Loading...
HomeMy WebLinkAbout20071441 Ver 3_Stormwater Info_20090701I Soil & Environmental Consultants, PA 248 LePhillip Court • Concord, North Carolina 28025 • Phone: (704) 720-9405 • Fax: (704) 720-9406 www.SandEC.com Transmittal To: NC DWQ 2321 Crabtree Blvd. STE 250 Raleigh, NC 27604 Attn: Annette Lucas We Transmit to you Herewith: ? Drawings ? ? Specifications ? ? Brochures or photos ? Project # 5-1925.WX Date Project Name: 6/30/09 Ridge Rd (Prosperity Village) File: For your information and files For comment or approval Returned for correction, resubmit Under Separate Cover: ? By mail ? By courier ® By express UPS tracking Q @ -.d W A 5 # 1ZXR690122 ? Correspondence ® Permit Related JUL 1 2009 10003314 ? As per your request DFNR - WA7FR QUALITY WETLANDS AND STCRWATER BRANCH No. Co ies Document No. Date Description 1 Request for storm water management plans Remarks: 2 ups packages (separate package tracking # 1ZXR69012210003323) If enclosures are not as listed as above, kindly notify us at once. By: Wendell Overby Greensboro Office: Raleigh Office: 3817-E Lawndale Drive 11010 Raven Ridge Road Greensboro, NC 27455 Raleigh, NC 27614 Phone: (336) 540-8234 Phone: (919) 846-5900 Fax: (336) 540-8235 Fax: (919) 846-9467 Y3 June 29, 2009 S&EC #5-1925wx N.C. Division of Water ualit D ? , @ r? ?.l ryr@ 01 Oversight and Express Permits Unity Attn: Annette Lucas JUL ? 2` r.q V .J. 2321 Crabtree Boulevard, Suite 250 DEW- WATER QUALITY Raleigh, NC 27604-2260 IYETlJ OS AND S70RH#;, CR BRAHCH RE: Prosperity Village (Ridge Road) Apartment Site-Mecklenburg County, NC Dear Ms. Lucas: As per condition #8 of the attached 401 Water Quality Certification Approval (DWQ# 07-1441v3) we have enclosed the requested storm water management plans. A full set of plans as well as calculations are enclosed. The City of Charlotte, a locally delegated Phase II NPDES Stormwater program, has reviewed and approved the storm water management plans. The applicant understands proposed impacts cannot be performed until storm water plans are approved by the NC DWQ and required mitigation payments made. The applicant has an NC EEP invoice valid until July 7, 2009 in reference to condition #5 of the Certification (see attached). On behalf of the applicant, S&EC has requested an extension to the current EEP invoice which we expect in the next couple of days. The applicant plans to pay the forthcoming invoice before expiration. Please call if you have questions or comments regarding the information provided. Sincerely, Wendell Overby NC Licensed Soil Scientist NC Registered Forester Attachments: City of Charlotte preliminary subdivision plan approval 401 General Water Quality Certification NC EEP invoice City of Charlotte approved plans (full set) Storm water management plan calculations Greensboro Office: Raleigh Office: 3817-E Lawndale Drive 11010 Raven Ridge Road Greensboro, NC 27455 Raleigh, NC 27614 Phone: (336) 540-8234 Phone: (919) 846-5900 Fax: (336) 540-8235 Fax: (919) 846-9467 Environmental Consultants, PA rt • Concord, North Carolina 28025 • Phone: (704) 720-9405 • Fax: (704) 720-9406 CITY OF CHARLOTTE TENTATIVE APPROVAL OF PRELIMINARY SUBDIVISION PLAN Name of Project: Location of Subdivision: Owner's Natfne Prosperity Village Ridge Road Citv of Charlotte Charter Properties 1520 South Boulevard Charlotte. NC 28203 (City, State, Zip) 704-377-4172 704-333-4532 ('relephone Number) (Fax Number) JLI l(a,charterproperties.com (E-Mail Address) Date of application submitted for Preliminary Plan approval: May 15. 2008 CITY ENGINEERING DEPARTMENT: The preliminary plan for this subdivision is approved for construction and development in accordance with the Engineering provision of the City of Charlotte Subdivision Ordinance. /7 / City Engineering De,u-ti nent Date e CHARLOTTE-MECKLENBURG PLANNING COMMISSION: The preliminary plan for this subdivision is approved for construction and development in accordance with all provision of City of Charlotte Subdivision Ordinance;' Planning Staf Date Note: The approval of this preliminary Subdivision Plan may be appealed within ten days of the date signed by the Planning Commission Staff. in accordance with Section 4.102 and 4.103 of the Subdivision Ordinance. This appeal may be initiated by any person aggrieved or by any officer, department, board, or bureau of the City of Charlotte or Mecklenburg County. http://www.ci.cfiarlotte.ne.us/ciplannin,7/index httn NCDENR -North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves-Perdue - - Coleen-H:-Sullins Governor Director SCANNED Date: Resources r -Dee Freeman Secretary April 22, 2009 DWQ# 07-1441V3 Mecklenburg County Mr. Jim Holman Charter Properties, Inc. 1520 South Boulevard, Suite 215 Charlotte, NC 28203 Subject: Prosperity Village Development APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Holman: You have our approval, in accordance with the general certification and those conditions listed below, to impact 386 linear feet (If) of unnamed tributary to Stony Creek (370 If, permanent) in order to construct the project in Mecklenburg County, as described in your application received by the Division-of Water Quality (DWQ) on April 9; 2009. After reviewing your application; we have determined that this protect is covered by Water Quality General Certification Number 3687, 3699; and 3705, which can be viewed on our we site at http://h2o.enr.state nc.usfncwetlands. The General Certification'allows you to use Nationwide Permit Number 3, 12, 29 once they are issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The above noted Certifications will expire when the associated 404 permits expire unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you maybe required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. In addition to the requirements of the certification, you must also comply with the following conditions: 1. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 2 Existing stream dimensions (including the cross section dimensions; pattern, and longitudinal profile) must ',e ntalned (.or restored v a constructed benches) above and below locations of each culvert. If any of the existing'pipes,are or become perched, the appropriate stream grade shall bere-established or, if the pipes rnstalied_in a perched manner, the pipes; shall be removed and re'.-installed correct) Culverts placed in streams/wetlands shall be Installed 9h the dry" Immediately upon completion of the Installation, water flow shall be returned to its natural course: Mooresville Regional Office One Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 NoWiCarolliina Phone: (704) 663-1699\Fax- (704) 663-6040\ Customer Service: 1-877-623-6748 ??ItliL q?llJ Internet: www ricwateraualitv.ora An Fnncal (lnnnrtnnihdCfFrmefivn Crfinn Fmnlnvcr _ rnOl- RcnvAl A/ 00/ Dnef Rnnenmur PAnor 0 3. The stream shall be restored to its original grade and elevation and riprap limited to.the maximum extent practicable upon completion of the installation of the sewer line. If riprap is required, it shall be embedded into the soil matrix. 4. Deed notificationsor similar mechanisms shall be'placed. on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for fufure wetland; water and`buffer impact. These' mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed 'notification can be downloaded from'the'401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 5. Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the restoration fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (91'9) 715=0476 if you-have any°' uestions concerning payment into a ---- restoration fund. You have 60 days from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the restoration fund to meet the following compensatory mitigation requirement: Compensatory Mitigation Required River and Sub-basin Number Stream 298 feet Yadkin 03040105 Wetlands =. acres - Waters acres 6. Use of native vegetation and other soft stream bank stabilization techniques must be used where: practicable instead- of riprap or other bank hardening methods.` If riprap is necessary ;it shall not be placed in.the streambed, unless approved by the DWQ. 7. Storm water discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. 8. A final, written storm water management plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd., Suite 250; Raleigh, NC, 27604) within 60 days of the issuance of the 40rtWater Quality Certification. The storm water management plans shall be approved in writing by this Office (or local approved delegated authority) before the impacts specified in this Certification occur. You have the option of using the Express Review Program for expedited approval of these plans. If you propose to use the Express Review Program, remember to include the appropriate fee with the plan. The storm water management plan must include construction plans, specifications, storm water BMP worksheets, and supporting calculations. The storm water best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Storm water Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality (or local delegated authority). Also, before any permanent building is occupied at the subject site, the facilities shall be constructed and operational, and the storm water management plan shall be implemented. The structural storm water practices as approved as well as drainage patterns must be maintained in perpetuity. No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality. 9. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from DWQ. If approved, they shall be removed and the natural grade restored within two months of the date of the close out/stabilization of the given drainage area. 10. Upon.completion of the project,ahe applicant shall;,complete and return-the-enclosed "Certificate of: - Completion"-form to-the.401/Wetian.ds Unit-of the NC ;Division of;Water Quality:.; 11. Continuing Compliance The;appl'rcant:(Charter Properties, Jim Homan) shall?conduct all activities in a manner so as not to contravene any state water quality standard: (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in.accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be ptovided'to the applicant in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. . If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter.. To ask for a hearing, send a written petition that conforms to Chapter 1506 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This. certification and its conditions are final and binding unless you ask fora hearing: This letter_completes the review. of the Division of,Water Quality_.under :Section 401 of the Clean Water Act_. If you have,any questions; `please telephone Mr °Alan'Johnsori in, the Mooresville aegional Office at 704 663 1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733=9721. Sincerely, for Coleen H. Sullins Attachments cc: Army Corps of Engineers, Asheville Ian McMillan, Wetlands Unit Wendell Overby I Ecosystem PROGRAM INVOICE May 7, 2009 Jim Homan Charter Properties, Inc. 1520 South Blvd. Suite 215 Charlotte, NC 28203 Project: Ridge Road Apartments County: Mecklenburg DWQ# 07-1441 COE#: 2009-00706 EEP #: ILF-2007-5519/ IMS#10734 Location: Yadkin 03040105 invoice expires: July 7, 2009 You have elected to satisfy the compensatory mitigation requirements of the Section 401/404/CAMA permit(s) issued for the above referenced project through payment of a fee to the North Carolina Ecosystem Enhancement Program (NCEEP). In accordance with 15A NCAC 2H.0500, the amount you owe is based upon the 2008-09 Fee Schedule and has been calculated as follows (Please note: payment for wetlands is calculated in increments of 0.25 acres). If you have any questions concerning this payment, please call Kelly Williams at (919) 716-1921. Habitat Type Invoiced Amount Riparian Wetlands 0.25 acres Stream 298 linear feet TOTAL AMOUNT DUE if paid within 60 days Fee Schedule Cost x $ 59,600.00 = $14,900.00 x $ 323.00 = $96,254.00 $111,154.00 If payment is not received within 60 days of the date of this invoice, it will expire. Note that your permit(s) may require payment before this date. Subsequent invoices will be based on the fee schedule in effect on the date they are issued. Please send a check payable to NCEEP for the Total Amount Due to the appropriate address below and enclose a copy of this invoice. US Mail: NCDENR Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 Physical Address (for other delivery services): NCDENR Ecosystem Enhancement Program 2728 Capital Boulevard, Suite 1H 103 Raleigh, NC 27604 Please note that requests for reimbursement of payments made to NCEEP are considered on a case by case basis. Requests for reimbursement must be received within 12 months of the date of the receipt. Any such request must be accompanied by letters from the permitting agencies stating that the permit and/or authorization have been rescinded and/or that NCEEP is not responsible for providing mitigation credit. If the account name on the check is not the same as the permit holder's name please include a signed statement by the permit holder that the check is being written on behalf of and with full knowledge and authorization of the permit holder. YOU MUST BE IN POSSESSION OF THE PAYMENT RECEIPT FROM NCEEP PRIOR TO COMMENCING THE ACTIVITIES AUTHORIZED BY THE DEPARTMENT OF ARMY 404 PERMIT AND/OR THE 401 WATER QUALITY CERTIFICATION. cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Steve Chapin, USACE-Asheville, Thelma Hemmingway, USACE-Wilmington Ian McMillan, NCDWQ-Wetlands/401 Unit Wendell Overby, agent File R&StoYr,p?5 ... E .. _Pro" our Std ??'"a"''??k7A???,*? r•n& North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net City of Charlotte Land Development Division Detention Worksheet Project Name: ?405P.ciztr\j 1`14t466 Date: 3/mss`/v Project Description: Attach brief explanation of detention plans and any assumptions if necessary. i/ l?r?tr, p,,-/ p? vtI-cti r . ?- OF r OF T WD ?At IV PC'kP'iJC fit- rE-'s P&-r €v A,N V,LtA T-/HE- 5arv N4S ;.FiFr4 P,V1Dr l+17.0 F:;Ot.s 5; rt-kc7- 1>;?Af/,lAC? t3?}-,r,t5 -iNA-pjZ41f.C To 7-wo ', se14,; &f }?t?r#t7? PRE-DEVELOPED SUMMARY Basin area: A- 35 S . 6- (-.(-y ac. (Delineated on attached drainage area map) Time of Concentration, Tcp,,;: A - (o .5 . 3 ! to. 2 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Mecklenburg Storm Water Design Manual - SCS Travel. Time. Curve Number, Cnpr,;: A - ?'7 P B - y, o POST-DEVELOPED SUMMARY Basin area:+ -? a • ::?_ - - ` D-1.0 ac. (Delineated on attached drainage area map) Time of Concentration, Tcp'ost: , S F 13. D-5 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Mecklenburg Storm Water Design Manual - SCS Travel Time. Curve Number, Cnpost: Ar - G , , a - 90, t e - 90, ?€ . D DETENTION SUMMARY Computer Method Used: Nut7aAt=lwow 'RLand Development Plan Review Staff will verify all detention submittals using HEC-1 for compliance with the City of Charlotte Zoning Ordinance, Section 12.6. This summary is to accompany all detention analysis and is not intended to replace that requirement. Pre (cfs) Post (cfs) Routed (cfs) Elevation 14 - 95.9-:5 - (0-4.11 a- 5.fve A - F} - l 2 yr. 31- 1.x49 C- 3.9y P-•0,95 B- 030 - 0.41 6 1 , .2 A - )zs.oi - is1,9 - 43.E is tp,Ct 10 r. y - y ' m, 30 C- 9.9t 1. 9 ("PI zo 34,z,s A- aali,6 A - -1?0, 50 r. N/A - aa'a3 P rb, -j. q &I, Coo PRE-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: A- (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved Sheet Paved 50 3,0 0.011 O' co Shallow Conc. (Unpaved) Shallow Conc. (Paved) 3, o Channel /o9U 5 +/5 e- 3. 72- Pipe ?D te F. sr e- 2. 0 TOTAL N/A N/A N/A Te pre = (0 , S- `Z Acreage Land Use Soil "Type Hydrologic Group CN Weighted CN (Arreage/l'atxl Area) x (CN) //? ?p + ' F UP I V W --rr L., N CNpre=! t4% _0, 0 'OST-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: A (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved Sheet Paved S`C> 6, Shallow Conc. (Unpaved) Shallow Conc. Paved) , 44 1 , C f Channel , i a t>` C S e i Pie t Et" TOTAL N/A N/A N/A Te past= Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Aeraageratal Area) x (ON) ;s CatttYlt£ r P ceaz Ac 972 SD.G 4 f, 22_Fc 4f 4-9 17- 72 Mr ? 4,p' # ?,lpU -Z2N11 CCt3 ' e52 U G"I •d PRE-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: 3 (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved /00 2-, y a a Sheet Paved Shallow Conc. (Unpaved) f 13U l • } Shallow Conc. (Paved) Channel (? 5 *,,4 Are Pipe TOTAL N/A N/A N/A Te pre = f (?, Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreagit'rotal Arcs) x (CN) LI Woor?r6 9?_ (041 CNPre ' (o 1 POST-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: $ (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved 00 0 Sheet Paved Shallow Conc. (Unpaved) 100 ? k b C>.?'? L?, c/ Shallow Conc. (Paved) Channel) v o 1*`tvs a SOLD S ? f "•' /, Pipe TOTAL N/A N/A N/A Te post= 3-1 5. £. - Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreagefrotal Area) x (CN) } Opt G I7 f CNPnst- t q50, I PRE-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: ?,. (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved Sheet Paved 4 A Shallow Conc. (Unpaved) - Shallow Conc. (Paved) Channel Pipe TOTAL N/A N/A N/A Tc pre = Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreagerrotai area) % (CN) CNp,, = POST-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: C, (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved / 00 (o w 0.2 e-/ 47, Sheet Paved Shallow Conc. (Unpaved) 00 (0.0 0,Z Shallow Conc. (Paved) a A4s) Channel 127,s??+ ftat.: /Z D Pipe TOTAL N/A N/A N/A Te post= Z Acreage Land Use Soil Type Hydrologic Group CN Weighted CN rea) z (CN) ( lcreagerratalA j OLt ? ., . ?a j 7 y z /t c Pr (91 CNp.,e= ? L4 S-P 0 0. y PRE-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: D (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved Sheet Paved Shallow Conc. (Unpaved) Shallow Conc. (Paved) Channel Pipe TOTAL N/A N/A N/A Sttt t?°t F ? Te pre _ x" t ht - D D_22_ Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreageffmal Areu) x (CN) dr 'et c n gi , 31012. (? R D5P_rrq S,;>Ac E ,r t..,.e l# p L3 (0 35; /1 CNPre= T•!Q POST-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: P (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannin s (n) Time (min.) Sheet Unpaved Sheet Paved Shallow Conc. (Unpaved) Shallow Conc. Paved Channel Pipe TOTAL N/A N/A N/A (S OSt A5, MIt Te M, I Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreagefrotal Area) x (CN) £ 5A-M? .4J PRE CNPost= 0IE Tx{.f TURNBULL SIGMON DESIGN loos Morehead Square Drive Suite 530 Charlotte, North Carolina 28203 Phone: 704.529.6500 Fax: 704-522.o882 Prosperity Village Project No: 07-085 CALCULATIONS FOR: Storm Water Detention DATE: 9/25/08 REV: 3/20/09 7 Prosperity Village Project No: 07-085 Table of Contents. Section 1: Introduction I - Project Summary Section 2: Hydrology Input I - Drainage Basin Data II - Time of Concentration Calculations Section 3: Hydra Flow Output I - Hydra-Flow Output lI - Detension Summary III - Anti Floatation Calculations Project No: 07-085 DATE: ,3/2%9 Section i: Introduction TURNBULL SIGMON DESIGN iooi Morehead Square Drive Suite 530 Charlotte, North Carolina 28203 Phone: 704.529.6500 Fax: 704.522.0882 Prosperity Villa ge Turnbull Sigmon Design JOB NO.: 07-085 BY: R.LF rooi Morehead Square Dr., Suite 530 + DATE: 942g o8 T.L.: Charlotte, North Carolina 28203 zR ' r WISED: 0A/20/00 P.M.: Bcm Watershed