HomeMy WebLinkAbout20030179 Ver 6_Modifications_20090625 D LS?? v June 24, 2009 JUN 2-5 2009 DENR - WATER (VAI Mr. John Dorney WETLANDS AND STORMWA TER BRANCH , NCDENR-DWQ Wetlands and Stormwater Branch 401 Oversight/Express Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Subject: Duke Energy Carolinas, LLC - Nationwide Permit Modification Request Dillsboro Dam and Powerhouse Removal - Bank Stabilization Project DWQ #2003-0179, version 6.0 Dear Mr. Dorney: HDRIDTA would like to 'submit the enclosed permit modification request on. behalf of Duke Energy Carolinas, LLC (Duke). Enclosed please find two copies of the modification request, which include a bank stability report demonstrating the need for the permit modification and describing methodologies. All original, signed and sealed documents have been sent to Ms. Lori Beckwith of the U.S. Army Corps of Engineers. A courtesy copy has also been sent to Mr. Mark Cantrell of the U.S. Fish and Wildlife Service. On behalf of Duke, we would like to thank you for your attention to the Dillsboro Dam Removal Project. Should you have any questions or concerns,. please do not hesitate to contact me at (704) 342-7364 or by email at jason.isbanioly@hdrinc.com. Sincerely, HDRIDTA Jason N. Isbanioly Scientist JNI/cef Enclosures HDRI DTA HDR Engineering, Inc. of the Carolinas 400 S Tryon Street Phone: 17041377-4182 Suite 2401 Fax: (704) 377-4185 Charlotte, NC 28285-0106 www.hdrinc.com L? DZ.A? June 22, 2009 L v U `?? ' U JUN ' Ms. Lori Beckwith U.S. Army Corps of Engineers WETLANDSANDSTORMyy gsgNCH 151 Patton Ave Room 208 ' Asheville, NC 28801-5006 Subject: Duke Energy Carolinas, LLC - Natio nwide Permit Modification Request Dillsboro Dam and Powerhouse Removal - Bank Stabilization Project Action ID 200701194 i e Dear Ms. Beckwith: The following permit modification request is being provided by 14DRIDTA on behalf of Duke Energy Carolinas, LLC (Duke). Duke is requesting a change in allowable impacts described in the previously submitted Pre-Construction Notification (PCN) for the Dillsboro Dam and Powerhouse Removal Project, dated March 21, 2007, and approved under Nationwide Permit (NWP) 27 (Action ID 200701 l 94), dated June 5, 2008. Located in the Town of Dillsboro, in Jackson County, North Carolina, the dam and powerhouse removal project is scheduled to begin in January 2010 and be completed by March 2010. Duke is requesting an additional 300 linear feet of stream impacts for bank stabilization within the Dillsboro Reservoir. The affected area is on the northeastern bank and extends from the existing powerhouse upstream into the reservoir. The following table providesa summary of the proposed impact to this area. Table 1. Dillsboro Bank Stability Project - Proposed Impacts Stream Perennial Avg Impact Impact Stream Type of or Stream Length Area of Number (indicate on Name Impact Intermitte Width Before (linear Impact (acres) ma) nt Im act ft) Section I Tuckasegee Permanent Perennial 135 300 0 12 River . Total Stream Impact (by length and acreage) 300 0.12 HDRIDTA HDR Engineering, Inc. ofthe Carolinas 1 400 S Tryon Street Suite 2401 Charlotte, NC 28285-0106 Phone: (704) 377-4182 Fax: (704) 377-4185 www.hdrinc.com ' Ms. Lori Beckwith June 22, 2009 Page 2 of 2 Based on a slope stability analysis (enclosed) of the eastern bank immediately upstream of the powerhouse, HDRIDTA has determined that lowering the reservoir water level could lead to bank failure through subsidence at this location. Geotechnical borings taken in this area show the bank and road bed material to be predominately a mixture of silt and sand alluvium. Given the existing bank slope upstream of the powerhouse (3:1 to 1:1), the saturated bank may fail once the supporting water is removed. (i.e., during and after drawdown). This scenario will likely occur despite Duke's compliance ' with the terms and conditions of the existing Section 404 and 401 permits regarding gradual drawdown procedures. ' Although bank failure may occur in other parts of the reservoir, the reason for concern in this particular area is due to a sanitary pipe and a fiber-optic cable, which are located between the bank and the road. These would be impacted by bank failure with potentially severe consequences. Additionally, the adjacent road (North River Road) would be affected by bank failure in the area. To protect against bank failure, Duke is proposing to armor 300 feet of the northeastern bank with North Carolina Department of Transportation (NCDOT) Class 2 rip-rap, creating a rip-rap slope buttress ' approximately 12 feet high and 18 feet wide at the base. Rip-rap volume is estimated to be 1,200 cubic yards. No concrete rubble will be used for the bank stabilization; only natural stone will be utilized. The