Loading...
HomeMy WebLinkAbout20181215 Ver 1_CAMA Application_20180830Coastal Management ENVIRONMENTAL QUALITY August 28, 2018 MEMORANDUM: TO: FROM: SUBJECT: Applicant: 20181215 Karen Higgins Div. of Water Resources Gregg Bodnar Major Permits Processing Coordinator CAMA Permit Application Review Horizon East LLC Project Location: Tidal Bluff Court, Pelletier NC 28584 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Proposed Project: To construct a six slip docking facility to serve an existing six lot subdivision (Tidal Bluff) Please indicate below your agency's position or viewpoint on the proposed project and return this form by September 18, 2018. If you have any questions regarding the proposed project, please contact Gregg Bodnar, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 DCM MP -1 APPLICATION for Maier Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Horizons East, Llc Tidal Bluffs Bell & Phillips Surveying, Pllc Applicant 1: First Name MI Last Name Agent/ Contractor 1: First Name Jennifer M. Ward Cyrus Applicant 2: First Name MI Last Name Agent/ Contractor 2: First Name If additional applicants, please attach an additional page(s) with names listed. Last Name Mailing Address PO Box City PO Box State 104 Garnet Lane 604E Cedar Point Blvd. Jacksonville N.C. ZIP Country Phone No. Phone No. 1 FAX No. 28540 USA 910 - 459 - 9129 ext. 910 - 346 - 1895 Street Address (if different from above) City State - ext. ZIP Same as Above 252 393 3522 - Email Street Address (if different from above) Jennifer@horizon seastbuildingco.com City State 2. Agent/Contractor Information Business Name Bell & Phillips Surveying, Pllc Agent/ Contractor 1: First Name MI Last Name Cyrus A. Bell Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 604E Cedar Point Blvd. Cedar Point N.C. ZIP Phone No. 1 Phone No. 2 28584 252 - 393 - 6101 ext. - ext. FAX No. Contractor # 252 393 3522 Street Address (if different from above) City State ZIP Same - Email alanbell@eastnc.twcbc.com RECEIVED <Form continues on back> +SAY 14 2018 3 -MHD CITY 252-808-2808 .. 1-888-4RCOAST .. www.nccoastalroanagernent.net Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret Tidal Bluffs Ct. 375' Subdivision Name City State Zip Tidal Bluffs Peletier N. C. 28584 - Phone No. Lot No.(s) (if many, attach additional page with list) 910 - 459 - 9129 ext. #1, #2, #3, #4, #5 & #6 a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Pettiford Creek Bay c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown White Oak River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. i. Is the proposed project consistent with the applicable zoning? Peletier 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 375' 235,224 Sq. Ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or See attached, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 10' ®NHW or ❑NWL e. Vegetation on tract Sparce trees & grass on uplands, Typical wetland and coastal wetland species in wetlands f. Man-made features and uses now on tract Tidal Bluffs Ct. is a paved street. Lots are vacant. g. Identify and describe the existing land uses adjacent to the proposed project site. Single family residence to the north and south, vacant land to the east h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R-20 (Attach zoning compliance certificate, if applicable) ®Yes ❑No [INA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 :. 1-888-4RCOAST :: www.nccoastalmanagernent.net Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ®No (ii) Are there coastal wetlands on the site? ®Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Common Conventional single family residential septic system, not installed o. Describe existing drinking water supply source. West Carteret Water Corp. p. Describe existing storm water management or treatment systems. Natural run-off, Low density stormwater permit 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The pier and boat lifts are intended for private use by the future residents of Lots 1-6, Tidal Bluffs. