HomeMy WebLinkAbout20181246 Ver 1_401 Application_20180911Action History (UTC -05:00) Eastern Time (US & Canada)
Submit by Anonymous User 9/11/2018 10:59:15 AM (Start Event)
Accept by Montalvo, Sheri A 9/11/2018 12:55:23 PM (Non DOT Initial Review)
The task was assigned to Montalvo, Sheri A. The due date is: September 14, 2018 5:00 PM
9/11/2018 11:00 AM
DWR
Dfutslon of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
January 31, 2018 Ver 2.3
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered.
Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf
A. Processing Information
County (or Counties) where the project is located:*
Wake
Is this project a public transportation project?*
r Yes G No
This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project.
1a. Type(s) of approval sought from the Corps:*
PF Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
r% Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits.
All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form.
Nationwide Permit (NWP) Number: 18 - Minor Discharges
NWP Number Other:
List all WV nun-bers you are applying for not on the drop dow n list.
1c. Type(s) of approval sought from the DWR:*
check all that apply
401 Water Quality Certification - Regular r 401 Water Quality Certification - Express
r Non -404 Jurisdictional General Permit rJ Riparian Buffer Authorization
r Individual Permit
*
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
b Yes r No
a Yes r No
1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
V so, attach the acceptance letter from mitigation bank or in -lieu fee program
r Yes r No
1f. Is the project located in anyof NC's twenty coastal counties?*
r Yes r No
1h. Is the project located in a designated trout watershed?*
r Yes r No
Link to trout information: http://wuwv.saw.usace.army.miI/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx
B. Applicant Information
1a. Who is the Primary Contact?*
Town of Cary
1b. Primary Contact Email:*
Eric. Kulz@townofcary.org
1c. Primary Contact Phone:*
(xxx)xxx-xxxx
(919)462-3931
1d. Who is applying for the permit?
rJ Owner r- Applicant (other than owner) r Agent/Consultant
(Check all that apply)
2. Owner Information
2a. Name(s) on recorded deed:
Town of Cary
2b. Deed book and page no.:
002983/00871
2c. Responsible party:
(for Corporations)
Eric Kulz
2d. Address
Street Address
P.O. Box 8005
Address Line 2
City
Cary
Fbstal / Zip Code
27512-8005
2e. Telephone Number:
(xxx)xxx-xxxx
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
State / Rovince / Fbgion
NC
Country
Eric.Kulz@tovvnofcary.org
..............................
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Bond Lake Beachfront Improvements
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/ town:
Cary
1d. Driving directions*
If it is a new project and can not easily be found in a GFS mapping system Rease provide directions.
801 High House Road.
2. Project Identification
2a. Property Identification Number:
(tax RN or parcel ID)
0102447
2b. Property size:
(in acres)
288 acres
2c. Project Address
Street Address
801 High House Road
Address Line 2
aty
Cary
Postal / Zip Code
27513
State / Province / Fbgion
NC
Country
USA
2d. Site coordinates in decimal degrees
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as
appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude:* Longitude:*
35.781086 -78.826295
ex: 34.208504 -77.796371
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Bond Lake (Crabtree Creek)
3b. Water Resources Classification of nearest receiving water:*
Q NSW
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Neuse
River Basin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Bond Park is a metro park with a lake that offers fishing and boating with non -motorized craft. Rental vessels
include paddleboats and canoes. epsting docks, paved walkways and boardwalks are located at the site. The site
is heavily used by citizens, either on their own or through organized programs.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
click the upload button or drag and drop files here to attach docunent
Figure 1 USGS.pdf
File type rrust be pdf
102.55KB
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
click the upload button or drag and drop files here to attach docurrent
Figure 2 Soils.pdf 146.46KB
File type crust be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
None in project area.
4e. List the total estimated linear feet of all existing streams on the property:
(intermttent and perennial)
None in project area (open water ands buffer only)
4f. Explain the purpose of the proposed project:*
The purpose of the project is to upgrade the existing park facilities to make more areas ADA compliant, including
constructing a kayak/canoe launch ramp with an ADA -compliant trail from the parking lot to the ramp. The project
also includes adding additional boardwalk along the waters edge to provide connectivity between various
beachfront areas.