Information Basin A Pre Delevopment I age Area:= 34.50 acres 11 Area Description Zoning SoY Type H d. Group Area (SF) % CN Wtd CN A-1 Commercial CC CeB21HeB BIC 785,565 52.27% 93 48.61 A-2 Wooded R-3 CeB21HeB BIC 644,219 42.87% 57 24.43 A-3 Pond R-3 W BIC 73,036 4.86% 98 4.76 Total 1,502,820 100.00% 77.81 H dra-Flow Basin Area BA 34.50 Acres Curve Number LS 77.81 Prosperit y Village Turnbull Sigmon Design r JOB NO.: 07-085 BY: RLT xooi. Morehead Square Dr., Suite 530 ` r i ,- PATE: 9125108 T.L.: Charlotte, North Carolina 28203 , . dISED: 03 2%9 P.M.: BCIVI PrQiect Introduction INTRODUCTION: Prosperity Village is a future multi-family developments located along Ridge Road (SR#26oi) near the intersection of Ridge Road and Prosperity Church Road (SR#2475) within the City of Charlotte, NC. The project will be designed and constructed in phases. The initial phase of the project consists of the construction of two new public streets, Thomas Ridge Drive and Prosperity Village Road, and the required utilities associated with these roads. The following calculations are stormwater detention calculations to account for the increased peak runoff that is generated by the impeivious area generated by Thomas Ridge Drive and Prosperity Ridge Road. The site has been divided into four distinct drainage basins that drain to two discharge points. For the purpose of these calculation the discharge points have been identified as Study Point A and Study Point B. The 2-year and io-year 6 hr peak flows have been controlled so that the post development peak flows do not exceed the pre development peak flows. Future Development of the site has not been taken into account. J0. JL 4 Project Nos 07-®85 DATE: 312o/o9 0.0 0 Seciaon2. Hydrology Input TURNBULL SIGMGN DESIGN ioox Morehead Square Drive Suite 530 Charlotte, North Carolina 28203 Phone: 704.529.65oo Fax: 704.522.0882 Prosperity Villa a Turnbull Sigmon Design JOB NO.: o7-o85 BY: RLF loos Morehead Square Dr., Suite 530 nATE: 9J25108 T.L.: Charlotte, North Carolina 28203 WISED: 0s/20/00 P.M.: BC1111 Watershed Information Basin B Pre Delevopment IlDraina-g-e-Area = 6-64 acres 11 Area Description Zoning Soil-Type H yd. Group Area SF % Md ' CN B-1 Wooded R-22 HeB1CeB2 BIC 289,238 100.00% 64 64.00 Total 289,238, 100.00% 6420 idra-Flow asin Area BA 6.64 Acres urve Number LS 64.00 Prosperity Village Turnbull Sigmon Design JOB NO.: 07-085 BY: Rcm loos Morehead Square Dr., Suite 530 DATE: g i%8 T.L.: Charlotte, North Carolina 2820f ISED: 3120109 P.M.: I3CIb1 Drainage Basin Data ' ~-`- ?:, Basin A Post Delevopment a aC a rea = 33.5 acres Area Description Zoning Soil Type d. Grou Area Se " % CN Wtd. CN A-1 CC HeB/CeB2 B/C 785,565 0.54 93 50.07 A-2 R-22MF(CD) HeB C 33,010 0.02 79 1.79 A-3 R-22MF(CD) w w 73,036 0.05 98 4.91 A4 R-22MF(CD) CeB2 B 497,808 0.34 69 23.54 A-5 R-22MF(CD) CeB2 B 69,671 0.05 69 3.29 Total 1,459,090 1.00 83.6 H draflow Input Basin Area BA 33.5 ac Curve Number LS 83.6 in Lag Time UD 6.5 min 'ros ` eri Vida e Turnbull Sigmon Design OB NO.: 07-085 BY: RLF zoos Morehead Square Dr., Suite 530 f=x )ATE: 9125108 T.L.: Charlotte, North Carolina 28203 3,` casF 'ISED: 03120109 P.M.: ELH Watershed Information Basin B Post Deleuopment Mrains a rea = 4.74 acres Area Description ' Zoning Soil,. Type H yd, Group Area SF % CN Wtd. CN B-1 Impervious R-22MF(CD) NIA NIA 55,983 27.13% 98 26.59 B-2 Open Space R-22MF(CD) HeB C 65,899 31.94% 79 25.23 B-3 Open Space R-22MF(CD CeB2 B 84,457 40.93% 69 28.24 Total 206,339 100.00% 80.06 Hydra-Flow Basin Area BA 4.74 Acres Curve Number LS 80.06 ros er Villa a Turnbull Sigmon Design B NO.: 07-085 BY: BCM tool Morehead Square Dr., Suite 530 TE: 9125108 T.L.: Charlotte, North Carolina 28203 a ZSEL o3120109 P.M.: BCI Watershed In ormation Basin C - Post Post Delevopment IlDrainage Area = 2.99 acres Area Description Zoning Soil Type H yd, Group Area (SF) % CN WK CN C-1 Impervious R-22MF(CD) NIA NIA 21,092 16.22% 98 15.89 C-2 Open Space R-22MF(CD) HeB C 86,83+6 66.77% 79 52.75 G-3 Open Space R-22MF CD) CeB2 B 22,123 17.01% 69 11.74 Total 130,051 100.00% 80.38 Flow Area BA 2.99 Acres Number LS 80.38 Prosperity Village Turnbull Sigmon Design - w _ JOB NO.: 07-085 BY: R l* loo1 Morehead Square Dr., Suite 530 t DATE: 9125108 T.L.: Charlotte, North Carolina 28203 \{,mot y 'ISED: 03120109 P.M.: EL Watershed Information Basin D Pre & Post Development mina a rea'= 1.00 acres Area Descri tion Zoning Soil.Type H yd. Group Area °s SF % GN Wtd CN D-1 Open Space R-22MF(CD) HeB C 21,320 49.01% 79 38.72 D-2 Open Space R-22MF(CD) CeB2 B 22,184 50.99% 9 35.19 A 43,504 100.00% 73.90 Hydra-Flow Basin Area BA 1.00 Acres Curve Number LS 73.90 Prosperity Village Turnbull Sigrnon Design JOB NO.: 07-085 BY: BCM low Morehead Square Dr., Suite 530 DATE: 9125108 T.L.: Charlotte, North Carolina 282og REVISED: 03120109 P.M.: BCM Watershed Information Basin D Pre & Post Development •aina a rea = 1.00 acres Area Description , Zoning Soil Type H yd, Group Area (SF) % CN Md. CN D-1 Open Space R-22MF CD} HeB C 21,320 49.01% 79 38.72 D-2 Open Space R-22MF(CD) CeB2 B 22,184 50.99% 69 35.19 Total 43,504 100.00% 73.90 Hydra-Flow Basin Area BA 1.00 Acres Curve Number LS 73.90 Prosperity Village Turnbull Sgmon Design - -' JOB NO.: 07-085 BY: BCIW im Morehead Square Dr., Suite 530 DATE: 9/2,5 o8 T.L.: Charlotte, Noith Carolina 2820 REVISED: 3120109 P.M.: BCJW TIME OF CONCENTRATION e Basin A Pre-Developed Pre-developed Type: Sheet Flow Flow Phase #1 Length: 50 ft "N" Value: 0.011 from tables Slope: 0.03 ftlft Com uted 'T' 0.6 Minutes Pre-developed Type: Shallow Concentrated Flow Flow Phase #2 Surface: P Length: 50 ft u=unpaved Slope: 0.03 ft/ft p= paved Velocit : 3.52 Alsec computed T. 0.004 hr, or 0.24 Minutes IF- Pre-developed e: Open Channel Flow Flow Phase #3 Len the 1712 ft Velocity. 5 ft/sec Computed T. 0.095 hr, or 5.7 Minutes Pre-developed Time o Concentration Total Flow Total T,= 6.5 Minutes Summary La Time T LAG = 3.9 Minutes T LAG =0.6 x T? T LAG = 0.0650 Hours Prosperity Village Turnbull Sigmon Design JOB NO.: 07-085 BY: BCIVI cool Morehead Square Dr., Suite 530 l DATE: 9125108 Charlotte, North Carolina 2820 REVISED: 3120109 P.M.: BC AI TIME OFCONCENTRA77ON -- Te Basin. B Pre-Developed Pre-developed Type: Sheef Flow Now Phase #1 Length: 100 ft "N" Value: 0.24 from tables Slope: 0.024 ft/ft Com uted T` 13.4 Minutes Pre-developed Type: Shallow Concentrated Flow Flow Phase #2 Surface: u Length: 100 ft u=unpaved Slope: 0.019 ft/ft p= paved velocit : 2.22 ft/sec Computed 'T': 0.013 ' hr, or 0.78 Minutes Pre-developed e: Open Channel Flow Flow Phase #3 Length: 610 ft Velocif . 6 ft(sec Computed T. 0.034 hr, or 2.0 Minutes Pre=developed Time o Concentration Total Flow Total T,. 16.2 Minutes Summary La Time TLAc = 9.7 Minutes ?T LAo =0.6 x T c T LAG = 0.1620 Hours Prosperity Village Turnbull Sigmon Design JOB NO.: 07-085 BY. BCf iooi Morehead Square Dr., Suite 530 DATE: 9125108 T.L.: Charlotte, North Carolina 28203 REVISED: 312o/o9 P.M.: BCtvf TIME OFC®NCEWRATIOIV Te Basin. Post Developed Post-developed Type: Sheet Flow Flow Phase #1 Length: 50 ft "N" Value: 0.011 from tables Slope: 0.03 ftlft Computed T' 0.6 Minutes Post-developed Type: Shallow Concentrated flow Flow Phase #2 Surface: P Length: 50 ft unpaved 17 Slope: 0.03 ftlft paved p= Velocit : 3.52 ft/sec Cam uted 'T': 0.004 hr, or 0.24 ;Minutes Post-developed e: Den Channel Flow Flow Phase #3 Len the 1712 ft Velocity., 5 ft/sec Computed 'T ." 0.095 `hr, or 5.7 Minutes Post-developed lime o Concentration Total Flow Total Tc= 6.5 Minutes Summary La Time TLAr. = 3.9 Minutes TLA2 =0.6 x T? __I TLAa = 0.0650 Hours Prosper i Villa a Turnbull Sigmon Design JOB NO.: 07-085 BY: BCM iool Morehead Square Dr., Su to 530 DATE: 9125108 T.L.: Charlotte, North Carolina 28203 F REVISED: 312o log P.M.: BCM TIME OF CONCENTRATION - -' ' Tc Basin B Post-developed Post-developed Type: Sheet Flow Flow Phase #1 Length: 100 ft "N" Value: 0.24 from tables Slope: 0.04 ftlft Com `uted 'T 11 Minutes Post-developed Type: Shallow Concentrated Flow Flow Phase #2 Surface: u Length: 100 ft u=unpaved Slope: 0.06 ft/ft p= paved Velocit : 3.95 ftlsec Computed 'T . 0.007 hr, or 0.42 Minutes' Post-developed Type: en Channel Flow Flow Phase #3 Length: 500 ft Velocit : 5 ft(sec Computed T': 0,028 hr, or 1.7'Minutes Post-developed Time o Concentration Total Flow Total T c. 13.1 Minutes Summary La Time T Lac = 7.9 Minutes T Lac =0.6 x Tc T Lac = 0.1320 Hours Prosperity Villa a Turnbull Sigmon Design '- JOB NO.: 07-085 BY: BCM loot Morehead Square Dr., Suite 530 ' DATE: 9125108 T.L.: Charlotte, North Carolina 28203 REVISED: 3120109 P.M.: BCM TIME OF CONCENTRATION Tc Basin CPost-Developed Post-developed Type: Sheet Flow Flow Phase #1 Length: 100 ft "N" Value: 0.24 from tables Slope: 0.06 ft/ft Cam uted 'T` 9.3 Minutes Post-developed' 7Vpe: Shallow Concentrated' Flow Flow Phase #2 Surface: u Length: 100 ft u=unpaved Slope: 0.06 ft/ft p= paved Velocit : 3.95 fUsec Com uted 'T': 0.007 hr, or 0.42 Minutes Post-developed Type: Open ' Channel' Flow blow Phase #3 Length: 120 ft Velocit . 5 ft/sec Computed T: 0.007 hr, or 0.4 Minutes Post-developed Time o Concentration Total Flow Total T C . 