Loading...
HomeMy WebLinkAboutNCG190106_Site Visit_20180904Compliance Inspection Report Permit: NCG190106 Effective: Expiration: Owner: United States Army Corps of Engineers Wilmington District SOC: Effective: Expiration: Facility: Engineering Repair Yard County: New Hanover 323 Battleship Rd Ne Region: Wilmington Wilmington NC 28401 Contact Person: Craig Garrison Title: Phone: 910-251-4853 Directions to Facility: from the battleship north carolina, drive south on battleship rd, ne, continue until passing under the cape fear memorial bridge, the engineering repair yard is the first property east of battleship rd, south of bridge. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/04/2018 Entry Time: 02:OOPM Exit Time: 02:45PM Primary Inspector: Brian P Lambe Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NCG190106 Owner - Facility: United States Army Corps of Engineers Wilmington District Inspection Date: 09/04/2018 Inspection Type : Technical Assistance Reason for Visit: Routine Inspection Summary: Met with Craig Garrison, Facility Contact USACE, Ken Bailey, Site Manager USACE, and Anthony Watts, ERGO USACE. Reviewed the NOI and permit requirements for sampling and SWPPP. The sampling points are determined to be as per submitted. The first point is at the ramp. There are sand bags to prevent tidal flooding and a sump pump. Recommended that the sample be taken from the ramp, not the ponded water behind the sand bags. The second sample point is the stormwater discharge pipe. The pipe has a one-way valve and is inundated every day. Samples will be pulled from last inlet. This point should qualify for ROS if samples in the next year are good. Behind the maintenance shop they collect 55 -gallon drums. The drums are cut and wiped down. There is some minor oil residue on the gravel. Recommend using a tarp in the area they cut and wipe. The yard is in early planning to be raised 4 feet. Did not send report. Page: 2 Permit: NCG190106 Owner - Facility: United States Army Corps of Engineers Wilmington District Inspection Date: 09/04/2018 Inspection Type : Technical Assistance Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ ❑ Comment: Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ ❑ Comment: Page: 3