4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
An ADA -compliance paved trail will be constructed from the parking area to the ramp. 3) Additional boardwalks will
be installed along/over the waters edge to provide connectivity along the lakefront for pedestrians. Additional
tasks include removal of several old boat racks, removal of some ebsting paved walkways, and fencing out some
areas of buffer from pedestrian traffic to allow them to rehabilitate. Equipment will include typical construction
equipment.
4h. Please upload project drawings for the proposed project.
click the upload button or drag and drop files here to attach docunent
Bond Park waterfront -buffer & water impacts-vl .pdf 999.02KB
Kayak launch section.pdf 109.7KB
File type mast be pdf
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No r Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
r Preliminary r Approved r Unknown f• N/A
Corps AID Number:
Bcarrple: SAW2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5d1. Jurisdictional determination upload
pick the upload button or drag and drop files here to attach docurrent
File type crust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
7. Future Project Plans
7a. Is this a phased project?*
r Yes t: No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre -construction notification.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
F- Wetlands r Streams -tributaries fJ Buffers
rJ Open Waters r Pond Construction
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list
all open water impacts below.
4a. Site # - Reason for
4b. Impact type *
4c. Name of waterbody*
4d. Activity type * 4e. Waterbody type *4f. Impact
impact *
area
Pervious Kayak Launch
P
Bond Lake (Crabtree
Other Lake 0.04
Ramp
Fbrrrenent (F� or
Creek)
(acres)
IVbp label (e.g. Finad Crossing 1)
Temporary (T)
(if applicable)
New Boardwalk Section
P
Bond Lake (Crabtree
Other Lake 0.02
IVbp label (e.g. Fbad Grossing 1)
Fbrrrenent (F� or
Creek)
(acres)
Tenporary (T)
(if applicable)
4g. Total temporary open water Impacts:
0.00
4g. Total permanent open water impacts:
0.06
4g. Total open water impacts:
0.06
4h. Comments:
New boardwalk provides ADA -compliant access to more areas of the lakefront
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below
6a. Project is in which protect basin(s)?*
Check all that apply.
W Neuse r- Tar -Pamlico
F Catawba r Randleman
r- Goose Creek r Jordan Lake
F Other
6b. Impact Type *
6c. Per or
6d. Stream name
Temp*
Pervious Kayak Launch Ramp
P
Bond Lake
Location and Exempt, Allowable, allowable w/
F2rrranent (P/ or
mitigation
Temporary (T)
Concrete Paved Trail to Ramp
P
Bond Lake
Location and Exerrpt, Allowable, allowable w/
Permanent (F7 or
mitigation
Tenporary (T)
New Boardwalk
P
Bond Lake
Location and Exempt, Allowable, allowable w/
F2rrranent (F) or
nitigation
Temporary (T)
Short -Term Boat Storage Rack
P
Bond Lake
(upper end of ramp)
Fbrrranent(F)or
Location and Exempt, Allowable, allowable w/
Temporary (T)
mitigation
6h. Total buffer impacts:
Zone 1 Zone 2
Temporary impacts: 0.00 0.00
Zone 1 Zone 2
Permanent impacts: 1,752.00 253.00
Zone 1 Zone 2
Total buffer impacts: 1,752.00 253.00
6e. Buffer mitigation 6f. Zone 1 6g. Zone 2
required?* impact* impact*
No 141 0
(square feet) (square feet)
No 885 253
(square feet) (square feet)
No 294 0
(square feet) (square feet)
No 432 0
(square feet) (square feet)
61. Comments:
It should be noted that impervious surface (existing sidewalk) is being removed in several locations, totaling 357
SF of Zone 1 and 16 SF of Zone 2, for a net impervious project impact of 528 SF of Zone 1, and 237 SF of Zone
2. In addition, the re-routing of pedestrian travel and boat storage racks will result in 'rehabilitation" of compacted
barren buffer (1142 SF of Zone 1 and 322 SF Zone 2). These rehabilitated areas will be fenced with split rail
fencing, mulched and where possible, vegetation will be established. While the boat rack at the upper end of the
launch ramp is being added, a total of 641 SF of boat storage is being removed from the buffer.
Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc.
Click the upload button or drag and drop files here to attach docurrent
File crust be FDF
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
Since the project is associated with water -dependent structures and targets improvements to the beachfront,
impacts to open water and buffer are essential to the success of the project. Where possible, pervious structures
(kayak launch map, wood -slatted boardwalk) will be used to minimize new impervious on the project site.
