HomeMy WebLinkAboutNC0025534_Inspection_20180905NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1
NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)]
1. Control Authority (POTW) Name: Hendersonville WWTP
2. Control Authority Representative(s): Amy Huffman, Scott Chovan
3. Title(s): Environmental Services Coordinator, Lab Manager
4. Last Inspection Date: 5/20/2016 Inspection Type (Check One): PCI Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? YES
6. Is POTW under an Order That Includes Pretreatment Conditions? NO
Order Type, Number, Parameters: _______________________________ Are Milestone Dates Being Met? YES NO
ICIS CODING
Main Program Permit Number MM/DD/YY
| N | C | 0 | 0 | 2 | 5 | 5 | 3 | 4 | | 09 | 04 | 18 |
7. Current Number Of Significant Industrial Users (SIUs)? 3
8. Number of SIUs With No IUP, or With an Expired IUP ? 0
9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0
10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0
11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi-Annual
Periods?
0
12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0
13. Number of SIUs in SNC with Pretreatment Schedule? 0
14. Number of SIUs on Schedules? 0
15. Current Number Of Categorical Industrial Users (CIUs)? 2
16. Number of CIUs in SNC? 0
POTW INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits Violations?
If Yes, What are the Parameters and How are these Problems Being Addressed?
YES NO
1 minor pH violation.
18. Since the Last PCI, has the POTW had any Problems Related to an Industrial
Discharge (Interference, Pass-Through, Blockage, Citizens’ Complaints, Increased
Sludge Production, Etc.)?
If Yes, How are these Problems Being Addressed?
YES NO
19. Which Industries have been in SNC for Limits or Reporting during
either of the Last 2 Semi-Annual Periods? Not Been Published for
Public Notice?(May refer to PAR if Excessive SIUs in SNC)
SNC for Limits: none
SNC for Reporting: none
Not Published:
20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an
Order, Has a Signed Copy of the Order been sent to the Division?
none
21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which
Ones?
YES NO
LTMP/STMP FILE REVIEW:
22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? YES NO
23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? YES NO
24. Is LTMP/STMP Data Maintained in a Table or Equivalent? YES NO Is Table Adequate? YES NO
25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? YES NO Inspector, please verify yourself!
26. If NO to 23 - 26, list violations _______________________________________________________________________________
27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? YES NO
If yes, which ones? Eliminated: Added:_______________________
DocuSign Envelope ID: 5B02B399-2DBD-419F-884D-61765379870B
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2
28. PRETREATMENT PROGRAM ELEMENTS REVIEW- Please review POTW files, verify POTW has copy of Program Element
in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info:
Program Element Last Submittal
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headworks Analysis (HWA) 5/16/2018 Yes No 6/28/2018 Yes No
Industrial Waste Survey (IWS) 1/27/2014 Yes No 4/21/2014 Yes No
Sewer Use Ordinance (SUO) 1/4/2013 Yes No 4/29/2014 Yes No
Enforcement Response Plan (ERP) 9/28/2016 Yes No 10/19/2016 Yes No
Long Term Monitoring Plan (LTMP) 9/15/2016 Yes No 10/19/2018 Yes No
________________________________________________________________________________________________________________
INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION)
29. User Name 1. Coats North America 2. 3.
30. IUP Number 003
31. Does File Contain Current Permit? Yes No Yes No Yes No
32. Permit Expiration Date 12/31/2018
33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A 414.55
34. Does File Contain Permit Application Completed Within One Year Prior
to Permit Issue Date?
Yes No Yes No Yes No
35. Does File Contain an Inspection Completed Within Last Calendar Year? Yes No Yes No Yes No
36. a. Does the File Contain a Slug/Spill Control Plan?
b. If No, is One Needed? (See Inspection Form from POTW)
a. Yes No
b. Yes No
a. Yes No
b. Yes No
a. Yes No
b. Yes No
37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
Organic Management Plan (TOMP)?
Yes No N/A Yes No N/A Yes No N/A
38. a. Does File Contain Original Permit Review Letter from the Division?
b. All Issues Resolved?
a. Yes No
b.Yes No N/A
a. Yes No
b.Yes No N/A
a. Yes No
b.Yes No N/A
39. During the Most Recent Semi -Annual Period, Did the POTW Complete
its Sampling as Required by IUP, including flow?
