Loading...
HomeMy WebLinkAbout20050732 Ver 12_Staff Comments_20090630Page 1 of 2 Jeremy, I approve your modification of the drainage area and accept your technical information supporting the design of the wet detention basin. Good luck with this project. Thanks, Annette Annette Lucas, PE NC Division of Water Quality - 401 Oversight/Express Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 Phone: (919) 715-3425 Fax: (919) 733-6893 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Finch, Jeremy [mailto:JFinch@ecoengr.com] Sent: Tuesday, June 30, 2009 2:27 PM To: Annette Lucas Cc: Joseph Gyamfi Subject: Briar Chapel (Chatham County, NC) - Phase 4 (DWQ Project # EXP 05-0732v12) - Stormwater Management Plan Modification Request Good Afternoon Annette I hope you are doing well. I would first like to thank you for allowing me to tag on to our meeting yesterday morning with some additional questions regarding Briar Chapel, as it was greatly appreciated. As you may recall, we discussed the proposed revisions to the site layout for a small area in Phase 4 of Briar Chapel that will result in a net increase in the total number of lots and a net increase in the total impervious to a previously permitted wet pond. In summary, the layout revisions take place entirely within a single pond drainage area, and although the total impervious area to this wet pond will increase, the previously permitted design is still valid without any structural modifications necessary. Please find the attached documentation containing a letter explaining in detail the proposed layout revisions, a revised BMP supplement for the affected wet pond, an exhibit showing the layout revisions, and supporting wet pond calculations demonstrating the previously permitted facility can handle the increase in the total impervious area without any structural modifications necessary. You may also recall my mentioning yesterday that we are submitting to Chatham County a recombination plat for these layout revisions. However, before approving the recombination plat, Chatham County is requiring "approval" from the various agencies (NCDOT, NCDWQ, etc.) of these layout revisions. Therefore, as we discussed yesterday, is there anyway we could receive an email approval of these revisions so that we can forward to Chatham County to satisfy their requirement that NCDWQ approve the revisions? If there is anyway we could receive an email approval by the end of this week, I would greatly appreciate it. I am also copying Joseph on this email so that he is in the loop on these revisions because he has previously done all the Express Review for Phase 4 of Briar Chapel. Also, I will also be sending a hard copy of the attached documentation to you in the mail for your files. As always, I appreciate your help on this project. If there is anything else you need to process this request, please do not hesitate to contact me. https://mail.nc.gov/owa/?ae=Item&a=Preview&t=IPM.Note&id=RgAAAAAAOgPoLNIPQ... 7/1/2009 Page 2 of 2 Thanks and take care. Jeremy Finch, PE Project Manager Office: 919-287-4262 Cell: 919-624-3672 Add to address book EcoEngineering A division ot" the John R. McAdams Compam, Inc. P.O. Box 14005, Research Triangle Park, NC 27709 Design Services Focused On Client Success Please consider the environment before you print this e-mail. https://mail.nc.gov/owa/?ae=Item&a=Preview&t=IPM.Note&id=RgAAAAAAOgPoLNIPQ... 7/1/2009