10.9 Minutes Summary La Time -1 T LAG = 6.1 Minutes T LAG =0.6 x T, TIAG = 0.1020 Hours age Project No: 07-o85 DATE: 312%8 Section 3. Hydra-Flow Output TURNBULL SIGMON DESIGN ioox Morehead Square Drive Suite 530 Charlotte, North Carolina 28203 Phone: 704.529.6500 Fax: 704.522.o882 Hydrograph Return Period Recap HydraflowHydrographsbylntelisolvev9.02 yd. Hydrograph Inflow Peak Outflow (cfs) - Hydrograph ti i d .Jo. type Hyd(s) on escr p (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------ ---- - 45.93 ------ ------- 123.01 -- -- 194.49 ------ Basin A Pre-Development 2 SCS Runoff ------- ------- 67.92 ------ ------ 151.45 ----- 224.62 ---- Basin A Post-Development 3 Reservoir 2 - - - 24.71 -- -- ----- 43.00 ------ 87.23 ------- Basin A - Post Routed 5 SCS Runoff ------ ------ 1.281 - - -- 7.440 ------ 14.87 - -- Basin B Pre-Development 6 SCS Runoff ------ ------ 5.684 ------- ------- 14.30 ------- 22.23 - - Basin B Post-Development 7 SCS Runoff ----- ------ 3.938 ------- ------- 9.809 ------- 15.19 ------ Basin C Post-Development 8 Diversionl 6 ------ 2.558 ------ ------- 6.436 -- -- 10.00 - -- WQ Flow 9 Diversion2 6 ------ 3.126 -- -- --- 7.866 - --- 12.23 ------ To Detention 11 Reservoir 9 ------ 0.294 ------- - -- 1.787 ------- 6.742 -- - Basin B-Post Routed 12 Reservoir 7 ---- 0.907 --- - - -- - 1589 -- -- 9.299 - --- Basin C - Post Routed 14 SCS Runoff ------ ---- 0.948 ------ ---- 2.963 ----- 4.931 I ------- I Basin D Pre & Post-Development Proj. file: 3rd Submittal.gpw Monday, Mar 23, 2009 yrograph Summary Report HydraflowHydrographsbylntelisolvev9.02 yd. .40. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 45.93 1 187 83,701 - - -- - -- Basin A Pre-Development 2 SCS Runoff 67.92 1 187 118,896 --_- ------ - - - Basin A Post-Development 3 Reservoir 24.71 1 199 1,200,085 2 775.25 455,773 Basin A - Post Routed 5 SCS Runoff 1.281 1 203 4,801 --- --- -- -- Basin B Pre-Development 6 SCS Runoff 5.684 1 192 12,619 ---- ------ -- - Basin B Post-Development 7 SCS Runoff 3.938 1 191 8,390 --- -- - --- - Basin C Post-Development 8 Diversionl 2.558 1 192 5,679 6 ------ - - WQ Flow 9 Diversion2 3.126 1 192 6,940 6 - -- -- - To Detention 11 Reservoir 0.294 1 270 6,911 9 767.84 4,500 Basin B-Post Routed 12 Reservoir 0.907 1 219 8,380 7 761.28 3,882 Basin C - Post Routed 14 SCS Runoff 0.948 1 188 1,829 -- - -- ---- Basin D Pre & Post-Development 3rd Submiftai.gpw Return Period: 2 Year Monday, Mar 23, 2009 3 ydrorap report Hydraflow Hydrographs by lnteliso[ve v9.02 Hyd. No. 1 Basin A Pre-Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 34.450 ac Basin Slope = 0.0% Tc method = USER Total precip. = 2.28 in Storm duration = 6hourl mn2.cds Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 60 Hyd No. 1 Monday, Mar 23, 2009 Peak discharge = 45.93 cfs Time to peak = 187 min Hyd. volume = 83,701 cuff Curve number = 78 Hydraulic length = 0 ft Time of conc. (Tc) = 6.50 min Distribution = Custom Shape factor = 484 Basin A Pre-Development Hyd. No. 1 -- 2 Year 120 180 240 300 360 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 420 Time (min) ydro rap Report 4 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 2 Basin A Post-Development Hydrograph type = SCS Runoff Peak discharge = 67.92 cfs Storm frequency = 2 yrs Time to peak = 187 min Time interval = 1 min Hyd. volume = 118,896 cuft Drainage area = 33.500 ac Curve number = 84 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6.50 min Total precip. = 2.28 in Distribution = Custom Storm duration = 6hourl mn2.cds Shape factor = 484 Basin A Post-Development Q (cfs) Hyd. No. 2 -- 2 Year 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 60 Hyd No. 2 120 180 240 300 360 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 420 Time (min) Hydrograph Report 5 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 3 Basin A - Post Routed Hydrograph type = Reservoir Peak discharge = 24.71 cfs Storm frequency = 2 yrs Time to peak = 199 min Time interval = 1 min Hyd. volume = 1,200,085 cuft Inflow hyd. No. = 2 - Basin A Post-Development Max. Elevation = 775.25 ft Reservoir name = Existing Pond Max. Storage = 455,773 cult Storage Indication method used. Wet pond routing start elevation = 774.80 ft. Basin A - Post Routed Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0 00 0 00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 3 Hyd No. 2 tflTl:Tl;CH Total storage used = 455,773 cuft Pond Report 6 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Pond No. 2 - Existing Pond Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 768.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 768.00 47,871 0 0 1.00 769.00 52,207 50,018 50,018 2.00 770.00 55,948 54,061 104,080 3.00 771.00 59,535 57,726 161,806 4.00 772.00 63,267 61,385 223,192 5.00 773.00 67,156 65,195 288,387 6.00 774.00 73,330 70,213 358,600 7.00 775.00 79,954 76,610 435,211 8.00 776.00 87,027 83,457 518,668 9.00 777.00 101,196 94,013 612,681 10.00 778.00 116,883 108,934 721,615 Culvert 1 Orifice Structures Weir Structures [A] [g] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 42.00 8.00 0.00 0.00 Crest Len (ft) = 20.00 20.00 0.00 0.00 Span (in) = 42.00 36.00 0.00 0.00 Crest El. (ft) = 776.00 776.25 0.00 0.00 No. Barrels = 1 4 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 764.61 774.50 0.00 0,00 Weir Type = Riser Broad --- Length (ft) = 61.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0,60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi-Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvervonfice outflows are analyzed under inlet and outlet control. Weir risers are checked for orifice conditions. Stage (ft) Stage / Discharge Elev (ft) 10.00 8.00 6.00 4.00 2.00 0.00 778.00 776.00 774.00 772.00 770.00 768.00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 300.0 330.0 360.0 Total Q Discharge (cfs) ydrogra h Repo 7 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 5 Basin B Pre-Development Hydrograph type = SCS Runoff Peak discharge = 1.281 cfs Storm frequency = 2 yrs Time to peak = 203 min Time interval = 1 min Hyd. volume = 4,801 cult Drainage area = 6.640 ac Curve number = 64 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 16.20 min Total precip. = 2.28 in Distribution = Custom Storm duration = 6hourl mn2.cds Shape factor = 484 Q (cfs) 2.00 1.00 Basin B Pre-Development Hyd. No. 5 -- 2 Year 0,00 0 60 Hyd No. 5 i n 120 180 240 300 360 Q (cfs) 2.00 1.00 - 0.00 420 Time (min) ydrograph Report 8 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 6 Basin B Post-Devel opment Hydrograph type = SCS Runoff Peak discharge = 5.684 cfs Storm frequency = 2 yrs Time to peak = 192 min Time interval = 1 min Hyd. volume = 12,619 cuft Drainage area = 4.740 ac Curve number = 80.1 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 13.10 min Total precip. = 2.28 in Distribution = Custom Storm duration = 6hour1 mn2.cds Shape factor = 484 Basin B Post-Development Q (cfs) Hyd. No. 6 -- 2 Year 6.00 5.00 4.00 3.00 2.00 1.00 0.00 1 1 0 60 Hyd No. 6 120 180 240 300 360 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 ? 0.00 420 Time (min) 9 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 7 Basin C Post-Development Hydrograph type = SCS Runoff Peak discharge = 3.938 cfs Storm frequency = 2 yrs Time to peak = 191 min Time interval = 1 min Hyd. volume = 8,390 cuft Drainage area = 2.990 ac Curve number = 80.4 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.10 min Total precip. = 2.28 in Distribution = Custom Storm duration = 6hour1 mn2.cds Shape factor = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 Basin C Post-Development Hyd_ No. 7 -- 2 Year Q (cfs) 4.00 0 60 Hyd No. 7 3.00 2.00 1.00 ? 1 I 1 1 7k ? 0.00 120 180 240 300 360 420 Time (min) ydrograph Report 10 Hydraflow Hydrographs by Intelisolve v9.02 Hyd. No. 8 WQ Flow Hydrograph type = Diversion1 Storm frequency = 2 yrs Time interval = 1 min Inflow hydrograph = 6 - Basin B Post-Development Diversion method = Flow Ratio Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 60 120 180 240 300 360 420 Hyd No. 8 -- Q = 0.45 x Qln Hyd No. 6 -- Inflow Hyd No. 9 -- 6 minus 8 Time (min) WQ Flow Hyd. No. 8 -- 2 Year Monday, Mar 23, 2009 Peak discharge = 2.558 cfs Time to peak = 192 min Hyd. volume = 5,679 cult 2nd diverted hyd. = 9 Flow ratio = 0.45 yrograph Report Hydraflow Hydrographs by Intellsolve x9,02 Hyd. No. 9 To Detention Hydrograph type = Diversion2 Storm frequency = 2 yrs Time interval = 1 min Inflow hydrograph = 6 - Basin B Post-Development Diversion method = Flow Ratio 11 Monday, Mar 23, 2009 Peak discharge = 3.126 cfs Time to peak = 192 min Hyd. volume = 6,940 cult 2nd diverted hyd. = 8 Flow ratio = 0.45 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 60 120 - Hyd No. 9 -- Q = 0.55 x Qin To Detention Hyd. No. 9 - 2 Year 180 240 Hyd No. 6 -- Inflow 300 360 - Hyd No. 8 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 -- 0.00 420 Time (min) 12 ydrogra Report Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. II Basin B-Post Routed Hydrograph type = Reservoir Peak discharge = 0.294 cfs Storm frequency = 2 yrs Time to peak = 270 min Time interval = 1 min Hyd. volume = 6,911 cuft Inflow hyd. No. = 9 - To Detention Max. Elevation = 767.84 ft Reservoir name = Pond B Max. Storage = 4,500 tuft Storage Indication method used Q (cfs) 4.00 3.00 2.00 1.00 Basin B-Post Routed Hyd. No. 11 -- 2 Year Q (cfs) 4.00 3.00 2.00 1.00 0.00 ,, ; 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 11 Hyd No. 9 1111.1111.10 Total storage used = 4,500 cuft Time (min) L f' h 1 i t. Pond Report 13 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Pond No. 1 - Pond B Pond Data Contours - User-defined contour areas. Con ic method used for volume calculation. Begi ning Elevation = 766.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 766.50 2,990 0 0 0.50 767.00 3,259 1,562 1,562 1.50 768.00 3,785 3,518 5,080 2.50 769.00 4,339 4,058 9,138 3.50 770.00 4,923 4,627 13,766 4.50 771.00 5,531 5,224 18,989 5.50 772.00 6,165 5,845 24,834 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 3.25 6.00 0.00 Crest Len (ft) = 12.00 10.00 0.00 0.00 Span (in) = 24.00 3.25 18.00 0.00 Crest El. (ft) = 770.10 770.70 0.00 0.00 No. Barrels = 1 1 3 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 766.50 766.50 769.00 0.00 Weir Type = Riser Broad --- Length (ft) = 36.