Loading...
HomeMy WebLinkAboutSW6180801_Calculations (Wet Pond #2)_20180829Project #No Date Project Name 1 8/29/2018 Date 1)Calculate percent impervious draining to pond. Drainage Area =16.90 acres Road/Parking 2.23 ac Impervious Area =9.70 acres Sidewalk 0.65 ac Lots 5.62 ac % Imperv. =57.42 %Driveways 0.70 ac Amenity 0.50 ac 2)Find the volume of the 1.0" storm using the "Simple Method" (Schueler 1987): Rv = 0.05 + 0.009 (I) Rv = runoff coefficient (ratio of runoff to rainfall in inches) I = percent impervious Rv =0.567 in/in Volume of 1.0" storm (must exceed 3630 cf): WQv = 3630 x RD x Rv X A WQv = volume of runoof gnerated from design storm RD =Design storm =1 inch Rv = Runoff Coef =0.567 inch/inch A= Drainage Area = 16.90 acre WQv =34,772 ft 3 3)Determine Surface Area to Drainage Area Ratio & Surface of Permanent Pool (Water Quality) Desired Depth =5 ft Imp. %Ratio Lower Limit =50.00 1.31 Upper Limit =60.00 1.49 10,627 ft 2 Acutal =57.42 1.44 The volume of the 1" storm must be detained in the pond above the permanent pool and must be drawn down over a period of two to five days. Minimum SA Required = Project Data Revisions Description State Stormwater Comments WATER QUALITY & SURFACE AREA CALCUALTION Wet Detention Pond #2 2018-002 Kathryn's Place 8/29/2018 Impervious Project #No Date Project Name 1 8/29/2018 Date Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf) 0 247.5 5544 0 0 Main Pool Vol = 49583 cf 0.5 248 5829 2843 2843 Main Pool SA = 9102 sf 1.5 249 6429 6129 8972 2.5 250 7054 6742 15714 3.5 251 7708 7381 23095 4.5 252 8391 8050 31144 5.5 253 9102 8747 39891 6 253.5 9467 4642 44533 6.5 254 10732 5050 49583 Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf)Total Main Pool Vol = 49583 cf 0 251 1265 0 0 Total Forebay Vol = 7569 cf 1 252 2003 1634 1634 Is Forebay ~ 15-20%YES 15% 2 253 2900 2452 4086 3 254 4066 3483 7569 Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf)WQ Volume = 34772 cf 0 254 14798 0 0 Temp. Pool Vol = 35123 cf 0.5 254.5 16325 7781 7781 Volume Enough YES 1 255 17578 8476 16257 2 256 20154 18866 35123 Average Depth Calculation: Vshelf = 276 cf Dmax over shelf =0.5 ft Peimeter =368 ft Width =3 ft VPP = 49583 cf Abottom of shelf =9467 sf Davg =5.21 ft Project Data Revisions 2018-002 Description Kathryn's Place State Stormwater Comments 8/29/2018 POND VOLUMES Wet Detention Pond #2 Total Main Pool Permanent Pool Volume Check Total Forebay Volume Forebay Volume Check Temporary Pool Volume Temporary Pool Volume Check Project #No Date Project Name 1 8/29/2018 Date 1)Input Orifice and Spillway Information 2.50 in 0.60 Volume Provided =35,123 cf Number Orifices =1.00 Inv Orfice =254.00 Inv Primary Spillway =256.00 2)Calculate Area, Head and Discharge Flow g=32.2 ft/s2 h= use h/3 to simulate decreasing head A= cross section area of orifice Q= discharge cfs Q=discharge cfs 0.034 sf 0.667 feet 0.134 cfs 3)Calculate Drawn Down Time Time =Volume/Flowrate 3.03 days Check =OK Drawdown Time = Orifice Diameter = Orfice Coefficent = Orfice Cross Section Area = Average head = Discharge = 8/29/2018 WATER QUALITY VOLUME DRAW DOWN CALCULATION Wet Detention Pond #2 Project Data Revisions 2018-002 Description Kathryn's Place State Stormwater Comments ghACQ20 Project #No Date Project Name 1 8/29/2018 Date Step 1.DETERMINE BOUYANT FORCES Volume = Depth * Area Depth = Riser Top Elev - Riser Bottom Elev Riser Top Elev. =258 ft Bottom of Riser Elev. =254.00 ft Riser Wall Thickness =6.00 in Diameter of Manhole =6.00 ft Area = pi * diameter^2 / 4 Area (@ outside diam)=38.48 sf Volume =153.94 cf times wt of water 62.4 lbs/cf Bouyant Force =9,606 lbs Step 2.DETERMINE COUNTERWEIGHT REQUIREMENTS Riser Top Top Elevation =258 Thickness =0 inches Outside Diam =7.00 ft Volume =0.00 cf Riser Walls Inside Diam =6.00 ft Wall Thickness =6.00 in Height =4.00 ft Volume =40.84 cf Riser Bottom - Extended Base Bottom Elevation =254.00 Diameter =0.00 ft Thickness=6.00 in Volume =0.00 cf 40.84 cf 150 lbs/cf 6,126 lbs 0.64 Y 6,361 lbs Step 3.ADD CONCRETE BELOW INVERT IN RISER 28.27 sf Volume Required =72.62 cf 2.57 ft 32 in 75.40 cf 6605 lb 1.33 Y Summary Amount of Concrete Required = Area of Riser (@inside diam) = Factor of Safety > 1.30 (Y/N) = Calculated Depth of Concrete = Actual Depth Used = Backcheck Volume = Backcheck Weight of Added Conc (150-62.4) = Factor of Safety = Total Volume = x unit weight of reinforced conc. CounterweIght = Factor of Safety Provided (FSP) = Additional Concrete Required (Y/N) = Add minimum 32 inches below invert of pond 8/29/2018 RISER ANTI-FLOATATION Wet Detention Pond #2 Project Data Revisions 2018-002 Description Kathryn's Place State Stormwater Comments