HomeMy WebLinkAbout20161002 Ver 2_Approval Letter_20180911September 11, 2018
Eastern Petroleum Corporation
Attn: Yvonne Jones.
P.O. Box 398
Enfield, NC 27823
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
DWR #16-1002 v2
Edgecombe County
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL
CONDITIONS
Eastern Petroleum Tarboro Site
Dear Ms. Jones:
You have our approval for the impacts listed below for the purpose described in your application
received by -the Division of Water Resources (Division) on July 24, 2018 with payment received on
July 25, 2018. These impacts are covered by the attached Water Quality General Certification
Number 4135 and the conditions listed below. This certification- is associated with the use of
Nationwide Permit Number 14 once it is issued to you by the U.S. Army Corps, of Engineers.
Please note that you should get any other federal, state or local permits before proceeding with
your project, including those required by (but not limited to) Sediment and Erosion Control, Non
.Discharge, and Water Supply Watershed regulations. This 401 Water Quality Certification for
DWR #16-1002 v2 replaces the 401 Water Quality Certification for #16-1002 v1 dated
November 21; 2016.
This approval requires you to follow the conditions listed in the enclosed certification and the
following additional conditions:
1. The following impacts are hereby approved provided that all of the other specific and general
conditions of the Certification are met. No other impacts are approved, including incidental
impacts. [15A NCAC 02B .0506(b)(c)]
Type of Impact
-Amount.
Amount
Approved (units)
Approved (units)
Permanent
Temporary
Wetland
W1 -Fill
0.009 (acres)
0 (acres)
Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portal.ncdenr.org/-Vveb/,,vq/aps
1'628 Mail Service Center,; Raleigh; NC 27699-1628 Phone: (919) 791-4200
Location: 3800 Blrrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159
Eastern Petroleum Tarboro Site
DWR #16-1002 v2
401APPROVAL
Page2 of 4
2. Stormwater Management Plan (SMP) Approval from Local Community Required
The stormwater management plan (SMP) must be approved by the City of Tarboro and meet
the requirements of this Certification. The SMP may not be modified. without prior written
authorization from the City of Tarboro.,- [15A NCAC 02H .0506(b)(3)]
3. The permittee shall report to the Raleigh Regional Office any noncompliance with this
certification, any violation of stream or wetland standards.[15A NCAC 02B .0200] including
but not -limited to sediment impacts, and any violation of state regulated riparian buffer rules
[15A NCAC 02B.0200]. Information shall be provided orally,within 24 hours (or the next
business day if a weekend or holiday) from the time the applicant became aware of the
circumstances. A writtensubmission shall also be provided ;within 5 business days of the
time the applicant,becomes aware of the circumstances. The written submission shall contain
a description of the noncompliance, and its causes; the period of noncompliance, including
exact -dates and'times, if the noncompliance has not been corrected, the anticipated time
compliance is expected to continue; and steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance. The Division may waive the written submission.
requirement on a case-by-case basis.
4. No Waste, Spoil„ Solids, or Fill of Any Kind .
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre -Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0501
and .0502]
5. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within
these boundaries approved under this authorization shall be clearly marked with orange
warning fencing (or similar high visibility material) for the areas that have been approved to
infringe within the buffer, wetland or water prior to any land disturbing activities to ensure
compliance with 15 NCAC 02H.0500. [15A NCAC 02H.0506 (b)(2) and (c)(2) and 15A NCAC
02H .0507 (c)]
6. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of. Ihe Certification. If you
change your project, you must notify the Division and you may be required -to submit anew
application package with the appropriate fee. If the property is sold, the new owner must be
given a copy of this approval letter and General Certification and is responsible for complying
with all conditions. [15A NCAC 02B .0507(d)(2)]
7. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5]
Eastern Petroleum Tarboro Site
DWR #16-1002 v2
401APPROVAL
Page 3 of 4
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by
filing a written petition for an administrative hearing to the Office of Administrative Hearings
(hereby known as OAH). A petition form may be obtained'fro'm the OAH at
http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A
petition is considered filed when the original and one (1) copy along with any applicable OAH
filing fee is received in the OAH during normal office hours (Monday through Friday between
8:00am and 5:00pm, excluding official state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of
the petition along with any applicable OAH filing fee is received by the OAH within five (5)
business days following the faxed transmission.
Mailing, address for the OAH:
If sending by First Class Mail
via -the US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If'sending via delivery service
(e.g. UPS, FedEx):
Office, of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to Department of Environmental Quality:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 276994601
Please send one (1) copy of the petition to DWR:
If sending by First Class Mail
via the US Postal Service:
Karen Higgins
NC DWR-401 & Buffer Permitting
Branch
1617 Mail Service Center
Raleigh, NC27699-1617
If sending via delivery service
(e.g. UPS, FedEx):
Karen Higgins
NC DWR —'401 & Buffer Permitting
Branch
512 N. Salisbury Street
Raleigh, NC 27604
Eastern Petroleum Tarboro Site
DWR #16-1002 v2
401 APPROVAL
Page 4 of 4
This letter completes the review of the Division under section 401 of the Clean Water Act. Please
contact Stephanie Goss at 919-791-4256 or stephanie.goss@ncdenr.gov if you have any
questions concerns.
Sinc rely,
Danny Smith
Supervisor, Water Quality Regional Operations Section
Enclosure: GC 4135
cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Drive,
Ste. 105; Wake Forest, NC 27597
DWR RRO 401 file
DWR 401 & Buffer Permitting Unit via Laserfiche
Jason Hartshorn via e-mail at Jason.hartshorn@kimlev-horn.com