buttress will be installed prior to drawdown. The location of the post dam removal ordinary high ' water mark (OHWM) is unknown and therefore the amount of rip-rap that will be below the OHWM is unknown. Because this stabilization effort will be partially underwater, filter fabric cannot feasibly be installed beneath the rip-rap. Aside from this issue, however, all general and specific conditions for installing rip-rap contained within NWP 27 will be adhered to while working in this area. Once installed, the buttress will be permanent and no materials will be double-handled or removed. As mentioned, please find enclosed the supporting Dillsboro Dam River Bank Stabilization slope analysis report. Should you have any questions or concerns regarding this submittal, please do not hesitate to contact me at (704) 342-7364 or Mr. Scott Fletcher at (704) 342-7380. Sincerely, HDRIDTA 2 T / Jason N. Isbanioly S.eott T. Fletcher, CWB, PWS Scientist Environmental and Regulatory Manager ' Enclosures cc w/enclosures: John Dorney - North Carolina Division of Water Quality Hugh Barwick - Duke Energy Carolinas, LLC File HDRI DTA HDR Engineering, Inc. ofthe Carolinas 1 w a Project Number: Calculation Number: CALCULATION COVER SHEET 102444 DD-01 Rev. Page 1 of 1 Title: Dillsboro Dam River Bank Stabilization Purpose: To evaluate the proposed river bank stabilization measure by means of a slope stability analysis. Conclusion: Please refer to the analysis results and discussion. Originator: `=-?` ` Date: -c % I C: e QC Review/Checked By: F CC, Date: C /13 JZ o-y Approved By: Date: 6 / / f i? 4VIA" Fid?. Supersedes Calculation No: Superseded by Calculation No: Corporate Seal: Professional Engineer Seal: N.C.B.E.L.S. License Number. F-0116 400 South Tryon Street Charlotte, NC 28285 CARO? // p FSSS16 •? ?? ?2•?4 29.9, . Q SEAL r . _ • 029912 ; G 11??tiQ`. C HDR Engineering, Inc. of the Carolinas 400 S. Tryon Street, Suite 2401 Charlotte, NC 28285 N.C.B.E.L.S License No: F-0116 1 03/2002 Dillsboro Dam River Bank Stabilization i 1 1 1 1 1 t Y 1 1 1 1 1 1 Introduction During construction activities to remove the Dillsboro Dam structure, there is a concern that dewatering of the river may result in a rapid drawdown loading condition of the adjacent river bank. If this condition occurs, the river bank may destabilize and fail through subsidence. The following report summarizes a proposed stabilization measure that would reduce the risk of failure of the river bank during the dam removal. The report also provides an evaluation of the proposed measure by means of a slope stability analysis. River Bank Stabilization The proposed stabilization measure will involve placing riprap along the north river bank for approximately 300 linear feet upstream of the powerhouse. This measure is considered to be the most feasible alternative and provides the least disturbance given the space and access limitations. The riprap will be dumped against the river bank prior to dewatering at an approximate slope inclination of 2.5H:1V (Horizontal to Vertical). The riprap slope will extend from the existing full pond water level at an elevation of ±1972 ft msl to the riverbed at an elevation of ±1960 ft msl. The proposed riprap location and typical geometry of the riprap are shown on Attachment 1. The riprap will generally consist of North Carolina Department of Transportation (NCDOT) Class 2 stone (Reference 1). A summary of a typical section for the river bank stabilization is provided in Table 1. Slope Stability Analysis Slope stability analyses were conducted to estimate the factors of safety of the river bank with the proposed stabilization measure for rapid drawdown and long-term loading conditions. The analysis section was developed based on existing topography and incorporated available information from a geotechnical exploration (Attachment 3). HDRIDTA HDR Engineering, Inc. ofthe Carolinas 400 S Tryon Street Phone: (704) 377-4182 Suite 2401 Fax: 17041377-4185 Charlotte, NC 28285-0106 www.hdrinc.com 1UR I TA 1 iJ t Dillsboro Dam River Bank Stabilization Slope Analysis Report Page 2 of 5 Analysis Method The slope stability analyses were performed using the UTEXAS4 computer program (Reference 2) with appropriate conditions and material properties represented for each loading condition. The analyses were conducted to determine representative shear failure surfaces that are likely to result in significant or catastrophic subsidence of the river bank. Factors of safety in the slope stability analyses were calculated using Spencer's procedure with an automatic search feature assuming a circular shear surface. Material Properties Fill and foundation material properties were estimated based on materials encountered during the geotechnical