Loading...
HomeMy WebLinkAbout20180817 Ver 1 _Site 1 impact 09-28-18 _20180830d' / 20' GREENWAY A I I I I I I NOTE: SEE SHEET 2 of 2 FOR OVERALL DESIGN OF 110 LARGE OAKS DRIVE j / / / / / / EIP / / E / a PROPOSED CONTOUR FILL CUT ELEVATION p � � 359 CONSTRUCTION NOTES 10 CONTRACTOR SHALL REMOVE Site 1 and Site 2 FALLEN TREE(S) AND DEBRIS. O A NEW CENTERLINE OF CREEK. 03 RIPRAP FACE (SEE 'SITE 1' SECTION VIEW ON SHEET 4 & DETAIL MS -42 ON SHEET 5). ® RIPRAP FACE AT 3:1 (SEE 'SITE 2' SECTION VIEW ON SHEET 4). CLEAN WATER DIKE. © SEDIMENT DIKE. 07 12 FT. TEMPORARY ACCESS ROUTE. / SITE 1 SITE 1 STREAM & BUFFER IMPACT: STREAM IMPACT= 95 L.F. ZONE 1 BUFFER IMPACT = 2147 S.F. RETNN,NG WN-� T I I /I 365 aa6 651 � — MH NEW TOB 359.78' 6s5 yf 70 '•:.t III// .i�11ev.. � RIPRAP CLASS B FILL 0 TOB: 351.34' ,a66C, P \ n TOB: 351.60' o.K D C, O �LGNE,— 114 LARGE OAKS DRIVE � 1 36G � 112 LARGE OAKS DRIVE2G ` I sPNT,E,A, 5 SITE 2 STREAM & BUFFER IMPACT` Imo/ F STREAM IMPACT = 47 L.F. ZONE 1 BUFFER IMPACT = 208 S.F.85HE5 z o / 35 d A —R DP 2161 j5a 1 — —J5 ♦ \ m 111 12 - - - - - - - o O d and west bank of Site 1 and Site 2 O A Prol. No. N/A Design By: J. Patterson Drawn By: S. O'Shea Date: October 17, 2017 Scale Hor: V=20' / ,EEE 21 M/H 'B' 1°iP 1111111111111111111111 �pF / I 1111111111111111111111111111111111111111111111111111111 00001/ 4� 215 STRATHBURGH LANE NOW OR FORMERLY , THO 215 &VICKI J. SCHUSTER 215 STRATHBURGH 3 /' CARV, 2331069 / / •��Q" 'lam yZ" „p? 7 PIN 0772 33 1069 / BM 1997, PG 1187 / 1.^ / dN11 -86 p TIE INTO EXISTING TOP m � a 12' TEMPORARY ACCESS ROUTE OF BANK EL: 350.24' _ B" PVC . P�0 ti Y Z 2100 1" ZU� 107 GREENWAY OVERLOOK iso ECM NOW OR FORMERLY — — — TOWN OF CARV O 4 ---------------- — 7 r6n 2 STAgNG AREA vENT 217 STRATHBURGH LANE NOW OR FORMERLY MICHAEL S. & WENDY J. ROONEY 217 STRATHBURGH LN CARY, NC 2 751 8-9 036 PIN 0772 32 1909 HIM 1994, PG1187 •Y 1 � / '"EE FA�EaRIAPsRsAP a �i �• M ro FILL i TOB: 349.52' 00 NE RIP RAP ELEANOUT E r Q � U ( E Q =REEK �> E 0) c Q c LU vENTO I s I °Ax 1s• , / wa ,r _„ uAaE 10 q... (D 1n 0 J I / / O O 00 _J a, (n U �Ny W LU / / CO POST e BIINuAxc 24 V / / VJ LOWER MANHOLE TO NEW FOR SITE 1 REFERENCE 2 SECTION V1EW5 ARE Q N GRADE AND REONLY TO SHOW SLOPES MOVE k 0+70 SITE AND OTHER PERTINENT INFORMATION. THE C0 OZj REPLACE RING & COMER SAMPLE DNES USED TO CREATE THESE 372 . METAL POST NTH TYPE 1 SECTION VIEWS ARE NOT PERPENDICULAR Lr) GRADE 11'-0° TO AUGNMENT. SOME DISTORTION AT THE 368 0O 2% RIPRAP 2'-0° MINIMUM THICKNESS OFFSET DISTANCES WILL TAKE PLACE. 368 (V START 1'-0°— n BEHIND MH vai 364 3 n 3'-0° BENCH 364 J O 4X SLOPE �xe 360 PE 7D Mt Low PONT p ro 360 %yA EL 354.Bir n 7 °wooe POST L356 EL• 380.0' Tae SMT Z.A �d 356 13 _ LL R gStyby tzi 352 MH RAp? U _ EXISTING GRADE _ _ 35 2 PRELIMINARY GEOTEXTILE ---- - WT DO NOT USE FO T iI a P�H�,G, FABRIC _ RIPRAP CLASS B 348 '- , „ TOM„ �- --x ' a a 348 CONSTRUCTION SEE CONSTRUCTION NOTES NEW EAM 344 344 (THIS SHEET) (TYPICAL) CHANNEL w aRgT 342 342 20 -10 0 10 20 30 40 50 60 70 M n M M Ma " a Signature M Revisions 2+12.90 SITE 2 August 28, 2016 Added Class B rira 360 - 356 1 352 344 340 360 356 352 348 344 340 along stream channel and west bank of Site 1 and Site 2 Prol. No. N/A Design By: J. Patterson Drawn By: S. O'Shea Date: October 17, 2017 Scale Hor: V=20' 1111111111111111111111 � I 1111111111111111111111111111111111111111111111111111111 r• n 111■111■111■111■111■111■ 111■111■111■111■111■111■111■111■1111, 360 356 352 348 344 340 along stream channel and west bank of Site 1 and Site 2 Prol. No. N/A Design By: J. Patterson Drawn By: S. O'Shea Date: October 17, 2017 Scale Hor: V=20' OFFSET -40 -30 -20 -10 0 10 20 30 40 50 60 Scale Ver: 1 =10 m m m ,�, SHEET NO. ELEVA,10N5ExlsnNc7vnmosEe p p 7 of 2