HomeMy WebLinkAbout20181241 Ver 1_401 Application_20180910Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/10/2018 10:45:54 AM (Start Event) Accept by Montalvo, Sheri A 9/10/2018 2:26:01 PM (Non DOT Initial Review) The task was assigned to Montalvo, Sheri A. The due date is: September 13, 2018 5:00 PM 9/10/2018 10:47 AM DWR Dfutslon of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf A. Processing Information County (or Counties) where the project is located:* New Hanover Is this project a public transportation project?* r Yes G No This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. 1a. Type(s) of approval sought from the Corps:* PF Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* r% Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number: NWP Number Other: 03 - Maintenance 39 - Commercial/Institutional Developments List all WV numbers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply PF 401 Water Quality Certification - Regular r Non -404 Jurisdictional General Permit r Individual Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solely for the record because written approval is not required? For the record onlyfor DWR 401 Certification: r Yes r No For the record only for Corps Permit: r Yes r No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? It so, attach the acceptance letter from rrhgation bank or in -lieu fee program r Yes r No 1f. Is the project located in anyof NC's twentycoastal counties?* r Yes r No 1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* r Yes r No r Unknown 1h. Is the project located in a designated trout watershed?* r Yes r No Link to trout information: http://wuwv.saw.usace.army.miI/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Kim Williams; Land Management Group 1b. Primary Contact Email:* kwilliams@Imgroup.net 1c. Primary Contact Phone:* (xxx)xxx-xxxx 1d. Who is applying for the permit? W Owner r- Applicant (other than owner) W Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: Cape Fear Country Club Inc. 2b. Deed book and page no.: 2386 0257 2c. Responsible party: (for Corporations) Mary Geiss 2d. Address Street Address 1518 Country Club Road Address Line 2 Cay Wilmington Postal / Zip Code 28403 2e. Telephone Number: (xxx)xxx-xxxx State / Province/ Region NC Country USA 2f. Fax Number: (X")MX-XXM Email Address:* mgeiss@capefearcountryclub.net 4. Agent/Consultant (if applicable) 4a. Name: Kim Williams 4b. Business Name: (if applicable) Land Management Group 4c. Address Street Address 3805 Wrightsville Avenue; Suite 15 Address Line 2 city Wilmington Fbstal / Zip Code 28403 4d. Telephone Number: (910)452-0001 (xxx)xxx-xxxx 4e. Fax Number: (910)452-0060 (xxx)xxx-xxxx 4f. Email Address:* kwilliams@lmgroup.net Agent Authorization Letter* Pease provide the Agent Authorization Letter If you are submitting this docurrent. Cape Fear Country Club Agent Form.pdf RLETYFE M- ST BE RDF State / Province / Region NC Country USA 238.63KB C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Cape Fear Country Club Renovation 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town:* Wilmington 1d. Driving directions* If it is a new project and can not easily be found in a GFS napping system Rease provide directions. From USACE office, turn left onto Independence Blvd; turn right onto Oleander Drive; turn left onto Country Club Road; road will take you directly to country club. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) R05415-003-006-000 2b. Property size: (in acres) 177.9 2c. Project Address Street Address 1518 Country Club Road Address Line 2 aty Wilmington Fbstal / Zip Code 28403 2d. Site coordinates in decimal degrees State / F rovince / Fbgion NC Country USA Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 34.216596 -77.919853 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Jumping Run Branch 3b. Water Resources Classification of nearest receiving water:* C; SW Surface Water Lookup 3c. What river basin(s) is your project located in?* Cape Fear River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* Site is an existing country club with golf course. Land use in the vicinity of the project is mostly residential, with some commercial use along the western property boundary. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent CFCC Topo.pdf 673.51 KB File type rrust be pdf 4c. Attach an 8 1/2 X11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent CFCC Soils.pdf 423.19KB File type rust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0.6 4e. List the total estimated linear feet of all existing streams on the property: (intermittent and perennial) 540 4f. Explain the purpose of the proposed project:* The purpose of the project is to maintain and improve drainage throughout the site by installing storm drainage outlets, removing accumulated sediment from existing channels, and reshaping sections of the channel. Proposed stormwater improvements are part of Golf Course Renovation project. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: The applicant proposes to install several storm drains that will connect into jurisdictional non -stream channels (Sheets W-2, W-3, and W-4); remove accumulated sediment from two jurisdictional non -stream channels (Sheets W-3 and W-4); and install 3 weirs and additional fill to one non -stream channel (Sheet W-4). One existing outlet structure will also be replaced, a concrete bridge will be removed, and a piling -supported bridge will be constructed (Sheet W-4). 4h. Please upload project drawings for the proposed project. Click the upload button or drag and drop files here to attach docurrent File type rust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* t: Yes r No r Unknown Comments: LMG performed the delineation in 2018. 