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 0.50 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet and outlet control. Weir risers are checked for orifice conditions Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 1 ' 0.00 7.00 Total Q Stage / Discharge 14.00 21.00 28.00 35.00 42.00 49.00 Elev (ft) 772.50 771.50 770.50 769.50 768.50 767.50 I ' ' ' 766.50 56;00 63.00 70.00 77.00 Discharge (cfs) ydrograh Report 14 Hydratlow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 12 Basin C - Post Routed Hydrograph type = Reservoir Peak discharge = 0.907 cfs Storm frequency = 2 yrs Time to peak = 219 min Time interval = 1 min Hyd. volume = 8,380 cult Inflow hyd. No. = 7 - Basin C Post-Development Max. Elevation = 761.28 ft Reservoir name = Pond C Max. Storage = 3,882 cult Storage Indication method used. Q (cfs) 4.00 3.00 2.00 1.00 0 00 Basin C - Post Routed Hyd. No. 12 - 2 Year F E f: Q (cfs) 4.00 3.00 2.00 1.00 0 00 0 60 120 180 240 300 360 420 480 540 600 660 720 min) Time ( Hyd No. 12 Hyd No. 7 MT 11.1:1..1± Total storage used 3,882 craft Pond Report 15 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Pond No. 3 - Pond C Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 760.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Co ntour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 760.00 2,613 0 0 1.00 761.00 3,191 2,897 2,897 2.00 762.00 3,813 3,497 6,394 3.00 763.00 4,438 4,121 10,515 4.00 764.00 5,087 4,758 15,273 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] LB] [C] [D] Rise (in) = 30.00 6.00 6.00 0.00 Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (in) = 30.00 6.00 12.00 0.00 Crest El. (ft) = 763.00 0.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 760.00 760.00 761.35 0.00 Weir Type = Broad -- - -- Length (ft) = 58.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(In/hr) = 0.000 (by Wet area) Multi-Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.00 1.00 n o0 Note: Culvert/Orifce outflows are analyzed under inlet and outlet control. Weir risers are checked for orifice conditions. Stage / Discharge Elev (ft) 764.00 763.00 762.00 761.00 760 00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 Total Q Discharge (cfs) ydroraph Report HydratlowHydrographs by Intelisolve v9.02 Hyd. No. 14 Basin D Pre & Post-Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 1 min 1.000 ac 0.0% USER 2.28 in 6hourl mn2.cds 16 Monday, Mar 23, 2009 Peak discharge = 0.948 cfs Time to peak = 188 min Hyd. volume = 1,829 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Custom Shape factor = 484 Basin D Pre & Post-Development Hyd. No. 14 -- 2 Year 0 60 120 180 240 300 Hyd No. 14 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 360 420 Time (min) 17 H y rog ra p h Summary Report Hydraflow Hydrographs by Intelisolve v9.02 'yd. .Jo. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 123.01 1 187 214,914 - - - - -- - Basin A Pre-Development 2 SCS Runoff 151.45 1 187 266,633 - ------ ------ Basin A Post-Development 3 Reservoir 43.00 1 201 1,323,347 2 776.04 522,063 Basin A - Post Routed 5 SCS Runoff 7.440 1 197 19,992 - - -- - --- Basin B Pre-Development 6 SCS Runoff 14.30 1 191 30,828 - - - -- - - - Basin B Post-Development 7 SCS Runoff 9309 1 190 20,357 - - ------ -- Basin C Post-Development 8 Diversionl 6.436 1 191 13,873 6 - - - -- - WQ Flow 9 Diversion2 7.866 1 191 16,956 6 - - - - - To Detention 11 Reservoir 1.787 1 217 16,927 9 769.20 10,070 Basin B-Post Routed 12 Reservoir 3.589 1 205 20,347 7 762.54 8,607 Basin C - Post Routed 14 SCS Runoff I 2.963 1 187 5,218 --- ----- --- Basin D Pre & Post-Development I 3rd Submittal.gpw Return Period: 10 Year Monday, Mar 23, 2009 Hydrograph Report 18 Hydraflow Hydrographs by Intelisolve v9.02 Hyd. No. 1 Basin A Pre-Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 34.450 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.72 in Storm duration = 6hourl mn2.cds Q (cfs) 140.00 20.00 100.00 80.00 60.00 40.00 20.00 0 00 Monday, Mar 23, 2009 Peak discharge = 123.01 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 187 min 214,914 cult 78 Oft 6.50 min Custom 484 Basin A Pre-Development Hyd. No. 1 -- 10 Year Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0 60 Hyd No. 1 120 180 240 300 360 420 Time (min) Hydrograph Report Hydraflow Hydrographs by Intellsolve v9.02 Hyd. No. 2 Basin A Post-Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 33.500 ac 0.0% USER 3.72 in 6hour1 mn2.cds Basin A Post-Development Q (cfs) Hyd. No. 2 -- 10 Year 160.00 10.00 120.00 100.00 80.00 60.00 40.00 20.00 19 Monday, Mar 23, 2009 Peak discharge = 151.45 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (TO Distribution Shape factor 187 min 266,633 cult 84 Oft 6.50 min Custom 484 0.00 0 60 Hyd No. 2 120 180 240 300 360 Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 =.J- 0.00 420 Time (min) Hydrograph Deport 20 Hydraflow Hydrographs by fntelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 3 Basin A - Post Routed Hydrograph type = Reservoir Peak discharge = 43.00 cfs Storm frequency = 10 yrs Time to peak = 201 min Time interval = 1 min Hyd. volume = 1,323,347 cult Inflow hyd. No. = 2 - Basin A Post-Development Max. Elevation = 776.04 ft Reservoir name = Existing Pond Max. Storage = 522,063 cult Storage Indication method used. Wet pond routing start elevation = 774.80 ft. Basin A - Post Routed Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 160.00 160.00 110.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0 00 0 00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 3 Hyd No. 2 01] 111,1t Total storage used = 522,063 cult Pond Report 21 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Pond No. 2 - Existing Pond Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 768.00 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 768.00 47,871 0 0 1.00 769.00 52,207 50,018 50,018 2.00 770.00 55,948 54,061 104,080 3.00 771.00 59,535 57,726 161,806 4.00 772.00 63,267 61,385 223,192 5.00 77100 67,156 65,195 288,387 6.00 774.00 73,330 70,213 358,600 7.00 775.00 79,954 76,610 435,211 8.00 776.00 87,027 83,457 518,668 9.00 777.00 101,196 94,013 612,681 10.00 778.00 116,883 108,934 721,615 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 42.00 8.00 0.00 0.00 Crest Len (ft) = 20.00 20.00 0.00 0.00 Span (in) = 42.00 36.00 0.00 0.00 Crest El. (ft) = 776.00 776.25 0.00 0.00 No. Barrels = 1 4 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 764.61 774.50 0.00 0.00 Weir Type = Riser Broad --- --- Length (ft) = 61.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi-Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet and outlet control. Weir risers are checked for orifice conditions. Stage (ft) Stage I Discharge Elev (ft) 10.00 8.00 6.00 4.00 2.00 0 00 778.00 776.00 774.00 772.00 770.00 768 00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 300.0 330.0 360.0 Total Q discharge (cfs) Hydraffow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 5 Basin B Pre-Development Hydrograph type = SCS Runoff Peak discharge = 7.440 cfs Storm frequency = 10 yrs Time to peak = 197 min Time interval = 1 min Hyd, volume = 19,992 cuft Drainage area = 6.640 ac Curve number = 64 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 16.20 min Total precip. = 3.72 in Distribution = Custom Storm duration = 6hour1 mn2.cds Shape factor = 484 Q (cfs) 8.00 6.00 4.00 2.00 Q (cfs) 8.00 6.00 4.00 2.00 0.00 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) Basin B Pre-Development Hyd. No. 5 -- 10 Year 23 ydrogra Repod Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. S Basin B Post-Development Hydrograph type = SCS Runoff Peak discharge = 14.30 cfs Storm frequency = 10 yrs Time to peak = 191 min Time interval = 1 min Hyd. volume = 30,828 cuft Drainage area = 4.740 ac Curve number = 80.1 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 13.10 min Total precip. = 3.72 in Distribution = Custom Storm duration = 6hour1 mn2.cds Shape factor = 484 Q (cfs) 15.00 12.00 9.00 6.00 3.00 0.00 0 60 Hyd No. 6 Basin B Post-Development Hyd. No. 6 --10 Year 120 180 240 300 Q (cfs) 15.00 12.00 9.00 6.00 3.00 0.00 360 420 Time (min) 24 ydroraph Repo Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 7 Basin C Post-Development Hydrograph type = SCS Runoff Peak discharge = 9.809 cfs Storm frequency = 10 yrs Time to peak = 190 min Time interval = 1 min Hyd. volume = 20,357 cult Drainage area = 2.990 ac Curve number = 80.4 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.10 min Total precip. = 3.72 in Distribution = Custom Storm duration = 6hour1 mn2.cds Shape factor = 484 Basin C Post-Development Q (cfs) Hyd. No. 7 --10 Year Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 10.00 8.00 6.00 4.00 2.00 0 00 0 60 120 180 240 300 360 420 Hyd No. 7 Time (min) 25 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 8 WQ Flow Hydrograph type = Diversionl Peak discharge = 6.436 cfs Storm frequency = 10 yrs Time to peak = 191 min Time interval = 1 min Hyd. volume = 13,873 cuft Inflow hydrograph = 6 - Basin B Post-Development 2nd diverted hyd. = 9 Diversion method = Flow Ratio Flow ratio = 0.45 Q (cfs) 15.00 12.00 9.00 6.00 3.00 0 00 WQ Flow Hyd. No. 8 -- 10 Year Q (cfs) 15.00 12.00 9.00 6.00 3.00 o 00 0 60 120 180 240 300 360 420 min) Time ( Hyd No. 8 -- Q = 0.45 x Qin Hyd No. 6 -- Inflow --? Hyd No. 9 -- 6 minus 8 26 Hydrograph Report Hydraflow Hydrographs by Intelisoive v9.02 Monday, Mar 23, 2009 Hyd. No. 9 To Detention Hydrograph type = Diversion2 Peak discharge = 7.866 cfs Storm frequency = 10 yrs Time to peak = 191 min Time interval = 1 min Hyd. volume = 16,956 cuft Inflow hydrograph = 6 - Basin B Post-Development 2nd diverted hyd. = 8 Diversion method = Flow Ratio Flow ratio = 0.45 Q (cfs) 15.00 12.00 9.00 6.00 3.00 0 00 To Detention Hyd. No. 9 -- 10 Year i Q (cfs) 15.00 12.00 9.00 6.00 3.00 0 00 0 60 120 180 240 300 360 420 Time (min) Hyd No. 9 -- Q = 0.55 x Qin ® Hyd No. 6 -- Inflow - Hyd No. 8 27 Hydrograph Report Hydraflow Hydrographs by Intellsoive v9.02 Monday, Mar 23, 2009 Hyd. No. 11 Basin B-Post Routed Hydrograph type = Reservoir Peak discharge = 1.787 cfs Storm frequency = 10 yrs Time to peak = 217 min Time interval = 1 min Hyd. volume = 16,927 cult Inflow hyd. No. = 9 - To Detention Max. Elevation = 769.20 ft Reservoir name = Pond B Max. Storage = 10,070 cuft Storage Indication method used. Q (cfs) 8.00 6.00 4.00 2.00 Q (cfs) 8.00 6.00 4.00 2.00 I I I? - - ...i......r. .