HomeMy WebLinkAbout20181232 Ver 1_Stream Impact Exhibits_20180905XR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WASPHALT
PAV
ING
GATECHAIN LINK FENCECONCRETEVAUL
T
24
"
CM
P METALBUILDINGEX. 72
"
CMP
18"
R
C
P
1
8
"
RCPSSSSSSSSS
SSSSSSS
SSSS
SSESSESSESSESSESSESSESSESSESSESSESSENORFOLK SOUTHERNNORFOLK SOUTHERNWETWETWET
WET WETWETW
E
T
W
E
TR/WSSE SSE SSE
639.5 inv
.
out
EX. 24" RCPapprox. 639
.220' SETBACK100' CLASS
A
BUFFERREDUCED TO
75
'
W
/
BERM75'R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WNORFOLK-SOUTHERN RAILROAD13005 SAM NEELY RDCHARLOTTE, NORTH CAROLINAWESTINGHOUSELOGISTICS PARK SOUTHEXISTING CONDITIONS5950 FAIRVIEW RD STE 100CHARLOTTE NC 28210(T) 704.553.8881burtonengineering.com017.554.026PROJECT NUMBER2018.08.08DATEWATERS OF THE USABUTTING WETLANDSWATERS OF THE USADJACENT WETLANDSWATERS OF THE USPERENNIAL RPW A± 1,255-LFAPPROVED JURISDICTIONAL DETERMINATION SAW-2016-02435WETLAND & STREAM DELINEATION PROVIDED BY STV FEB. 17TH 2017PERENNIAL RPW A, AN UNNAMED TRIBUTARY TO STEELE CREEK(RPW). FLOWS EAST TO STEELE CREEK WHICH FLOWS TO SUGARCREEK (RPW) WHICH THEN FLOWS TO THE CATAWBA RIVER, ATRADITIONAL NAVIGABLE WATER (TNW)0300SCALE: 1" = 300'SHEET 1 OF 6EX. 10" VCPSANITARY SEWERTO BE RELOCATEDEX. SAM NEELY RDTO BE RELOCATEDPROP. CAROWINDS BVEXTENSION
XR/W R/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WGATECHAIN LINK FENCECONCRETEVAUL
T
METALBUILDINGSSSSSSSSS
SSSSSSS
SSSS
WETWETWET
WET WETWETW
E
T
W
E
TR/W639.5 inv
.
out
EX. 24" RCPapprox. 639
.220' SETBACK100' CLASS
A
BUFFERREDUCED TO
75
'
W
/
BERM75'SSSS
SSSSR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W13005 SAM NEELY RDCHARLOTTE, NORTH CAROLINAWESTINGHOUSELOGISTICS PARK SOUTHPROPOSED SITE DEVELOPMENT5950 FAIRVIEW RD STE 100CHARLOTTE NC 28210(T) 704.553.8881burtonengineering.com017.554.026PROJECT NUMBER2018.08.08DATEIMPACT - S1108-LF OF PERMANENTSTREAM IMPACTIMPACT - S220-LF OF TEMPORARY STREAMIMPACT(SANITARY SEWER CROSSING)WATERS OF THE USPERENNIAL RPW ANEW WET DETENTIONPOND DISCHARGINGTO PERENNIAL RPW ANEW SAND FILTERDISCHARGING TOPERENNIAL RPW ANEW WET DETENTIONPOND DISCHARGING TOADJACENT WETLANDS0300SCALE: 1" = 300'PERMANENT STREAM IMPACTS: 108-LFTEMPORARY STREAM IMPACTS: 20-LFTOTAL STREAM IMPACTS: 138-LF1.WORK IN PERRENNIAL STREAM SHALL BE PLANNED TO MINIMIZE THE NUMBER OFDAYS OF DISTURBANCE.2.THE CONTRACTOR IS TO OBSERVE THE LOCAL WEATHER FORECASTS AND NOTBEGIN WORK IN THE CREEK UNLESS AT LEAST THREE DAYS WITHOUT RAIN ISANTICIPATED.3.ALL DISTURBED CREEK BED AND BANKS ARE TO BE STABILIZED PRIOR TO THEEND OF EACH WORK DAY.4.A TEMPORARY PIPE OR PUMP MAY BE INSTALLED TO CONTROL CREEK FLOWDURING CONSTRUCTION.5.BYPASS PUMP SHALL DISCHARGE TO ENERGY DISSIPATING RIP RAP.IMPACT - W10.036-AC OF TEMPORARYWETLAND IMPACTSHEET 2 OF 6EX. SANITARY SEWERTO BE RELOCATEDPROP. SANITARYSEWER RELOCATIONNORFOLK-SOUTHERN RAILROADPROP. 710K-SF BUILDINGPROP. 232K-SF BUILDINGPROP. BYPASS SYSTEM
SSSSSSSSSSESSESSESSESSESSESSE625S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSESSESSES
S
E
S
S
E
S
S
E
S
S
E
S
S
E
S
S
E
S
S
E
S
S
E
S
S
E
S
S
E
S
S
E
S
S
E
S
S
E
PCC
PCC
PCC PCCPCCPCCPCC10
"
D
u
c
t
i
l
e
I
r
o
n
P
i
p
e