exploration and experience with regional soils. Material properties for the riprap were estimated based on judgment. The material properties used in the slope stability analyses for each material are summarized in Table 2. Loading Conditions Two loading conditions were assessed in this slope stability analysis: rapid drawdown loading and long-term loading. A rapid drawdown loading condition represents a situation where the water level outside a slope drops quickly enough such that the fill materials within the slope do not have sufficient time to drain. The available information on materials comprising the river bank slope was extremely limited and variable. Therefore, it was conservatively assumed that a rapid drawdown condition may develop in the slope during drawdown of the river water level. A long-term loading condition represents a situation over time after the dam removal where the water level and groundwater reach a steady state condition and the fill materials within the river bank have drained completely. Analysis Results Analysis results are presented in Attachment 2. Calculated slope stability factors of safety and the criteria for each loading condition analyzed are summarized in Table 3. The analysis results indicate that the factors of safety for the river bank with the proposed stabilization measure described is adequate for the river bank subsidence concerns. HDRI DTA HDR Engineering, Inc. ofthe Carolinas 1 ' Dillsboro Dam River Bank Stabilization 1 Slope Analysis Report Page 3 of 5 I References ' 1) North Carolina Department of Transportation. 2006. Standard Specifications for Roads and Structures Book. 2) Wright, S.G. 1999. UTEXAS4, A Computer Program for Slope Stability Calculations, Shinoak Software, Austin, Texas. F HDR DTA HDR Engineering, Inc. ofthe Carolinas I Dillsboro Dam River Bank Stabilization Slope Analysis Report Page 4 of 5 t t Table 1. Summary of river bank stabilization Stabilization Method Riprap Slope Buttress Location North river bank upstream of dam Len-th ± 300 ft Height Min. 12 ft Bottom Width ± 18 ft Slope Inclination 2.5H:1 V Riprap Top Elevation 1972 ft msl (Existing full pond water level) Riprap Toe Elevation 1960 ft msl (Riverbed) Riprap Material NCDOT Class 2 Total Volume of Riprap ± 1,200 cubic yards HDR IDTA HOR Engineering, Inc. of the Carolinas 11 t 1 i t? N C ? Y ? O 1 y .nor c? `n cw. O ¢ ? ?_ O bo Q C,? a t 0 ? II a C L Q, ? C O ? O Q II z ? z ' ' z z O fV J L II m N N u ? $ II j? .b II II ?- II I C p $ $ w" $ O , T ?" O v) v) w ? A v? a, n. O O a O o -- o ? II II II II II ? ? ? ? u U U U U U f a o v ?+ U o WS ?n 00 O tr) N N 0 L 3 J ? f cC ( ( ? f 71J ? y J Q ? a F Q G 0 C N z ( U U ~ I r ? ? 3 ? ?, w a j T E O ? O 'O C c f? y to . c ( ? s ? c c ? O ( " I j U U 7 C A U C s V t j I a >?e i O ? F ? O ? ? U U 4 w t U ) II I L ,T O CIS C O M b u V i ? U w O v u ? U C y O O ,..a U C O LC it as F Q ? ''O O a cz 0 m U O O U c c m Q c H m p c - w [C ¢ p p 2 2 IJ t fj Attachment 1 Design Drawing Attachment 2 Slope Stability Analysis Results m CD v 3 mT V ? C O C O m 0) (0 0 N O O N CCI I D 0 cn a- 0 0 i 0 w 3 I (D 3 o m CD (D (D 0) o co C' 0 0 0 i (D CD i O O m 0 ca w N Cfl v (D CD C --I .p 1 O O O O N (0 CD 00 CO O O O O O_ N O O 0 cn 6 0 0 3 (D co v X, 0) Q 0 Q 0 1 TABLE NO. 1 COMPUTER PROGRAM DESIGNATION: UTEXAS4 Originally Coded By Stephen G. Wright Version No. 4.0.1.5 - Last Revision Date: 2/15/2003 (C)4COpy?right41985-2002 S. G. Wright - All rights reserved # 4 R4 x# R4 4R#444#4#44484#4#4g4wwR#4#x#4wRtr4##Rb4wp4#RtrRw4 RESU * LTS OF COMPUTATIONS PERFORMED USING THIS SOFTWARE * SHOULD NOT BE USED FOR DESIGN PURPOSES UNLESS THEY HAVE * BEEN VERIFIED BY INDEPENDENT ANALYSES, EXPERIMENTAL DATA " * OR FIELD EXPERIENCE. THE USER SHOULD UNDERSTAND THE ALGORITHMS " AND ANALYTICAL PROCEDURES USED IN THIS SOFTWARE AND MUST HAVE READ ALL DOCUMENTATION FOR THIS SOFTWARE BEFORE ATTEMPTING * * TO USE IT. NEITHER SHINOAK SOFTWARE NOR STEPHEN G. WRIGHT * * MAKE OR ASSUME LIABILITY FOR ANY WARRANTIES, EXPRESSED OR * IMPLIED, CONCERNING THE ACCURACY, RELIABILITY, USEFULNESS ° " OR ADAPTAB#ILIT4 # Y OF4THISgSOFTWARE. w #####448#Kdltr4dA44lA#4#4AR#tq4e4#x#44R44x4#4gtr4tr4#####AdAd { R UTEXA54 5/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: Wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_DillsborO_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid DrawdOWn Slope Stability Analysis (Spencer - circular) TTABLE N0. 