Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0025071_ATC Plans_20180906
z z O Iowa y� wa ¢3z �o¢ w Z 0 :3g (Oj?O ZWO �Q pi Og �Na zw �o Rm 0 0aff LEGEND SHRUB LINE TREE LINE ® TELEPHONE PEDESTAL © WATER METER D4 WATER VALVE GA FIRE HYDRANT 0-T SPIGOT G.6 STORM DRAINAGE MANHOLE 1111 �__� DROP INLET G.8 EXISTING STORM SEWER LINE co CLEAN OUT Q SSMH SANITARY SEWER MANHOLE ss EXISTING SANITARY SEWER LINE ® TRANSFORMER - UE- UE UNDERGROUND ELECTRIC/UTILITY LINES -OE- - of OVERHEAD ELECTRIC/UTILITY LINES --0- SIGN EXISTING PS No. 2 - PROPOSED DEMOLITION STREET SIGN Q POST IT V TELEVISION PEDESTAL -52z2--- 2z-.__ ---- CONTOUR LINE INV INVERT RCP REINFORCED CONCRETE PIPE G.21 CORRUGATED METAL PIPE rr' CORRUGATED PLASTIC PIPE FES FLARED END SECTION EP EDGE OF PAVEMENT EG EDGE OF GRAVEL CMF CONCRETE MONUMENT FOUND O IRON FOUND DETAILS AND SUPPORTS PK NAIL FOUND SLUDGE TRANSFER PUMP STATION RIGHT OF WAY MONUMENT R/W RIGHT-OF-WAY CONC. CONCRETE ELEV. . ELEVATION FF FINISHED FLOOR ELEC. ELECTRIC BLDG. BUILDING UTV UNDERGROUND CABLE TELEVISION LINE - - - - APPROXIMATE RIGHT-OF-WAY LINE - - - - PROPERTY LINES (NOT SURVEYED) FROM DEEDS, MAPS, FO AND GIS DATA . FIBER OPTIC LINE -- -G -----G --- DITCH LINE W W EXISTING GAS LINE LS EXISTING WATER LINE -a- LANDSCAPED AREA UTILITY POLE ITY OF N NORTH CA OLINA SEPT 2018 SRF PROJECT No. E=SRPmWml7mOO26 F� �' 6 KINGS H� - � z Z } Z E. ARBOR LN. EDEN < � Z o v w � o W HARRIS PL. -' pP rn ST. f Ft\Oc'E P�� PROJECT oP� LOCATION z LAKE ME pGE pt0 FOco RES? GS 0R 0 J MEBANE WWTP �P LOCATION MAP NOT TO SCALE SHEET LI GENERAL GA COVER G.2 EXISTING SITE CONDITIONS & DEMOLITION PLAN G.3 SITE PLAN GA ENLARGED SITE PLAN G.5 PROPOSED FORCE MAIN - PLAN & PROFILE G.6 EXISTING PROCESS SCHEMATIC G.7 PROPOSED PROCESS SCHEMATIC G.8 PROPOSED CLEAN B UNIT P&ID EXISTING PUMP STATIONS G.9 EXISTING PS No.1 - PROPOSED DEMOLITION - TOP PLAN & ELEVATION G.10 EXISTING PS No.1 -PROPOSED DEMOLITION - SECTIONAL PLAN G.11 EXISTING PS No. 1 - PROPOSED TOP PLAN G.12 EXISTING PS No.1 - PROPOSED SECTIONAL PLAN G.13 EXISTING PS No.1 - PROPOSED SECTIONS G.14 EXISTING PS No.1 - PROPOSED SECTION C G.15 EXISTING PS No. 2 - PROPOSED DEMOLITION G.16 EXISTING PS No. 2 - PROPOSED DEMOLITION PLAN G.17 EXISTING PS No. 2 -PROPOSED SECTIONAL DEMOLITION PLAN & SECTIONS G.18 EXISTING PS No. 2 - PROPOSED TOP PLAN G.19 EXISTING PS No. 2 - PROPOSED SECTIONS CLEAN B UNIT AND CHEMICAL STORAGE SHED G.20 CHEMICAL SHED - PLAN & SECTIONS G.21 CHEMICAL STORAGE SHED - EXTERIOR G.22 CLEAN B - PLAN AND ELEVATION VIEWS SLUDGE HOLDING TANK SYSTEM G.23 SLUDGE HOLDING TANK - PLAN G.24 SLUDGE HOLDING TANK - SECTIONS G.25 MIXING SYSTEM LAYOUT G.26 MIXING HEADER DETAILS G.27 DETAILS AND SUPPORTS G.28 SLUDGE TRANSFER PUMP STATION G.29 MIXING COMPRESSOR ASSEMBLY G.30 MIXING P&ID DETAILS DA D.2 PAVEMENT REPAIR DETAILS D.3 EROSION CONTROL NOTES AND SEEDING DA EROSION CONTROL DETAILS NOTICE TO CONTRACTOR 1) THE CONTRACTOR. SHALL FIELD VERIFY THE ONSITE CONTROL POINTS w/ EXISTING ELEVATIONS. THE CONTRACTOR SHALL IMMEDIATELY CONTACT W.K. DICKSON & CO., INC. @ 704-334-53481F ANY DISCREPANCIES ARE FOUND IN ELEVATIONS SHOWN. SURVEY INFORMATION DATED NOVEMBER 2017 PROVIDED BY W.K. DICKSON 909 MARKET ST., WILMINGTON, NC 28401 @ TELEPHONE (910) 762-4200. 2) PRIOR TO CONSTRUCTION, DIGGING, OR EXCAVATION THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT MAY EXIST AND CROSS THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER INDICATED ON THE PLANS OR NOT. CALL"811" A MINIMUM OF 72 HOURS PRIOR TO DIGGING OR EXCAVATING. REPAIRS TO ANY UTILITY DAMAGED RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. M• Know what's below. Call before you dig z O 0 cc U) z O 0 crO U- 0 W W Q W O z 1 J z O U) W U) O 0- W W cr c O LL 1 0 z Q 0 Q z U- ZW, :_ "o Op¢. ,a Y?1Q 3YZ ©0M No - oma N¢¢ FO 8wx 0p .-_ --- - ---. ---- - ___---.--- ---- - -_- - - - - ---- - ------ -- - -------- ---- - ---- - ----- ----- ---------------- ------ -------- - ------ ---- -------------------------_--.--------------------------- --- ---------------------------------------------------,----------------------------------------- ----------------------------------------------------------- --------------- ---- - - -- --- --_----.------------,-----------,----------- CERTIFICATE OF SURVEY AND ACCURACY _,�_,_ ,, �� / I,,t r #�_ ,§ i t Int 3 � -- vw GRAPHIC SCALE t ON STORY / DIC ON I DURWARD S. LEGGETT CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE" tItLiAi1O ` ( 20' 0 20' 40' ra 544 9& �� i CHARGE FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED , communityinfrastructure consultants I IN ACCORDANCE WITH THE MINIMUM STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROtiNA THAT"" . �f ��.m__• I ,✓ __ "' ,„ �' THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A TOPOGRAPHIC/PLAN[METRIC SURVEY TO THE ` s.. ' `---I-",-- 616 COLONNADE DRIVE : ACCURACY OF A °AA° AND VERTICAL A �� �� HORIZONTAL\` ...p HORIZONTALCLASS L CCURACY TO THE CLASS C STANDARD. `�,. � CHARLOTTE, NC 2s2o5 t , N -- ( ',, ' (t)(704) 334-5348 i i � , \ ;,;v.---- � \ a — LA ER � ` I I FURTHER CERTIFY THAT THIS SURVEY WAS BASED ON HORIZONTAL AND VERTICAL CONTROL POINT DETERMINED (fl (704) 334-0078 %', l t I FROM AN ACTUAL GPS (OR GNSS) SURVEY MADE UNDER MY DIRECT SUPERVISION AND THE FOLLOWI G , . f AL' `� \ ` y � AI : � WWW.WKDICKSON.COM j ' INFORMATION WAS USED TO PERFORM THE SURVEY: \ V_�1. ` \ -.-- . :- `�, f p� ; �� I HORIZONTAL POSITIONAL ACCURACY: 0.10 FEET��� � �# NC LICENSE NO.F-0374 I \ \ e/__ VERTICAL ACCURACY:.10 FEET \ . I , v ! .� F .a "e,., Y ,i I TYPE OF GPS: RTK/VRS - \ \\ `. r \.\ I I DATE OF SURVEY: 11/14/2017 I N `,,., . `t w w_ - 1 .~~w e 'er '_ �'� HORIZONTAL DATUM/EPOCH. NAD83 2001 ` \` -___ ..` / ~ '- _ fre I _ ( ) _ „^ ,,` 4 ._ " ~. � i \\ I i f ,� �� ��i VERTICAL DATUM: NAVD 88 ., \ , _..f ._ _ ~ k"MR \ I .,. "DUKE" ,, � , `, , ,., ,. I \ w _ PUBLISHED/FIXED-CONTROL: NCGS MONUMENT DUKE <;; \ -� -/ --- t \��� •t -, �. � '116_ O� S ( , '. _. _ GEOID MODEL: GEOID12A ,,, \ ..,\ ai' . - `, "`.. -� `, ' " c '�t ( 11 � ,. , 4` ii .. _1111 _ .�.� . _ \ ,, %mm .." :� I � COMBINED FACTOR: 1.00008717UNITS: US SURVEY FEET 'OI \,'Ap ",.s., ... Y^7 tµ __ ' SEAL T . _ _ 045626 WIA ED11 _ 11 \ � / \ �i x� ( CONTROL POINTS ARE GROUND LOCALIZED ABOUT NCGS 1, '` ;z 11 \ �\ , �.' \ `.11 , VVI 11 - e 3 ( "� ::� �� �� �� "DUKE": ! MONUMENT \ \ I 11 ` s \\ s 4 /// III I NCGS MONUMENT "DUKE" % �I 11 \ 4 : ° _: f AI I I::: �1 ,I \ �� f j ;.> z �' \ � �z' / �., I PUBLISHED DATA ' \ \., \ � •.,, P 544;14 y v v �� �` A I � 1 � FA1 w ,� i I � PROFESSIONAL SEAL NAD$3 (2001 } 1 N 1004219.40 \� \ \ \ .\ \\ ,.., f t f 5;.i I I I I I I m 1 E 1788348.10` ELEV. 642 NAVD 88 \\� \\\ \ \ #, \; , *l , A v ° . ��. v. "ten SURVEY DATA \� `v. i� ��� ""? I NAD83 (2011 VRS)l �v N 1004219.22 1 ��� v v � "`-\. "'/ � � � E 1788348.25 ":� \ I- 1 `--,��� %��> — ELEV.641.38 (NAVD 88} §`\� '' � Z `, . ..e c s 1 ( 11 , _ \ o . 5 9.,, , a ,g _ CF - 1.00008717 1 ,`; E, 0>� ``� � � - `> � 'j lw ..- `,.. Ill�. - - ' - f= _L „,,-, " ��* _. ' ' A i" i6i FPffSi ""�,\\ \�� � - � '"�... I p ~It /I ~b,� ,,, r^. ... �' "^",. ...g.g ' s,., - ,,,,,• ^.,,,,tee `4, :l,,w t,lft�'a }�I fI1 \ - �`�•" '`'•' '¢z�'. if v.. "".., ,., L`.,,.,� "�. /'``A. "�"` """ f� PL EXISTING 4" FORCE MAIN `'" \ £ � `� I", � � I AND ABANDON IN PLACE . lr \ti, � _ § C r �` 6 I a f i �r ,---,. I P ; PANEL ---,,_ \ I - :� :: I ~11 a () Fr cc (n ! / I c I i ,f , �: r z o I ORfO i I -; I T i14# 't� I # �� 3._ .i€Ar" ; w `�..,,f .. '4; '�Ili fJ) n 3 _ i .. �,• ,} /St e. a 5z' '�s�evt-,.......,.w,•,.,._.,....�,"..,w #f` r = ,. L,.}_.P'i.,Y' / ; ,' i X g}3 4"I"', LII § ' Eh,II` 7 t %' : `�`` # fig i .:I'Y i} { /-.,,,,, 4 J ,...,' �',.,.--..�-� .'Ij £r r rte � AL ,2I. �4 � � � F ' `a.. �. r t ice. ( ,;� ...„Y 1 " 7 i z...:✓ ..,., i fff jxe _ . L � 7 ..% 3 j ` ( a F I i ", -) -, COW, LI : zt L\ C, ." r . REMOVE EXISTING PUMP ZONE R. A{F ("GE HAI 1;l }€.ei'i r `' 4 ii s' �,/� 'y279»�3 s, .' _�;, PIPING AND APPURTENANCES;W. " �. -\ c - WITH MATERIAL AND fs'„ / 7 ) U �,,. SELECT r" y .., { 1 CAP EXISTING24" PIPE; g 1 FILL I , . A CAP WITH 8 THICK CONCRETE, # r �' _ " FILL WITH PLOWABLE - _. ,# i IA �I , '',` r ��, 1 A ,3 ;�-., i"=_," t , _ - j_ - °: P�, ` i I D FILL AND ABANDON IN PLACE ;I ;'r - SEE EXISTING PUMP STATION No. 1 '� If , ", . .>. F , -� ff�fh w 7 -� i �. "` a, 0 ,,,{ 4 °; a DEMOLITION PLAN AND SECTIONS, ��- _ ff f SEE SHT. G.16 . SHT. G.10 -G.11 AIN , ;,l �� �� t, � � _H4 f, EXISTING 12" L E 11 � ��� .. � ��` I'll,� ABANDON I N ' 1cr _ i I -M TC _. _ -_ _ _ ---w. ` - v } - t - j ; i ; ? I € �k- \ " ��w ;� IN PLACE ` <, , � Z o s f # y#, ,• ( ` \"^^-�...`. §§ g y ' `l j = t t 1:,5.2 I'�} 4 Ea .f ell l . � "'., 1 14 4' ' tf ' � �� ,,�(�^� i lt,�, O,!_.7 ( ( ( ( ( ( ( ( O I I ,... 1 ? i t ✓ / 7 t f # Fps '#J k 1, I _ ✓' ,,, i i t j, , jjffl v ## t iVl�E.0 b . , _ x �� ! �/ \ i h t f z F` ✓'� ;t'#; SRi ,Ai a~ -.a •✓} ` k 1 i."}: a I }� { ( E �.„ .~ ".--.—-„.,,_. § ,, a 5 �. C, r'�-.,. _ u.o -.-,111,1..'„'._,._...... >$ i `"'" "' /""'y1. u, ( O fjj �` ,,r^” t / A i£�tft i'.. #fkE 7'b ,_ l P ," S. J I �,,, REMOVE EXISTING PUMPS, �i I A§ifOt I fE � � �� ; �," r � "� � t 1 ILL f x �k PIPING AND APPURTENANCES, `. R ; £ ; I I# � �, \ v` / f '� � '- 1 11 kly I 1111... I I . It FILL WITH SELECT MATERIAL AND f=; I iI "„ -8 Q ICAP WITH 8" THICK CONCRETE, #, , I,,� I �- L7 s `"� r I� .. �;A` , 1 ( f � I \ -- , " ' i , �j1 i�l. , Aai.✓£`Ey, Ir z,. S -...:yi ) £7p �', �, '' f F'r\ "aw ,Z y'i„ ,_,` ,"4 yf j Y Y "" SEE EXISTING PUMP STATION Na. 2 - C — I f { �.__ # �' ". ! j ` . I Y W a �" � 1 ._, DEMOLITION PLAN AND SECTIONS, i - �fz c. . " Imo;. 18 ', : i _.w- - ,.w. I " _ W H � m a z g i � e. SHT G 16-G r 1 _•__ _ _ �._ _..--.._.._..� _ _1.1__1.1. �0W� �� f� �O'� C5T T _. _-"p„ 11.E l `1111.-,� ..,� »."�,. .., r -.., ... _.. %�...: .,.., _ .._ . # s --•-.. p ��"." '� � ,_ 1 r ,l.. ? } ,r+`k'i%"..._ /^ „- A L T if e " `'•"- -.~�.. "'i, } '�„'t�`:''~:.�. _.- a �.,•n,_ f g '`” r aC yf i ' s. iit_ ,_rstS .,.,�.!"""",. iX ,." �,_ , A`� v�� .. , . , l .. ,LL1:6� �u : f1 f P ' ,�w �' 1_1,1,1._ __ ,_ i <, ,",,.,.� `'".. .71i=-,' r „4. r'_"....,, --'-~ �'v„ �J% t �yri� ,,! t.. `� i...,,.; "„„,..-„1,,111"”,".- ... --~„ p^g r ; .!i it' ° 'I � I F I sf . e I i '.<<:.'I m 11,11.., .,,. i F ' I.f' .` �_..✓'S i %„.,../` '� j W CD L g r CL 12 $ : .$ t” ,- !klS� , ,.„"„--^-"`• {..t r _ "° , �.. ' 1. 1 •I - ABANDON EXISTING 8 WAS PIPE �_� �,� 1.. �" - _�. _ - ,,, :' I.... ;. �, __ z ._ ;. _ IN PLACE �.. �:"-_,_ _ .� t cw ' 1111 } ..-.,.. (3 '' R a ---. 11,11_ "f i' i °.' .,.,.,,,--.✓'1,`111.„1111_.. .,. E t "., r _ , , a `A `^w.< z, a # ! M q ., � ` E t# MAUI OL? I � _ . , � s , ,”„I,_,.' �.,..h �11 � x� fff' � W Z 5 O I "I�� ll �, 1 t ;I ABANDON EXISTING 8 DECANT , )Lu _ Q Q _ �_ I-V - r-''~� tea; ..3' ` o -,. ; t, � 1 ._.. � i .\ PLACE I Z Z Z a O __ �,� Hit:., LINE IN d _ �, j _. - L 4I 19G, 4 I �..... I �...,... ;' <.!'j, .Q,,,~.~e.,�4 ' ,.,.., ""„� sl ru,:: 3. , e r J} _ __ — �. I / /_ j - E k -.