Loading...
HomeMy WebLinkAboutNCS000240_2018 Permit Renewal Fact Sheet_20180101Page | i Page | 1 Clean Water Act municipal separate storm sewer systems stormwater management program Page | 2 Page | 3 U.S.Environmental Protection Agency Best Management Practices Page | 4 • • • • • • • • • • • • • • • • • • Page | 5 stormwater rules permittees “ .” Page | 6 Thepermittee’soutreach program,includingthoseelementsimplemented locallyor througha Pursuant to Federal Regulations40 CFRSection 122.34 (b) permittees“ participationprogram.” ✓ ✓ ✓ ✓ ✓ ✓ Page | 7 n 122.34 (b) permittees“ “ ” Page | 8 ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Page | 9 ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ • • • • • • • ✓ ✓ • • • ✓ • • Page | 10 • • ✓ ✓ ✓ ✓ ✓ ✓ Pursuant to Federal Regulations40 CFRSection 122.34 (b) permittees“ stormwater management plan approved by theCommission that satisfiesthe six“minimum control measures” required by 40 Code of Federal Page | 11 ’sStormwater Management Programsfor post comply with therequirementsof thesecond party’spost system. Where streets “convey” stormwater, all SCM shall be sized to treat and control stormwater Pursuant to Federal Regulations40 CFRSection 122.34 (b) permittees“ system maintenance.” stormwater management plan approved by theCommission that satisfiesthe six“minimum control measures” required by 40 Codeof Federal Regulations§122.34(b). Page | 12 evaluate pollutants in storm water discharges to the permittee’s MS4 from hazardouswastetreatment, disposal, and recovery facilities, industrial facilities sub ject to Section 313 of Title III of the Superfund Amendments and Reauthorization Act of 1986 (SARA), and industrial facilities that the Permittee determi nes are contributing or have a potential to contribute a substantial pollutant loading to the municipa l storm sewer system. ,within 24 monthsthePermitteeshall evaluatestrategiesand tailor BMP’swithinthe Permittee’sMS4serviceareaandinthecontextofthescopeofthesix des“the measures.” This assessment is critical to Page | 13 permittees“ ” ✓ ✓ ✓ ✓ Page | 14 befound on EPA’swebsite: • • Page | 15 Page | 16 permittee’s – – – Page | 17 ’sproposeddeterminationstothefollowing ’smailinglistatleastthirtydayspriortothemeeting. ’sdeterminationsaresubstantiallyunchanged,thepermit will Page | 18 ’srevised determinationswill bemade.