3 # 4x844#wAd4x44##w#R ° NEW PROFILE LINE DATA R RR4bR44ApwR#44#44dAR44rt# ---------------------------------------------------------- Material Type (Number): 1 _____ ____-Profile -Line -NO_ 1 _ -- - - -_- Description: Partially weathered Rock - saturated Point X Y 1 0.00 1962.00 2 42.00 1960.00 1 3 100.00 1960.00 ---------------------------------------------------------- ----- Profile Line No. 2 - Material Type (Number): 2 ----- --------------------------------- ------------------------ Description: Random Fill - saturated Point X Y 1 0.00 1969.00 2 30.00 1972.00 3 42.00 1960.00 ____- Profile Line No. 3 _ Material Type (Number) 3 _____ ------ ---- ----- --- _ Description: Random Fill - Moist Point X Y ' 1 0.00 1975.00 2 27.00 1975.00 3 30.00 1972.00 ----------------------------------------------------------- ----- Profile Line No. 4 - Material Type (Number): 4 ----- ---------------------------------------------------------- Description: Road Bed Fill - Moist Point X Y 1 0.00 1979.00 2 23.00 1979.00 3 27.00 1975.00 ----- ---------------------------------------------- -----Profile Line No. 5 - Material Type (Number): 5 ---- -------------------------------------- -------------------- Description: Riprap Point X Y 1 30.00 1972.00 2 60.00 1960.00 UTEXA54 5/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates 1 Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Rivereank_Riprap_orawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - circular) x4b44x4##Rtrtr!###trw444##gl4x844444de xRxx44tr44xxxtr4!#p4x##4 * NEW MATERIAL PROPERTY DATA - CONVENTIONAL/FIRST-STAGE COMPUTATIONS * x4# 844#44trwR4R4##!#4Rx48#ARRx###4lppp4#R4R444#RdRR4#4xbA#444x48#d44 ------------------------------------------------------------------ --------------------DATA-FOR-MATERIAL-NUMBER-1----------- -------- Description: Partially Weathered Rock - Saturated unit weight of soil (material): 135.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS 1 cohesion - - - - - - 1500.0 Friction angle - - - - - 35.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 1 Negative pore water pressures are NOT allowed - set to zero. ------------------------------------------------------------'----- ---`-------------- DATA FOR MATERIAL NUMBER 2 ------------------- _________________ ___________________________________________ Description: Random Fill - Saturated unit weight of soil (material): 115.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS Cohesion - - - - - - 0.0 Friction angle - - - - - 25.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ------------------------------------------------------------------ ------------------- DATA FOR MATERIAL NUMBER 3 ------------------- _____________________________________________________________ Description; Random Fill - Moist ' Unit weight of soil (material): 108.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS cohesion - - - - - - 0.0 Friction angle - - - - - 25.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ' ------------------------------------------------------------------ ------------------- DATA FOR MATERIAL NUMBER 4 ------ ______________________________________ ____________________________ Description: Road Bed Fill - Moist unit weight of soil (material): 115.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS cohesion - - - _ _ _ - 100.0 Friction angle e - - 32.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. --------------------------------------------------------------- ------------------- DATA FOR MATERIAL NUMBER 5 ------------------- _________________________ _________________________________________ Description: Riprap Unit weight of soil (material): 125.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS Cohesion - - 0.0 Friction angle - - 45.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. UTExAS4 S/N:00136 - Version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 f Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Ban k\Analysis\Di1Isbo ro_RiverBank_Ri p rap_Drawdown_Deep. dat 1 Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - circular) TABLE 11 # ggqRR#qRq##Yaq #RRgtr#Ygtr #aa#YR * NEW PIEZOMETRIC LINE DATA - CONVENTIONAL/FIRST-STAGE COMPUTATIONS RR#xYRRaxYRxxxRaYYaa#Ra##RaxaggqaYatrYqaa#traaaRRRx#qRa#YYa#gRRRq#Raagx 1 __________ ----_---________________________'_-___-_-_- ---------____ Piezometric Line Number 1 --------------- ---- _------ unit weight of fluid (water): 62.4 Point X y 1 0.00 1969.00 2 30.00 1972.00 3 100.00 1972.00 UTEXAS4 S/N:00136 - Version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River sank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - circular) TABLE N0. 11 a#trgq#RatrgRa#RR#aRRrttrx Y * x RRggtrqqYYRxYRqx##R#YaR#Yxgx#RaaxR##Yax#Ya##R #Ye.E. nlxDonrRnBaenD#nOa?qDancRx#nqV N IONAL/FIRST-STAGE COMPUTATIONS *?Nenxna?n+xcnY#C3#xnxcaa?#Yea+sa?#naa Normal Shear Point x y Pressure Stress 1 ' Distributed loads will be generated from piezometric line number 1 See Output Table number 27 UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Rivereank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown ' slope stability Analysis (Spencer - Circular) TABLE N0. 