- 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Myd No. 11 Hyd No. 9 1111.1.11 -MI Total storage used = 10,070 cuff Time (min) Basin B-Post Routed Hyd. No. 11 -- 10 Year Pond Report 28 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Pond No. 1 - Pond B Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 766.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft) 0.00 766.50 2,990 0 0 0.50 767.00 3,259 1,562 1,562 1.50 768.00 3,785 3,518 5,080 2.50 769.00 4,339 4,058 9,138 3.50 770.00 4,923 4,627 13,766 4.50 771.00 5,531 5,224 18,989 5.50 772.00 6,165 5,845 24,834 Culvert/ Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [Dl Rise (in) = 24.00 3.25 6.00 0.00 Crest Len (ft) = 12.00 10.00 0.00 0.00 Span (in) = 24.00 3.25 18.00 0.00 Crest El. (ft) = 770.10 770.70 0.00 0.00 No. Barrels = 1 1 3 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 766.50 766.50 769.00 0.00 Weir Type = Riser Broad - Length (ft) = 36.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (°/a) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet and outlet control. Weir risers are checked for orifice conditions Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 Stage / Discharge Elev (ft) 772.50 771.50 770.50 769.50 768.50 767.50 0.00 t ' ' 1 1 1 1 1 1 1 I 766.50 0.00 7.00 14.00 21.00 28.00 35.00 42.00 49.00 56.00 63.00 70.00 77.00 - Total Q Discharge (cfs) Hydrograph Report L 29 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 12 Basin C - Post Routed Hydrograph type = Reservoir Peak discharge = 3.589 cfs Storm frequency = 10 yrs Time to peak = 205 min Time interval = 1 min Hyd. volume = 20,347 cuft Inflow hyd. No. = 7 - Basin C Post-Development Max. Elevation = 762.54 ft Reservoir name = Pond C Max. Storage = 8,607 cuft Storage Indication method used. Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 0 60 Hyd No. 12 Basin C - Post Routed Hyd. No. 12 -- 10 Year izr !, .M 120 180 240 300 360 420 480 -- Hyd No. 7 1-11I1tI1I11 Total storage used = 8,607 cult Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 540 Time (min) Pond Report 30 Hydraflow Hydrographs by Intellsolve v9.02 Monday, Mar 23, 2009 Pond No. 3 - Pond C Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 760.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (tuft) 0.00 760.00 2,613 0 0 1.00 761.00 3,191 2,897 2,897 2.00 762.00 3,813 3,497 6,394 3.00 763.00 4,438 4,121 10,515 4.00 764.00 5,087 4,758 15,273 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 30.00 6.00 6.00 0.00 Crest Lan (ft) = 10.00 0.00 0.00 0.00 Span (in) = 30.00 6.00 12.00 0.00 Crest El. (ft) = 763.00 0.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 760.00 760.00 761.35 0.00 Weir Type = Broad --- Length (ft) = 58.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Wet area) Multi-Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: CulverVOdfice outflows are analyzed under inlet and outlet control. Weir risers are checked for orifice conditions Stage (ft) 4.00 3.00 2.00 1.00 0 00 Stage / Discharge Elev (ft) 764.00 763.00 762.00 761.00 760 00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 - Total Q Discharge (cfs) Hydrograph Report HydraFlow Hydrographs by Intelisolve v9.02 Hyd. No. 14 Basin D Pre & Post-Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (cfs) 3.00 2.00 1.00 0 00 1 min 1.000 ac 0.0% USER 3.72 in 6hour1 mn2.cds 31 Monday, Mar 23, 2009 Peak discharge = 2.963 cfs Time to peak = 187 min Hyd. volume = 5,218 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Custom Shape factor = 484 Basin D Pre & Post-Development Hyd. No. 14 -- 10 Year Q (cfs) 3.00 0 60 Hyd No. 14 2.00 1.00 I i 1 1 3_1 Q.00 120 180 240 300 360 420 V V Time (min) 32 Hy'"r®graph Summary Report HydrafiowHydrographsbylntelisolvev9.02 lyd. No, Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 194.49 1 187 340,964 ---- ------ ----- Basin A Pre-Development 2 SCS Runoff 224.62 1 186 400,961 --- --- ---- Basin A Post-Development 3 Reservoir 87.23 1 197 1,446,124 2 776.56 571,017 Basin A - Post Routed 5 SCS Runoff 14.87 1 195 37,311 ---- ---- -- -- Basin B Pre-Development 6 SCS Runoff 22.23 1 191 47,971 ---- ---- ---- Basin B Post-Development 7 SCS Runoff 15.19 1 190 31,592 ---- ----- ------ Basin C Post-Development 8 Diversionl 10.00 1 191 21,587 6 ---- --- WQ Flow 9 Diversion2 12.23 1 191 26,384 6 ------ ---- To Detention 11 Reservoir 6.742 1 201 26,355 9 769.60 11,911 Basin B-Post Routed 12 Reservoir 9.299 1 198 31,582 7 763.32 12,025 Basin C - Post Routed 14 SCS Runoff 4.931 1 187 8,612 --- ---- ---- Basin D Pre & Post-Development 3rd Submittal.gpw Return Period: 50 Year Monday, Mar 23, 2009 Hydrograph Report Hydraflow Hydrographs by InWisolve v9.02 Hyd. No. 1 Basin A Pre-Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 1 min Drainage area = 34.450 ac Basin Slope = 0.0% Tc method = USER Total precip. = 4.92 in Storm duration = 6hourl mn2.cds 33 Monday, Mar 23, 2009 Peak discharge = 194.49 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 187 min 340,964 cult 78 Oft 6.50 min Custom 484 Basin A Pre-Development Q (cfs) Hyd. No. 1 -- 50 Year 210.00 80.00 150.00 120.00 90.00 60.00 30.00 Q (cfs) 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 0 00 0 60 Hyd No. 1 120 180 240 300 360 420 Time (min) Hlydrograph Report 34 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 2 Basin A Post-Development Hydrograph type = SCS Runoff Peak discharge = 224.62 cfs Storm frequency = 50 yrs Time to peak = 186 min Time interval = 1 min Hyd. volume = 400,961 cuft Drainage area = 33.500 ac Curve number = 84 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6.50 min Total precip. = 4.92 in Distribution = Custom Storm duration = 6hourl mn2.cds Shape factor = 484 Basin A Post-Development Q (cfs) Hyd. No. 2 -- 50 Year 240.00 10.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 0 60 Hyd No. 2 Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 120 180 240 300 360 420 Time (min) Hydrograph Report 35 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 3 Basin A - Post Routed Hydrograph type = Reservoir Peak discharge = 87.23 cfs Storm frequency = 50 yrs Time to peak = 197 min Time interval = 1 min Hyd. volume = 1,446,124 cuft Inflow hyd. No. = 2 - Basin A Post-Development Max. Elevation = 776.56 ft Reservoir name = Existing Pond Max. Storage = 571,017 cuft Storage Indication method used. Wet pond routing start elevation = 774.80 ft. Q (cfs) 240.00 10.00 180.00 150.00 120.00 90.00 60.00 30.00 Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 1 I I I I _;.m, ' 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 3 Hyd No. 2 tILMU.1It Total storage used = 571,017 cuft Time (min) Basin A - Post Routed Hyd. No. 3 -- 50 Year Pond Report 36 Hydraffow Hydrographs by Intellsolve v9.02 Monday, Mar 23, 2009 Pond No. 2 - Existing Pond Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begi ning Elevation = 768.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (tuft) 0.00 768.00 47,871 0 0 1.00 769.00 52,207 50,018 50,018 2.00 770.00 55,948 54,061 104,080 3.00 771.00 59,535 57,726 161,806 4.00 772.00 63,267 61,385 223,192 5.00 773.00 67,156 65,195 288,387 6.00 774.00 73,330 70,213 358,600 7.00 775.00 79,954 76,610 435,211 8.00 776.00 87,027 83,457 518,668 9.00 777.00 101,196 94,013 612,681 10.00 778.00 116,883 108,934 721,615 Culvert 1 Orifice Structures Weir Structures [A] [13] [C] [PrfRsr] [A] [13] [C] [D] Rise (in) = 42.00 8.00 0.00 0.00 Crest Len (ft) = 20.00 20.00 0.00 0.00 Span (in) = 42.00 36.00 0.00 0.00 Crest El. (ft) = 776,00 776.25 0.00 0.00 No. Barrels = 1 4 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert EL (ft) = 764.61 774.50 0.00 0.00 Weir Type = Riser Broad --- - Length (ft) = 61.