✓ .. i� rf:^ g '°'.-,,.,, v-~b�-.� F ” �_�.............. _1,,,111 "`"i> -", , , i✓ f _. P. ,iG,,. fsF �=g:+�"e ......,✓Y , ,, lea �w ��"" yr j // ,z 3 { a - I° ,,/// z ✓ .. ..," " .. .., I rz � I I F,. _/'\, �f ~~ j ' ir�,� . ' i i^d �' ..} .'.has'-.. �I. ..'f"` "^»4.. ' �'• Y f / E : -n om � 'A r,. 1 /� -:..."...~.: f i I `J / - r Q J �/� z o 0 V) O W cc 06 m z m a ¢ 1"_ i j �( " < �' � -�,�.".w 5�.,_ r � f � �# ;x i , `",ham � ._. i2i r rG 1s•, s ......................................... _ 1,1,1~„,1.-- "' A . RIA , :,r; - � ' ,. .. , .: L't _,. I\ ! 1 1 \ �, ,4A1DRAit_ _, L _ t ,!� z, GG i`;;. - yrs ✓ 0 _ , ..:�, .i �' ,.! - }s 3 ':^„ a'" i -I _V� -� ✓' L'✓' "'"/.. `.,„. f t f. �,. ? :S. <r ili6�x �w�'f,,`.. i ``b # -' ? f,,. \„� E.:�,.� ( f ?"` /,.s. 4 t � a� J � s „#' ;, 'F F \ f i \� ; q i'�._.,�✓” •' ��. ""f, r #� �t ^`1I 'ail^-.,_,� `"�, I � ! 0 ! rn WQ Q _ z _ Z _ F- O_ OC M C) O 1- W Li W Q �'- (r O I I yp -% rte' __ ? •1111",!!{ „�...Ti" I• l,_ .:.✓"! {s�✓�y'.f�2T,7 _,.~/' } ,,',_N ._.,„ I w, i , IL ..N-'." E fY3 f Li{ 'r{ ""-e .. M,. S - F z ,,,,§ t ,~ `w`y }„-�'.: ..,,.,'�` ^•� E _ f > i . ".."5 i , J ,p~ r_ -- - ),t i s f'ry-.,, ��-... 'z{ f. E ( I i I P S� .aY ..Fe z z ,,. ^"� S �' Ss'x� �`p ..✓' a,... 4N lS"z ♦ l 'w., ..•?F' 1111 f�'Y'i I I � ! "'y ! f�J' J1� ,_, _,i , " �✓f ✓� 3 ✓( J .� ,/ I ,, � i 1 ,._, x � .,_ � i6 f ` ., ✓(i j �e.! ",...� ,.... `' „-- :w;"} °3 .".'S _ .a,-.` "."y. w, ,.�„.�. �:., �,.. ,_.,yam--"^. ., , „F;;,„ t �.,- "",l _ �" : `, '-,. _',''»` 'tel I-s� )t j mss„,{y �) (-- ,,, �....,_ --.,..` i ' ' % ';� i -';,,, `+�.,.--a�'"„ j f y [__" '``�} ^y ' Ys L.: i ` �� V / v ■ /// 0 _ Z a. W U It z Q V � W W I� O j""'-..._• i f \..� \.,. �, F {,,,,.m.;;- q. , ( < -.� �\y ,F �§Sr.,.,,,..rv� ".....,,,/�.,...a! ; "L._.,,� N t...._,�%� ,% `t,.�...! 1„,.r \1111.-,.,'f� Si,....,.. t'.._..i "`:,,...-'� 'i..,..r.l # ".,,., 1„" ,-. �•,,.., r r`i,..,,.% ..,,.,°' !„.r` ,...,, "'' ,.' ''"' '.' W .�.,. -, 5:�: ,Nc __..., ...r''.. iV ... .�..�.\,c-_, _._., e�'. ✓� '� .�.`."."1 i!'s„ i!"._` �......" �';.,. - # i` ur`"lA 6,1111./ yv''',.,' i $"'^ mss/"'''_. . `tzi"/ _ �,t,;�"_ ..✓_".'' �"--_ qC '_ i1 yv _.,»...., "� , , ` `�". �` ,��µ�'Y� ' 1 i ' � y ` IIS /'" j ,1r!� ,. `!- __ .., .5�,,,,...., 1 f ,"' e CC W 1 7 ;s.,,..... � ..?� \�1.....! t...,\ 5..._..f f b. >.� ,.,...r'{ f >.<rfa� ; i L , Vii.,_ z" ,,,, I :6 -f 1 r F A. ""! -,r,? ill ox � - //��, `� s; CONSTRUCTION SEQUENCE: a ir L I � M ! As L �.�7, ; � - ' % %� ., y �_„ q; ?` TOP 521, 96 1 j ' /✓�q'//// � � r � ��i) wco X Lu a 12 _ , " \ t l �� 1. OBTAIN ALL APPLICABLE PERMITS PRIOR TO CONSTRUCTION COMMENCEMENT. 1i c ABANCONEXISTWG 8 WAS PIPE -,� W 2 Lu NI a - >f IN PLACE, SEE SHT. G.12 FOR CONNECTION _ ,_.� •_ �! 1 �>1 __coIx ', IS 1 I I."---,- .. Y. I 3 � I'� .,a. _,/( " w.z�"`_.'.,."f ,-, k"' ,_ g ^'.,'" - .., �``a ( \ �, - \ ��'�A3.7? I { " /T / -_; - # . F � ! v // ,c g _ ' a �} 018 2. UP AND HEDULE PRE -CONS UCTION E sg - .. a . �, r M I I # v11 REMOVE EXISTING LP "- . ,, : v ' ! `_, . � , ff r 3. INSTALL ALL EROSION CONTROL MEASURES AS INDICATED ON PLANS, ALL EROSION '_' f ! �' 'ft -t,-. — I W i � 0 Z W 'S p Q r� /�^- CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF S.? i.; _ ; \ It CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL _ . .� DISTURBED AREAS HAVE BEEN STABILIZED. z ,- 4. �\ / UE TO BE ABANDONED F . 0 j LL i" ?_., � I PROJ. MGR.: JWH I `� %% `� `°i �� �M �� 1 � 4. INSTALL ALL UTILITIES AND APPURTENANCES. WASTEWATER TREATMENT PLANT r I , _ . i§§ a r ��._._ �;�;;fu v' I ' L TIES PU ES ALL � I 0 DESIGN BY: RET DRAWN BY: CH ¢ a f ; , _ -' # , �,�,�, )i * FUNCTIONALITY AND OPERATIONS SHALL BE MAINTAINED THROUGH ALL PHASES OF _ ' r#A?P 1111 1 -y # z PROD. DATE: 1 . , � 4 I IIfI ,. L ! 1 ✓ CONSTRUCTION. ALL ALL SCHEDULING SHALL BE SUBMITTED AND COORDINATED � a, ' If I t OWNER i SEPT 2018 DRAWING NUMBER: , _ , — THROUGH THE AND ENGINEER AND SHALL BE APPROVED PRIOR TO TASK Fh ,F K � t � ,��\ 1 �\-, Q o o , '� r INITIATION. ` � � ( ,I '' fI � 4 , �- ,\ I CLARIFIER 11 Xl \j ` � OF 34 m'^-1111.' FF ~`...^..,y ti: i sf TOP V kt'A.i� °E` '�R .£.,, ^� ,.,,,, p '^...i :g -si 1# tq (f t I _✓° n <:! > Y { x..._..✓ ,�`,'\...,. o q I - i t 'y} ///11t��� j ■ 2 i �_ . _ _ r F - ..„.,,,,,_.�w..�..,,_._.._... -� amu.. j1 � �r�""" '�� ,' ,,,,r F 1yz ; i!`�"..r_ 111 2 r J WKD PROJ. NO.: a ' `'^" �! , , _ 2r#w' ,.M'""" � 1111...✓ "7" t� fM 6 `5 I. I` #t� , f r'' I' �~� � f i p I 20170041. L 00 C - - ow Za FUO �JW �Q7 It Zo X0o 7 :Dm> 0=W Om ya0 €NW Ozw 0 a zO, z 06 z m� Oy W 3 �rOrN ZZz Q VU4 0Wz aKN ws S2 N�Q =a� ZZ W oz� 0-0 z W U00 p00 y£n §FQ — ©oT ,,Z= aa92 owo Y t CERTIFICATE OF SURVEY AND ACCURACY �� ���� � \�=pAGL '� GRAPHIC SCALE 4 I DICKSON I I, DURWARD S. LEGGETT, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE 30' 0 30' 60' �`� FROM AN ACTUAL SURVEY UNDER MY SUPERVISION; THAT THIS SURVEY WAS PERFORMED communitV infrastructure consultants CHARGE MADE GROUND IN ACCORDANCE WITH THE MINIMUM STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA; THAT ABOVE POUND — \s, _ �. `." \._ \ 616 COLONNADE DRIVE THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A TOPOGRAPHIC/PLANIMETRIC SURVEY TO THEA f~ HORIZONTAL 1,1YW? HORIZONTAL ACCURACY OF CLASS "AA" AND VERTICAL ACCURACY TO THE CLASS "C" STANDARD. CHARLOTTE, NC 28205 (t)(704) 334-5348 334-0078 I FURTHER CERTIFY THAT THIS SURVEY WAS BASED ON HORIZONTAL AND VERTICAL CONTROL POINTS DETERMINED VAI S[Vr' P MA MY �—' \ \" (f)(704) WWW.WKDICKSON.COM FROM AN ACTUAL GPS (OR GNSS) SURVEY MADE UNDER DIRECT SUPERVISION AND THE FOLLOWING , TOOP 544.721 INFORMATION WAS USED TO PERFORM THE SURVEY: ®R,#�F ;tvly IN �z �`� ' r . ,._. / ilii ON Zaw CO) O 0}JU W �OQ Zoo U= 0¢m Nao €_W oZW F -o Z�ZU Z Oj N m ( wo j w o soo ZW lIUQ 00 ¢3z w�o w=7d cc w�= Z JH Z OZ M U Z U W D z ()OLL 0p0 �� 3za �rs ©og 0 tom 0 U 0 TRANSFER RANSFER TING r. G.5 STRUCTURE LOCATION POINTS TABLE POINT NUMBER NORTHING EASTING DESCRIPTION 1 992485.02 1781785.64 CENTER OF TANK 2 992502.67 1781807.37 NW CORNER TRANSFER PS SHED 3 992505.09 1781821.16 NE CORNER TRANSFER PS SHED 4 992484.95 1781810.51 SW CORNER TRANSFER PS SHED 5 992487.37 1781824.30 SE CORNER TRANSFER PS SHED 6 992489.14 1781839.78 NW CORNER CLEAN B 7 992480.77 1781841.24 SW CORNER CLEAN B 8 992496.09 1781879.68 NE CORNER CLEAN B 9 992487.71 1781881.14 SE CORNER CLEAN B 10 992481.60 1781869.38 NW CORNER CHEMICAL STORAGE SHED 11 992484.35 1781885.14 NE CORNER CHEMICAL STORAGE SHED 12 992469.78 1781871.44 SW CORNER CHEMICAL STORAGE SHED 13 992472.53 1781887.20 1 SE CORNER CHEMICAL STORAGE SHED PROPOSED CHEMICAL STORAGE SHED, SEE SHT. G.21 LIMITS OF PROPOSED GRAVEL GRAVEL TO BE 3/4" CRUSHER RUN STONE @ 8" THICK ENTIRE LIMITS GRAPHIC HORIZONTAL z O E— U Z) H U) z O U O U- 0 W U) Q W J W O z I J z O W O rr W_ W C ILL1 L z Q c DW n DICKSON community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 lf1 //� a SEAL 045626 ��s1111Ittt�i PROFESSIONAL SEAL LLl z Et 0 z g w H w z w m JWH DESIGN BY: w H DRAWN BY: CH C SEPT 2018 DRAWING NUMBER: z H z w 2 w X a z z J z U) O z cr o U <_ = W 0 J c O wQLO O cr 1:� rZ C z U z w w w 0 0 m w z w w Q m w z F- 0 U Ir a Cl)LU z O w W a 0 �z LLl z Et 0 z g w H w z w r> JWH DESIGN BY: w H DRAWN BY: CH C SEPT 2018 DRAWING NUMBER: H z w 2 w a a z z J z U) O z cr U <_ = W 0 J c O wQLO cr 1:� rZ C z U z w w w 0 0 m w z w Q m w z F- 0 w O a LLl z Et 0 z g w H w z w G.4 OF 34_ WKD PROJ. NO.: 20170041.00. C L PROD. MGR.: JWH DESIGN BY: _ RET DRAWN BY: CH PROD. DATE: SEPT 2018 DRAWING NUMBER: G.4 OF 34_ WKD PROJ. NO.: 20170041.00. C L W z 0 c/) z 0 C) fr 0 U- 0 ui U) J uj cr 0 z z 0 U) U)uj 0 (L tr ui ui 0 LL I 0 z z LL N �,Qlv 560 555 550 545 540 535 530 525 520 515 510 505 500 _I PROFILE - FORCE MAIN SCALE: HORIZ. 1"=20' VERT. 1"=10' 'A' V 10, V 211- /,N -------is "v 3+00 560 555 550 545 540 535 530 525 520 515 510 505 500 - — — — ss____ ........... cp. 6-, v J f y 0 A e Z6 'A' V 10, V 211- /,N -------is "v 3+00 560 555 550 545 540 535 530 525 520 515 510 505 500 - — — — ss____ ........... 0 2+00 STk3+68± �ls CONNECT TO EX. 6" SLUDGE FORCE MAIN WITH 6"x4" TAPPING STA. 3+20± PROPOSED 450 SLEEVE AND VALVE BEND /41- -0 N: 992724.9441 c E: 1782027.0401 W1 CONCRETE THRUST BLOCK V, ING STA. 3+58± x hz PROPOSED 450 BEND 11Y ,EMAIN N: 992731.6473 E: 1782065.0561 W/ CONCRETE THRUST BLOCKING 15— N GRAPHIC SCALE 20' 0 20' 40' HORIZONTAL D'DICKSON nitinfrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t)(704) 334-5348 (f)(704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 S/ SEAL 045626 Il't I I PROFESSIONAL SEAL Im 0 z it 0 0 L cr_ crIll w z 0 w d z cl) w z _j W I0 —L M Ill cr_ 0 (L Z< 06 z z 0 z We ct 0 Ill < < W o w z LL Fn m 0 cc Lu < LL 0 CC 3: z 0 D.. Ill - cc: cr z 0 LL 0 a. 0 m m Ill (L Z m Lij _j Z M Z 0 PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G-5 OF 34_ WKID PROJ. NO.: 20170041.00.0 cp. 0 2+00 STk3+68± �ls CONNECT TO EX. 6" SLUDGE FORCE MAIN WITH 6"x4" TAPPING STA. 3+20± PROPOSED 450 SLEEVE AND VALVE BEND /41- -0 N: 992724.9441 c E: 1782027.0401 W1 CONCRETE THRUST BLOCK V, ING STA. 3+58± x hz PROPOSED 450 BEND 11Y ,EMAIN N: 992731.6473 E: 1782065.0561 W/ CONCRETE THRUST BLOCKING 15— N GRAPHIC SCALE 20' 0 20' 40' HORIZONTAL D'DICKSON nitinfrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t)(704) 334-5348 (f)(704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 S/ SEAL 045626 Il't I I PROFESSIONAL SEAL Im 0 z it 0 0 L cr_ crIll w z 0 w d z cl) w z _j W I0 —L M Ill cr_ 0 (L Z< 06 z z 0 z We ct 0 Ill < < W o w z LL Fn m 0 cc Lu < LL 0 CC 3: z 0 D.. Ill - cc: cr z 0 LL 0 a. 0 m m Ill (L Z m Lij _j Z M Z 0 PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G-5 OF 34_ WKID PROJ. NO.: 20170041.00.0 ON W poa p U O J U �Z] om zoo .0< oDm x, .0m It m_a0 N_ W ozw -o ON �00 `d U oZ N m WY -4 0 Y W3 jLLmZ 00¢ Z W W �0a mzz W OmV W� m3z X00 m�Z. P0 Saa (7 a Z O ZZ W g cOJ Z V ZWD N� U0LL p'0 ym4 3=z ®r3 0 Q m O Zw 00, MonLL f 9 F{ LABORATORY i f U-1 cr- w Lu 2 PROD. DATE: SEPT 2018 DRAWING NUMBER: o I z INE CHLORINE z FINAL SETTLING TANK NO. 1 I ------------ CHLORINE ODIUM IUL.EITE CHLORINE �JVASTE SLUDGE PLANT EFFLUENT O DAN RIVE FLOW LEGEND EXISTING WASTEWATER --- SLUDGE -- CHEMICAL FEED LINE z O U Z oC H z O U rr O LL 0 W U) Q w J W crH O z J z O U) w U) O W W cc O LL 0 0 z Q r- 0 J Q z LL DICKSON communitV infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (17 (704) 334-0078 WWW.WKDICKSON.COM NC LICENSENO.F-0374 i o a SEAL r —_ 045626 PROFESSIONAL SEAL J w U w O Iz CL 0 z w u.i I— H 0 z Q i PROD. MGR.: JWH m RET DRAWN BY: w PROD. DATE: SEPT 2018 DRAWING NUMBER: m z z w w O O 2z O zo Iz O J cr O wQo LL O ct W CL m UZ z Ill w o= Irc/) m w z ui � m W z I— U w O Ir a z p O crw W Q 0 IIIIIIIIZ w U w O Iz CL 0 z w u.i I— H 0 z Q i PROD. MGR.: JWH DESIGN BY: RET DRAWN BY: w PROD. DATE: SEPT 2018 DRAWING NUMBER: m z w w O 2z O zo Iz ul J cr O wQo LL O ct W CL m UZ z Ill w w 0 m w z ui � m W z I— U w O Ir a w U w O Iz CL 0 z w u.i I— H 0 z Q i PROD. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROD. DATE: SEPT 2018 DRAWING NUMBER: WKD PROD. NO.: 20170041.00. C L cc Om Zaw FUO O�U 0 z0- g12-. 5 On OX, Om ya0 oZt�Y -o ON wUO -6, 06 OXNmw J w38 ,COO 0 oOma? 0 Y Y 3 0 cn U DICKSON communitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 I LABORATORY WWW.WKDICKSON.COM NC LICENSE NO.F-0374 I € FINAL_ SETTLINGMIXED TANK NO. 3 l LIQUORBUILDING OPERATIONS BIOSOLIDS SCREEN MIXED I ASO, 3 LIQUOR � I IAERATION _ a SEA2 FINALBOXAI EFI0 SPLITTER MI E - NO, I ISO. t , t SCREEN Ll I NO. 1 r O, 1 PROFESSIONAL SEAL CELT PEC I i INFLUENT RETURN INFLUENT STRUCTURE SLUDGE DOSING METER INFLUENT RETURN RETURN ACTIVATED SLUDGE _ METER STATION NO, 1 , t TNI _I L ITTF SPLITTER VAULT FLOW SLUDGE SPE RETURN E0 f BOX RETURN ACTIVATED SLUDGE _., I .� METER � I ISLUDGE ... [ f PUMPING 7'STATION €— WASTE SLUDGE METER CLEAN B UNIT 0 a I L0 ---- SEE SHT. G.8 SLUDGE TRANSFER FOR P&ID HOLDING z ____n _� ___ PUMP z0 Q TANK ` f STATION BLEU ( I ICD L.IOUO �q FINAL I SCREED I U ISETTLING $"� l€ C f � i TANK 0, 24 L11 Q UOR NO. ' AERATION CL.�ITTE I BASINI z � O I N0. MIXED MIE3� 0. � E .....................e,.,.,_., r....,,...,,,.,....,.,,.,,, ..,.,.,. .,.... _, SCREEN NN 10, 4I 1 , Z a O [ FINAL SETTLING I Z aTANK NO, 4cr- UL N - 1 v N e W ,q S i I w a ( w F- F- 0 0 ...._._...� CHLORINE HLOI?E CHLORINE CHLORINE I F-MIXI O w CHAMB ER zC"LORINE .. LLI I � U z Z Z_ W a O i i i t[ ............ ..._...._....._....._ .......... ........................._..._...... _.._.._ < Z J U 0 ...........__ ._..._._._........_._...; i..__._....._....._ CHEMICAL I 0 Z U H FEU J H p Q t/) ...._� _� CHLORINATIONI UBLDG, zBLDG� ~U- = cl CHLORINE IICHLORINE On o JY O CONTACT CO AC CONTACT U)OuJ C 2 u � Z �— _._ TANK TANK TANKW t1 W U 0 NO. 1 110.1 No, 3 W CD W O EL W I F— t 0 SR�._......�.�... M,.,.....c mow...., m.....mmm...._�? 0 Jy FLOW LEGEND w EXISTING w m W z WASTEWATER J— 0 a ,.,..,_........ DE -Cd ,,.,z P R w U Z cc CHAMBER SODIUM ICULFITS SLUDGE p _....... ....._._......_.._......._........__....__ w..._.....__. _.__. ..__...__....._... Q 0 CHEMICAL FEED LINE O a L PROJ. MGR.: JWH DESIGN BY: RET PLANT z DRAWN BY: CH EFFLUENT � PROJ. DATE: SEPT 2018 TO DAN s RIVER DRAWING NUMBER: o Q G.7 O 34 QWKD PROD. NO.: J z 20170041.00. CL H Q a u— J LL I o� O pa Eoo qJU q Z W OQ Zoo C9_ 5 Fn ox, o0w 'fro fN0 -is- w§2-4 LLq= OX P j LL tll 0 °Wa oms CoQ 0 wiz wrmz W�= Xao z iq �oa aoZ ZW (OjZFU ZZa W N= UQLL qq0 Y m Q ®o¢ rSNO O ZO F Fqg 01 NOTE: 1. THE INFORMATION ON THIS SHEET IS SHOWN DICKSON WITH EXPRESSED WRITTEN CONSENT FROM BCR SOLID SOLUTIONS. communitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 TI (f) (704) 334-0078 ETM HOA ZIC HOA ETM ZIC DO AA AA WWW.WKDICKSON.COM 2101 2101 2002 2100 H1O 2001 2000 2000 NC LICENSE NO.F-0374 DOFAIL RUN ZIO RUN ZIO FIQ CIR AIR AIR FIQ FIQ 2101 2101 2002 X2100 2100 2001 2000 2000 2000 2000 2000 WOO \\\�� ! SIC SIC SIC OCA FI CI DO Al Al FI AAHO; ,y' Q SEAL. r 2101 2002 2100 2001 2000 2000 2000 2000 2000 2000 _ oass2s OPERATOR INTERFACE -- - -- -- -- -- -- -- -- - -- -- ---- -- -- -- -- N'0� I I I I I i I I I t°1't PROFESSIONAL SEAL 201 207 202 204 205 206 DO 203 208 209 /210 W PLC INTERFACE -- -- -- -- -- - -- -- -I- -- -- -- -- - -- -- -- -- - -- -- -- -- -1---- -- -- --I -- -- -- -- --t--- --I---- -I �_ I -�-__ i I i I L L — L_ — — — — MOV j I I I - - CL02 GENERATOR - - -i -1 I I { 2001 EQ -06 I � I I M I i I I M � II z REUSE WTR RW RW RW RW RW -�-- — RW ( ( {4nm�= WAS WAA CLO2 GQgATOR WAS 1NAS WAS (WAS)SHT: G.9 fr O RW -01 i I 2"- RW - PVC I RW -02 I { TE ( I STATIC r t ( 1 6" -WAS -PVC OU a. FLOW(GPM): XX—XXX I I I I ( AE AI I MIXER -1 I I ( I W ARV -01 71 I g I I IT -07 2000 000 ( Q EQ -05 I I ZO o � PR(PSI): XX -XXX i I I I I DO PROBE I I > III TEMPT: XX XXX { { I — — — — — I I I I I CL02 GAS AE Of AR -01 i FIT CT AE -01 ( < ; DETECTOR/ALARM 2000 DRAIN I 2001 2000 I z IT -13 IT -10 TS I I-- -- --� mom WAS WAS -10 WAS WAS �r WAS M �i WAS WAS WAS AS 6" -WAS -PVC WAS -02 I 6" -WAS -PVC I U I FLOW METER Q I (120-270) GPM I I MOV RW -03 I s CHEMICAL DELIVERY SKID BOUNDARY T� I I LuLu 2002 I I I I v, z o I i { I O CAL COLUMN PG P I ( I i { I I I TO SKID 10 CU. IN. Q I COLLECTION P U) I I O N I TOTE I I I PAN { ILL - { ` A-12 F�'FSA SA SA SA SA I W I I SA 10 DDP SA 11 I Q w SA 1 I 3 I 21 0 Q FIT D - - I � U) 2001 IT -12 ( ( W U) DEQ -03 SA -09 FLOW(GPM): XX -XXX (SA) SUPPLY FROM SOURCE SA SA SA SA O IP45 SA SA SA M SA SA SA ---� SA SA SA z > 2"- SA - Pk 1 /2"- SA - PTFA 1 /2"- SA -PVC O PSIG 5 PSIG 1/2"- SA - PVC r W WA -07 FLOW METER SA -08 PR(PSI): XX—XXX I W o _ SA SA[:TI o 0 I ' TEMPT: XX -XXX cn Q RW RW RW RW RW RW RW RW RW RW --�- RW RW { Z Z Z U 1/2" -RW -PVC 1 /2"- RW - PTFA 1/2" -RW -PVC RW -04 1 /2" RW - PTFA 1 /2" -RW -PVC 1 /2"-SA-PTFA I z JO W ;u( I i- U) o w cr I z J ul I CAL COLUMN PG z 0 H �= p O 0 J I I P I V)m0�� a I u_ I W TO SKID 10 CU. IN. { I It = z m D COLLECTION P I W CLW U Z TOTE I V' PAN I Ir Z Q C-12 (%) W W Sc Sc --�— Sc Sc Sc RW -05 w J Sc1 { SC -10 SC-11/--------------------/�-------------� I O W W DDP �- C'3 w F —��---------�L— FIT ' cn � cn I---------- D � 2100 � O � 2001 pC c) EQ -04 IT -12 IF FLOW(GPM): XX -XXX (L W O SC -09 Z Ir (SC) SUPPLY FROM SOURCE SC Sc Sc Sc O Sc Sc Sc Sc M -� Sc Sc --� Sc Sc Sc Sc --0- Sc a. 45 PSIG v15 PSIG W m J 2 - SC -PVC 1/2"- SC -PTFA 1/2"- SC -PVC O SC -06 SC -07 1 /2 SC - PVC PR(Psp: XX -XXX W a W FLOW METER � Z � D Sc Sc TEMP°F: XX—XXX w U Z CHEMICAL DELIVERY SKID BOUNDARY � W � RAW (WAS) WAS —�-- WAS WAS WAS 1 /2"- SC -PTFA O Q was -01 O a O "-WAS- PVC LL PROJ. MGR.: JWH DESIGN BY: RET o c o PA z DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: Q o G.8 OF 34 I J WKD PROD. NO.: Q 20170041.00.CL i z f OL 2 OW E" " �o 0 j �0. o:.' Zoo =m, ox, om ya0 N_ W oiw dN oZO Z0 06 Z aW. N LL N M so o=oz W i iso WIZ Z boa ZoZ _W 0Z= U -U Z W O a0i3� UOo �O 1 N Q 3�o ©os 0 moo, aqm o0 ax PI PI V3000 3000 OPERATOR INTERFACE 301 302 PLC INTERFACE I I i (WAS)SHT: G.8 WAS 6" -WAS -PVC STATIC MIXER -2 EQ -07 NOTE: 1. THE INFORMATION ON THIS SHEET IS SHOWN WITH EXPRESSED WRITTEN CONSENT FROM BCR SOLID SOLUTIONS. ORP n a_ pH CL 305 303 U)304 I i I I EL � 0- QL cr o 0101 0 0 0 I I i I-------- ---� I I --� I I SII I ( I------------------------- I I I I I I I I II I DR DR DR DR DR DR DR DR DR I WAS -03 MANUAL DRAINI i i I I 4"— DR —PVC DR r— DR DR DR DR �I II I o I I I CONTACT COIL — WAS I I I i i I I I I TOY IDRI DR DR DR DR DR DR PLANT I DRAIN WAS— P 1C Q ' I I I I II EQ—O8 I D I I i I C/) AS -04 I I o I( DR DR DR DR DR DR DR DR DR --�-� I -1" .PVC DR I ( D o �- I- — — — — AE TE Al ORP I AE TE AI PH I f i----------- IT-06 3000 00 I IT -05 3001 300 I I D N � I PT E-02 E-03 > I IT -09 3001 D `" P WAS -05 Lo.- WAS WAS WAS WA WAS WAS WAS WAS WA ------10000--WAS WAS WAS WAS WAS WAS WAS WAS WA 3 3001 MOV 4"—WAS— PVC c t � a D U U d. FLOW(GPM): XX -XXX TS(%): O.X-X.X PR(PSI): XX -XXX TEMPT: XX -XXX 4"—WAS— PVC TO SLUDGE BELT PRESS WAS WAS WAS WAS WAS WAS z O U z O U O u- 0 W (n Q J W O z 1 J z O W O W W cr- cr O u— II r V z cr 0 J Q z LL "'bVVK DICKSON communitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ` SEAL • 045626 • •q' Etc-'•� PROFESSIONAL SEAL m o Z o 0 L W U cr w O w crw 0 ICIlilllz W W W w U w I' Z O z z U z J to 0 W cr U �tQ-= III U 0 �J�0F a. CC w¢LL O 0 p„ 06 W U Z a.. z m w Q W W 0C) U cr w m W W 0 z a w m w O _j� W cr-, Z U Z W O Q a o PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.9 OF 34_ WKD PROJ. NO.: 20170041.00. C L i FORP =1 AA AA ZIC AA AA 3000 3000 I 3001 3001 I 3000 ORP AIR I pH I AIR AIR ZIO AIR 3000 3000 3001M30 3000 ORP I AlA{ AlAI PH I Al I OCA m 3000 3000 I m o bi o 3001 3001 4Ld o \_300000 I i I ORP n a_ pH CL 305 303 U)304 I i I I EL � 0- QL cr o 0101 0 0 0 I I i I-------- ---� I I --� I I SII I ( I------------------------- I I I I I I I I II I DR DR DR DR DR DR DR DR DR I WAS -03 MANUAL DRAINI i i I I 4"— DR —PVC DR r— DR DR DR DR �I II I o I I I CONTACT COIL — WAS I I I i i I I I I TOY IDRI DR DR DR DR DR DR PLANT I DRAIN WAS— P 1C Q ' I I I I II EQ—O8 I D I I i I C/) AS -04 I I o I( DR DR DR DR DR DR DR DR DR --�-� I -1" .PVC DR I ( D o �- I- — — — — AE TE Al ORP I AE TE AI PH I f i----------- IT-06 3000 00 I IT -05 3001 300 I I D N � I PT E-02 E-03 > I IT -09 3001 D `" P WAS -05 Lo.- WAS WAS WAS WA WAS WAS WAS WAS WA ------10000--WAS WAS WAS WAS WAS WAS WAS WAS WA 3 3001 MOV 4"—WAS— PVC c t � a D U U d. FLOW(GPM): XX -XXX TS(%): O.X-X.X PR(PSI): XX -XXX TEMPT: XX -XXX 4"—WAS— PVC TO SLUDGE BELT PRESS WAS WAS WAS WAS WAS WAS z O U z O U O u- 0 W (n Q J W O z 1 J z O W O W W cr- cr O u— II r V z cr 0 J Q z LL "'bVVK DICKSON communitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ` SEAL • 045626 • •q' Etc-'•� PROFESSIONAL SEAL m o Z o 0 L W U cr w O w crw 0 ICIlilllz W W W w U w I' Z O z z U z J to 0 W cr U �tQ-= III U 0 �J�0F a. CC w¢LL O 0 p„ 06 W U Z a.. z m w Q W W 0C) U cr w m W W 0 z a w m w O _j� W cr-, Z U Z W O Q a o PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.9 OF 34_ WKD PROJ. NO.: 20170041.00. C L cc ow Zaw FUO 0JO �Z� Woo O=w oom ya0 w Ozw f2omQ'." - Z Z otlU 7- U O m mo LL w w3 0 O N 2Zi 'W w w x Z Z W O N= U p LL p�0 1 y Q 3rz crs 0 ZW 0 �qm o o0 LL SAFETY RAILING VALVE OPERATORS AND AIR INTAKE SKYLIGHTS STANDS TO BE REMOVED TO BE REMOVED TO BE REMOVED TO BE REMOVED __...x ROOF VENTILATOR TO BE REMOVED HALVES AND OPERATORS ' TO BE REMOVED 1" ' EL. 522.10 ME 'i S< z ' 2t CL EL. 5201.85 t ^A � � f w... f E L- f' C: i'W Ti DRAIN PIPE¥ �l II i�£ 11 TO BE REMOVEDI, I ...... .._..... _.... AND WALL ; , u -.a.0 L_. PENETRATION TO BE FILLED EX. 8" DISCHARGE PIPE WITH GROUT TO BE PLUGGED AND ABANDONED IN PLACE I ... ...... ._ _ ................. __ _ _ ._ m_ ..... `�— REMOVE EXISTING CHECK VALVE AND CL EL. 512.60 PLUG VALVE, TYP. 3, WALL PIPE AND FLANGE EACH SIDE OF WALL TO REMAIN f fALL PUMPS, PIPING, AND VALVES DRAIN PIPING Tn Pt= Dr-RAn i=n TO BE REMOVED f Aj, mL AAML SCALE: 3/8"=1'-0" z 0 U U) z O U IC 0 LL 0 W ui W 0 z i J z 0 U) w U) 0 (Lcr CL CL W LLQ cr 0 LL 0 z crQ 0 J Q z LL DICKSON communitV infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 1 IIlp// a SEAL r- 045626 A 161k� PROFESSIONAL SEAL m p z cr o O 1-- rc a:� z p O w W Q 0 IIIIIIIIZ z O 5 L w /111 w W V/ 0 F- z W W � Q � O z z z J z Z O cn 0 Z)I=F-�= cr 0 W<o CLU z W W W O a w O `W V 0- cr- m O W z Lli Q I C m Q W F— z z F- F- -U Z W W O Q a � PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.10 OF 34 WKD PROJ. NO.: 20170041.00. C L cc oN Zaw FUO 0�0 w iow iF 0d MWS O(Lj R25 =U� 0 OY�w3 jLLN �O�-- ZW N Q 7 AUC O W ¢¢ N ¢5� W O W Z W � z H Sao zI jXI oa wm 601 ?W M ,3-, 0W,o 05 UpLL pp0 Y N q 3�z ©oQ N 0 00r Mn 0 OO O LL s Ow NWy OZoa FOO p JO ZW �occ ZOd wf�!� Uma 2W 0m ps ya0 =U� LLp= O�[J y3¢ul X00 0 o¢ w s =' 4 Qw0 w ¢¢z .3z W5� a W c� j22 p R ¢acs ZOZ OZV O ZWp Y UpLL pp0 Ym� 3�'G7 pOg N O ZW -O� N2 O OaIF �L PROPOSED 6" WAS TO CLEAN B UNIT, FOR , l , , CONTINUATION SEE SHT. G.4 _-,,,,_ ..._..._.. _. _ ........ _....,_a ..,,.,,a. - N, FROM ,X No. 