Impervious space will be removed as part of this project, multiple semi-permanent boat storage racks were
removed from the buffer, and areas of buffer are being 'reclaimed"
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
Plans are for the work to be done when Wake County lowers the water level in November to work on the riser
structure. All work will be done in the dry.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Open water impacts are minimal. Buffer impacts are for boardwalks and greenway trails, which are Allowable.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
"` Recent changes to the stormwater rules have required updates to this section ."'
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
r Yes r No
1b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a
state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained.
All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated
supplement forms and other documentation shall be provided.
What type of SCM are you providing?
F- Level Spreader
r- Vegetated Conveyance (lower SHWT)
r- Wetland Swale (higher SHWT)
r- Other SCM that removes minimum 30% nitrogen
(check all that apply)
For a list of options to meet the diffuse flow requirements, click here.
Diffus Flow Documentation
Click the upload button or drag and drop files here to attach docurrent
Stormwater.pdf
File type rust be FDF
2. Stormwater Management Plan
6.74KB
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
f Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
r Yes
r No
To look up low density requirement click here 15A NCAC 02H .1003(2).
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?*
r Yes r No
Comments:*
Local funds only
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes r No
2b. Is this an after -the -fact permit application?*
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
Project consists of improvements to an existing park
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
r Yes r Nor NiA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
r Yes C No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
5d. Is another Federal agency involved?*
r Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?*
r Yes r No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEBSLOPES&apps.pdf
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers,
mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
NCNHP website (9/11/18) and USFWS iPac website (9/11/18).
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
Not within a coastal county
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NC Historic Protection Office HPOWEB Service (accessed 9/11/18). No elements on or near the project site.
7c. Historic or Prehistoric Information Upload
Click the upload button or drag and drop files here to attach docurrent
File rrust be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA -designated 100 -year floodplain?*
r Yes r No
8b. If yes, explain how project meets FEMA requirements:
Existing grades shall be maintained.
8c. What source(s) did you use to make the floodplain determination?*
Map No. 3720076400K Firm Panel: 0764. date: 5/2/06.
Miscellaneous
Miscellaneous attachments not previously requested.
Click the upload button or drag and drop files here to attach docurent
Figure 3 Aerial.pdf 87.94KB
File rust be FDF or KNE
Signature
V By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Eric W. Kulz
Signature
Date Submitted:
9/11/2018
Initial Review
Is this project a public transportation project?*(?)
r Yes r No
Change only ff needed.
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
BIMS # Assigned*
20181246
Version#*
1
Reviewing Office
Raleigh Regional Office - (919) 791-4200
Select Project Reviewer*
Stephanie Goss:eads\szgoss
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
What amout is owed? *
Q $240.00
0 $570.00
User Name: amackin Date lime: Wednesday. 29 August 2018 — 11:28=r x 34" Border
/ �htldlU� So) �
� d
'Xdwoo°,�/
�m
-n�m
z �_ D
:E0
D Z
0 m M
D z
> z z
Cn 0= C
D 7\
O
C
I
-1 -
r- z
mm2*
�-nm
DXX
I
Wr
mm
O
Doz
Z O
D
co
m
�D„�
r
Z Z
z m
o m
m
m0
�m
�Dm
, O
•
I
��
00
z0
= Z
�_ 0
I
2 w
I
I
I
O
O
0
I
Z
Z
ZC O
U)
�ci�
O
I
D O
0
I
I
I
��
D�
I
I
z�
nD
oDo(�D
nCr
DO
Z
I
Dpi
o
OD
�D
c0
zo
M
O
•
O0z
I
-nm
mrn
O��
o
z
•
I
I
X
=-
°m
I
Cf) G)
C�0
I
.