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Wet area) Multi-Stage = nla No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet and outlet control. W eir risers are checked for orifice conditions. Stage (ft) Stage I Discharge Elev (ft) 10.00 778.00 8.00 6.00 4.00 2.00 776.00 774.00 772.00 770.00 0.00 1 1 1 1 1 1 1 1 , 1 f r 768.00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 300.0 330.0 360.0 Total Q Discharge (cfs) 37 ydrograp Report Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 5 Basin B Pre-Development Hydrograph type = SCS Runoff Peak discharge = 14.87 cfs Storm frequency = 50 yrs Time to peak = 195 min Time interval = 1 min Hyd. volume = 37,311 cuft Drainage area = 6.640 ac Curve number = 64 Basin Slope = 0.0% Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 16.20 min Total precip. = 4.92 in Distribution = Custom Storm duration = 6hour1 mn2.cds Shape factor = 484 Q (cfs) 15.00 12.00 9.00 6.00 3.00 0.00 , 0 60 Hyd No. 5 Basin B Pre-Development Hyd. No. 5 -- 50 Year 120 180 Q (cfs) 15.00 12.00 9.00 6.00 3.00 0.00 240 300 360 420 Time (min) ydrogra h Report 38 Hydra@ow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 6 Basin B Post-Devel opment Hydrograph type = SCS Runoff Peak discharge = 22.23 cfs Storm frequency = 50 yrs Time to peak = 191 min Time interval = 1 min Hyd. volume = 47,971 cuft Drainage area = 4.740 ac Curve number = 80.1 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 13.10 min Total precip. = 4.92 in Distribution = Custom Storm duration = 6hourl mn2.cds Shape factor = 484 Basin B Post-Development Q (cfs) Hyd. No. 6 -- 50 Year 24.00 20.00 16.00 12.00 8.00 4.00 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0.00 0 60 120 180 240 300 360 420 Hyd No, 6 Time (min) 39 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 7 Basin C Post-Deve lopment Hydrograph type = SCS Runoff Peak discharge = 15.19 cfs Storm frequency = 50 yrs Time to peak = 190 min Time interval = 1 min Hyd. volume = 31,592 cuft Drainage area = 2.990 ac Curve number = 80.4 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.10 min Total precip. = 4.92 in Distribution = Custom Storm duration = 6hourl mn2.cds Shape factor = 484 Basin C Post-Development Q (cfs) Hyd. No. 7 -- 50 Year 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 60 Hyd No. 7 Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 120 180 240 300 360 420 Time (min) 40 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 8 WQ Flow Hydrograph type = Diversion1 Peak discharge = 10.00 cfs Storm frequency = 50 yrs Time to peak = 191 min Time interval = 1 min Hyd. volume = 21,587 cuft Inflow hydrograph = 6 - Basin B Post-Development 2nd diverted hyd. = 9 Diversion method = Flow Ratio Flow ratio = 0.45 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0 00 WQ Flow Hyd. No. 8 -- 50 Year Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0 60 120 180 240 300 360 420 Time (min) Hyd No. 8 -- Q = 0.45 x Qin Hyd No. 6 -- Inflow Hyd No. 9 -- 6 minus 8 Hydrograph Report 41 Hydraflow Hydrographs by Intellsolve v9.02 Monday, Mar 23, 2009 Hyd. No, 9 To Detention Hydrograph type = Diversion2 Peak discharge = 12.23 cfs Storm frequency = 50 yrs Time to peak = 191 min Time interval = 1 min Hyd. volume = 26,384 cuft Inflow hydrograph = 6 - Basin B Post-Development 2nd diverted hyd. = 8 Diversion method = Flow Ratio Flow ratio = 0.45 Q (cfs) 24.00 To Detention Hyd. No. 9 -- 50 Year 20.00 16.00 12.00 8.00 4.00 0.00 I I I _---t-? 0 60 120 180 240 300 360 Hyd No. 9 -- Q = 0.55 x Qin - Hyd No. 6 -- Inflow - Hyd No. 8 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 __L- 0.00 420 Time (min) Hydrograph Report 42 Hydraflow Hydrographs by inteiisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 11 Basin B-Post Routed Hydrograph type = Reservoir Peak discharge = 6.742 cfs Storm frequency = 50 yrs Time to peak = 201 min Time interval = 1 min Hyd. volume = 26,355 cuft Inflow hyd. No. = 9 - To Detention Max. Elevation = 769.60 ft Reservoir name = Pond B Max. Storage = 11,911 cuft Storage Indication method used. Basin B-Post Routed Q (cfs) Hyd. No. 11 -- 50 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 0 120 240 360 480 600 720 840 960 min) Time ( Hyd No. 11 ?- Hyd No. 9 [7TII [I [Ii Total storage used = 11,911 cuff Pond eport 43 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Pond No. 1 - Pond B Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 766.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 766.50 2,990 0 0 0.50 767.00 3,259 1,562 1,562 1.50 768.00 3,785 3,518 5,080 2.50 769.00 4,339 4,058 9,138 3.50 770.00 4,923 4,627 13,766 4.50 771.00 5,531 5,224 18,989 5.50 772.00 6,165 5,845 24,834 Culvert / Orifice Structures Weir Structures [Al [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 3.25 6.00 0.00 Crest Len (ft) = 12.00 10.00 0.00 0.00 Span (in) = 24.00 3.25 18.00 0.00 Crest El. (ft) = 770.10 770.70 0.00 0.00 No. Barrels = 1 1 3 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 766.50 766.50 769.00 0.00 Weir Type = Riser Broad --- Length (ft) = 36.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet and outlet control. Weir risers are checked for orifice conditions Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 " I 0.00 7.00 - Total Q Stage / Discharge Elev (ft) 772.50 771.50 770.50 769.50 768.50 767.50 I I ` I I I I I 1 1 766.50 14.00 21.00 28.00 35.00 42.00 49.00 56.00 63.00 70.00 77.00 Discharge (cfs) Hydrograph Report 44 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 12 Basin C - Post Routed Hydrograph type = Reservoir Peak discharge = 9.299 cfs Storm frequency = 50 yrs Time to peak = 198 min Time interval = 1 min Hyd. volume = 31,582 cult Inflow hyd. No. = 7 - Basin C Post-Development Max. Elevation = 763.32 ft Reservoir name = Pond C Max. Storage = 12,025 cult storage Indication method used. Basin C - Post Routed Q (cfs) Hyd. No. 12 -- 50 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 If. 6.00 6.00 3.00 (rt` 3.00 0.00 0.00 V 60 120 180 240 300 360. 420 480 Time. (min) Hyd No. 12 Hyd No. 7 liffln-1.1 Total storage used = 12,025 cuft Pond Report 45 Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Pond No. 3 - Pond C Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 760.00 it Stage / Storage Table Stage (ft) Elevation (ft) Co ntour area (sqft) Incr. Storage (tuft) Total storage (cuft) 0.00 760.00 2,613 0 0 1.00 761.00 3,191 2,897 2,897 2.00 762.00 3,813 3,497 6,394 3.00 763.00 4,438 4,121 10,515 4.00 764.00 5,087 4,758 15,273 Culvert / Orifice Structure s Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 30.00 6.00 6.00 0.00 Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (in) = 30.00 6.00 12.00 0.00 Crest El. (ft) = 763.00 0.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 2.60 133 3.33 3.33 Invert El. (ft) = 760.00 760.00 761.35 0.00 Weir Type = Broad -.- --- --- Length (ft) = 58.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inthr) = 0.000 (by Wet area) Multi-Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet and outlet control. Weir risers are checked for orifice conditions. Stage (ft) 4.00 3.00 2.00 1.00 0 00 Stage / Discharge Elev (ft) 764.00 763.00 762.00 761.00 760 00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 Total Q Discharge (cfs) 46 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.02 Monday, Mar 23, 2009 Hyd. No. 14 Basin D Pre & Post-Development Hydrograph type = SCS Runoff Peak discharge = 4.931 cfs Storm frequency = 50 yrs Time to peak = 187 min Time interval = 1 min Hyd. volume = 8,612 cuft Drainage area = 1.000 ac Curve number = 74 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (TO = 5.00 min Total precip. = 4.92 in Distribution = Custom Storm duration = 6hourl mn2.cds Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 60 Hyd No. 14 Basin D Pre & Post-Development Hyd. No. 14 - 50 Year 120 180 240 300 360 Q (cfs) 5.00 4.00 3.00 2.00 1.00 __j- 0.00 420 Time (min) Hydraflow Rainfall Report Hydraflow Hydrographs by intelisolve v9.02 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 69.8703 13.1000 0.8658 ------- 3 0.0000 0.0000 0.0000 ------- 5 79.2597 14.6000 0.8369 - --- 10 88.2351 15.5000 0.8279 - - - 25 102.6072 16.5000 0.8217 - -- - 50 114.8193 17.2000 0.8199 - - 100 127.1596 17.8000 0.8186 -------- File name: SampleFHA.idf Intensity = B 1(Tc + D)^E 47 Monday, Mar 23, 2009 Return Intensity Values (in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 224 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. Precio. filename: Citv6hrlmin.DcD Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SCS 6-Hr 0.00 2.28 0.00 0.00 3.72 4.38 4.92 5.34 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 1.00 2.28 0.00 0.00 3.72 4.38 4.92 5.34 Hydraflow Table of Contents Hydraflow Hydrographs by Intelisolve v9.02 3rd Submittal.gpw Monday, Mar 23, 2009 Hydrograph Return Period Recap ...................................................................... 1 2 - Year Summary Report ................................................................................................................. 2 3 Hydrograph Reports ........................................................................................................... Hydrograph No. 1, SCS Runoff, Basin A Pre-Development ............................................. 3 Hydrograph No. 2, SCS Runoff, Basin A Post-Development ........................................... 4 Hydrograph No. 3, Reservoir, Basin A - Post Routed ....................................................... 5 Pond Report - Existing Pond ........................................................................................ 6 Hydrograph No. 5, SCS Runoff, Basin B Pre-Development ............................................. 7 Hydrograph No. 6, SCS Runoff, Basin B Post-Development ........................................... 8 Hydrograph No. 7, SCS Runoff, Basin C Post-Development ........................................... 9 Hydrograph No. 8, Diversionl, WQ Flow ........................................................................ 10 Hydrograph No. 9, Diversion2, To Detention .................................................................. 11 Hydrograph No. 11, Reservoir, Basin B-Post Routed ..................................................... 12 Pond Report - Pond B ............................................................................................... 13 Hydrograph No. 12, Reservoir, Basin C - Post Routed ................................................... 14 Pond Report - Pond C ............................................................................................... 15 Hydrograph No. 14, SCS Runoff, Basin D Pre & Post-Development ............................. 16 10 - Year Summary Report ............................................................................................................... 17 Hydrograph Reports ......................................................................................................... 