Yes No Yes No Yes No
40. Does File Contain POTW Sampling Chain -Of-Custody Forms? Yes No Yes No Yes No
41. During the Most Recent Semi -Annual Period, Did the SIU Complete its
Sampling as Required by IUP, including flow?
Yes No N/A Yes No N/A Yes No N/A
41b. During the Most Recent Semi-Annual Period, Did SIU submit all reports
on time?
Yes No N/A Yes No N/A Yes No N/A
42a. For categorical IUs with Combined Wastestream Formula (CWF), does
file include process/dilution flows as Required by IUP?
Yes No N/A Yes No N/A Yes No N/A
42b. For categorical IUs with Production based limits, does file include
production rates and/or flows as Required by IUP?
Yes No N/A Yes No N/A Yes No N/A
43a. During the Most Recent Semi-Annual Period, Did the POTW Identify
All Limits Non-Compliance from Both POTW and SIU Sampling?
Yes No
N/A
Yes No Yes No
43b. During the Most Recent Semi-Annual Period, Did the POTW Identify
All Reporting Non-Compliance from SIU Sampling?
Yes No N/A Yes No N/A Yes No N/A
44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self-
Monitoring Violations?
b. Did Industry Resample and submit results to POTW Within 30 Days?
c. If applicable, Did POTW resample within 30 days of becoming aware
of SIU limit violations in the POTW’s sampling of the SIU?
a.Yes No N/A
b.Yes No N/A
c.Yes No N/A
a.Yes No N/A
b.Yes No N/A
c.Yes No N/A
a.Yes No N/A
b.Yes No N/A
c.Yes No N/A
46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? Yes No Yes No Yes No
47. During the Most Recent Semi -Annual Period, Was Enforcement Taken
as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)?
Yes No N/A Yes No N/A Yes No N/A
48. Does the File Contain Penalty Assessment Notices? Yes No N/A Yes No N/A Yes No N/A
49. Does The File Contain Proof Of Penalty Collection? Yes No N/A Yes No N/A Yes No N/A
50. a. Does the File Contain Any Current Enforcement Orders?
b. Is SIU in Compliance with Order?
a.Yes No N/A
b.Yes No N/A
a.Yes No N/A
b.Yes No N/A
a.Yes No N/A
b.Yes No N/A
51. Did the POTW Representative Have Difficulty in Obtaining Any of This
Requested Information For You?
Yes No Yes No Yes No
DocuSign Envelope ID: 5B02B399-2DBD-419F-884D-61765379870B
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3
FILE REVIEW COMMENTS: 23. The copper detection limit is indicated as 5 ug/L in the lab reports. It should be 2 ug/L.
INDUSTRY INSPECTION ICIS CODING:
Main Program Permit Number MM/DD/YY
| N | C | 0 | 0 | 2 | 5 | 5 | 3 | 4 | | 09 | 04 | 18 |
1. Industry Inspected: Coats North America
2. Industry Address: 1710 Brevard Rd, Hendersonville, NC 28791
3. Type of Industry/Product: Manufacturer of industrial thread
4. Industry Contact: Danny Fulcher Title: Maintenance Manager
Phone: 828-693-4222 ext 185 Fax:___________________
5. Does the POTW Use the Division Model Inspection Form or Equivalent? YES NO
6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A. Initial Interview YES NO
B. Plant Tour YES NO
C. Pretreatment Tour YES NO
D. Sampling Review YES NO
E. Exit Interview YES NO
Industrial Inspection Comments: The facility needs a new flume for accurate flow measurement. Installation is planned.
OVERALL SUMMARY AND COMMENTS:
Comments: The Hendersonville Pretreatment Program appears to be thoroughly documented and well organized.
__________________________________________________________________________________________________________
Requirements: ______________________________________________________________________________________________
__________________________________________________________________________________________________________
Recommendations: ____________________________________________________________________________________________
__________________________________________________________________________________________________________
NOD: YES NO
NOV: YES NO
QNCR: YES NO
POTW Rating:
Satisfactory X Marginal UnSatisfactory
PCI COMPLETED BY: Daniel Boss DATE: 9/5/2018
DocuSign Envelope ID: 5B02B399-2DBD-419F-884D-61765379870B