I
•
•
I
Cn
T
g
O
D
Z
0
°
o
O
�
cnO
n
\
m m
•
I
m
oW
M
0
D
I
m
Cn
D
D
X
r �
Dy
�
O
°
m
p
°°
n
m
O
r0
D
M
r
M
D
Cn
C
mO
M
Z
�
r
m
m
p m
r
m
r-�,
<
z
:U
D
W
C
m
m
T
Or
O
p
m
v
D
z
-n
o�
D
Cn
=i
D
F
T
m
Z
m
p
(D
=
o
Cn
Cn
z
m
p
CD
o
o
o
o
--i
m
m
X
O
m
0
O
m
m
z
0
(D
°—'
E:
p
Cn
C
D
Z
0
m
m
p
X
�z
m
�
4�,
�
�
z
X
;U 2:
o
D
D
0
>
m
zi
0
FM
O
m
0
0
m o
6, ,
o,
>
z
0
N
Cn
/ �htldlU� So) �
� d
'Xdwoo°,�/
�m
-n�m
z �_ D
:E0
D Z
0 m M
D z
> z z
Cn 0= C
D 7\
O
C
O=�
-1 -
r- z
mm2*
�-nm
DXX
CnCn
Wr
mm
O
Doz
Z O
D
co
--
�D„�
r
Z Z
z m
o m
m
m0
�m
�Dm
, O
��
00
z0
= Z
�_ 0
2 w
M D
O
O
Z
ZC O
U)
�ci�
O
D O
0
o
��
D�
z�
nD
oDo(�D
nCr
DO
Z
r0
-n
Dpi
o
OD
�D
c0
zo
M
O
�1
O0z
-nm
mrn
O��
o
z
M
X
=-
°m
O
Cf) G)
C�0
W
O
0
Cn
X
KX
°'
�
cnO
n
z
m m
X O
m
oW
M
0
D
m
Cn
D
D
X
r �
Dy
�
O
°
m
p
°°
n
m
O
Z
r
O
C C�
m
z
m
O
Ci)
m
z
m
X
�z
m
�
�
�
z
X
;U 2:
o
D
D
p
>
m
zi
0
FM
O
m
0
m o
6, ,
o,
>
z
0, n
I mac_
M � O D m
zbXr �
-1
X
zCn 0
� D G)
M
M
Cn m
D * � X
00 D X X
Z m z �
O 0D
nz
Z
0
I
XX
nK
CnO
s0 m
E:m
CZ X
n�
= z
z00
0
---1 0
XO
m�
D
M
D
o c�
� D Z
Z < o �
O
ON o :fE
z' zo
OC) Co
w 00
�x- o
O D
000.000
Jc O
0
U1
-1X
mmC
z �_ D
:E0
D Z
0 m M
D z
> z z
Cn 0= C
D 7\
p O Z
D
Cn Cn
mp—
-1 -
r- z
mm2*
�-nm
DXX
0
DmDC)
pC7
Z>MZ
Doz
Z O
O p O
A
mnm
�D„�
r
Z Z
z m
>C=
w
m0
o
, O
M
O
mD
zm
()
mm
X
z�
M
G1
Om
D
2 O
D
X m
z
zp
M
r
D
n
M
N.C. GRID NORTH
NAD 83
>q � M � (n Z
z -OO�;Um
p"m�X�*
�r-00DM0
-i0�K0Cm
mn
�� �p �
DDm_
S a u'u,
SOC)
oDWcn
�
K p co m
X kJ
D
O
K0
zm
CD Cb
:-4
d7 Cn A W N 0
POO -I 9) Cn � W N
0);0OooWCn33z0D3X�Docnw�3�v�0oX-0�(n—i �>0E om�C�C�Q�
m 0 CD • w 0(D = w CD 0= O S p) C• • o w v o 3 = o cn v o o CD
aa3�'° wcD-- 300 cQ wm cDca v30cDg0752maD M_ ivC70 CD vo
CD c v w 3 m`< a_='-77
Qm m? m �CD 0- CD 3 T. CD - 0 0 0 iv
v ° o m �' N_ a v o w 0 w ca m- (a m v(D �. CD -O 0 a=
'vc0n� �aZ° :a) Cr *o�o°'�0 o��mcOi��n0 (a�mw0CD 0CDvm-am
CD o o w° `< w o Q cn v m° 0 w m w o o- w m a== cCDi o
CD 0 W 0� m v ° CD g� < CD w a_ w a s 3 3 w= 0= 0 Q.