5 2222222222222222222222222222222222222222222222222222222222 2 NEW MATERIAL PROPERTY DATA - SECOND-STAGE COMPUTATIONS 2 2222222222222222222222222222222222222222222222222222222222 t t 1 1 1 1 1 t t d 1 1 ------------------------------------------------------------------ ------------------- DATA FOR MATERIAL NUMBER 1 ------------------- ------------------------------------------------------------------ Description: Partially Weathered Rock - saturated unit weight of soil (material): 135.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS Cohesion - - - - - - - - 1500.0 Friction angle - - - - - 35.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ------------------------------------------------------- ------------------- DATA FOR MATERIAL NUMBER 2 -------- -----------------------------------`------------------- Description: Random Fill - Saturated Unit weight of soil (material): 115.0 ---- 2-STAGE STRENGTHS FOR SECOND STAGE OF COMPUTATIONS KC = 1 ENVELOPE: intercept of envelope ("d") - - - - - - - - 500.0 Slope of envelope ('psi") - - - - - - - - - 18.00 (degrees) Kc = Kf ENVELOPE: Intercept of envelope ("d") - - - - - - - - 0.0 Slope of envelope ('psi") - - - - - - - - - 25.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ------------------------------------------------------------------ ------------------- DATA FOR MATERIAL NUMBER 3 ------------------- ------------------------------------------------------------------ Description: Random Fill - Moist Unit weight of soil (material): 108.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS cohesion - - - - - - - - 0.0 Friction angle - - - - - 25.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ------------------------------------------------------------------ ------------------- DATA FOR MATERIAL NUMBER 4 ------------------- ------------------------------------------------------------------ DesCription: Road Bed Fill - Moist Unit weight of soil (material): 115.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS Cohesion - - - - - - - - 100.0 Friction angle - - - - - 32.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. -------------------------------------------- ------------------- DATA FOR MATERIAL NUMBER 5 ---------------------------------------------- DeSCripti . Riprap unit weight of soil (material): 125.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS cohesion - - - - - - 0.0 Friction angle - - - - - 45.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. 4 UTEXAS4 S/N:00136 - Version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - Circular) TABLE NO. 7 1 „ 222222222222222222222222222222222222222222222222222222222222222222222 2 NEW PIEZOMETRIC LINE DATA - CONVENTIONAL/FIRST-STAGE COMPUTATIONS 2 222222222222222222222222222222222222222222222222222222222222222222222 11 _______________-__---____------------------------------- --------------- Piezometric Line Number 1 --------------- ------ --------- ----------------------------- unit weight of fluid (water): 62.4 Point X Y 1 0.00 1969.00 2 30.00 1972.00 3 39.00 1963.00 4 100.00 1963.00 UTEXAs4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Di 11 sboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Rivereank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - circular) TABLE N0. 12 222222222222222222222222222222222222222222222222222222222222222 2 NEW DISTRIBUTED LOAD DATA - SECOND/THIRD-STAGE COMPUTATIONS 2 222222222222222222222222222222222222222222222222222222222222222 Normal Shear Point X Y Pressure Stress Distributed loads wi11 be generated from piezometric line number 1 See Output Table number 28 s UTEX.AS4 s/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - Circular) TABLE N0tr.AAx 16 #AAIIdaAdtr+AAx+#A+AxxtrxAAA# * NEW ANALYSIS/COMPUTATION DATA A #AAA#xtrxxtr;+AIIxAtr4AAAxxxxtrAAAAxAA Starting Center Coordinate for Search at - x: 42.00 1 v: 2000.00 Required accuracy for critical center (= minimum spacing between grid points): 0.500 critical shear surface not allowed to pass below Y: 1900.00 For the initial mode of search circles are tangent to horizontal line at - Y: 1960.00 Radius: 40.00 Three-stage computations will be performed. ' -------------------------------------------------------------------------------- The following represent default values or values that were prevously defined: Subtended angle for slice subdivision: 3.00(degrees) There is no crack. There is no water in a crack. seismic coefficient: 0.000 1 unit weight of water (or other fluid) in crack: 62.4 Automatic search output will be in long form. search will be continued after the initial mode to find a most critical circle. Maximum number of trial grids for a given search mode: 50 No restrictions exist on the lateral