'A' PROPOSED 4" DRAIN/REJECT FROM CLEAN B UNIT, SEE SHT. GA FOR CONTINUATION 23 PROPOSED 19'-8"x12'-0" OVERHANG W/ METAL ROOFING; SLOPE TO DRAIN PROPOSED ALUMINUM GRATING TO COVER ENTIRE LENGTH AND WIDTH OF WET WELL 20 if s 1cv -volo-J I immm- 'B' PROPOSED 72"x80" DOUBLE HUNG DOOR PROPOSED NEMA 4x RAS PUMP CONTROLPANEL EXISTING PUMP STATION No. 1 - PROPOSED TOP PLAN SCALE: 3/8"=1'-0" 1 PIPE, FITTINGS AND VALVES SCHEDULE [i] 10" 90° BEND (FLANGED) Q 10" CHECK VALVE Q 10" PLUG VALVE ® 6" 90° BEND (FLANGED) 05 4" PLUG VALVE © 4"x4"x4" TEE (FLANGED) ❑7 4" 90° BEND (MJ) ® 8"x4" REDUCER (MJ) [9 4" CHECK VALVE 10 16"x10" REDUCING 90° BEND (FLANGED) 11 4" 90° BEND FLANGED 12 16" BLIND FLANGE 13 16" TELESCOPIC VALVE ASSEMBLY 14 6" SUCTION 15 10" SUCTION 16 10" DISCHARGE 17 4" DISCHARGE 18 4"x4"x4" MJ TEE 19 16" SLIDE GATE 20 16" TELESCOPIC VALVE OPERATOR 21 16" SLIDE GATE OPERATOR 22 4" 90° BEND (FLANGED x PE) rl� 4" 22-1/2° BEND (MJ) u s 1cv -volo-J I immm- 'B' PROPOSED 72"x80" DOUBLE HUNG DOOR PROPOSED NEMA 4x RAS PUMP CONTROLPANEL EXISTING PUMP STATION No. 1 - PROPOSED TOP PLAN SCALE: 3/8"=1'-0" 1 PIPE, FITTINGS AND VALVES SCHEDULE [i] 10" 90° BEND (FLANGED) Q 10" CHECK VALVE Q 10" PLUG VALVE ® 6" 90° BEND (FLANGED) 05 4" PLUG VALVE © 4"x4"x4" TEE (FLANGED) ❑7 4" 90° BEND (MJ) ® 8"x4" REDUCER (MJ) [9 4" CHECK VALVE 10 16"x10" REDUCING 90° BEND (FLANGED) 11 4" 90° BEND FLANGED 12 16" BLIND FLANGE 13 16" TELESCOPIC VALVE ASSEMBLY 14 6" SUCTION 15 10" SUCTION 16 10" DISCHARGE 17 4" DISCHARGE 18 4"x4"x4" MJ TEE 19 16" SLIDE GATE 20 16" TELESCOPIC VALVE OPERATOR 21 16" SLIDE GATE OPERATOR 22 4" 90° BEND (FLANGED x PE) 23 4" 22-1/2° BEND (MJ) z O E— U U) z O U O LL 0 w U) Q J w rr O z .�J z O W w U) O >L w w crO LL I r V z Q 0 J Q z LL DICKSON communitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 rrr l � ®• •OF E S /OZ �A i Z a SEAL 045626 N r E� • �s v PROFESSIONAL SEAL c)z fr O Oa ct � z p O U) w Lu Q IIIIIIIIZ �)w F- F- z z g w75 a O Z Z_ ~ O Z zi w O w rr O �Huj swo 0 —i x 0 CL W u- 0 •- aW UZ O pC z z Q a. w O 0_z o F- m X w w z m J Q w z F= U Z Lu O Q a � PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROD. DATE: SEPT 2018 DRAWING NUMBER: G.12 OF 34 WKD PROJ. NO.: 20170041.00.CL m Om Zaw r -0o ppp J W aon Zoo mfg = W oQm 'fro w�w F -o � UZQ.z OU °� Z U m Q oll p N 0 zwa 00 a 0 !S p Z Z Q W � LL�N Z W5 W = o _ N Q Z� �Og J LL PROPOSED 6" WAS TO CLEAN B UNIT, FOR CONTINUATION SEE SHT. GA I I c Ill ' B l II ( 18 I PROPOSED 4" WAS I II II II I ( I I I I II II ( I I I I I II I I I I it I ( II 'A' PLUG WALL PIPE WITH CONCRETE — �--fin PROPOSED 4" DRAIN/REJECT FROM CLEAN B UNIT, SEE SHT. GA FOR CONTINUATION D VA vcv -ma4m I I wo, 'Bi EXISTING PUMP STATION No. 1 - PROPOSED BOTTOM PLAN SCALE: 3/8"=11-0" PROPOSED 12"x12" SUMP W/ SUMP PUMP EX, 1-6'0, DISCflARGE 'A' 1 m PIPE, FITTINGS AND VALVES SCHEDULE 1] 10" 90° BEND (FLANGED) 12 10" CHECK VALVE 03 10" PLUG VALVE ® 6" 90° BEND (FLANGED) �5 4" PLUG VALVE © 4"x4"x4" TEE (FLANGED) 07 4" 90° BEND (MJ) ® 8"x4" REDUCER (MJ) 09 4" CHECK VALVE 10 1611x10" REDUCING 900 BEND (FLANGED) 11 4" 90° BEND (FLANGED) 12 16" BLIND FLANGE 13 16" TELESCOPIC VALVE ASSEMBLY 14 6" SUCTION 15 10" SUCTION 16 10" DISCHARGE 17 4" DISCHARGE 18 4"x4"x4" MJ TEE 19 16" SLIDE GATE 20 16" TELESCOPIC VALVE OPERATOR 21 16" SLIDE GATE OPERATOR 22 4" 90° BEND (FLANGED x PE) 23 4" 22-1/2° BEND (MJ) z O F- U DC F— W z O V crO u- 0 W W Q W 1.1J F- 0 z J z O f1) W W O a_ cr D a_ W Lu cr O u - e _z Q 0 J Q z u- DICKSON communitV infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 i Q � 7 _ SEAL _ 045626 �/ ifs • yGIN ��� i PROFESSIONAL SEAL m /p z I.L. O O a li U) Lu U) w W Q 0 OZ 15 W E- H z a, w O O Z z m cn0 wcc w U) < H =wU � D JF- L = O wr• Q ° O CL crm z T a� Uz O Q Z w In w °' 0 O p Z ZE F- m U w w Z 2 m Q w z U Z_ W CL o PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROD. DATE: SEPT 2018 DRAWING NUMBER: G.13 OF 34 WKD PROJ. NO.: 20170041.00. C L jr om. Zaw FUO o¢ Zod o o=w pmm ya0 iNo w ozP5 -o z�z o Z ()Om =Y� U_ o2 �y� yaw o o m O zzQ Soa ¢W6 �3z w5o W?� W�= ¢Fr S ac' '5 z a- u UOZ ?F3w oz81 o -o ZWo U00 oa YNQ ©�doo fL No (,zw 0wo0 UoLL 0 Y U co 12' PROPOSED 19'-8"x12'-0" OVERHANG W/ METAL ROOFING; SLOPE TO DRAIN PROPOSED NEMA 4x WAS PUMP CONTROL PANEL ©l"Em [=] 4 _ . r s e MAX WAUER M E14 �- 7 PROPOSED 4 DRAIN/REJECT FROM CLEAN B UNIT, SEE SHT. GA FOR CONTINUATION 19 PLUG WALL PIPE WITH CONCRETE �....................... ............,.............,..�\ . PROPOSED 6"----_ FLARE L 14' rlllllllll' PROPOSED 19'-8"x14'-0" METAL SHED 1 � 2 ` PROPOSED 1-1/2" I RAS PUMP NO. 3--ru LPVC 900 EL �Ilf fl l/ II L PROPOSED.10" FLARE 12 2'-5" - u -PLUG WALL PIPE WITH CONCRETE EXISTING PUMP STATION No. 1 - SCALE: 3/8"=1' 1' --PROPOSED12"x12" SUMP E L. ..._5 i , EL s 2 i.1, I GROUT SLOPE TO PROPOSED SUMP EX, SIDEWALK EL4.35 PIPE, FITTINGS AND VALVES SCHEDULE i 10" 90° BEND (FLANGED) R 10" CHECK VALVE 33 10" PLUG VALVE ® 6" 90° BEND (FLANGED) 05 4" PLUG VALVE © 4"x4"x4" TEE (FLANGED) 17 4" 90° BEND (MJ) ® 8"x4" REDUCER (MJ) ® 4" CHECK VALVE 10 16"x10" REDUCING 900 BEND (FLANGED) 11 4" 90° BEND (FLANGED) 12 16" BLIND FLANGE 13 16" TELESCOPIC VALVE ASSEMBLY 14 6" SUCTION 15 10„SUCTION 16 10” DISCHARGE 17 4" DISCHARGE 18 4"x4"x4" MJ TEE 19 16" SLIDE GATE 20 16" TELESCOPIC VALVE OPERATOR 21 16" SLIDE GATE OPERATOR 22 4" 90° BEND (FLANGED x PE) 23 4" 22-1/20 BEND (MJ) EXISTING PUMP STATION No. 1 - PROPOSED SECTION 'B' SCALE: 3/8"=1'-0" z O U) z O U rr O u- 0 W U) Q J W O z 1 z O �W v O `/_ cr— Z) a_ cr- I W Ir O LL I 0 z Q 0 J Q z DWDIKCKSC)N comm:nitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 a SEAL _ - 045626 PROFESSIONAL SEAL Illll lm p z Iz o O � cl) `O`^^ VJ w w 0 IIIIIIIIz W z z w 0 F- W U Z Z 0 O W J J 0 W Q 0 a O J ~W = cr w U) ¢ u 0 cc 0 a. aW Uz O ir z z W 1..1. /w 0 V z VJ cr X m W W z m 6i W Z I— U z W O Q a D PROD. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.14 OF 34 WKD PROJ. NO.: 20170041.00.0 L O 0 z a w EUO QJ() �o� Woo 03:, .0, ya0 m w ozW �-o oz UO z Dom Wy OY W 00`� zz< oZ, 0!;R CIZZ 0.0 r �s� oa Wiz F. F. f2 0 Z �0ccZ< LioZ ?Fwwig 0zU zwo Np� U0I 0p0 '20, N Q 3isz ©oa 0 rr 1 z 0 �0g 0 i )OfF \li✓K DICKSON community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 PIPE, FITTINGS AND VALVES SCHEDULE (1)(704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 �, \ ' 19 -8 ?OAF E S`O • i ',� 2' 2 Q SEAL :v — 045626 _ i w PROPOSED 19'-8"x12'-0 /��f/it 11100 OVERHANG W/ METAL PROFESSIONAL SEAL ROOFING; SLOPE TO DRAIN 11 I m 11 5 6 4 Z 21 21 CC) 20 CV 3f 41A 1 =i 4 E N W U 1 W U 2 i ,_.......,...._..._........_..w._.__._._...w...,...�,�..,._..c �.WW.a.e......_. r.___..._...._.__,....._.a...r...........�....._...._......a ,._�x._,.. ....,a_ .,..,��_..,..._....n4.__e.,.. w.�.,x�: „_...,,..._...........��.�.�.........�...�._........ ?_..�� �..... ... ......�_.._.. ._......_....... . �... E _.. ..........._ .. ............_. .......... i Cr � I� z w _. _ O o 4" WAS DISCHARGE FOR CONTINUATION SEE SHT. GA & G.12 LU 22 cr_ 13 ! — — ----- E 13 O 14 7 E � U F F t� Lu f E __ _ r ,r 19 { t 3 o 19 ! .. I( r: V I I I 1 10 �...._..._ if E: t_F , j7 F . ,,.....,............. F i ` .... _, ...... ..._.... _..._. ....... _ ... _ 3 i P q_...................W......,._....... .,..___._..._...,.._.,.._.......__.__.._.....,.,. i t j . __.. E .c. .._..,.... _.. ,....�........... ............ _.... .... ....._ . _, . .�._._..._ .._,...... , .... ,.. .. . _... ..,............,......, u........ .. I {... t... t I s; I PROPOSED 6"�' FLARE, TYP, OF 2 T-6" 3' 7'-6" 0 I..I..i EXISTING PUMP STATION. No. 1 -PROPOSED SECTION 'C' C!) SCALE: 3/8"=1'-0" Q w m J � W a CC z z w O U a F— UJI wf�1 po z v! z z Q J 0 N J �� w� O A z = =wU O = O ~0= Iz WM0 fn a Q ° W°C w U z O U) n- Cr z `z w w w c9 W z 0 g o F- D � X I w w z a w m W W Qw �a z 2 1= a W U z N w o a a � a°C. o O O 'c LL a i PROD. MGR.: JWH m 4 DESIGN BY: RET 9 z DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: s Q o G.15 OF 34 G QWKD PROD. NO.: g 20170041.00. C L Z a — U— LL 1Q 10" 90° BEND (FLANGED) ❑2 10" CHECK VALVE ❑3 10" PLUG VALVE ® 6" 90° BEND (FLANGED) Q 4" PLUG VALVE © 4"x4"x4" TEE (FLANGED) Q 4" 90° BEND (MJ) ® 8"x4" REDUCER (MJ) Q 4" CHECK VALVE 1 Q 16"x10" REDUCING 90° BEND (FLANGED) 11 4" 90° BEND (FLANGED) 12 16" BLIND FLANGE 13 16" TELESCOPIC VALVE ASSEMBLY 14 6" SUCTION 15 10" SUCTION 16 10" DISCHARGE 17 4" DISCHARGE 18 4"x4"x4" MJ TEE 19 16" SLIDE GATE 20 16" TELESCOPIC VALVE OPERATOR 21 16" SLIDE GATE OPERATOR 22 4" 90° BEND (FLANGED x PE) 23 4" 22-1/2° BEND (MJ) al REMOVE HATCH F—amew— 'AV EX SN' WAS ,.._ .. F > F. e ,\ ._, .' ,..: ............. .................«...«....,.max., .... ._.. EX. 20" INTAKE REMOVES SKYLIGHTS, TYP. REMOVE INTAKE Nowl.— vAV mm— EXISTING PUMP STATION No. 2 - DEMOLITION PLAN SCALE: 3/8"=1'-0" CAP EXISTING PIPE; FILL WITH FLOWABLE FILL ABANDON 24" PIPE IN PLACE ABANDON 900 BEND IN PLACE VALVES AND OPERATORS TO BE REMOVED 'C z O E -- U D OC U) z O C) crO LL I.I.I U) Q w --.I W crI— O z I J z O c/) ) �W v ) O cr- Z) IL W W rr rr O LL i z Q 0 J Q z u— DICKSON communitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 O O • FES �Z> _� ?•moo SEAL 045626 _ i PROFESSIONAL SEAL Q z cr O O L 0 cr cc � z o O w cc w 0 illllll10 W N z Z O W ~ 2 m O Q Q W z z_ z J O zIll tW WU O DJ~ILL cc= W QLLOo a W U z N rY z O z W c/) W 0 0 z a P EE m X W W m J W F - z F- U Z W cr a PROD. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.16 OF 34 WKD PROJ. NO.: 20170041.00. C L 00 Za" FUO 0 j U �O� �ZOo �r7 gym; 0Ow Dom Nao .0 aZ� N dZ 0 06 'LL�t=q jLLW118 O 0w Z< oma 7 U Z 0 W . to �3z id w�= Sao 0 Z� o� ZZ 0281 zz 0W� NO� U00LL Es Y N 000-,- 0 OOF Ujg O 0. EE U REMOVE INTAKE c, -&AAe A lr- Ck"IM i A r-AMCD '_ �,-C S . » REMOVE EXHAUST i l S,(' 1AR(,'E L -o, 'A' EXISTING PUMP STATION No. 2 - DEMOLITION SECTIONAL PLAN & EL. 524.00 SCALE: 3/8"=1'-0" REMOVE EX. WATER LINE vcv 7 D J D Y z J LL 0 W C/3 Q W J w It O z z O U) W O a- n� W W L.I. O U- I 0 z Q CC 0 .J Q Z_ U- DICKSON community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 z /•g/•� 1..1.E z O F— J 2 W cl w U) a cra N z U) V z U) X LLI w J I— V z Q PROJ. MGR.: JWH DESIGN BY: w F- m CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.17 OF 34 I— z 5W L w Q z Q z z �0 cc:o �Ia—=wU D J ct O O wQL O _ (L z U Z W o~ U w /w V �0 /LL W LUEr w z W m w Q z I" - U W O a w z o O U) w W Q 0 IIIIIIIIz z /•g/•� 1..1.E z O F— J 2 W cl w U) a cra N z U) V z U) X LLI w J I— V z Q PROJ. MGR.: JWH DESIGN BY: w F- DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.17 OF 34 I— 5W L w Q z Q z z �0 J z0 �Ia—=wU D J ct O wQL O _ (L z U Z W w /w V �0 /LL W w z W m w Q z I" - U W O a z /•g/•� 1..1.E z O F— J 2 W cl w U) a cra N z U) V z U) X LLI w J I— V z Q WKD PROJ. NO.: 20170041.00.CL PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.17 OF 34 WKD PROJ. NO.: 20170041.00.CL om Zaw FVO 0�w �o:5 zo �k� �mg o=w p.r 0n2 w Ozw -o ZOZ a{O0 Z 0Nm jr_-2a O= Oy'8 ti3 ,oto QZa ZZo w UpLL p�0 ®o2 NO �zw 0,0 0 UtjFF LL 111 � ■ DICKSON community infrastructure consultants REMOVE VENT 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 REMOVE INTAKE (f)(704) 334-0078 \ REMOVE EXHAUST WWW.WKDICKSON.COM REMOVE SKYLIGHTS, TYP. 20" INTAKE 20" EXHAUST NC LICENSE NO.F-0374 i _......