Loading...
HomeMy WebLinkAboutSW6180801_Calculations (Wet Pond #1)_20180829Project #No Date Project Name 1 8/29/2018 Date 1)Calculate percent impervious draining to pond. Drainage Area =4.20 acres Road/Parking 0.63 ac Impervious Area =2.40 acres Sidewalk 0.15 ac Lots 1.45 ac % Imperv. =57.20 %Driveways 0.18 ac 2)Find the volume of the 1.0" storm using the "Simple Method" (Schueler 1987): Rv = 0.05 + 0.009 (I) Rv = runoff coefficient (ratio of runoff to rainfall in inches) I = percent impervious Rv =0.565 in/in Volume of 1.0" storm (must exceed 3630 cf): WQv = 3630 x RD x Rv X A WQv = volume of runoof gnerated from design storm RD =Design storm =1 inch Rv = Runoff Coef =0.565 inch/inch A= Drainage Area = 4.20 acre WQv =8,611 ft 3 3)Determine Surface Area to Drainage Area Ratio & Surface of Permanent Pool (Water Quality) Desired Depth =3 ft Imp. %Ratio Lower Limit =50.00 1.49 Upper Limit =60.00 2.09 3,516 ft 2 Acutal =57.20 1.92 The volume of the 1" storm must be detained in the pond above the permanent pool and must be drawn down over a period of two to five days. Minimum SA Required = Project Data Revisions Description State Stormwater Comments WATER QUALITY & SURFACE AREA CALCUALTION Wet Detention Pond #1 2018-002 Kathryn's Place 8/29/2018 Impervious Project #No Date Project Name 1 8/29/2018 Date Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf) 0 252 1452 0 0 Main Pool Vol = 14960 cf 1 253 1849 1651 1651 Main Pool SA = 4689 sf 2 254 2293 2071 3722 3 255 2780 2537 6258 4 256 3284 3032 9290 5 257 3808 3546 12836 5.5 257.5 4689 2124 14960 Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf)Main Pool Vol = 14960 cf 0 255.5 896 0 0 Total Forebay Vol = 2751 cf 0.5 256 1108 501 501 Is Forebay ~ 15-20%YES 18% 1.5 257 1628 1368 1869 2 257.5 1901 882 2751 Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf)WQ Volume = 8611 cf 0 257.5 6653 0 0 Temp. Pool Vol = 10146 cf 0.5 258 7921 3644 3644 Volume Enough YES 1.25 258.75 9420 6503 10146 Average Depth Calculation: Vshelf = 201 cf Dmax over shelf =0.5 ft Peimeter =268 ft Width =3 ft VPP = 14960 cf Abottom of shelf =3808 sf Davg =3.88 ft 8/29/2018 POND VOLUMES Wet Detention Pond #1 Total Main Pool Permanent Pool Volume Check Total Forebay Volume Forebay Volume Check Temporary Pool Volume Temporary Pool Volume Check Project Data Revisions 2018-002 Description Kathryn's Place State Stormwater Comments Project #No Date Project Name 1 8/29/2018 Date 1)Input Orifice and Spillway Information 1.50 in 0.60 Volume Provided =10,146 cf Number Orifices =1.00 Inv Orfice =257.50 Inv Primary Spillway =258.75 2)Calculate Area, Head and Discharge Flow g=32.2 ft/s2 h= use h/3 to simulate decreasing head A= cross section area of orifice Q= discharge cfs Q=discharge cfs 0.012 sf 0.417 feet 0.038 cfs 3)Calculate Drawn Down Time Time =Volume/Flowrate 3.08 days Check =OK Project Data Revisions 2018-002 Description Kathryn's Place State Stormwater Comments 8/29/2018 WATER QUALITY VOLUME DRAW DOWN CALCULATION Wet Detention Pond #1 Drawdown Time = Orifice Diameter = Orfice Coefficent = Orfice Cross Section Area = Average head = Discharge = ghACQ20 Project #No Date Project Name 1 8/29/2018 Date Step 1.DETERMINE BOUYANT FORCES Volume = Depth * Area Depth = Riser Top Elev - Riser Bottom Elev Riser Top Elev. =260 ft Bottom of Riser Elev. =257.50 ft Riser Wall Thickness =6.00 in Diameter of Manhole =4.00 ft Area = pi * diameter^2 / 4 Area (@ outside diam)=19.64 sf Volume =49.09 cf times wt of water 62.4 lbs/cf Bouyant Force =3,063 lbs Step 2.DETERMINE COUNTERWEIGHT REQUIREMENTS Riser Top Top Elevation =260 Thickness =0 inches Outside Diam =5.00 ft Volume =0.00 cf Riser Walls Inside Diam =4.00 ft Wall Thickness =6.00 in Height =2.50 ft Volume =17.67 cf Riser Bottom - Extended Base Bottom Elevation =257.50 Diameter =0.00 ft Thickness=6.00 in Volume =0.00 cf 17.67 cf 150 lbs/cf 2,651 lbs 0.87 Y 1,331 lbs Step 3.ADD CONCRETE BELOW INVERT IN RISER 12.57 sf Volume Required =15.20 cf 1.21 ft 24 in 25.13 cf 2202 lb 1.58 Y 8/29/2018 RISER ANTI-FLOATATION Wet Detention Pond #1 Project Data Revisions 2018-002 Description Kathryn's Place State Stormwater Comments Summary Amount of Concrete Required = Area of Riser (@inside diam) = Factor of Safety > 1.30 (Y/N) = Calculated Depth of Concrete = Actual Depth Used = Backcheck Volume = Backcheck Weight of Added Conc (150-62.4) = Factor of Safety = Total Volume = x unit weight of reinforced conc. CounterweIght = Factor of Safety Provided (FSP) = Additional Concrete Required (Y/N) = Add minimum 24 inches below invert of pond