extent of the search. No shear surfaces other than the most critical will be saved for display later. Neither slope face was explicitly designated for analysis. standard sign convention used for direction of shear stress on shear surface. Procedure of Analysis: Spencer iteration limit: 100 Force imbalance: 1.0000OOe-005 (fraction of total weight) Moment imbalance: 1.0000OOe-005 (fraction of moment due to total weight) Minimum weight required for computations to be performed: 100 Initial trial factor of safety: 3.000 initial trial side force inclination: 17.189 (de rees) Minimum (most negative) side force inclination allowed in spencer's procedure: -10.00 UTExAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 { Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_Drawdown_Deep.dat ' Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - Circular) TABLE NO. 26 xa#AAAdAII#;AA#aAAtr#AIIxAaA+#AIItrddd;AAA A NEW, COMPUTED SLOPE GEOMETRY DATA tr AA+a#tr#dA+dAAdAIIAAd;AAAR#trAAAxtrR#dIIAA These slope geometry were generated from the Profile Lines. Point x Y 1 0.00 1979.00 2 23.00 1979.00 ' 3 27.00 1975.00 4 30.00 1972.00 5 42.00 1967.20 6 60.00 1960.00 7 100.00 1960.00 UTEXAS4 S/N:00136 - Version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use b : f D i b ll y , ev ne Tar e & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River sank\Anal sis\Dill b i y s oro_R versank_Riprap_Drawdown_Deep.dat ' Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - Circular) TABLE 10. 27 A*##AR##4#*rt#x#rtfiRtrrtdrtx #YAAtr#fi#ARRAdR#rtYR#YYA#A#rtA#RYA*d#Y4##rtrt4#R ° NEW DISTRIBUTED LOAD DATA - CONVENTIONAL/FIRST-STAGE COMPUTATIONS A ArtfitrRrtfi AArtrt*Rrtdd4Rrt#RtrrtrtdRY444tr##trAYrt4*RYAdRAAA#Rrt#A*#rtfi#tr#YAA#RRRRAfi Normal Shear Point x Y Pressure Stress 1 30.00 1972.00 0.0 0.0 2 42.00 1967.20 299.5 0.0 3 60.00 1960.00 748.8 0 0 . 4 100.00 1960.00 748.8 0.0 The above data were generated automatically from piezometric line number 1. UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates i T me and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_DaM-Removal\Engineering\River Bank\Anal sis\Dill b i y s oro_R verBank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - Circular) TABLE N0. 28 222222222222222222222222222222222222222222222222222222222222222 2 NEW DISTRIBUTED LOAD DATA - SECOND/THIRD-STAGE COMPUTATIONS 2 222222222222222222222222222222222222222222222222222222222222222 Normal Shear Point x Y Pressure Stress I 1 52.50 1963.00 0.0 0.0 2 60.00 1960.00 187 2 0 0 . . 3 100.00 1960.00 187.2 0.0 The above data were generated automatically from piezometric line number 1. search will be conducted for RIGHT face of slope f UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Danl_Removal\Engineering\River sank\Anal sis\Dill b i y s oro_R verBank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - Circular) eAeie NO> A30A x x ##d#A#RYAA x#rtfidRAfifitrrtrtA#RRrt*dRAA*Art " OUTPUT FO PE 1 AUTOMATIC SEARCH WITH CIRCLES * #*xAAR****xtrA#ARtrAfixtrrtAx#rtfiAtrRrtARRrt4RRRrtAd#4rtd4RYdtr output for circles Tan t t i gen o a G ven Horizontal Line ------ ------ Tangent line elevation, Y: 1960.00 3-Stage center coordinates Factor Side Force of Inclination X Y Radius safety (degrees) Iterations messages 27.00 1985.00 25.00 center rejected as follows: UTEXAS ERROR NUMBER 9270 iterations Solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations 42.00 1985.00 25.00 1.870 -18.615 4 57.00 1985.00 25.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 iterations solution did not converge in iteration limit of 100 Failed to converge during 27.00 2000.00 40.00 Center rejected as follows: UTEXAS NOTICE NUMBER 8060 stage 1 computations Circle does not intersect the slope. 42.00 2000.00 40.00 1.857 -16.208 4 57.00 2000.00 40.00 2.058 -21.362 5 27.00 2015.00 55.00 center rejected as follows: UTEXAS NOTICE NUMBER 8060 circle does not intersect the slope. 1 42.00 2015.00 55.00 2.044 -14.509 5 57.00 2015.00 55.00 1.432 -20.901 4 - - - - - - New 9-Point Grid (only new points calculated) - 72.00 2000.00 40.00 center rejected as follows: UTEXAS NOTICE NUMBER 8130 Circle intersects slope 2 entirely within the slope times, but there is no segment ' 72.00 2015.00 55.00 center rejected as follows: UTEXAS NOTICE NUMBER 8130 Circle intersects slope 2 times, but there is no segment entirely within the slope 42.00 2030.00 70.00 center rejected as follows: UTEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. 57.00 2030.00 70.00 1.374 -17.728 4 72.00 2030.00 70.00 2.501 -26.080 1 - - - - - - New 9-Point Grid (only new points calculated) - - - - - - 42.00 2045.00 85.00 center rejected as follows : UTEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. 