HomeMy WebLinkAbout20061362 Ver 2_Emails_20090629Chapman, Amy
From: Kevin Burch [kevin@clearwater-engineering.com]
Sent: Monday, June 29, 2009 1:21 PM
To: Chapman, Amy
Attachments: Kevin Burch.vcf; woodard base ncdenr (1).pdf
Amy, I've been asked to provide some information that you've requested on the Woodard case in Raleigh. Attached is a
drainage basin map and a pipe sizing chart for the 10 year storm. The pipe is adequately sized. Please let me know if
you need anything else.
Thanks
Kerrin Burch
Clearwater Engineering &Design
President
C'319)878-0507 "919,
kevin@dearwater-engineerirg.com
1100 Logger Court
Suite A-102
Ralegh, North Carolina 27609
Qli=R @ IN oer?p
JUN 2 9 2009
DENR - WATER QUALITY
WETLANDS AND STORMWATER BRANCH
F@MVIR§
JUN 2 9 2009
M4R-WAnRDUAM
vo,p a AND slow TERBtW A
3 ^s
o: A
°o;
a
?i
gx ?gA
a?
b
_ a
;- S
? - ?
BLI999Y
Yx ?Cr? a ? v y
- -- -
1 I I ? ? '_
t -<_- '--_
o f 1 1 1 --_ __
,--
310
r
I 1'1 1 1 ? ? ?
\ \ ----- -_---- /
1
°
J n WOODARD DRAINAGE ANALYSIS
mA
m z 9012 HONEYCUTT ROAD C L E AR W AT E R
DZ? n ^ > RALEIGH
NORTH CAROLINA
n m m s
F ,
x