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The pilings will be vibrated in. A barge will be used for accessibility and portable generator for electric supply. d. List all development activities you propose. Construction of 579' of pier and Installation of six boat lifts. e. Are the proposed activities maintenance of an existing project, new work, or both? New work f. What is the approximate total disturbed land area resulting from the proposed project? 4,000 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. There are no proposed and no existing discharges to waters of the state i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> MAY 14 20118 9'9CM m4Lio em.s y Y52-808-2808 „ 1.888-4RC®AST „ www.nccoastallmanagement.net Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Billy M. Norris Phone No. 910-389-1684 Address 377 Norris Landing Rd., Peletier, N.C. 28584 Name Billy R. Parker, Jr. Phone No. Address 383 Norris Landing Rd., Peletier, N.C., 28584 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Stormwater Permit No. SW8 170604 S. & E. Project ID: CARTE -2017-026 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date April 26, 2018 Print Name Signature Please indicate application attachments pertaining to ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information Morton Ward project. CM MP -5 Bridges and Culverts 252-808-2808 :. 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret Tidal Bluffs Ct. d. Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip Tidal Bluffs Peletier N.C. 28584 - Phone No. Lot No.(s) (if many, attach additional page with list) 910 - 459 - 9129 ext. #1, #2, #3, #4, #5 & #6 a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Pettiford Creek Bay c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade []Unknown White Oak River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Peletier 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 375' 235,224 Sq. Ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or See attached, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 10' ®NHW or ❑NWL e. Vegetation on tract Sparce trees & grass on uplands, Typical wetland and coastal wetland species in wetlands f. Man-made features and uses now on tract Tidal Bluffs Ct. is a paved street. Lots are vacant. g. Identify and describe the existing land uses adjacent to the proposed project site. Single family residence to the north and south, vacant land to the east h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R-20 (Attach zoning compliance certificate, if applicable) ®Yes [:]No [INA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No [--INA If yes, by whom? I. Is the proposed project located in a National. Registered Historic District or does it involve a []Yes ®NoCEIVED National Register listed or eligible property? <Form continues on next page> MAY 14 2018 DCM-MHD CITY 252-808-2808 .. 1-888-4RCOA5T .: www.nccoastalmanagement.net Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ®No (ii) Are there coastal wetlands on the site? ®Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Common Conventional single family residential septic system, not installed o. Describe existing drinking water supply source. West Carteret Water Corp. p. Describe existing storm water management or treatment systems. Natural run-off, Low density stormwater permit 5. Activides and impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The pier and boat lifts are intended for private use by the future residents of Lots 1-6, Tidal Bluffs. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The pilings will be vibrated in. A barge will be used for accessibility and portable generator for electric supply. d. List all development activities you propose. Construction of 579' of pier and Installation of six boat lifts. e. Are the proposed activities maintenance of an existing project, new work, or both? New work f. What is the approximate total disturbed land area resulting from the proposed project? 4,000 ®sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. There are no proposed and no existing discharges to waters of the state i. Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No ❑NA j. Is there any mitigation proposed? ❑Yes ®No [INA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED MAY 14 2018 252-808-2808 .. 1-888-4RCOAST .. CITY Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Addidonal. Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package; to be complete. Items fa) - (0 are; always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Billy M. Norris Phone No. 910-389-1684 Address 377 Norris Landing Rd., Petetier, N.C. 28584 Name Billy R. Parker, Jr. Phone No. Address 383 Norris Landing Rd., Peletier, N.C., 28584 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Stormwater Permit No. SW8 170604 S. & E. Project ID: CARTE -2017-026 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date April 26, 2018 Print Signature _ Please indicate application attachments pertaining to your I ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information _Jinnifer Morton Ward project. CM MP -5 Bridges and Culverts RECEIVED MAY 14 2018 .ne 252-808-2808 .. 1-888-4RCOAST .. www.nccoastallmanagemen l Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. ?. DUCKING FAGILITY/MARINA GHARAE;TERISTICS This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government ®Private/Community ❑Yes ENo c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 579' (iv) Width 5' (v) Floating ❑Yes ENo e. (i) Are Platforms included? []Yes ENo If yes: (ii) Number (iii) Length (iv) Width (v) Floating []Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 0 (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel EOpen water; no dredging required ❑Other; please describe: k. Typical boat length: Max. 26' m. (i) Will the facility have tie pilings? ❑Yes ENo (ii) If yes number of tie pilings? 2. DOCKING FACILITY/MA, d. (!)Are Finger Piers included? EYes ENo If yes: (ii) Number 3 (iii) Length 24' (iv) Width 3' (v) Floating ❑Yes ENo f. (i) Are Boatlifts included? EYes []No If yes: (ii) Number 6 (iii) Length 13' (iv) Width 13' h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Vet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: E Other, please describe: Private Boat Lifts j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (i) Will the facility be open to the general public? ❑Yes ENo 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net RECEIVED to This section not applicable Mm i 4 2018 DCM-MHD CITY revised: 12/27/06 Form ®CM MP -4 (Structures, Page 2 of 4) a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? RECEIVED ❑Yes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? MAY 14 2018 ❑Yes ❑No DCIV/-MHD CI 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaaement.not revised: 12/27/06 V Form DCM MP -4 (Structures, Page 3 of 5) o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV OSB OWL []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ® This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 83+' b. Number d. Description of buoy (color, inscription, size, anchor, etc.) b. Proximity of structure(s) to adjacent docking faciElities 520+' Note: For buoy or mooring piling, use arc of swing including length of vessel. MAY 14 2018 1-31QM H ®r-ITY 252-808-2808 :: 1-888-4RCOAST :: wwwmccoastalmanagement.net revised: 12/27/06 Form DCAJI P- (Structures, Page 4 of 4) c. Width of water body 690+' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 2.2'-2.4' 8. OTHER El This section not applicable a. Give complete description: See Narrative 04/24/18 Date Tidal Bluffs Project Name MAY 14 2018 DCM- HD CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised.- 12/27/05 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Horizion East LLC. (Tidal Bluffs) 2. LOCATION OF PROJECT SITE: Tidal Bluff Ct., Pelletier Latitude: 3442'59.34"N Longitude: 77'05'11.91"W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 6/12/18 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received — 5/14/18 Application Complete- 8/2/18 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Carteret County Land Classification from LUP — Limited Transition (B) AEC(s) Involved: EW, PTA, ES, CW (C) Water Dependent: (yes) (D) Intended Use: Residential (E) Wastewater Treatment: Existing — N/A Planned — NA (F) Type of Structures: Existing — N/A Planned — Dock (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: DREDGED CHADFD lTCiTRPF.n (A) Open Water N/A 1,222.5ft2 3,675ft2 (B) Coastal Wetlands (C) Section 404 1375ft2 675ft2 (D) Total Area Disturbed: 5,725ft2 (E) Primary Nursery Area: Yes (F) Water Classification: SA (G) Shellfish Classification: Closed 8. PROJECT SUMMARY: Horizions East, LLC. is proposing to construct a six slip docking facility to serve an existing six lot subdivision (Tidal Bluff). A Field Investigation Report: Horizions East, LLC. Page 02 9. NARRATIVE DESCRIPTION: The Horizons East, LLC. project is located at Tidal Bluff Ct. which is a cul-de-sac in Tidal Bluff subdivision in Pelletier. Tidal Bluff subdivision is located by turning West off of Hwy. 58 onto Pelletier Loop Rd. Travel .lmi down Pelletier Loop Rd. before turning South on Norris Landing Rd. Norris Landing Rd. is a gravel road and Tidal Bluff is located near the end and is contiguous with Pettiford Creek Bay. Tidal Bluff is a six lot(5.4ac) subdivision. Roads and utilities are complete within the subdivision. No houses have been constructed at this time. This project would occur on a dedicated community access between lots 3 and 5. The high ground is vegetated with grasses and woody vegetation. An area of Coastal Wetlands and high ground hammocks exist between the high ground and Pettiford Creek Bay within the project area. Coastal Wetland plants consist of Smooth Cordgrass and Black Needle Rush. The bottom of Pettiford Creek Bay in this area is sand and silt. Water depths in the area are -1' to -3' at NLW. No SAV was observed in the area. Adjacent properties are large track residential. The shoreline is irregular and is 560' in -length. The Division of Water Resources classifies this area of Pettiford Creek as SA waters. This is a Primary Nursery Area. This portion of Pettiford Bay is closed to harvesting shellfish. The parcel is classified in the Carteret Co. LUP as Limited Transition. The subdivision Stormwater Permit No. is SW8 170604 and the S & E Project ID is CARTE -2017-026. 10. PROJECT DESCRIPTION: The proposed community dock in Tidal Bluff subdivision would be 5' wide and would leave high ground before crossing 135' of Sec. 404 Jurisdictional Wetlands and 275' of regular and irregularly flooded Coastal Wetlands. A 3' clearance would be maintained between the dock and wetland substrate in this area. - The dock would continue for 135' into the waterbody before connecting to a 5'X67.6'(338ft2) platform. Three 3'X24' finger piers would extend from the platform creating a total of 6 slips. A 13'X13' boatlift would be placed in each slip. This docking facility would extend a total of 160' from the waterward edge of marsh into the 1000' wide waterbody with a non-linear shoreline. The dock as proposed would not extend further than similar docks already existing along the shoreline. Adjacent properties are 83' and 240' from the dock respectively. Water depths in the area of the slips range from -2'to - 2.2' at NLW as surveyed by Bell & Phillips Surveying. 11. ANTICIPATED IMPACTS: The proposed docking facility would shade 1,222.5ft2 of Shallow bottom, 1375ft2 of Coastal Wetland, 675ft2 of Federal wetlands and usurp 3,675ft2 of Public Trust Area. A temporary increase in turbidity would occur during construction. Bottom disturbance by boats could occur during extreme low tide events as a result of power loading boats onto lifts. Marsh substrate would be disturbed during construction and would be restored after completion. Conclusion: no substantive changes to impacts on upland or aquatic resources would result from proposed pier access and docking facility. Name: Ryan Davenport Date: 8/16/18 Morehead City Qrr April 24, 2018 PLLC ProfessionaC Land Surveyors , 604E Cedar Point Bfv& Cedar Point, .NC 28584 (252) 393-6101 Fax: (252) 393-3522 Ryan Davenport Division of Coastal Management 400 Commerce Ave. Morehead City, N.C. 28557 Dear Mr. Davenport: I am applying for a CAMA Major permit on behalf of Jennifer