_... _... __._...._......... 10,P WAILi.. . s _...__ . SKYLIGHT SKYLIGHT SKYLIGHT SLAB O 2.�oFES ip'L'•2y s IP 5 _ SEAL = e s_ OG ell .. ' r ,s SHIPS LADDER '�2a ° Ie ° FLEX DU RAS PUMP No. 2 PUMP GUIDERAIL� vl�; - V, 51,16,"Y""', CONNEC A 24„ \ SHIPS PUMP PUMP PUMP 3 No. 2 No, 1 ABANDON IN PROFESSIONAL SEAL h. REMOVE \No. \ \ PLACE LADDER 24" TIED 24" TIED �. �; ` 6" PIPE COUPLING COUPLING \ I U . .. _, . � i I m I. I a REMOVE ALL PIPING, VALVES WAS PUMP No. 2 AND APPURTENANCES ? ELEV. 514.18 i AI 1 l� WATER ' Ie SCREEN CONC REMOVE ALL PIPING, PUMPS ~° REMOVE SUBMERSIBLE PUMP, TYP. OF 2 BASE f AND APPURTENANCES • a., I .,.__ ..._ . .. .. _..,._ .. ...'_. .. _. ' g REMOVE PIPE SUPPORTS _. _. _M rvar - aw . ,_ _ - -� i - - .> z PIPE SUPPPORT S t _ EXISTING PUMP STATION No. 2 - SECTIONAL'A v REMOVE PIPE SUPPORTS, TYP. w SCALE: 1/4"=V-0" �� EXISTING PUMP STATION No. 2 - DEMOLITION SECTIONAL 'B' Iz o n SCALE: 1/4"=V-131" w REMOVE SHIPS LADDER z x __ .__..m_.. _... REMOVE EXHAUST U 20" EXHAUST 1 xh U) W PUMP No. 3 PUMP No. 2 PUMP No. 1 Q Ld 0 0 0 o 0 z J fn J J J r/! A O HOSE BIB v .,� REMOVE WATER LINE, U_ BACKFLOW PREVENTER \ Z REMOVE ALL PIPING, VALVES 3/4" AND HOSE BIB W O WATER AND APPURTENANCES ACCESS ` AACH, � PEDESTAL. PEDESTAL U W BFP f' W G7 m s WATER WATER WATER x r ! — 06 W a Q I \ i W � Q7 J a P GUTTER, EV. 509.50 B , a _„ Z a a 3 a _, . _ LU Gia_ Y r I as: -� -. • - 8" DIscH CHECK VALVES Z Z .. CL ELEV. 519.00 TO BE REMOVED ( � Q -� � Z W n gid., 16" ELEV. H" EL, f,, 16' LEE 512.33 _'°.313 � � 1.3 O W ---� J H R Q Q I r� o 90 BENDS, TYP. REMOVE SUBMERSIBLE z W ~ = W Z 0 SLIDE GATE AND _, . REMOVE __ ,_.._.._....,,.__. ____..._.__ _W_....,..,__.__ __; PUMPS AND GUIDERAILS O p -j cc WO H O m OPERATOR TO BE - .�, „_ „ °� w 2 k 5� 935 ' ..a VALVE AND OPERATOR: VALVE AND OPERATOR U) m O aC U REMOVED ; SLIDE GATE AND PUMP � � w V Z W a REMOVE SUBMERSIBLE PUMPS OPERATOR TO BE TO BE REMOVED WAS WAS PUMP TO BE REMOVED W a fA LL REMOVED � LLJ W . ,�. M £ G A 1 x _ ELIV, 51 1, F p o s a.p,may .. 11 I < , _. _ _...- _ .° .. i .............. .. z i t �M}" j " . _ J CI I , >,.�£ F. :.•.i�r \ -. : t FROM, his 1 j( jj I I.t f.. 3 ._...�. ;' } _ i �/ h III<,F ,, 'W€C Icli E � � ,..•:. ciE—TIL SANK e x IL (� o ¢ :-TANil : PRF .e : x;e « 'ft3' =�,E", _ . 1 ..'.z. 15,1,,. _, ., Eye ,3 .:,: :; ': ,...,.,... ..,, v,� ,t .._ : _ .: i i F S t >' a Z (j i tl ..,.=h F L..M,...., i- I li i •, ., ... '.� _ . -..m.>;- S, _t f ........ ..,..,_.. ttt '.<t, .?s. .. G�» _ €..... ,.,,..._,_.__..,.......... t .. _... N Ys 51 Ev 51,3.75 G W 3 VALVE AND OPERATOR £>n � .. a �� . , ,.' - ° . VALVE AND OPERATOR TO SLIDE GATE AND OPERATOR STATION N - DEMOLITION SECTIONAL EXISTING PUMP STA IO 0 2 E C SLIDE GATE AND OPERATOR iLi m W iii U) —I a a a TO BE REMOVED ? BE REMOVED TO BE REMOVED SCALE: v4•=V-0" TO BE REMOVED z I_ __.......... _ . __. -- - "._ _ _....... __ _ _ __ .. ___ __.___ _____. ___. __-... _ _- _.. ,A, _ > w w H Z z w � - DEMOLITION SECTIONAL PLAN ELEVATION 516.50 EXISTING PUMP STATION No. 2 DEMOLIT O @ o SCALE: 1/4"=V-0" O � o N LL m PROJ. MGR.: JWH W v' DESIGN BY: RET a z DRAWN BY: CH a .� s PROJ. DATE: SEPT 2018 DRAWING NUMBER: w U 0 °� G.18 OF 34 r o WKD PROJ. NO.: Q a z 20170041.00. C L a a J U_ LL 2 ow Zs F 00E 23JU W r oa .d z g 7 0 Cly o0 uj .o m Wap z ozw r -o oz U Z'6 UO Z o m Q ~lt=d OY N3� ] LL V) oOz zz< UOa ¢wcIz. aCN Q z Z Woo w=ad w�= ¢rr- =a� O � z_ 0 zoz ,ZU Zo WD 0, Y U�LL poo Yd4 ®oa No ooh owo ()O LL it 10" 90° BEND (FLANGED) Q2 10" CHECK VALVE Q3 10" PLUG VALVE ® 10"x10"x10" TEE (FLANGED) �5 10" 90° BEND (MJ) © 24"x24"x10" TEE (MJ) W/ 24" PLUG ❑7 10" FLOW METER ® 10" DISCHARGE 10" SUCTION 10 24" TELESCOPIC VALVE 11 24" SLIDE GATE 12 24" TELESCOPIC VALVE OPERATOR 13 24" SLIDE GATE OPERATOR 14 SUBMERSIBLE PUMP 15 8"x4" REDUCER (FLANGED) 16 8" CHECK VALVE 17 8" 90° BEND (FLANGED) Om Zaw FUO J �U Z� O¢ wap �m ox. om 0X w oIW F _ p Z. owz Z Up ulLL Oy8 W3� N :3LLw ZW¢ 00¢ D I) ozz 0W. . S2 o-- W=j W0, 0 0LLp Z� .I FILL WITH SELECT BACKFILL AND COMPACT TO 95% STANDARD PROCTOR; CAP WITH 12" CONCRETE PAD, SEE DETAILTHIS SHEET PIPE, FITTINGS AND VALVES SCHEDULE II IIS' Ile PROPOSED 26'-0"x17'-0" METAL SHED N PROPOSE[ PUMP GUI[ TYP. OF 21 m�mr%e%rm nn- Alf—A-71 nn 1❑ 10" 90- BEND (FLANGED) Q 10" CHECK VALVE 03 10" PLUG VALVE 141 10"x10"x10" TEE (FLANGED) ❑5 10" 90- BEND (MJ) 161 24"x24"x10" TEE (MJ) W/ 24" PLUG 07 10" FLOW METER ® 10" DISCHARGE 09 10" SUCTION 10 24" TELESCOPIC VALVE 11 24" SLIDE GATE 12 24" TELESCOPIC VALVE OPERATOR 13 24" SLIDE GATE OPERATOR IR SUBMERSIBLE PUMP 15 8"x4" REDUCER (FLANGED) 16 8" CHECK VALVE 17 8" 900 BEND (FLANGED) FLARE EXISTING PUMP STATION No. 2 - SECTIONAL 'A' SCALE: 1/4"=l' -O" ZC iD1N. \may fj ,f 3 2-", l --r.- 'A' EXISTING PUMP STATION No. 2 - SECTIONAL PLAN @ ELEVATION 516.50 SCALE: 1/4"=1'-0" COMPACTED TO 95% STANDARD PROCTOR CONCRETE CAP DETAIL FOR PUMP STATION NO. 2 FILL WITH SELECT BACKFILL AND COMPACT TO 95% STANDARD PROCTOR; CAP WITH 12" CONCRETE PAD, SEE DETAIL THIS SHEET vpv ..... I c v V l £ a'•°c's��v �"s. EXISTING PUMP STATION No. 2 - SECTIONAL 'C' SCALE: 1/4"=V-0" � zw E RAMP :Lw z O F— U cr F- U) Z O U O LL.. W Q W J W F- 0 Z I J z O W CL cc 1 WK DICKSON communit infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ;2 a SEAL 045625 Z N� PROFESSIONAL SEAL m a z o O a U X UJI U) z p O w w 0 IIIIIIIIz w U) U) w O W F- 0 UJI Q Q (f) z z cl UJI 2z z0 U)) O x Ill Q Q= W U p -J F— = Om.. LL wQu- O N a c U z z w o w w O w z O F - o m X 0° w w z w m J W Q w F- z E- W z w 0 < a o t'O f� PROJ. MGR.: JWH DESIGN BY: RET Z DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: Q o G.20 OF 34 J WKD PROJ. NO.: Z 20170041.00. C L 2 00 Z n.w o00 W �0 zoo g s, 7 Cly U = W O00 0.2 N w ozu� f2 -o OZ Z z - .1 Z 0 O m W y OY� N QQFzo Z W Q W N 6 0 0 oZ; Wzo ¢so Wax i2 n G Z ¢rrw Z OZ -� 0Z = U -U Zj8 UQLL 3,0 Y m 3Fz ©o¢ "o T2F �Nm 0 Uafi DICKSON communitv infrastructure consultants 12' 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 PROPOSED (f)(704) 334-0078 VENT, TYP. WWW.WKDICKSON.COM ® NC LICENSE NO.F-0374 PROPOSED CHEMICAL TOTE, TYP. PROPOSED EMERGENCY O �� EYE WASH PROPOSED • o� U/Oj , �y'•'� STATION CHEMICAL TOTE 2 a SEAL _ r = 045626 PROPOSED At 4" 900 BENDS �S}tt11 SODIUM CHLORITE SULFURICACID bo PROFESSIONAL SEAL 2 _6 SULFURICCID 80 PVO CARRIER PIPE 1908 V-6" 9" 2 2796 FOR TUBING TO CLEAN B UNIT m EL. 521.5± PROPOSED GRATING @ ___ - I ___ EL. 521.5± — -- I - PROPOSED CHEMICAL I PROPOSED FEED TUBING, SEE NOTE 1 PROPOSED SPILL CONTAINMENT I — — — — — — I I L I SPILL CONTAINMENT 4" 5'-9" 1'-3" — O F- CHEMICAL SHED -PLAN VIEW 6" CONCRETE SLAB 4 SPILL CONTAINMENT Z CD w a 6"x6"x1.4x1.4 WELDED SCALE: 1/2"=1'-0" #4 CONT. WIRE FABRIC @ 1-1/2" j r I 5, W cr CHEMICAL SHED - INTERIOR, EAST SIDE ELEVATION z 4" 16' 4„ !!� FILL W/ 6" t SCALE: 1/2 "=l' -O' 0 PROPOSED PROPOSED 2 - 4" 900 BENDS CRUSHER -RUN STONE 2 - 4" 90° BENDS CONCRETE PAD DETAIL FOR CHEMICAL SHED U SCALE: 1/2"=V-01' PROPOSED PROPOSED 4" PVC (CHEMICAL 4" PVC (CHEMICAL LINE CARRIER PIPE) LINE CARRIER PIPE) NOTE: U z w a CHEMICAL TUBING SHALL BE SMOOTH O BORE CLEAR PFA TUBING (0.50"x0.38" ID) 1 1 1 1 1 1 1 (Z PROPOSED PROPOSED d 0 4" 900 BEND 4" 900 BEND � o L.L 0 PROPOSED PROPOSED VENT, TYP. w a 72"x80" DOUBLE 72"x80" DOUBLE a HUNG DOORS HUNG DOORS Q W s LI_I U) r -----II Ir -----I ® wcn U z m 0 I I O I I OI _ PROPOSED PROPOSED EMERGENCY EYE WASH O z W Q Q z O U m I I CHEMICAL TO STATION Q J m I II II I r.z o O W 06 o --r J Q < < W Z m ps o oP�LL I 0- m PROPOSED mm0 W Q O o W 4" 900 BENDS W CL UZ c/) p < m SODIUM CHLORITE 0 W PROPOSED 6" CURB AROUND PROPOSED 4" SCH 80 PVC cc W Q W _ SPILL CONTAINMENT CARRIER PIPE FOR TUBING 1 TO CLEAN B UNIT 1908 D m W A W Z a PROPOSED uj Q 6j GRATING W Q W F - v> ----__ Z F- 6'-6" 3' 6'-6" ---- ___ __= EL 521.5± w U Z W m PROPOSED CHEMICAL a FEED TUBING, SEE NOTE 1 4" 1'-3" 5'-9" 4" O O a 0 U LL PROJ. MGR.: JWH m \ 2' \ d PROPOSED SPILL CONTAINMENT 0 DESIGN BY: RET z DRAWN BY: CH PROPOSED PROPOSED EMERGENCY 36"x80" SINGLE HUNG DOOR 4' PROJ. DATE: 2018 DRAWING NUM ERT 0 o EYE WASH STATION 5' Q G.21 OF 34 - CHEMICAL SHED PLAN VIEW 0 WKD PROJ. NO.: WJ SCALE: 1/2"=V-01' a CHEMICAL SHED - PLAN VIEW Z 20170041.00. C L SCALE: 1/2"=l'-O"I a J U LL cc ON Zaw F0O J W �O� zoo 5f� - 0 O = W w 0 m W.o w oiw 0 Z ° Z Z 0 Z V 0.0. w3 LLQ= o�2:� N 3 W � y ¢o 0 Z W WQ ioQ 11 o W ' 4 ¢FEZ w5O p. w �F� C7 � Zl ¢rrxl 0g ti0Z ?F�w OZ� O - O ZW. U.LL p2 E2 �0 3F_ ©o¢ 0 max >w0 OU O LL DICKSON 12' 12' communitV infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 ® ® ® WWW.WKDICKSON.COM NC LICENSE NO.F-0374 N. SUL �� U R'Llru" GfJy 7% , ' SEALSWUM 045626 CHLORME tinx* A u I LIJ PROPOSED �/ / 1 w0\\ t 0\\ 72"x80" DOUBLE HUNG DOORS PROFESSIONAL SEAL PROPOSED 72"x80" DOUBLE I I ( m HUNG DOORS I I I I I `o i I I II � z PROPOSED — — — — SPILL CONTAINMENT N CV — — — — PROPOSED SPILL CONTAINMENT U L Z O o 4' 4' w cr- 5' 5' CHEMICAL SHED - EAST SIDE VIEW CHEMICAL SHED - WEST SIDE VIEW z O SCALE: 1/2"=V-0" SCALE: 1/2"=V-01" U 16' 16' (f) z w ¢ 0 O 6'-6" 3' 6'-6" u- 0 W a N N V Q W V W W U) W W to W 2 �Z ..CG. li OM 0LLJ IO - cr W V - z Z z uj A a PROPOSED 36"x80" SINGLE ' ZO J Q _it J H uj HUNG DOOR W Q Q U to o O LL �J a~C u III C'3 2 W w ¢ O OC O aW UZ cc Z CD v VJ O w W QLL J U w U 11 11 11 11 11 11 11 ILW crm Q T m m � W T 2 I I I ( Q a m I N I u W z� W m n I PROPOSED L — — — — — — SPILL CONTAINMENT — 5'-6" 51_6,. — — — — — 5'-6" — — — I PROPOSED — — SPILL CONTAINMENT — 51-6" W O LL U Z Q PROJ. MGR.: JWH 61_6" 6'-6" 6 -6 ,� �_ �� 6 6 DESIGN BY: RET z DRAWN BY: CH PROD. DATE: I SEPT 2018 DRAWING NUMBER: m W CHEMICAL SHED - EXTERIOR REAR VIEW CHEMICAL SHED -EXTERIOR FRONT VIEW SCALE: 1/2"=l' -O" SCALE: 1 /2"=1'-0" G.22 OF 34 n o W J WKD PROJ. NO.: a - Q z 20170041.00. C L li I LL 00 z a w p00 gz= a¢ ZO 0 2�_ UO=w om Na0 ozw -0 zoz wU0 .6o 06 z W W y �UQ LL�y OY�W 2! j0 0 0 zwa N w = U Q 0 W a�N wg� �3z wso w=z w�a ONz ¢oa Q� z ?oZ �w oz� U_ ZW0o N� Uz,04. 000 `LUQ F z ©D 0Q O SOT 0w0° o 0 fL U T-0"XT-0" DOOR & ISO CONTAINER WALL/CEILING ARE NOT SHOWN FOR DRAWING CLARITY. ii r :. CONEX PENTRATION®` s s r • t FOR HEATER OVSODIUM C LO• ,. :o„• LINECONEX PENt ARV/ARV MOUNTING BRACKET/ ARV PIPING ARE SHIP LOOSE ITEMS FOUND IN THE CLEANB UNIT UPON ARRIVAL FIELD INSTALLATION REQUIRED. SULFURIC ACID CHEMICAL SKID ' CONNECTION SODIUM CHLORITE DETAIL j 22.5"X21.! RESERVE FOR SPACE OTE DOOR SVS 12"X12" VENTILIATION FAN LOCATED IN WALL NEXT TO CHEMICAL DELIVERY SKID NOT SHOWN F 04" NOMIMAL PIPE "DRAIN / REJECT DISCHARGE �r 12"X12" FRESH AIR INTAKE LOUVER f' \--¢.56.0" NOMINAL PIPE CONNECTION "WAS -INLET" ` 04.0" NOMINAL PIPE CONNECTION PROCESS WAS FEED 'TO DEWATERING". I\ NOTE: 1. CLEAN B PLAN AND ELEVATION VIEWS PROVIDED BY BCR SOLID SOLUTIONS. 