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Unknown r N/A Corps AID Number: Exarple: SAW2017-99999 Action ID# from previous JD is SAW -2005-00056 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Christian Preziosi Land Management Group 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Brennan Dooley of the USACE approved the line in the field on 4/26/18. No JD has been issued yet. Action ID# from previous JD is SAW - 2005 -00056. 5dl. Jurisdictional determination upload Click the upload button or drag and drop files here to attach docurrent File type rust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). Action ID# 2005-00056 Project History Upload Click the upload button or drag and drop files here to attach docurent Cape Fear Country Club Site Plan Drawings NWP appl.pdf 3.31VIB File type rust be FDF 7. Future Project Plans 7a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. No D. Proposed Impacts pacts Inventory .................... .. ...... ......... ........ ......... ......... .... ....... ....... . ......... ......... 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams-tributaries r Buffers W Open Waters r Pond Construction 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Site # - Reason for 4b. Impact type * 4c. Name of waterbody* 4d. Activity type * 4e. Waterbody type *4f. Impact impact * area Temporary Impact Storm T N/A Excavation Ditch 0.02 Drainage # 1-11 Fbrrranent (Fj or (if applicable) (acres) Wp label (e.g. Fbad Crossing 1) Terporary (T) TIM #1 T N/A Excavation Ditch 0.04 Nbp label (e.g. Fbad Crossing 1) Fl rrranent (F) or (if applicable) (acres) Terporary (T) TIM #2 T N/A Excavation Ditch 0.37 Wp label (e.g. Fbad Crossing 1) Fbrrranent (Fj or (f applicable) (acres) Terporary (T) TIM #3 T N/A Excavation Ditch 0.12 Nlap label (e.g. R -)ad Crossing 1) F2rrranent (P) or (if applicable) (acres) Terporary (T) TIM #4 T N/A Excavation Ditch 0.51 Nbp label (e.g. Fbad Crossing 1) Fbrrranent (P) or (if applicable) (acres) Terporary (T) TIM #5 T N/A Excavation Ditch 0.14 Map label (e.g. Fbad Crossing 1) Fbrrranent (F) or (if applicable) (acres) Terporary (T) TIM #6 T N/A Excavation Ditch 0.11 Nbp label (e.g. Fbad Crossing 1) Permanent (P) or (if applicable) (acres) Temporary (T) PIW #1 P N/A Fill Ditch 0.01 Nbp label (e.g. Finad Grossing 1) Fbrrranent () or (if applicable) (acres) Temporary (T) PIW #2 P N/A Fill Ditch 0.18 Nbp label (e.g. Road Grossing 1) Permanent (P) or (if applicable) (acres) Temporary (T) PIW #3 P N.A Fill Ditch 0.01 Ivbp label (e.g. Fbad Crossing 1) F brnanent (Fj or (if applicable) (acres) Temporary (T) 4g. Total temporary open water Impacts: 1.31 4g. Total permanent open water impacts: 0.20 4g. Total open water impacts: 1.51 4h. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* All wetlands and streams within the project area have been avoided. Most of the proposed open water impacts are for maintenance purposes. Permanent open water impacts are needed to improve site drainage. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* One piling supported bridge will be constructed over open waters to avoid impacts to this resource. Silt fencing will be utilized to ensure sediment does not leave site during construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: All impacts are to jurisdictional channels (non -stream). Most of these impacts consist of maintenance activities needed to remove accumulated sediment from the channels. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes t: No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Project located within the Cape Fear River Basin 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* r Yes r No To look up low density requirement click here 15A NCAC 02H .1003(2). G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 2b. Is this an after -the -fact permit application?* r Yes F No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Project consists of maintenance activities. No utilities or access to adjacent tracts are proposed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes C No 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8?* r Yes t: No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes t: No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf If you answered "Yes" to 5g(1), did you discover any signs of bat use?* r Yes r No r Unknown — If yes, please show the location of the bridge on the permit drawings/project plans. 5h. Does this project involve the construction/installation of a wind turbine(s)?" r Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. Click the upload button or drag and drop files here to attach docurrent Cape Fear Country Club bridge construction. pdf 52.38KB File rrust be FDF 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC review, NC Natural Heritage Program database review, and on-site assessment. The site is mostly an epsting golf course and does not provide suitable habitat for any federally -protected species known to occur in the area. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* According to the NC SHPO HPOWES GIS website, no historic properties are known to occur on site. 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach docurrent File rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* NC Flood Risk Information System Website Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurrent File crust be FDF or IZE Signature R By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Kimberlee C Williams Signature Date Submitted: 9/10/2018 Initial Review Is this project a public transportation project?*(? r Yes r No Change only if needed. Has this project met the requirements for acceptance in to the review process?* r Yes r No BIMS # Assigned* 20181241 Version#* 1 Reviewing Office Wilmington Regional Office - (910) 796-7215 Select Project Reviewer* Chad Coburn:eads\cccoburn Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification What amout is owed? E $240.00 O $570.00