57.00 2045.00 85.00 1.414 -15.590 4 72.00 2045.00 85.00 Center rejected as follows : UTEXAS ERROR NUMBER 9280 allowed . The side force inclination fell outside the range of values ' The minimum value allowed is: -8.00000e+001 degrees. The maximum value allowed is: 1.00000e+001 degrees. - - - - - - New 9-Point Grid (only new points calculated) - - - - - - 54.50 2027.50 67.50 1.356 -16.758 4 57.00 2027.50 67.50 1.373 -18.172 4 59.50 2027.50 67.50 Center rejected as follows : UTEXAS ERROR NUMBER 9280 ' The side force inclination fell outside the range of values allowed . The minimum value allowed is: -8.00000e+001 degrees. The maximum value allowed is: 1.00000e+001 degrees. 54.50 59.50 2030.00 2030.00 70.00 1.363 70.00 Center -16.385 rejected as follows 4 : UTEX AS ERROR NUMBER 9280 The side force inclination fell outside the range of values allowed . The minimum value allowed is: -8.00000e+001 degrees. The maximum value allowed is: 1.00000e+001 degrees. 54.50 2032.50 72.50 Center rejected as follows : UTEXAS ERROR NUMBER 9280 the side force inclination fell outside the range of values allowed . The minimum value allowed is: -8.00000e+001 degrees. The maximum value allowed is: 1.00000e+001 degrees. 57.00 2032.50 72.50 1.377 -17.313 4 59.50 2032.50 72.50 Center rejected as follows : UTEXAS ERROR NUMBER 9280 the side force inclination fell outside the range of values allowed . The minimum value allowed is: -8.00000e+001 degrees. The maximum value allowed is: 1.00000e+001 degrees. - - - - - - New 9-Point Grid (only new points calculated) - - - - - - 52.00 2025.00 65.00 1.352 -15.908 4 54.50 2025.00 65.00 1.351 -17.163 4 57.00 2025.00 65.00 1.376 -18.647 4 52.00 2027.50 67.50 1.362 -15.570 4 52.00 2030.00 70.00 1.374 -15.253 4 - - - - - - New 9-Point Grid (only new points calculated) - - - - - - 52.00 2022.50 62.50 1.343 -16.273 4 54.50 2022.50 62.50 1.347 -17.597 4 57.00 2022.50 62.50 1.381 -19.157 4 New 9-Point Grid (only new points calculated) - 49.50 2020.00 60.00 1.348 -15.429 4 52.00 2020.00 60.00 1.336 -16.663 4 54.50 2020.00 60.00 1.347 -18.062 4 49.50 2022.50 62.50 1.359 -15.104 4 49.50 2025.00 65.00 1.372 -14.800 4 New 9-Point Grid (only new points calculated) - 49.50 2017.50 57.50 1.337 -15.777 4 52.00 2017.50 57.50 1.330 -17.079 4 54.50 2017.50 57.50 1.349 -18.559 4 - - - - - - New 9-Point Grid (only new points calculated) - - - - - - 49.50 2015.00 55.00 1.329 -16.153 4 52.00 2015.00 55.00 1.327 -17.526 4 54.50 2015.00 55.00 1.355 -19.087 4 ' New 9-Point Grid (only new points calculated) - 49.50 2012.50 52.50 1.322 -16.557 4 52.00 2012.50 52.50 1.327 -18.008 4 54.50 2012.50 52.50 1.367 -19.653 4 49.50 2015.00 55.00 1.329 -16.153 4 54.50 2015.00 55.00 1.355 -19.087 4 49.50 2017.50 57.50 1.337 -15.777 4 52.00 2017.50 57.50 1.330 -17.079 4 54.50 2017.50 57.50 1.349 -18.559 4 - - - - - - New 9-Point Grid (only new points calculated) - - - - - - 47.00 2010.00 50.00 1.330 -15.646 4 49.50 2010.00 50.00 1.318 -16.993 4 52.00 2010.00 50.00 1.332 -18.526 4 47.00 2012.50 52.50 1.339 -15.286 4 1 47.00 2015.00 55.00 1.350 -14.955 4 New 9-Point Grid (only new points calculated) - 47.00 2007.50 47.50 1.323 -16.035 4 49.50 2007.50 47.50 1.317 -17.463 4 52.00 2007.50 47.50 1.341 -19.080 4 - - - - - - New 9-Point Grid (only new points calculated) - - - - - - 47.00 2005.00 45.00 1.318 -16.456 4 49.50 2005.00 45.00 1.320 -17.972 4 52.00 2005.00 45.00 1.357 -19.673 4 - - - - New 9-Point Grid (only new points calculated) - - - - - - 48.00 2006.00 46.00 1.316 -16.854 4 49.50 2006.00 46.00 1.318 -17.764 4 51.00 2006.00 46.00 1.332 -18.746 4 48.00 2007.50 47.50 1.317 -16.586 4 51.00 2007.50 47.50 1.327 -18.414 4 48.00 2009.00 49.00 1.320 -16.330 4 49.50 2009.00 49.00 1.317 -17.177 4 51.00 2009.00 49.00 1.323 -18.096 4 - - - - New 9-Point Grid (only new points calculated) - - - - - - 46.50 2004.50 44.50 1.320 -16.261 4 ' 48.00 2004.50 44.50 1.316 -17.136 4 49.50 2004.50 44.50 1.321 -18.079 4 46.50 2006.00 46.00 1.323 -16.012 4 46.50 2007.50 47.50 1.327 -15.774 4 - - - New 9-Paint Grid (only new points calculated) - - - - - - 46.50 2003.00 43.00 1.319 -16.522 4 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 48.00 2003.00 43.00 1.317 -17.431 4 49.50 2003.00 43.00 1.326 -18.409 4 - - - New 9-Point Grid (only new points calculated) - - - - - - 47.50 2004.00 44.00 1.316 -16.930 4 48.00 2004.00 44.00 1.316 -17.233 4 48.50 2004.00 44.00 1.317 -17.546 4 47.50 2004.50 44.50 1.316 -16.836 4 48.50 2004.50 44.50 1.316 -17.446 4 47.50 2005.00 45.00 1.316 -16.744 4 48.00 2005.00 45.00 1.316 -17.041 4 48.50 2005.00 45.00 1.316 -17.347 4 - - - - New 9-Point Grid (only new points calculated) - - - - - - 47.50 2005.50 45.50 1.317 -16.653 4 48.00 2005.50 45.50 1.316 -16.947 4 48.50 2005.50 45.50 1.316 -17.249 4 - - - - New 9-Point Grid (only new points calculated) - - - - - - 49.00 2005.00 45.00 1.317 -17.655 4 49.00 2005.50 45.50 1.317 -17.555 4 48.50 2006.00 46.00 1.315 -17.153 4 49.00 2006.00 46.00 1.316 -17.456 4 New 9-Point Grid (only new points calculated) - - - - - - 48.00 2006.50 46.50 1.316 -16.763 4 48.50 2006.50 46.50 1.316 -17.058 4 49.00 2006.50 46.50 1.316 -17.358 4 ----- Critical Circle After the current mode of search ----- x: 48.50 y: 2006.00 Radius: 46.000 Factor of safety: 1.315 Side force inclination: -17.153 R UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates rime and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - Circular) TABLE N0. 