2. THE INFORMATION ON THIS SHEET IS SHOWN WITH THE EXPRESSED WRITTEN CONSENT FROM BCR SOLID SOLUTIONS. WAS SUPPLY CONNECTION FROM PLANT. i r SUPPORTING STRUCTURE/PIPE SUPPORTS/WAS F ARE SUPPLIED/INSTALLED BY OTHERS. SIZE/DIMENSIONS ARE TO BE DETERMINED BY EOR/INSTALLING CONTRACTOR. PLAN VIEW END ELEVATION INTERIOR DOOR H RIM PANIC DEVICE ELEVATION z O v oc z O U O LL 0 w U) Q I w cc O z I J z O U) W V) O OL cr- Z) W LL! cr- cr O LL I r V z crQ 0 J Q z LL WK DICKSON communitV infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 '•- Q SEAL f 045626 G► 11PI111 PROFESSIONAL SEAL m p z Ir O O a cr- z o O w w a 0 llllllllz W H Z (n w 3: W W_ U, > Z Z Z_ _O < Z M ~ �O wcr W <I~a - mow= w u w<L0 z L a W U Z Z ac z g w w m w z o w EE U M W Z m w W 'J H Z F- U Z ir cr a. PROD. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.23 OF 34 WKD PROJ. NO.: 20170041.00. C L O0 Zaw FUO 0JU oZw ao� Z o p 5a� 0 ai oxw "ow yao Dow -o dN FUo Z°sU 2 UNm{ Oy8 w3� "o" °�aZ w w oz 5, ¢Wzo U wr OU w� ¢rte Z jo< UZ ?O�w OZ ZW� N=� o oo Soo YV1Q 3�2 ( Qoo 0 oo' odo 0 U ME WK DICKSON community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 4z - SEAL =_ 045626 PROFESSIONAL SEAL vAl 90° o, p.,9 PROPOSED 2" SCH5 HEADER SUPPLY PIPES m (EXACT LOCATION TO BE FIELD VERIFIED), ----__ FOR CONTINUATION SEE SHT. G.29 PROPOSED W O 24" MANWAY 0 n~ 30° w a= w ZO o PROPOSED 4"0 SUCTION TO us \ \ SLUDGE TRANSFER w \\ PUMP STATION, FOR aC \\ PROPOSED 4'x6' METAL \\ CONTINUATION SEE SHT. G.29 \ PLATFORM W/ \ KICKPLATE PROPOSED 4" PVC DECANT PIPE TO \ \ \ vBvSEE EX. PUMP STATION #2, \ \\ SHT. GA FOR CONTINUATION \ ���\O� 1700 vBv 0 -: .••.w::•a.:�.'': \ PROPOSEDuj PULLEY ASSEMBLY 00 — — — — — 1800 PROPOSED 4'x4'x4" :.' `. ;:; °, % ', .:'' '= ' PROPOSED CABLE '' — `--- o 0 Z CONCRETE PAD ' PROPOSED CRANK WINCH ASSEMBLY 1900 PROPOSED 4"0 PIPE (DOWN POSITION) WN J cc G is PROPOSED METAL PROPOSED 4"0 WAS FROM w aCLEAN STAIRWAY B UNIT, FOR Z CONTINUATION SEE SHT. G.3 c j Z o w o, m PROPOSED SAFETY w Q Q Z g RAILING, TYP. Z Z_ a � z J F- w Q z QQ w0 N F- z O LL= oJ�0E- Z a PROPOSED W Q u- O METAL STAIRWAY W Z a U W LANDING aC W o O L.{- •. 3 270° Z Y SLUDGE HOLDING TANK - PLAN W_a Q m F-_ N SCALE: 1/4"=1'-0" Z F' 0 W z No w cc Q cc o a o U O PROJ. MGR.: JWH a DESIGN BY: RET a z DRAWN BY: CH SEPT 2018 DRAWING NUMBER:s W j` G.24 OF 34 o L 0 J WKD PROJ. NO.: a z 20170041.00.CL a a J LL om ZaW poo MoW D Woo S sW oom aU N D als W =o 2 Z o� 6 zoz 0 z -U Z W N=� UpLL Q �O y�NQ 3~� ©o0 0 �zw o� do 0 U aLL 42'-0" (NOM. INSIDE DIA.) PROPOSED PULLEY ASSEMBLY DICKSON community infrastructure consultants PROPOSED CRANK WINCH---`�—� ASSEMBLY" o " O PROPOSED 4 0 90 BEND PROPOSED 4 0 90 BEND 616 COLONNADE DRIVE CHARLOTTE, NC 28205 PROPOSED 4'x6' PROPOSED TOP (t) (704) 334-5348 METAL PLATFORM OF SHELL SHEET (f)(704) 334-0078 W/ KICKPLATE WWW.WKDICKSON.COM N NC LICENSE NO.F-0374 PROPOSED WEB TRUSS STIFFENER QUANTITY AND LOCATION PER DESIGN REQUIREMENTS Aili �; 9 .7 CL SEAL r• : e PROPOSED 4"0 WAS (DIP) 045826 li PROPOSED .-. PROFESSIONAL SEAL METAL PROPOSED _ METAL STAIRWAY w PROPOSED TANK WALL } LANDING Y I I m PROPOSED TOP STIFFENER TYPES z BASED ON DESIGN REQUIREMENTS 4 � O PROPOSED SHELL SHEET z PROPOSED PIPE SUPPORT, TYP. -(20) PER RING co N PROPOSED METAL STAIRWAY SUPPORT, TYP. I p z o O PROPOSED v CONCRETE PAD Z w PROPOSED FLOOR LEVEL EL. 521.75 EL. 521.75± 1 PROPOSED 4"0 WAS FROM z CLEAN B UNIT, FOR O (D 5: g CONTINUATION SEE SHT. G.3 cr- EX. GRADE LEVEL fOvviv®�o�� �� �\ //v vivvivvi� 1vvi �� v vjvs^\� �O\ i� vf��`���\ vi®vvvv^0` �0 vivyv^\��Q 4PROPOSED 4" MJ 90o BEND O _ (ROTATED 22-1/2°) t— SLUDGE HOLDING TANK - SECTION 'A' WAS PIPING - SECTON 'C' U SCALE: 1 /4"=1'-0"D SCALE: 1/4"=l' -O" U) w PROPOSED CRANK WINCH PROPOSED PULLEY ASSEMBLY z O o ASSEMBLY o ' I I I I I I z PROPOSED CABLE O u a - m a Wm N L4 r� U) Lu Lu U Y II J II W cn W IIcc z o I I F-- W cn z m m I ( i PROPOSED 2" SCH5 HEADER SUPPLY PIPES z i W Z Z <:3 .J O U W to a I I I ( PROPOSED 4"0 PVC PIPE �- U)O W oOC Y z t PROPOSED SAFETY I I (UP POSITION) .1 z Q Q W a U F. _ RAILING, TYP. I I O `W = O O P Z I( II m �W� z U) II W a UO ° W PROPOSED METAL I ( U) W = STAIRWAY LANDING I ( O w W 0 II W o T (I OC o -� W m II II D n m a Q.L I I I **** PROPOSED AIR PIPING NOT SHOWN PROPOSED TANK WALL z FOR CLARITY PURPOSES, SEE SHEETS G.26 -G.28 ui m 6i W I ( FOR DETAILS AND PIPING LAYOUT W W o I ( PROPOSED 4"0 PVC PIPE Z o it~ w U 0 z N PROPOSED METAL j PROPOSED 4"0 SUCTION TO -' � I. STAIRWAY lI SLUDGE TRANSFER PUMP STATION, �- Q FOR CONTINUATION SEE SHT. G.29 O o I I (L PROJ. MGR.: JWH mo II a I PROPOSED TANK BOTTOM DESIGN BY: RET DRAWN BY: CH a PROPOSED z PROJ. DATE: SEPT 2018 CONCRETE PAD DRAWING NUMBER: m W EL. 521.75± 0 PROPOSED 4" DECANT PIPE cc G.25 O34 TO EX. PUMP STATION PROJ. NO.: NO.2 WET WELL,WKD SLUDGE HOLDING TANK - SECTON 'B' Q-0 Q J SEE SHT. GA FOR CONTINUATION SCALE: 1 /4"=1'" z 20170041.00. C L a J LJ LL ow ", W y ZEW F0 o �z U Z j O ¢ Woo �m� U = m o ¢ mao �No w -o FUO 06 oz ZZ m WT -4 U 1 N j LL. a Zza � 0Z 0W" "Ir N wm� °C3z 0 0a� O Z m¢� �Og Z OZ :�g z o. U -U ZZO Nj VOLL pp0 YNQ }�FZ _ (ry p0¢ 0 0ZS o� owo U O LL PROPOSED 1" HALF COUPLING, WELDED TO TOP PLATE SLUDGE HOLDING TANK MIXING SYSTEM LAYOUT ISOMETRIC SECTIONAL VIEW SCALE: NTS G) PROPOSED 1/4" NOZZLE BOTTOM PLATE (HDPE) PLATE ISOMETRIC VIEW SCALE: NTS PROPOSED 1/8" STAINLESS STEEL NOZZLE TOP PLATE CONNECT NOZZLE TO HEADER USING 1" NPT HALF COUPLING WHICH IS WELDED ONTO THE NOZZLE z N /PROPOSED 3/8" HEX NUT PROPOSED - 3/8" LOCK WASHER PROPOSED 3/8" OVERSIZED FLAT WASHER PROPOSED 3/8" OVERSIZED FLAT WASHER ROPOSED SLUDGE STORAGE TANK NOZZLE HEADER A PROPOSED —' 3/8" HEX NUT DETAIL A SCALE: NTS INSTALL MIN. OF 2 ADHESIVE ANCHORS WITH 3" EMBEDMENT. SHALL BE 3/8" THREADED ROD. EPDXY ADHESIVE TO BE USED. FLAT FLOOR NOZZLE SECTION SCALE: NTS HEA A -as SLUDGE HOLDING TANK MIXING SYSTEM LAYOUT PLAN VIEW LINEAR DROP LEG INSTALLATION DETAIL SCALE: NTS 'ROPOSED WELDED )UTLET COUPLING 'ROPOSED 1" SCH40 DROP LEG SCALE: NTS NOTES: TORAGE TANK ED HEADER No. 4: CL R=16'-0" .ES PER HEADER PROPOSED HEADER No. 3: CL R=12'-0" 10 NOZZLES PER HEADER 1. ALL NOZZLES TO BE INSTALLED APPROX. 2" OFF OF GROUND. 2. COORDINATE WITH ENGINEER FOR FINAL HEADER PLACEMENT FOLLOWING FIELD VERIFICATION OF DIMENSIONS. 3. LAYOUT HEADER IN ACCORDANCE WITH PLAN DIMENSIONS. FIELD LOCATE NOZZLES AND ANCHORS USING ASSEMBLED HEADER TO INSURE OFFSETS ARE INSTALLED AS THEY LAY. DO NOT PRE -DRILL ANCHORS BASED ON FABRICATED DIMENSIONS. 4. DRILL AND INSTALL ALL THREADER ROD ANCHORS VERTICAL. 5. ALL NOZZLES ON A GIVEN HEADER TO BE INSTALLED WITHIN 1/2 INCH ELEVATION OF EACH OTHER. SUBMIT FINAL ELEVATION MEASURED FROM TOP OF NOZZLE PLATE TO EMX DURING STARTUP (MIN. 3 NOZZLES PER HEADER ON OPPOSITE ENDS). 6. ALL HEADER SUPPLY PIPES SHALL BE LEVEL OR SLOPING DOWN FROM THE VCP TO THE HEADERS. 7. ROUTE ALL HEADER SUPPLY PIPES BELOW THE NORMAL MINIMUM WATER SURFACE ELEVATION. 8. APPLY PIPE TAPE AND THREAD COMPOUND TO ALL THREADED PIPING CONNECTIONS. 9. DO NOT INTRODUCE CONSTRUCTION DEBRIS SUCH AS PIPE TAPE INTO THE COMPRESSED AIR PIPING SYSTEM. 10. FLUSH ALL COMPRESSED AIR PIPING BETWEEN COMPRESSOR AND VCP THOROUGHLY WITH AIR FOLLOWING INSTALLATION. 11. FLUSH ALL HEADER SUPPLY PIPES AND HEADERS THOROUGHLY WITH AIR OR WATER PRIOR TO NOZZLE INSTALLATION. 12. MIXING SYSTEM SHALL BE FULLY INSTALLED AND STARTED UP PRIOR TO FILLING TANK WITH PROCESS LIQUID. 13. MIXING SYSTEM SHALL BE ON (ENABLED AND MIXING) PRIOR TO FILLING WITH PROCESS LIQUID AND REMAIN ON AS A NORMAL OPERATING PROCEDURE. IT SHOULD BE DISABLED FOR ONLY SHORT DURATIONS FOR ROUTINE MAINTENANCE OR WHEN TANK IS EMPTY. 14. IF OFF CYCLING IS TO OCCUR FOR MORE THAN 24 HOURS, REFER TO O&M MANUAL FOR OFF CYCLING OPERATION. 15. REFERENCE SCOPE AND P&ID FOR ENVIROMIX SCOPE OF SUPPLY. 16. INSTALLATION OF OFFSET STYLE DROP LEGS WILL BE THE SAME AS SHOWN FOR STRAIGHT DROP LEGS. 17. INSTALLATION OF CURVED HEADER TRUNKLINES WILL BE THE SAME AS SHOWN FOR STRAIGHT HEADER TRUNKLINES. 18. HEIGHT OF DROP LEG MAY RANGE FROM 6" TO 18". VERIFY DROP LEG LENGTH WITH HEADER DRAWINGS. 19. ALL HARDWARE TO BE 316SS UNLESS OTHERWISE NOTED. z 0 U cn z 0 U 0 LL 0 W U) Q W J W 0 z i J z 0 U) W U) O CL CL \W W cr cc 0 U- I 0 z Q 0 J Q z t1_ DDICKSON 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 LVITITIN%Tin T11 11 mI 9,sl11m NC LICENSE NO.F-0374 fill .� o`�' •' S / 'oma z: •• Q r a SEAL Tr- : 045626 _ s Q• sJ//lilt 1100 PROFESSIONAL SEAL i G.26 OF 34 WKD PROD. NO.: 20170041.00. C L PROJ. MGR.: JWH DESIGN BY: _ RET DRAWN BY: W F- PROD. DATE: SEPT 2018 DRAWING NUMBER: Z F_ Z o gW 5 W O z z W I— _j O �z J O W Q z Q Q= W U CL X HtL= Q Wfr Q� Lu a W UQ Z H W Z W Lij U) O 0 a Z cc 0 m p O W z J m 6i m z WF_ F- I_ w LuZ Q O cr d 0 m W Q 0 if 110 G.26 OF 34 WKD PROD. NO.: 20170041.00. C L PROJ. MGR.: JWH DESIGN BY: _ RET DRAWN BY: W F- PROD. DATE: SEPT 2018 DRAWING NUMBER: F_ Z o gW 5 W z z W I— _j U) �z J O W Q z Q Q= W U X HtL= Q Wfr Q� Z a W UQ Z H W Z W Lij O 0 a W cc 0 m 0 W z J m 6i m z WF_ F- I_ LuZ Q O cr d 0 G.26 OF 34 WKD PROD. NO.: 20170041.00. C L PROJ. MGR.: JWH DESIGN BY: _ RET DRAWN BY: CH PROD. DATE: SEPT 2018 DRAWING NUMBER: G.26 OF 34 WKD PROD. NO.: 20170041.00. C L i cc Om Zaw FUo o J zw �05 z�� gym* p=w am .a0 Oiw F -o wdz f..UO Z oz SUS 0 w3� 0 °w $Z, aS ozZ m¢ : - wi 3 wso ll�sgzd It =Q' Z o Zoz w oz� fro zwo Y'� U ooLL 069 Y�/1Q QO, rww (so 21 LLEM o 0 Uotfi OR NOTES: 1. PIPE SUPPORTS PLACED MAX. 10 -FEET APART AND AT ALL ROUTE BENDS. 2. UNISTRUT WILL BE CUT TO LENGTH IN THE FIELD. 3. MOUNTING HARDWARE PROVIDED BY MAUFACTURER UNLESS OTHERWISE STATED. 4. ALL HARDWARE TO BE 316SS. PROPOSED PIPE CLAMP MECHANICALLY JOINEI PRESS PIPE AND FITTINGS INJ4F.jIqU§J TANK WALL PIPE SUPPORT MOUNTING DETAIL SCALE: NTS PROPOSED PIPE CLAMP 'ROPOSED PIPE SUPPORT, TYP. PIPE SUPPORT AS PER kPPROVED BY TANK MANUFACTURER) ANICALLY JOINED PRESS PIPE AND FITTINGS PROPOSED 1" SCH40 LINEAR DROP LEG (31 TYP.) z O F— F- U) — HU) z O U fr O LL 0 ''..�^^.� v! Q J W CC F- 0 z I J z O U) W U) O CL It D W_ W cr M O LL I f V z Q J Q z DICKSON community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 7 :2 SEAL r'; 045626 � G FG rGQ'�i a i ��� 1 Iitlroe� PROFESSIONAL SEAL m Q z it O O a Cr 0 Z p O W w 0 IIIIIIIIz � J � W Cn p z W W p W W 0 _ Q Q ' Z Z Z J W W O W ir QQw0U U) p~ W W W 2 0 W Ill Q� O Q X n" oC U Z Z w ~ w 0 z p p O m = W W Z 0 W m w p W F- J z P vi U Z W O t1 p PROD. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.27 OF 34 WKD PROJ. NO.: 20170041.00.CL PROPOSED 2" SCH5 HEADER SUPPLY PIPES (4 TYP) SUPPORT PIPES EVERY 10' MAX. (INTERIOR AND EXTERIOR OF TANK) io Q 00 N N �> PROPOSED PIPE SUPPORT, TYP. (PIPE SUPPORT AS PER APPROVED BY TANK MANUFACTURER) PROPOSED NOZZLE HEADER PROPOSED 1" SCH40 LINEAR DROP LEG (31 TYP.) z O F— F- U) — HU) z O U fr O LL 0 ''..�^^.� v! Q J W CC F- 0 z I J z O U) W U) O CL It D W_ W cr M O LL I f V z Q J Q z DICKSON community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 7 :2 SEAL r'; 045626 � G FG rGQ'�i a i ��� 1 Iitlroe� PROFESSIONAL SEAL m Q z it O O a Cr 0 Z p O W w 0 IIIIIIIIz � J � W Cn p z W W p W W 0 _ Q Q ' Z Z Z J W W O W ir QQw0U U) p~ W W W 2 0 W Ill Q� O Q X n" oC U Z Z w ~ w 0 z p p O m = W W Z 0 W m w p W F- J z P vi U Z W O t1 p PROD. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.27 OF 34 WKD PROJ. NO.: 20170041.00.CL i ow w pOa FOO aJv clz19 19 oz, d �w� �mg b=w .o' ya0 w o1W .2 oz z`do ozZ w FU=0 Oy�w� �LLy 0 ZWa �U¢ o.6 oowz aCN ¢3z x W� S a Z �M zoz = z=w 3g 'ozo zWo 07� Joh No Q 3 F 2 do 'm �l orzii no U�LL 1/2"x3" NUT, BOLT AND WASHEF STRUT CHANNEL POST BASE 1-5/8" STRUT CHANNEL, LENGTH VARIES VIBRATION PROOF PIPE CLAMP, QTY MAY VARY E - c/) Z) J J =Q J Q<YWU) S W (L OW=(- UU)=-i �U)UQ- of OV U INSTALL MIN. OF 2 ADHESIVE ANCHORS PER BASE SUPPORT WITH 2" EMBEDMENT. SHALL BE 3/8" THREADED RODS. EPDXY ADHESIVE TO BE USED. DETAIL A: VERTICAL PIPE SUPPORT SCALE: NTS ANGLE BRACKET SCALE: NTS 3/ 8" OVERSIZED FLAT WASHER, LOCK WASHER AND NUT UNISTRUT PIPE CLAMP SCALE: NTS 1-5 %/I E)A"nKi oonnc DIMM POST BASE FRONT VIEW CHANNEL, .IES S11 3/ 8" OVERSIZED FLAT WASHER, LOCK WASHER AND NUT DETAIL B: HORIZONTAL PIPE SUPPORT SCALE: NTS NOTES: 1. FOR SLOPED FLOOR INSTALLATION, LEVEL POST BASE WITH NUT. 2. ALL HARDWARE TO BE 316SS. UNISTRUT BASE SUPPORT SCALE: NTS 1/2"x3" NUT, BOLT, AND WASHER DICKSON communitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 O ti''•(7 SEAL 045626 GIN PROFESSIONAL SEAL m p z O F= O rr U) O U) W w IIIIIIIIZ H W IZ U) Z Z W Q � J W Q W Q J � O W Q W j la— = Lu W U Cn � J cr U) Ir UJ LL 0 I= = I— Z Z CL Z X W Y W Q W I— Z m o W 0 m J W z 1= o U Z J W U) O Q Ir a � PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROD. DATE: SEPT 2018 DRAWING NUMBER: G.28 OF 34 WKD PROJ. NO.: 20170041.00.CL cc ON Zaw O0o E00 o zW O=) ZOO oSW .0, it �LLO w ozw F -o ON '1ZO ZZ U Q0.. W y � _a U m3� �LLN Doo zz< oww z, SO ozz w W 65 LLCN W Q ¢�Z 0 w=Cz W S SWim. (.9LLO Z& �H ZOZ _ W 0Z= U U - ZWi; y2= VULL pa OO YQ g ©oQi 0 c z oma. 0�io', UDLL PROPOSED SLUDGE HOLDING TANK, SEE SHT. G.24 & G.25 DICKSON communi infrastructure consultants DRIVE616 COLONNADE 14' PROPOSED 18'-0"x14'-0" CHARLOTTE, NC 8205 METAL SHED (t)(704) 334-5348 (f) (704) 334-0078 PROPOSED PUMP CONTROL PANEL PROPOSED 72"x80" WWW.WKDICKSON.COM DOUBLE HUNG DOORS NC LICENSE NO.F-0374 PROPOSED PROPOSED VALVE COMPRESSOR UNIT CONTROL PANEL I �/ ��`` �' • ' ��®moi 4 SEAL 3 3 _ 04568 1 PROFESSIONAL SEAL 1 5 MPN 5 MPN I I I I I I I m C.0 FF ELEV. 521.75± PROPOSED TRANSITION TO 4"0 PVC (SDR 21) FORCEMAIN, PROPOSED 4" FLARE I I SEE SHT. G.5 FOR CONTINUATION I—I 6 _--- _ \ III ----------- III1�1111 PROPOSED SLUDGE HOLDING TANK, TRANSFER PUMP STATION - SECTION VIEW 7 SEE SHT. G.24 & G.25 �0 SCALE: 1/2"=l' -O" 0 0 PIPE, FITTINGS AND VALVES SCHEDULE PROPOSED HORIZONTAL PIPE SUPPORT co PROPOSED 18'-0"x14'-0" w SEE DETAIL B, SHEET G.28 METAL SHED zz o PROPOSED HORIZONTAL > PIPE SUPPORT aWC SEE DETAIL B, SHEET G.28 ° z o U PROPOSED Co VALVE CONTROL PROPOSED rr PROPOSED 2" SCH5 PANEL COMPRESSOR UNIT LLJ~ HEADER SUPPLY PIPES z o O PROPOSED PUMP CONTROL PANEL V ( z PROPOSED PUMP SKIDcc O 2'-8" LL.. a 0 WN N t/ W < W PROPOSED 72"x80" J } DOUBLE 1 HUNG DOORS `° W PU P No. 1 PUMP o. 2 W F- Z 2 � � I--- W Q 8 z z Z U) Z 3 z a g 2 cn w °C m Q Q W 0 Q' 3 4 O J cr O P W a W=� z z i.lJ C W U Z m W W� � 0 LW'3 ® W Fil 1 Q U 7 W 0 8 5 3 4' �� `O � ® c% m W A Q oC III SOW 1 -------- -- z W m w G Z N N w Z � H 3 5 9 1 6 uJ U Z 0 Q � o a O o / u— m PROD. MGR.: JWH 4" 10'-7" 3'-5" 4" DESIGN BY: RET z DRAWN BY: CH PROJ. DATE: SEPT 2018 W 36"x80" SINGLE DRAWING NUMBER: U 0 HUN DOOR cr- G.29 OF 34 TRANSFER PUMP STATION - PLAN VIEW Q SCALE: 1/2"=1'-0" Q WKD PROJ. NO.: z 20170041.00. C L a a LL a J LL 1Q 4" 90° BEND (FLANGED} �2 4" 45° BEND (FLANGED) 03 4" PLUG VALVE ® 4" CHECK VALVE ❑5 4"x4"x4" TEE (FLANGED) © 4" 90° BEND (MJ) �7 4" 22-1/2° BEND (MJ) ® 4"Q1 SUCTION PIPE Q 4"QJ DISCHARGE PIPE I cc Oy Z -n- 25 J ° 0z'w °m zoo 'fHgym, o=W o¢m Na0 F N w W O 2 W F -o zoZ z ~`d Oo o oz m =UQ Oyj t/Wj3W O LL N zwa 0 7UQ a z z o W O WE ¢3z W5o = W0 W = ¢-'m (5 z¢ LL0 Q zoo �W 0Z0 ZWO N O tl00LL pnq zQ YN 3F ®o5 0 tea, �qm U o0 LL B COMPRESSOR AND MOTOR COOLING AIR INLET COMPRESSOR AIR INLET i OIL LEVEL INDICATOR FILTERED AIR OUTLET (DD/DD+PD OPTION) A 7 ---------- - - .. _ .. -- - r c V l� o COMPRESSOR AND MOTOR COOLING AIR OUTLET COOLING AIR INLET (VSD UNITS ONLY) i i VALVE ROTATION 3' Ja i DRYER SERVICE PANEL O 500 (0600) ELECTRICAL CABLE ENTRY 9 ar �x e W v' L` I 4 ONLY FOR OPTION DD/DD+PD FILTER W . I U 0 o m a 4 LL COMPRESSOR AND MOTOR COOLING AIR INLET COMPRESSOR AIR INLET i OIL LEVEL INDICATOR FILTERED AIR OUTLET (DD/DD+PD OPTION) A 7 ---------- - - .. _ .. -- - r c V l� o COMPRESSOR AND MOTOR COOLING AIR OUTLET COOLING AIR INLET (VSD UNITS ONLY) i i VALVE ROTATION 3' Ja i DRYER SERVICE PANEL O 500 (0600) ELECTRICAL CABLE ENTRY 9 ar �x e L` I 4 ONLY FOR OPTION DD/DD+PD FILTER FILTERED AIR OUTLET G 3/4 FEMALE AIR RECEIVER MANUAL DRAIN G 3/8" FEMALE (ADAPTOR FEMALE 3/8-18NPT FOR 60HZ) COMPRESSOR MANUAL DRAIN G1/4" —� COMPRESSOR AUTOMATIC DRAIN G1/4 DETAIL A SCALE: NTS FOR GA5-GA7 DRYER AIR - INLET 15 • NOTE: CENTER OF GRAVITY Ri z 0_ F— F- U) — F- U) z O U 0 LL W U) Q J W cr0 z 0 J z 0 U) ''W^^ vl 0/� CL cc D W W cr- cc 0 u- 0 crQ J Q z LL DICKSON communitv infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 a SEAL 'r- 04562:6 PROFESSIONAL SEAL m O z O O d W0 � CO Z p O W W Q 0 illlllllZ W H U) F - z W W -J m z Z W o J �0 zo Q W jF-3: O F- U__ C/) cc n Ill W < u- 0 n. a W U Z z O U W 0 z W X m W z W m J � W � Z F- F - —U Z O Q CE D PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROJ. DATE: SEPT 2018 DRAWING NUMBER: G.30 OF 34 WKD PROJ. NO.: 20170041.00. C L It ow N w uj o19 oO FUO z5 J U w WWo Dm� o=W ox .LLo � N2 O z w -o Z 9 z wO t2"so0 8 o m Y J Q LL Ei X.:OX8 w3 �ozo� °W4 r 00 S n 00 -Z 33 W=¢ 0 U zz jr 0� G a D Z �o� zOZ -� w oz-, O ZWOo Up0p0LL 14 �2Q 3�z ©occ N 0 3zw O,Z.. awp ow OnE NOTES: 1. EQUIPMENT AND PIPING PROVIDED BY ENVIROMIX (EMX) ARE NOTED AS SUCH. ALL OTHER ITEMS BY OTHERS. 2. COMPRESSOR PACKAGE SHALL BE LOCATED INDOORS OR IN CONDITIONED ENCLOSURES, OUTDOOR INSTALL ACCEPTABLE UNDER CANOPY PROTECTED FROM DIRECT SUNLIGHT AND BLOWING RAIN PROVIDED AMBIENT TEMPERATURES WITHIN COMPRESSIOR OPERATING LIMITS. 3. DISCONNECTS ARE NOT PROVIDED WITH COMPRESSOR. RECOMMEND EXTERNAL FUSE -PROTECTED DISCONNECTS FOR EACH COMPRESSOR. 4. ROUTE ALL HEADER SUPPLY PIPES BELOW THE NORMAL MINIMUM WATER SURFACE ELEVATION. 5. AERIAL PIPING IS RECOMMENDED. ALL AERIAL RUNS SHALL SLOPE DOWN 0.5% MINIMUM IN THE DIRECTION OF FLOW. THE RECEIVERS AND VCP(S) SHALL BE THE LOW POINTS OF THE AERIAL SUPPLY PIPING SYSTEM. SLOPE BURIED PIPEDOWN IN DIRECTION OF FLOW 0.5% MINIMUM TO A LOW SPOT PRIOR TO RISING ABOVE GRADE. 6. PROVIDE CONDENSATE BLOW -OFF AT LOW POINTS IN THE PIPING SYSTEM (WHEN LOW POINT IS NOT LOCATED AT A RECEIVER OR VCP). 7. RECOMMEND ELEVATING EACH STANDALONE RECEIVER APPROX. 6"-8" TO ACCOMMODATE CONDENSATE DRAIN PIPING AND VALVES. 8. HEAT TRACE AND INSULATE ALL CONDENSATE DRAINS WHEN SUBJECT TO FREEZING TEMPERATURES. 9. PIPE DIAMETERS ESTIMATED BASED ON GENERAL ARRANGEMENT. PIPE DIAMETERS SHOULD BE CONFIRMED FOLLOWING FNAL PIPE ARRANGEMENT. 10. PIPING UPSTREAM OF ALL VCPS SHALL BE STAINLESS STEEL OR OTHER CORROSION RESISTANT MATERIAL. IF PIPING IS NOT STAINLESS STEEL CONSULT ENVIROMIX. 11. ALL CONDUCTORS (C) 24VDC UNLESS NOTED OTHERWISE. 12. VPN CONNECTION THROUGH PCN OR SEPARATE LOCAL INTERNET ACCESS FOR REMOTE STARTUP AND PRODUCT SUPPORT. 13. ROUTE DRAIN TUBING INDEPENDENTLY FROM EACH COMPRESSOR PACKAGE. TUBING FITTING SEALS SHALL BE VITON OR OTHER COMPATIBLE MATERIAL. AIR COMPRESSOR NO. 1 W/INTEGRAL COOLER, SEPARATOR, DRYER, AND FILTER (BY EMX) EQUIPMENT COMPRESSOR N QTY 1 i HORSEPOWER / WATTS 10 HP Y POWER SUPPLY (VOLTAGE / PHASE) 460/3 MCP VP CA DR PCS PI EMX FC RG 4VM FO VAC O/C HT HTR RIO FC VFD PTC MOD ISB ABBREVIATIONS LEGEND MASTER CONTROL PANEL HT HEAT TRACING Da BALL VALVE VALVE PANEL P PRESS FITTING a REDUCER/BUSHING COMPRESSED AIR TSP TWISTED SHIELDED PAIR DRAIN TST TWISTED SHIELDED TRIAD 8 ROLL GROOVED COUPLING PLANT CONTROL SYSTEM TR INSTRUMENT TRANSMITTER III UNION PRESSURE INDICATION PR INSTRUMENT PROBE COUPLING (NPT X P) ENVIROMIX CAT CAT5/6 CABLE W/ RJ45 PLUG FIELD CABLE DO DISSOLVED OXYGEN I DRAIN ROLL GROOVED ORP OXIDATION REDUCTION POTENTIAL BUTTERFLY VALVE FOUR VALVE MANIFOLD PA PROCESS AIR FIBER OPTIC DPI DIFFERENTIAL PRESSURE GAUGE FLEXIBLE CONNECTOR VOLTS; ALTERNATING CURRENT TSH HIGH TEMPERATURE SWITCH OPEN / CLOSE F CONDUCTORS FURNISHED WITH EQMT HEAT TRACING PO POWER FUSED DISCONNECT HEATER PCN PLANT CONTROL NETWORK REMOTE INPUT/OUTPUT HMI HUMAN MACHINE INTERFACE FIELD CABLE C CONDUCTORS (DISCRETE) J JUNCTION BOX VARIABLE FREQUENCY DRIVE PLC PROGRAMMABLE LOGIC CONTROLLER POSITIVE TEMP COEFF THERMISTER LE LEVEL BY OTHERS MODULATE VFDC (VFD SHEILDED) CABLES BY EMX INTRINSICALLY SAFE BARRIER UNO UNLESS NOTED OTHERWISE CAN CANBUS NETWORK CABLE Z O 1 D D'DICKSON 0 tY O W Ir Z O w cc 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 Q SEAL :7 045626 = / I I1d PROFESSIONAL SEAL_____,,, m Z O U W 0 EMX-VCP-1 (4VM; ---------- ------ U ( I ( ( I °z A TYPICAL OF 4 (BY EMX) i CL 2" HEADER SUPPLY PIPE W HEADER W NOZZLE (NO. VARIES; TYP) j 0 a. z x 75 i PROJ. MGR.: JWH 2 _ RET DRAWN BY: W I- PROD. DATE: SEPT 2018 U) } OF 34 fA H Z W W 0 Q Q Z Z Z O w <<Wwo 0 1_' F- U- -r W < u- cr 0- W U aC Z Z W 0 W W C'3 0 m W Z W Q m W Z U W O Cc IL 0 a. z x 75 i PROJ. MGR.: JWH DESIGN BY: _ RET DRAWN BY: CH PROD. DATE: SEPT 2018 DRAWING NUMBER: G.31 OF 34 WKD PROJ. NO.: 20170041.00. C L ow Hwy poa FUO � J � W O 2 Zdp oxw .mo on .mo W oZW -o ozo U z SNm 011 w3 �LLc, 0 z w Q D U 2 ¢zz W� ¢3z o�39 w 0.0 W 2 Q W� oao z� joa w� zz �w g oZ= z wz _x U0LL 0p0 Y _ Q 3Fz 7 ©o0 w �z z �qo [000 I - z w D w m m w 14" DIAMETER NO. 3 REBAR NOTES: / \ A 1. GRANULAR EMBEDMENT MATERIAL SHALL BE CRUSHED ROCK, PEA GRAVEL COARSE AGGREGATE a a D MIN MIN PLUG SOIL ROCK 27" & SMALLER 6" 6" 14" DIAMETER NO. 3 REBAR NOTES: / \ A 1. GRANULAR EMBEDMENT MATERIAL SHALL BE CRUSHED ROCK, PEA GRAVEL COARSE AGGREGATE 0.11 - W/ wN LEGEND Bc OUTSIDE DIAMETER OF PIPE H COVER ABOVE TOP OF PIPE D NOMINAL PIPE SIZE a EMBEDMENT BELOW PIPE (SEE TABLE) HAND PLACED EMBEDMENT 90' BEND 45' BEND SIZE NUMBER 57. EMBEDMENT MATERIAL SHALL BE 11-1/4' BEND TEE PLUG PLACED IN LAYERS NOT MORE THAN 6" DEEP AND A B A COMPACTED AS SPECIFIED. GRANULAR EMBEDMENT REINFORCING STEEL 2. rn WHEN REQUIRED � HAND PLACED EMBEDMENT SHALL BE COMPACTED z�w 1 1 /4 Bc o FINELY DIVIDED MATERIAL FREE FROM DEBRIS AND OD 13 a z 3. STONES. z Bc+ 8" MIN z n 14pp --- 6 11 \ EMBEDMENT ABOVE THE TOP OF THE PIPE SHALL BE 12" 10" 13" `. AN UNCOMPACTED LAYER FOR ALL INSTALLATIONS. 