Loading...
HomeMy WebLinkAbout20180817 Ver 1_Approval Letter _20180912ROY COOPER Gov""Or MICHAEL S. REGAN secretary LINDA CULPEPPER interim Director Town of Cary ATTN: Billy Lee PO Box 8005 Cary, NC 27512-8005 NORTH CAROLINA Environmental Quality September 12, 2018 D W R q 18-0815 Wake County Subject: AFTER -THE -FACT APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES (15A NCAC 02B.0233) WITH ADDITIONAL CONDITIONS Speight Branch Sewer Repair/Streambank Stabilization Dear Mr. Lee: You have our approval for the impacts listed below for the purpose described in your application dated June 15, 2018, received by the Division of Water Resources (Division) June 15, 2018 with additional information received on August 30, 2018. These impacts are covered by the attached Water Quality General Certification Number 4134 and the Neuse River Basin Riparian Buffer Rules and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 13 once it has been issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts: North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh. North Carolina 27699-1617 919.707.9000 Speight Branch Sewer Repair/Streambank Stabilization DWR Project #20180817 Page 2 of 3 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream S1— Bank Stabilization 95 (linear feet) 0 (linear feet) S2— Bank Stabilization 47 (linear feet) 0 (linear feet) Buffers —Zone 1 Bl- Construction Access 2,147 (square feet) 0 (square feet) B2 — Construction Access 208 (square feet) 0 (square feet) Buffers — Zone 2 0 (square feet) 0 (square feet) 2. Monitorin¢ Visual monitoring of the restoration project shall be conducted at a minimum of quarterly for the first year or two bankfull events (whichever is longer), and then annually until the site is stable (particularly after storm events) and vegetation is successful. Any failure of structures, stream banks, or vegetation may require future repairs or replacement, which requires coordination with the Raleigh Regional office to ensure the stability and water quality of the stream and downstream waters. [35A NCAC 02H .0506 (b)(2) and (b)(3)] 3. Please be aware that impacting streams and the Neuse riparian buffer without first securing the issuance of a 401 Water Quality Certification and Buffer Authorization is a violation of Title 15A NCAC 02H .0500. Pursuant to G.S. 143-251.6A, these violations and any further violations may be subject to a civil penalty assessment of up to $25,000.00 per day for each violation. [15A NCAC 02H .0500] This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. 115A NCAC 02H .0507(d)(2)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). Speight Branch Sewer Repair/Streambank Stabilization DWR Project #20180817 Page 3 of 3 The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act and the Neuse River Basin Riparian Buffer Rules. Please contact Paul Wojoski at 919-707-3631 or Pau l.WoioskiCcDncdenr.Rov or me at Karen.Higgins@ncdenr.gov if you have any questions or concerns. Sincerely, itvo Karen Higgins, Supervisor 401 & Buffer Permitting Branch Enclosures: GC 4134 cc: Eric Kulz, Town of Cary (via email) DWR 401 & Buffer Permitting Branch file File Name: 180817SpeightBranchSewerRepairStreambankStabilization(Wake)_401 GC NRB