M. Ward, Horizons East, LLC to construct a pier and six (6) boatlifts, located in Tidal Bluffs Subdivision, Town of Peletier, in Carteret County, North Carolina. Please find enclosed the following: DCM MP -1, Application for Major Development Permit DCM MP -4, Structures Check in the amount of $400 Copy of the subject property deed Copy of the recorded subdivision plat Drawing consisting of one (1) sheet, vicinity map, existing upland conditions, proposed construction, plan view and cross-section view, and profile section of proposed construction Owner Authorization form. The boatlifts are for the private use of the eventual owners of the six lots in Tidal Bluffs. The property owner to the south and east is Billy M. Norris and the property owner to the north is Billy R. Parker, Jr. If you should have any questions on this project, please call me at 252-393-6101 or e-mail me at alanbell(@eastnc.twcbc.com. Sincerely, an UII. P.L.S. Major Permit Fee Schedule Circle One DCM % DWQ % Development Type Fee (14300160143510009316256253) (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100%($250) 0% ($0) Il. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100%($400) o%($0) Ilf. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C. or D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3490 (See attached) can be applied: $250 100%($250) 0%0 ($0) . III(B). Public or commercial development, if General Water Quality Certification No. 3490 (See attached) can be applied: $400 100% ($400) 0% ($0) III(C). If General Water Quality Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60%($240) 40%($160) III(D). If General Water Quality Certification No. 3490 (see attached) cannot be applied: $400 60%($240) 40%($160) IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60%($285) 400/.($190) mm Norris Pettiford Creek Bay Vicinity Map -Not to Scale ,318 x8" Calv. Lag Bolt -5/8 xt8' Galv. Timber Bolt 518K16" GGIV, Timber Bolt 318X8 " Golv. Lag Bolt 2"x6" S.T Sill Pe t tiford Cre ek Bay Plan View a '"M 10- Giraffe `(2) 5181.x78® Golv. umber Head Thru 2,5 Marine Grade 8' Piles -8, 04 (8, to 10' Pile Penetration) Section View Scale: 1 " = 4 2 '9 Finger Pier cv Water Depths at Normai �ow Water 4'x8'x4" 6000 PSI — Conc. Slats, Marine Grade W1 Rebar (2) 518 "x 18 — Golv, Timber Head Thru 2.5 Marine Grade 8" Piles -8' O.C. 4'x8'x4" 6000 PSI - Conc, Slats, Marine Grade W1 Reber 6"x6" S.T. Ground Contc,: 10.0 7. 0,(1- 7, C 6, C, 5,0 4.0 JC" 2.0 7.c 0. 0 _1,c —2, ' _30 - 4, C —50 676' Platform car Finger Pier 1 \v[j:6/ U2 \M'W/ 3 rScale: 1 ?0' Z ___ SixProposed IJ, x 13Boat Lifts Common Area C, C, 0^ 605 Sq. Ft. 0^ L 48 L44 L C� L43 �A `o' pen Vater Open Water ell -cx CE 4`5 18 15� /7 17 0,vp51 en Water 17 x 2,3 L r N,) 0 N) '9' Normal High Wcter Finger Oier /7 '9 /7Y 0r 487' 5' Wide Car 7R /7 6Y1 2 N 57-,'41 " "E E N3 Y, 2,3I3, 17 56 1 .19 Y, '5;r C), 19 i ­,ger Pier Normal High Water Line 15' from Riparian Corridor Line Riparian Corridor Line a go L Billy M. Norris Bk. 14 705 Pg. 446 M.B. 32, Pg. 446 Pin #537502572097000 2 Timber Piles: Embea-rent, Diameter, Placement, etc., per structural design, Building Code, Controv,toi & where applicable, Poot Lift Manufacturer. Six Proposed .S IJ' x IJ' Boat L ' "Iuu ZJU Horizontal Scale: 1" = 40' Vertical e® 1" ZUU 7�U 100 'M x t LEGEND 0 SET IRON PIPEIROD 0 -EXISTING IRON 'OHP-OVERHEAO POWER >0 Billy R. Parker, Jr. GW -GUY WIRE Bk 619 + -NONMONUMENTED POINT 115r . 126 71 Pg. 355 000 0 AG -ABOVE GROUND BG -BELOW GROUND M. B. 3 1, Pg. 4 3 7 -POWER POLE SOT -SIGHT DISTANCE TRIANGLE Pin #537502570694000 A —SET MAG NAIL (CONTROL) 10 0 9.0 8,0 7.0 60 5.0 4,O 3.0 2.0 7.0 1.2: (Normal High Water) 0. 0: (Normal Low Water) —1.0 —2. 0 _J.o —4.0 —5.0 I Z REV DESCRIPTION DA TE REV DESCRIFnON XX/XX/XX <- Tidal Bluffs Ct. (50' R/f 39.66' S 57'23'41 P W JO' M. 3. L. 4- Q14 N3 30' M. 8. L. 1,3,3.74 F 0 0%, <>1 am 40 0 40 8 G,"APHIC SCALE — FEET W co COD) CZ Date 06111118 Job 16785CAMA2 Cagy 16785NLW Drown CA B Scale 1 40' 120 Sheet I of Q ftIq (b q) kO (U W co COD) CZ Date 06111118 Job 16785CAMA2 Cagy 16785NLW Drown CA B Scale 1 40' 120 Sheet I of