18 Hydrograph No. 1, SCS Runoff, Basin A Pre-Development ........................................... 18 Hydrograph No. 2, SCS Runoff, Basin A Post-Development ......................................... 19 Hydrograph No. 3, Reservoir, Basin A - Post Routed ..................................................... 20 Pond Report - Existing Pond ...................................................................................... 21 Hydrograph No. 5, SCS Runoff, Basin B Pre-Development ........................................... 22 Hydrograph No. 6, SCS Runoff, Basin B Post-Development ......................................... 23 Hydrograph No. 7, SCS Runoff, Basin C Post-Development ......................................... 24 Hydrograph No. 8, Diversionl, WQ Flow ........................................................................ 25 Hydrograph No. 9, Diversion2, To Detention .................................................................. 26 Hydrograph No. 11, Reservoir, Basin B-Post Routed ..................................................... 27 Pond Report - Pond B ............................................................................................... 28 Hydrograph No. 12, Reservoir, Basin C - Post Routed .................................... ... 29 Pond Report - Pond C ............................................................................................... 30 Hydrograph No. 14, SCS Runoff, Basin D Pre & Post-Development ............................. 31 50 - Year Summary Report ............................................................................................................... 32 Hydrograph Reports ......................................................................................................... 33 Hydrograph No. 1, SCS Runoff, Basin A Pre-Development ........................................... 33 Hydrograph No. 2, SCS Runoff, Basin A Post-Development ......................................... 34 Hydrograph No. 3, Reservoir, Basin A - Post Routed ............................................. .... 35 Pond Report - Existing Pond ...................................................................................... 36 Hydrograph No. 5, SCS Runoff, Basin B Pre-Development ........................................... 37 Hydrograph No. 6, SCS Runoff, Basin B Post-Development ......................................... 38 Hydrograph No. 7, SCS Runoff, Basin C Post-Development ......................................... 39 Contents continued... 3rd Submittal.gpw Hydrograph No. 8, Diversion1, WQ Flow ....................................................................... 40 Hydrograph No. 9, Diversion2, To Detention .................................................................. 41 Hydrograph No. 11, Reservoir, Basin B-Post Routed ..................................................... 42 Pond Report - Pond B ............................................................................................... 43 Hydrograph No. 12, Reservoir, Basin C - Post Routed ................................................... 44 Pond Report - Pond C ............................................................................................... 45 Hydrograph No. 14, SCS Runoff, Basin D Pre & Post-Development ............................. 46 OF Report .......................................................................................................... 47 Prosperity Village Turnbull Sigmon Design FOB NO.: o7-o85 BY: 1ZL lom Morehead Square Dr., Suite 530 , )ATE: 9125108 P.M.: RC-11 Charlotte, North Carolina 28203 3 WISED: 3120109 Detention Summa Peak Flow and Run-otFVolume Summaru: Study Point A 7_Yaar Finwc Drainage' Pre Post Routed Basin Q Q Q A 45.93 _ 67.92 24.71 ff N/A 0.95 NIA _..___. _ 45.93 ?? 68.87 24.71 25.66 Total Release 1f1.Yaar Flnws Drainage Pre Post Routed Basin Q Q Q A 123.01 151.45 43.00 D NIA 2.96 N/A Total Site 123.01 154.41 43.00 45.96 Total Ketease Study Point B 9_Yoar Flows Drainage Pre Post Routed Basin Q Q Q B 1.28 5.68 0.30 C NIA 3.94 0.91 Total Site 1.28 9.62 1.21 1.zi I otal Kelease 1 n-Year Flows Drainage Pre Post Routed Basin Q Q Q B 7.44 14.30 1.79 C N/A 9.81 3,59 Total Site 7.44 24.11 5.38 5.38 Total Release Pros Brio Villa a Turnbull Sigmon Design ° JOB NO.: 07-085 BY: RLF cool Morehead Square Dr., Suite 530 m DATE: 9125108 P.M.: BCjW Charlotte North Carolina 28203 REVD: FLOATATION CALCULATIONS Calculations Given Data Standard` Footing Assumptions Buoyant Weight of Concrete 87.6 IbsiftA3 1. Footing base to be 1 ft. wider than structure Weight of Water 62 4 IbsiftA3 on all sides. ?.. . 11 Safety Factor (S.F.) 1.25 2. Footing depth to be a minimum of 8 inches in de th. E 'nations used: Outlet Structure Weight, W(s) = 4(w + t) x t x h x W(bc) where, w = outlet box Inside dimension, ft. Displaced Water Weight, W(w) = 4 x (w + 2t) x W(w) x h t = structure wall thickness, ft. h = height of structure, ft. Required Base Weight, W(b) = (W(w) x S.F.) - W(s) W(bc)= buoyant weight of concrete, lbs/ftA3 W(w)= weight of water, lbs/ftA3 Required Footing Volume, V(0 = W(b) / W(bc) S.F.= safety factor ut et: tructure #B13 Structure Dimensions Object Weights Height of structure, h 3.6 ft. Outlet Structure Weight, W(s) = 2208 lbs Structure wall thickness, t 6 in. Displaced Water Weight, W(w) = 3594-24 lbs OuUO box inside dimension, w = 3 ft. Re 'd Base Weight W(b) = 2285 ibs Footing Sin e Required Footing Volume, V(o = 26 cf Standard Footing Length, L = 6.00 ff. Provided Footing Volume, V(t) = - _...... 40 cf Standard Footing Width, W = ........ ......1-11111-11-". 6.00 ft. Footing Check okay Minimum Footing Depth, D = 1.04 ff. Footing Size to be used., Length = 6.00 ft. Width = 6.00 ft. Outlet Structure Depth = 1.10 ff. Otcttet Structure E1 Structure Dimensions Object Weights Height of structure, h = 8 ft. Outlet Structure Weight, W(s) = 7709 lbs _. _ Structure wall thickness, t = 6 in. __ --- W(w) = 11980.8 1bs Displaced Water Weight, Outlet box inside dimension, w - 5 tt. _ Re 'd Base Wei ht W(b) = 7267 lbs Footin Size Required Footing Volume, V(t) = 83 cf Standard Footing Length, L = 8.00 ft. - Provided Footing Volume, V(t) = 109 cf Standard Footing Width, W = 8.00 t. Footing Check okay Minimum Footing Depth, D = 1.69 ft. Footing Size to be used: Length= 8.00 ft. Width = 8.00 ft. Outlet Structure Depth = 1.70 ft. r. 1 TURNBULL SIGMON DESIGN 1001 Morehead Square Drive Suite 530 Charlotte, North Carolina 28203 Phone: 704.529.6500 Fax: 704.522.0882 Prosperity Village Project No: 07-0 85 CALL I ATI ONS FOR: Water Quality DATE: 5/x/08 REV. 3/20/09 I Prosperity Villa a Turnbull `Sigmon Design JOB NO.: 07-085 BY: RLF loos Morehead Square Dr., Suite 530 DATE: 511108 P.M.: BCIVI Charlotte, North Carolina 28203 - REVISED: 312o/o9 Bio-Retention V vATER OUALITYREQ UIREMENTS FOR BASIN B Drainage basin data Drainage area to pond (Da)= 4.74 ac Post-development impervious percentage = 23% i"rain all requh-ements Using the runoff volume calculations in the "Simple Method" Rv = 0.05 +.009 (1) Rv= 0.257 in/in Volume = (Design rainfall) (Rv) (Drainage Area) Volume = 1" rainfall x Rv in/in x 1/12 in/ft x Da = 0.10 ac-ft or 4,422 cft This volume must be released over a period of 2-5 days Surface area requirements Based on Darcy's Law using Maryland Design Manual Af = (WQv)(Df) Af = surface area of rain garden (sft) ((k)(Hf+Df)(Tf)) WQv = water quality volume to be captured Df = filter bed depth (2 feet min, 4 feet for trees) k = permeability coefficient of filter media (use 1 ft/day for sandy-loam, 2.4 ft/day for sandy soil) Hf = average height of water above filter bed (use 3 inches, which is half of 6" pond depth) Tf = design filter bed drain time in days (2 day or 48 hours) Surface Area Calculations k permeability coefficient = 0.5 Df ;filter bed depth (ft) = 2 Hf `average height of water (in) = 6 Tf 1 drain time (days) = 2 Af required Surface Area (sft) = 3,538 sft V 112" Storage Volume 3,538 cft A roximate Size Width 42 Length _ 72 10'x 20' minimum Sail Type K Inthr sand 6 loamy sand 2 sandy loam 0.5-1 silty loam 0.02 use Pros it-v Village Turnbull' Sigmon Design JOB NO.: o7-o85 BY: :rtLr fool Morehead Square Dr., Suite 530 , DATE: 51Y108 P.M.: LTCAI Charlotte, North Carolina 28203 REVISED: 31-?010q Bio-Retention - Surface area requirements Darcy's Equation (NCSU Rain Garden Design Worksheet, Bill Hunt) Q = (.0000232)K*A*(H/L) Q = flow (rate of draw) through bio-retention soil (cfs) K = hydraulic conductivity of soil (in/hr) use 1 in/hr A = surface area of bio-retention area H = height of water above drainage pipe L = thickness of soil bed Assume H/L = 1 Drawdown calculations K permeability coefficient = 0.5 A surface area of bio-retention = 3,538 H Average height of water (ft) _ 3 L thickness of soil bed (ft) = 2 Q draw through rate (cfs = 0.062 cfs Drawdown Time Time to drawdown water from inundation to saturation at surface Volume / Q T = 57471.3 seconds 16.0 hours Time to lower water table to 2 feet below surface assume 45% porosity Volume = Area x 2 x0.45 V = 3,184 cft T = 51724.1 seconds 14.4 hours to lower 2' below surface 30.3 hours to draw water through soil layer Under Drain Sizing Length of Under drain is based on 10% of Af (NY State Storm water Manual) L = 118 feet in 3' wide stone bed Required Diameter D = 7.5 inch (6" minimum) Use 8 inch HDPE Prosperity Village Turnbull Sigmon Design JOB NO.: 07-085 BY: R.LF low Morehead Square Dr., Suite 530 DATE: 511108 P.M.: RCIII Charlotte, North Carolina 28203 REVISED: 312o/o9 Bio-Retention Dry Detention Basin Storage Volumes Elevaflon (msl) Area (st) Area (ac) Volume (CU40 Volume (ac-ft) 766.5 2829 0.0649: 0 0.000 767 U 6 0.0706 1474 0.034 768 3590 0.0824 4801 0.110 769 j 4129 0.0948 i 8653 0.199 770 4693 0.1077 13057 ( 0.300 I I i