C-0 CD CD C=)3 �,m�o CD0�.�cn-n0ic° 'g°' 0-Cmv=crmm�m :5m�'ou°,��°��_0(n
Cr X 0 CD w o Q (n m o M O CD 0 m co cn - a_ w 0 C =- cn w cD -�
CD o m - cn m w D� w -� 0 cn 0 m
o a -. CD CD ai �' _ �' a 3 cD 0 cn w 07 `< ° m z° `n mo -
CD cna)cD� �'o���ma)ccnn-5m � mo�m�.�:3 <cno- w0 � -0
o (a v= CD N �� �' o 0 w 5 v o CD
� �(n 0 cD w 0 o o*, CCD
a)C� 3-�-a � 0-oCD0CDiw,�v 0- vcn�a�0'c(nn�Q-Cv3 (Q�C�a �
cD O cD 3 w ° C �, CD * w CD 0 (D w m =_ a w' a CD CD Ca v m ° CD _- w v
° � v M Cm �� �----h-0 CL w °' _� Q°0' 0 � ° ^'moo Q�� cwn 3 �0.� U)
cn 3 w (nc o v o D 3 C7�a = n< �(n -0 C 0 0 v w M
0) (n o w o m r. 0 :- 0 CD CD �_' v 5 T. 0= w EP= 0) 3 b' C � 0
3 =0w'cn w5 m3wcn 3 3-w-0 MCD C 0wm a
_ oo CD
�ccan O CCDn - n0i m � �0 3 � �- 3 � CD MCD- cn m � °' o =° o' D e c° -D`<
=r CDO * CD < �• N CD CD= O N 7 ,00-. 0 0 Z7 Q 7 p C cn ' Q
w O w < CD CSD n 0- a_ �_ N n O O 0 0 CD N O 7 7 7 C.
w CD 0 = T CD (D w C3 3 C O O _
CD CD 7 CD N _3 0 ° CCD CD w c O O w Q Q(D CD= °O CCD CD O M O 0= � O
7. � �"9.
�, (D c < O COD O O CQ 3 0 C w� O� n Q- O CD = 0 cn 7 (n w
-0 n N �. In CD C (�D Q 7 .CCn-. O N n v (O<D 0 D. (0 0' Cn o
CD CD v v @ �� w o v CT0 -0 0 c0 ° n0 v� v :o - m o m c0
O O CrCL CD CD O w w =3aCD
_ � �' = N0- CD 0 O� -' CD a
Ca a_ a_ =r C:) i_z O 0 CD ::r (D ;q: (0 p' (n �.
CD
Cn 7 < W w w `2— w 3 (p < 0 O j
(D (a (D w CD = a CD � ° 0
(a 0 r2
C � � � w � w C
Cn
M
0
O
z
Cn
Z7
C
0
O
z
z
O
M
Cn
=3 z00 03'I -S 1-:�° ; o� 'Ie
Q, �� Bond Park Waterfront Improvements0 0 A
_ J Z'.y
CD
T wN RY
Q m Z -t D Cn >
801 High House Road, Cary NC NORTH CAROLINA
CTI
Z w � _ �, a: p 316 North Academy Street
Mh O No p 0 �12 �d �e„ Cary, N.C. 27513 Contact Information:
N �:,7'Tp ' 31 i H� •' ��;` mana er townofca or
Tel: 919-469-4030 Fax: 919-460-4935
project. g @ rY 9
CD U' �'�S,y� `� ����`� www.townofcary.org
Open Water and Riparian Buffer Impacts 919.460.0000
FIGURE 1
2016 USGS TOPOGRAPHIC MAP
CARY QUADRANGLE
Bond Lake Beachfront
Improvements
Fred G. Bond Metro Park
Cary, NC
FIGURE 2
1970 NRCS SOILS MAP
Bond Lake Beachfront
Improvements
Fred G. Bond Metro Park
Cary, NC
FIGURE 3
2017 AERIAL PHOTO
Bond Lake Beachfront
Improvements
Fred G. Bond Metro Park
Cary, NC
i
cn
m—
co
�c
II ocn
IIII o>
IIII -
u
II
II � z
II �
II
IIII Deo
II Z><
0
111111 0
VIII X-E�:
— w=>
0 cn
E
Oz
-u
nrG)
-n
111111
IIIIIIII
>
O
cn>
m
IIII VIII
O
—
z
X m
z
III
o
z
O
D
cn
o
o
00
O
z
D
y
I I
cn O
D
IIII
m D O
C7
U)
O
m
m
z
00
y
II
III
oM
N �_
O
0
�
o
r
>z
G)
o
cn
mu
M
m
III
cnD
D
rv_
VIII
III
I III
III—III
=111111
d
�
Y
t-'
z
a
Stormwater Issues
This project involves installation of a kayak launch mat which will be flush with the existing
ground surface, and the greenway trail will be at grade.. Contours on the site will not be
changed.