10" 7" 10" REFER TO SPECIFICATIONS FOR GEOTECHNICAL m p �i om WE '00 3 Ji zW �o¢ woo 5m� om, a, Nao0 w ozW -o oN ZZo �, 0.0 Wm =V� ~ O = LL Oi� W3 j LL y 0 z 'z z m azzozz It 0G� W5� 0 mea CCW f29 xa0 Z�2 rr oa zooZ xW oz� U ZWo O lm� UoLL pp0 Y S2 Q 3=z �cq ©0, No moo, ��m 0 000 FE NOTE: 1, IF PATCH EXCEEDS 30' IN LENGTH EXPANSION JOINTS TO MATCH EXISTING OR AT 30' INTERVALS, WHICHEVER IS LESS (JOINT SEALER-N.C.D.O.T. NO. 920.2) 2. ALL O.S.H.A. REQUIREMENTS SHALL BE ADHERED TO FOR TRENCHING OPERATIONS. I3111t3oweli VARIES BROKEN BROKEN EDGES WILL BE SAWED WITH A CONCRETE SAW TO A NEAT LINE AND BROOMED CLEAN BEFORE PLACING PATCH. PATCH TO FIRST EXISTING WILL MATCH EXISTING PAVEMENT CONTROL JOINT ( NOTE: SAW TO A DEPTH OF 2.5" TO ENSURE THAT UNDER -BREAKAGE DOES NOT OCCUR. NEW CONCRETE COURSE CONSISTING OF MIX TYPE MINIMUM % OF Gmm SUPER PAVE MIXES A MINIMUM OF 8" 4000 PSI CONCRETE S 4.75A 85.0(a,b) j 90.0 S 9.5X, S 12.5X, 119.0X, B 25.0X, B 37.5X 92.0 - 6' LIFTS OF COMPACTED SOIL. BASE COURSE CONSISTS OF A MINIMUM . . _ ". . . . . __.. . . IF EXCAVATED MATERIAL IS TO WET OF THREE 4" LIFTS OF C.A.D.C. COMPACTED - OR UNSUITABLE. A PROPER FILL MATERIAL 6" LIFTS OF COMPACTED SOIL. WILL BE SUBSTITUTED. FILL MATERIAL BASE COURSE CONSISTS OF A MINIMUM- - - - - - - - - - _ - WILL BE PLACED IN 6" LIFTS AT OF TWO 4" LIFTS OF CABG. COMPACTED WILL BE SUBSTITUTED. FILL MATERIAL OPTIMUM MOISTURE AND COMPACTED 100% STANDAERD PROCTOR - 95% STANDARD PROCTER ` i • • •{ I- - -_ .............. ............ , { USE APPROPRIATE BEDDING FOR TYPE OF PIPE BEING INSTALLED 17 11 hR1 10 1 :a% � • � • EXIST. PAVEMENT 2" OF IS9.58 oc = 4" OF 119.08 :XIST.BASE COURS EXIST.PAVEMENT TACK WITH CRS -1 OR CRS -2. PATCH WILL MATCH EXISTING PAVEMENT MINIMUM DENSITY REQUIREMENTS MIX TYPE MINIMUM % OF Gmm SUPER PAVE MIXES MINIMUM SPECIFIC GRAVITY S 4.75A 85.0(a,b) SF 9.5A 90.0 S 9.5X, S 12.5X, 119.0X, B 25.0X, B 37.5X 92.0 -►j 1'-0"I-- -j 1 -0 NOTE: 1. EDGES TO BE SAWED WITH A CONCRETE SAW TO A NEAT SQUARED EDGE, DRY BROOMED CLEAN OF DUST BEFORE TACK COATIS APPLIED. 2. EDGES AND OVERLAY AREAS AND OVERLAY AREAS TO BE TACKED WITH RC OR AE -1 SPECIAL TACK. 3. 6" LIFTS OR SUITABLE SOIL OR ABC AT OPTIMUM MOISTURE COMPACTED 95% STANDARD PROCTOR , ALL WET OR UNSUITABLE MATERIAL TO BE REMOVED FROM SITE PRIOR TO BACKFILL. 4. N.C.D.O.T. APPROVED PATCH DETAIL 5. PATCH MUST BE SQUARE OR RECTANGULAR. 6. ALL O.S.H.A. REQUIREMENTS SHALL BE ADHERED TO FOR TRENCHING OPERATIONS. NOTE: 1. ALL O.S.H.A. REQUIREMENTS SHALL BE ADHERED TO FOR TRENCHING OPERATIONS. EXIST. PAVEMENT �UUo0vU�UvUUL 0 8" CABC COMPACTED EXIST. BASE COURSE�O 00 TO 100% A.A.S.H.T.O. T99 (THICKNESS VARIES) �O 4" LIFTS WEARING COURSE CONSIST OF A MINIMUM OF 2" SURFACE COURSE TYPE SF 9.5A OR S9.513 COMPACTED 92% PER N.C.D.O.T. STANDARD SPECIFICATION, TABLE 610-4. TACK WITH CRS -1 OR CRS -2. PATCH WILL MATCH EXISTING PAVEMENT = EXIST. PAVEMENT EXIST. BASE COURSE (THICKNESS VARIES) N.C.D.O.T. STANDARD SPECIFICATION TABLE 610-4 MINIMUM DENSITY REQUIREMENTS MIX TYPE MINIMUM % OF Gmm SUPER PAVE MIXES MINIMUM SPECIFIC GRAVITY S 4.75A 85.0(a,b) SF 9.5A 90.0 S 9.5X, S 12.5X, 119.0X, B 25.0X, B 37.5X 92.0 NOTE: 1. USE SUITABLE MATERIAL REMOVED DURING TRENCH EXCAVATION FOR BACKFILL UNLESS DIRECTED OTHERWISE BY ENGINEER. 2. ALL O.S.H.A. REQUIREMENTS SHALL BE ADHERED TO FOR TRENCHING OPERATIONS. EXISTING C.A.B.C.EXISTING C.A.B.C. (THICKNESS VARIES) (THICKNESS VARIES) mum BASE COURSE CONSISTS OF A MINIMUM :::::.:::.:::::........ OF THREE 4" LIFTS OF C.A.D.C. COMPACTED 100% A.A.S.H.T.O. T99. 6" LIFTS OF COMPACTED SOIL. IF EXCAVATED MATERIAL IS TOO WET ,t OR UNSUITABLE. A PROPER FILL MATERIAL WILL BE SUBSTITUTED. FILL MATERIAL WILL BE PLACED IN 6" LIFTS AT OPTIMUM MOISTURE AND COMPACTED ` 95% A.A.S.H.T.O. T99. .............. ............ USE APPROPRIATE BEDDING FOR TYPE OF PIPE BEING INSTALLED GRAVEL SURFACE REPAIR AND BEDDING z O F- U H U) z O U cc O U- 0 W U) Q W J �W�y�+ LL F_ O z J z O U) V ) W U) O^ I.L. D/� LL W W O LL I 0 z Q 0 J Q Z_ U- D 'DI CKSON Communit infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC 28205 (t) (704) 334-5348 (f) (704) 334-0078 WWW.WKDICKSON.COM NC LICENSE NO.117-0374 �� o�•FEss o'er, _ SEAL r 045626 PROFESSIONAL SEAL 1111111ca Z O 0 cr CL IY C/) Z p O w W Q 0 IIIIIIIIZ w F- F - Z W W Q Q J Zo W O z o 0 �F- 0Q oC � _jccr) W (nm O �C IY LL W U Z W z W > W n 0 IE m W S` m LijJ Q W F_ Z U Z W O Q a o PROJ. MGR.: JWH DESIGN BY: RET DRAWN BY: CH PROD. DATE: SEPT 2018 DRAWING NUMBER: D.2 O 34_ WKD PROJ. NO.: 20170041.00.CL ON Znw 0� E,-8 �00 r zoo .� 5m* ox, om ya0 y W ozW -o oN zO°z z WOj LL 011,8 w3 �o� °Wa N j0Z az ¢3z wTO0 w=zd W�= oeFF, 0a� 0 zI XaI 4°<2 WK DICKSON communitV infrastructure consultants 616 COLONNADE DRIVE SLOPES FLATTER THAN 4:1 PERMANENT SEEDING — GRASS—LINED CHANNELS CHARLOTTE NC28205 334-5348 (t)(704) 704)3 TEMPORARY SEEDING — LATE WINTER/EARLY SPRING Seeding Mixture (f)(704)334-0078 Species Rate (Ib/acre) WWW.WKDICKSON.COM Seeding Mixture Tall fescue 175-200 (3 Ib/1000 sq. ft.) Species Rate (Ib/acre) Kentucky bluegrass 20 (1 Ib/1000 sq. ft.) NC LICENSE NO.F-0374 Nurse plants Rye (grain) 120 Annual lespedeza (Kobe in Piedmont 50 Between May 1 and Aug. 15, add 10 Ib/acre German millet or 15 Ib/acre and Coastal Plain, Korean in Mountains) Sudangrass. Prior to May 1 or after Aug. 15, add 40 Ib/acre rye (grain). Seeding dates �,�` Ate Omit annual lespedeza when duration of temporary cover is not to extend Best Possible beyond June. Below 2500 ft: Aug. 15—Sept. 1 July 25—Sept. 15 p Mar. 1—Apr. 1 Mar. 1 -May 10 -- • a SEAL —_ Seeding dates Above 2500 ft: July 25—Aug. 15 July 15—Aug. 30 Mar. 20—Apr. 20 Mar. 5—May 15 = 045626 — Mountains — Above 2500 ft: Feb. 15—May 15 Soil amendments i Below 2500 ft: Feb. 1—May 1 Apply lime and fertilizer according to soil tests, or apply 4,000 Ib/acre ground '. Piedmont — Jan. 1—May 1 Coastal Plain — Dec.1—Apr. 15 agricultural limestone and 1,200 Ib/acre 10-10-10 fertilizer. Mulch Use jute, excelsior matting, or a similar channel lining material to cover the PROFESSIONAL SEAL Soil amendments bottom of channels and ditches. The lining should extend above the highest Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural calculated depth of flow. On channel side slopes above this height, and in limestone and 750 Ib/acre 10-10-10 fertilizer. drainages not requiring temporary linings, apply 4,000 Ib/acre grain straw and anchor straw by stapling netting over the top. I I I I m Mulch and anchoring materials must not be allowed to wash downslope where Mulch they can clog drainage devices. Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting or a Maintenance mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Inspect and repair mulch frequently. Refertilize in late winter according to soil tests or apply 150 Ib/acre 10-10-10 fertilizer (3 Ib/1000 sq. ft.). Mow regularly to a height of 2-4 inches. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch im— mediately following erosion or other damage. PERMANENT SEEDING SCHEDULE -MIXTURE #1 M Seeding Mixture z Species Rate (lb/acre) O a TEMPORARY SEEDING SCHEDULE — SUMMER Tall fescue 100 1 Sericea lespedeza 20Z o Seeding mixture Korean lespedeza 10 O_ Species Rate (Ib/acre) Redtop 5 a7 Kentucky bluegrass 5 w German millet 40 Seeding note cc In the Piedmont and Mountains, a small—stemmed Sudangrass may be After Aug. 1, use unscarified seed for sericea lespedeza. substituted at a rate of 50 Ib/acre. Z Nurse plants 0 Seeding dates Between May 1 and Aug. 15 add 10 Ib/acre German millet or 15 Ib/acre Mountains — May 15—Aug. 15 Sudangrass. Prior to May 1 or after Aug. 15, add 40 Ib/acre rye (grain). It V Piedmont — May 1—Aug. 15 may be beneficial to plant the grasses in late summer and overseed the D Coastal Plain — Apr. 15—Aug. 15 lespedezas in March. Seeding dates Soil amendments Best Possible w Follow recommendations of soil tests or apply 2,000 Ib/acre ground Below 2500 ft: Aug. 15—Sept. 1 July 25—Sept. 15 Z agricultural limestone and 750 Ib/acre 10-10-10 fertilizer. Mar. 1—Apr. 1 Mar. 1—May 10 O Above 2500 ft: July 25 -Aug. 15 July 15—Aug. 30 V I I 1 1 1 10 Mulch Mar. 20—Apr. 20 Mar. 5—May 15 Q[ Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, Complete seeding earlier in the fall, and start later in spring on north and O netting or a mulch anchoring tool. A disk with blades set nearly east facing slopes. LL straight can be used as an anchoring tool. Soil amendments Maintenance Apply lime and fertilizer according to soil tests, or apply 4,000 Ib/acre ground W Refertilize if growth is not fully adequate. Reseed, fertilize and mulch agricultural limestone and 1,000 Ib/acre 5-10-10 fertilizer. Q W immediately following erosion or other damage. ~ a Mulch J 3 Apply 4,000-5,000 Ib/acre grain straw or equivalent cover of another suitable W 9 mulching material. Anchor mulch by tacking with asphalt, roving or netting. cc Z O o Netting is the preferred anchoring method on steep slopes. W N, o TEMPORARY SEEDING SCHEDULE - FALL Maintenance ® ^^ W 'W W' VJ n Mow no more than once a year. Refertilize in the second year unless growth Z Q Q Z Z is fully adequate. Reseed, fertilize and mulch damaged areas immediately. < Z _JZ 0 J O Z cc v3 Seeding mixture J WW Q W U r Species Rate (Ib/acre) 1. GROUND COVER - WHEREVER LAND DISTURBING ACTIVITY IS z I_ = O UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE (1) ACRE, A O O I— Rye (grain) 120 GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE W Q o O PLANTED OR PROVIDED PER THE GROUND COVER SCHEDULE SHOWN (%) pc = Z ac Seeding dates ON THIS SHEET. W n- cc V Z Z OU W Mountains — Aug. 15—Dec. 15 2. GRADED SLOPES AND FILLS - PER THE GROUND COVER SCHEDULE O W o o — Coastal Plain and Piedmont Aug. 15—Dec. 30 SHOWN HERE, OR AT THE COMPLETION OF ANY PHASE OF GRADING, Z W O WHICHEVER PERIOD IS SHORTER, SLOPES SHALL BE PLANTED OR 0 a Soil amendments OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR p Follow soil tests or apply 2,000 Ib/acre ground agricultural lime— STRUCTURES SUFFICIENT TO RESTRAIN EROSION. cc w a stone and 1,000 Ib/acre 10-10-10 fertilizer. W Z GROUND COVER SCHEDULE W w m W o Mulch z o' Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS W U U Z straight can be used as a mulch anchoring tool. PERIMETER DIKES, 7 DAYS NONE w n SWALES, DITCHES AND SLOPES 0 a g Maintenance HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE a 0 o Repair and refertilize damaged areas immediately. Topdress with SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE 50 Ib/acre of nitrogen in March. If it is necessary to extend NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED s temporary cover beyond June 15, overseed with 50 Ib/acre Kobe 7 DAYS FOR SLOPES GREATER PROD. MGR.: JWH DESIGN BY: RET m (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in SLOPES 3:1 OR FLATTER 14 DAYS THAN 50 FEET IN LENGTH DRAWN BY: CH late February or early March. ALL OTHER AREAS WITH NONE (EXCEPT FOR PERIMETERS z 14 DAYS PROD. DATE: SEPT 2018 DRAWING NUMBER: 1. PER THE GROUND COVER SCHEDULE SHOWN HERE, OR AT THE Q COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS D.3 O 34 o SHORTER, DISTURBED AREAS SHALL BE PLANTED OR OTHERWISE Q W PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES J WKD PROD. NO.: SUFFICIENT TO RESTRAIN EROSION. Q a J Z 201 / OOT I.00. V L F a LL LLw SLOPES FLATTER THAN 4:1 AND HWQ ZONES)