HW-CVT01HW-CVT02SSSSSSSSSSESSESSESSESSESSESSE62562513005 SAM NEELY RDCHARLOTTE, NORTH CAROLINAWESTINGHOUSELOGISTICS PARK SOUTHIMPACT - S1PROPOSED STREAM CULVERTCULVERT PLAN5950 FAIRVIEW RD STE 100CHARLOTTE NC 28210(T) 704.553.8881burtonengineering.com017.554.026PROJECT NUMBER2018.08.08DATE22'9.4'IMPACT - S1108-LF OFPERMANENTSTREAM IMPACT30'3:1 SLOPE3:1 SLOPE020SCALE: 1" = 20'NEW SANITARYSEWERTEMPORARYDAMSTREAMBYPASS PUMPIMPACT - S1108-LF OF PERMANENTSTREAM IMPACTPERMANENTRIPRAP APRON030SCALE: 1" = 30'SHEET 3 OF 6EXISTING CONTOURPROPOSED CONTOURIMPACTED CENTERLINE OF STREAMAREA OF PERMANENT IMPACTJURISDICTIONAL STREAM DELINEATIONPROPOSED SANITARY SEWER100SSSSSS
6106206306406106206306400+250+500+751+001+1255 LF OF 66" CL III RCP @ -1.69%HW-CVT01
RIM/GRATE: 627.43
INV OUT: 621.98 66" CL III RCP
HW-CVT02
RIM/GRATE: 629.44
INV IN: 622.90 66" CL III RCPSANITARY SEWERFROM MH-810" DIINV: 617.96NEW RIPRAPAPRONFLOW LINE OF CULVERT(1' EMBEDMENT)13005 SAM NEELY RDCHARLOTTE, NORTH CAROLINAWESTINGHOUSELOGISTICS PARK SOUTHIMPACT - S1PROPOSED STREAM CULVERTCULVERT PROFILE5950 FAIRVIEW RD STE 100CHARLOTTE NC 28210(T) 704.553.8881burtonengineering.com017.554.026PROJECT NUMBER2018.08.08DATE4.25'12" EMBEDMENT(USE NATIVEMATERIAL)NEW CLASS B RIPRAP APRON15" THICK TYP.EXISTING SUBGRADEPROPOSED FILLPROPOSED CULVERT ANDHEADWALL NTS CULVERT SECTIONSHEET 4 OF 6
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSESSESSESSESSE
SSE
SSE
SSE
SSE
SSESSESSESSE
SSESSESSESSESSE
SSE
SSE
SSE
SSE
SSE SSESSESSEMH-3MH-410" Ductile Iron Pipe6006106206306006106206300+250+500+751+001+05CENTERLINE OFPERENNIAL RPW AELEV:617.04MH-4
RIM/GRATE: 619.64
INV IN: 613.44 10" PVC
INV OUT: 613.24 10" DI
MH-3
RIM/GRATE: 619.43
INV IN: 612.82 10" DI
INV IN: 612.62 8" PVC
INV OUT: 612.62 10" PVC105 LF OF 10" DI @ 0.40%IMPACT - S220-LF OF TEMPORARYSTREAM IMPACTNEW PUBLICSEWER CROSSING13005 SAM NEELY RDCHARLOTTE, NORTH CAROLINAWESTINGHOUSELOGISTICS PARK SOUTHIMPACT - S2PROPOSED SANITARY SEWER CROSSING5950 FAIRVIEW RD STE 100CHARLOTTE NC 28210(T) 704.553.8881burtonengineering.com017.554.026PROJECT NUMBER2018.08.08DATE020SCALE: 1" = 20'2
0
'PERENNIAL STREAMRPW ASHEET 5 OF 6EXISTING CONTOURPROPOSED CONTOURIMPACTED CENTERLINE OF STREAMAREA OF TEMPORARY IMPACTJURISDICTIONAL STREAM DELINEATIONPROPOSED SANITARY SEWER100SSSSSSSTREAMBYPASS PUMP
613.8R/W
R/W
R/W
R/W
R/WR/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
619.0619.0618.9618.6BENCHMARK=619.01NAIL IN 24" OAK24" CMPNORFOLK SOUTHERNWETWETWETWETWETWETWETWETWETWETWETWET WETWET
WET WET WETWETWET
WET WE
T
WET
WET
6
1
5 615615SDE
SDESDESDE
HW-BP01INV: 615.00IMPACT - W1TEMPORARYWETLAND IMPACTS13005 SAM NEELY RDCHARLOTTE, NORTH CAROLINAWESTINGHOUSELOGISTICS PARK SOUTHIMPACT - W1TEMPORARY WETLAND IMPACTS5950 FAIRVIEW RD STE 100CHARLOTTE NC 28210(T) 704.553.8881burtonengineering.com017.554.026PROJECT NUMBER2018.08.08DATE040SCALE: 1" = 40'IMPACT - W1TEMPORARYWETLAND IMPACT10'10'
10'10'ADJACENT WETLANDS2:1 SLOPE0.023-ac0.005-ac0.008-acSHEET 6 OF 6PROP. RETAINING WALLEXISTING CONTOURPROPOSED CONTOURIMPACTED CENTERLINE OF STREAMAREA OF TEMPORARY IMPACTJURISDICTIONAL WETLAND DELINEATIONPROPOSED SANITARY SEWERWETWET100SSSSSSWETWETWETWET