related materials from the site and stabilization of soils disturbed during removal of
the plant; or, 2) Action from Blythe to include this area in the permitted area covered under their own NCG16 permit; or,
3) This area being included in the Martin Marietta Mining Act / NPDES permitted area. From follow-up correspondence
with Richard Broughton, it appears that Martin Marietta will not be pulling this area back into their permitted area.
Let me know when actions at the site have been completed and I will conduct a follow-up inspection. Thank you,
Chad Broadway, Environmental Specialist
Charlotte -Mecklenburg Storm Water Services
Mecklenburg County Water Quality Program
2145 Suttle Avenue
Charlotte, NC 28208
704-280-1497 (mobile)
chad.broadwav@mecklenburecountync.eov
A Consider the environment before printing this email or the attachment
From: Broadway, Chad
Sent: Monday, August 21, 2017 8:55 AM
To: 'Richard Broughton'<richard.brouehton@martinmarietta.com>
Cc: Tom Neely <Tom.Neely@martinmarietta.com>
Subject: RE: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
Richard / Tom,
To follow up on my visit last week to conduct an evaluation for the rescission request submitted by Lane Construction
for NPDES permit certificate of coverage NCG160083:
At the time of my inspection, a very large pile of RAP, a few smaller piles of RAP, and a pile of sand were present within
the leased property that is covered by NPDES permit certificate of coverage NCG160083. Additionally, disturbed soils
were present in the area where the plant was demolished. The stockpiled materials represent process -related materials
and present a potential for sediment discharge. From my understanding, this area will not be pulled back into the
Mining Act / NCG02 permitted areas, nor will it be associated with the NCG16 permit of your other tenant. Since one of
the primary intents of the NCG16 permit is to monitoring and reduce sediment discharge (via TSS monitoring), I've
recommended to Raleigh that Lane's permit not be rescinded until the above listed materials are removed from the
parcel. Additionally, I would like to see at least moderate stabilization of the disturbed soils at the former Plant site.
From speaking with Tom, it sounds as if there is already an existing plan to move the RAP and sand to Blythe's area and
Tom also indicated that the current lease agreement may require Lane to stabilize the disturbed soils. I will plan to do a
follow-up inspection once I receive notification that the above actions have occurred.
I would like to mention that although I'm not willing to support the permit being rescinded, I did not find any violations
or other compliance -related issues during my inspection for either Lane Construction or Martin Marietta. The primary
issue is that Lane will need to continue complying with the terms of the permit until the permit is rescinded.
Please let me know if I've misunderstood any of the above stated information, particularly that the area is not being
pulled back into the permitted mine area. If the area will be pulled back into your permitted area, that changes my
opinion of the rescission since the potential sediment discharges will be accounted for by other permits.
I'll plan to reach out to Greg Davis with Lane Construction after I hear back from you. Thank you again for
accommodating my visit to your property.
Chad Broadway, Environmental Specialist
Charlotte -Mecklenburg Storm Water Services
Mecklenburg County Water Quality Program
2145 Suttle Avenue
Charlotte, NC 28208
704-280-1497 (mobile)
chad.broadwavPmecklenburgcountync.gov
A Consider the environment before printing this email or the attachment.
From: Richard Broughton [mailto:richard.broughton@martinmarietta.com]
Sent: Friday, August 18, 2017 3:40 PM
To: Broadway, Chad <Chad.Broadway@mecklenburgcountync.gov>
Cc: Tom Neely <Tom.Neely@martinmarietta.com>
Subject: Re: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry
Chad .... Thanks for the quick response... enjoy your vacation day.
Richard
Sent from my iPhone
On Aug 18, 2017, at 3:38 PM, Broadway, Chad <Chad.Broadway@mecklenburgcountync.gov> wrote:
EXTERNAL MAIL
Hi Richard,
I visited the site to do a brief inspection of the Lane site for their rescission request of the NCG16 permit.
I appreciate Tom taking the time to escort me to the site. I told Tom I would follow up with an email
yesterday afternoon with my findings but I got caught up out in the field and I'm on vacation today. They
have some more to do before the permit is released. I'll follow up Monday with a more detailed email to
you, Tom, and Lane's environmental coordinator. Have a good weekend.
Chad
Sent from my iPhone
On Aug 18, 2017, at 3:19 PM, Richard Broughton <richard.broughton@martinmarietta.com> wrote:
Hi Chad,
Tom Neely told me this morning that you inspected the Lane plant site on
our Matthews Quarry property this week. We are working with Lane to vacate the
property and terminate their lease with MM, and one of the things required is that
they satisfy all of permit requirements and terminate their permits. Were you
satisfied with the site, or is there additional work that needs to be completed?
Thanks,
Richard Broughton
Environmental Services Manager
Carolina South District/Mid-Atlantic Division
Phone (803) 978-6275 1 Mobile (803) 608-1566 1 Fax (803) 771-4200
Address 8451 Monticello Road, Columbia, SC 29203
Email richard.broughton(&martinmarietta.com