31 xxxrrrr rrrrn xarrx n xxxnrr xrrnnnrrxn rr nx xxrrnx x nnrrnaxxxxnrrnxn :,?UTPUTn FORxI Err1.AUTOMATICrr SEARCHxWITHrrCIRCLES x*rr ------- Output for Circles with a Given, Constant Radius ------ ------- Radius: 46.00 3-Stage Center Coordinates Factor side Force of Inclination x v Radius safety (degrees) iterations 33.50 1991.00 46.00 Center rejected as follows: 48.50 1991.00 46.00 Center rejected as follows: iterations 63.50 1991.00 46.00 Center rejected as follows iterations 33.50 2006.00 46.00 Center rejected as follows: Messages UTEXAS NOTICE NUMBER 8060 circle does not intersect the slope. UTEXAS ERROR NUMBER 9270 solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations UTEXAS ERROR NUMBER 9270 Solution did not Converge in iteration limit of 100 Failed to converge during stage 1 computations UTEXAS NOTICE NUMBER 8060 circle does not intersect the slope. 63.50 2006.00 46.00 2.406 -18.440 1 33.50 2021.00 46.00 4.542 -8.697 1 48.50 2021.00 46.00 Center rejected as follows: 63.50 2021.00 46.00 Center rejected as follows UTEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. UTEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. - - - - - - New 9-Point Grid (only new points calculated) - 46.00 2003.50 46.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 Solution did not converge in iteration limit of 100 iterations Failed to converge during stage 1 computations 48.50 2003.50 46.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 solution did not converge in iteration limit of 100 iterations Failed to converge during stage 1 computations 51.00 2003.50 46.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 solution did not converge in iteration limit of 100 iterations Failed to converge during stage 1 computations 46.00 2006.00 46.00 1.327 -15.745 4 51.00 2006.00 46.00 1.332 -18.746 4 46.00 2008.50 46.00 1.420 -16.817 4 48.50 2008.50 46.00 1.434 -18.730 4 51.00 2008.50 46.00 1.490 -20.871 4 - - - - New 9-Point Grid (only new points calculated) - 47.00 2004.50 46.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 solution did not converge in iteration limit of 100 iterations Failed to converge during stage 1 computations 48.50 2004.50 46.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 iterations solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations 50.00 2004.50 46.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 solution did not converge in iteration limit of 100 iterations Failed to converge during stage 1 computations 47.00 2006.00 46.00 1.320 -16.283 4 50.00 2006.00 46.00 1.321 -18.081 4 47.00 2007.50 46.00 Center rejected as follows: UTExAS ERROR NUMBER 9270 iterations solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations 48.50 2007.50 46.00 center rejected as follows: UTEXAS ERROR NUMBER 9270 iterations solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations 50.00 2007.50 46.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 iterations solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations New 9-Point Grid (only new points calculated) - 48.00 2005.50 46.00 2.861 -16.765 4 48.50 2005.50 46.00 2.851 -16.809 4 49.00 2005.50 46.00 2.864 -16.889 4 48.00 2006.00 46.00 1.316 -16.854 4 49.00 2006.00 46.00 1.316 -17.456 4 ' 48.00 2006.50 46.00 1.326 -17.190 4 48.50 2006.50 46.00 1.327 -17.509 4 49.00 2006.50 46.00 1.329 -17.832 4 ----- Critical Circle After the current mode of Search ----- x: 48.50 v: 2006.00 Radius: 46.000 Factor of safety: 1.315 side force inclination: -17 153 . UTExAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_R Bank\Anal sis\Dill b i emoval\Engineering\River y s oro_R verBank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - Circular) TABLE N0. 33 trtr4 Y #Y4R4#tr4Y##Yd##YtrR 4dYY##4Y4#YY4*###44 " 3-STAGE FINAL CRITICAL CIRCLE INFORMATION ° 44 Ytr44##Y44YYY*##*#d##Ytr 444Yd44Y4R4#di x coordinate of center ' Y coordinate of Center 2006.00 . . . . . . . . . . . . Radius . 46.00 Factor of Safety . . . . . . . . . . . . 1.315 Side Force inclination (degrees) . . -17.15 Number of Circles Tried . . . . . . . 129 Number of Circles F calculated for 101 Time Required for search (seconds) . . . . . . . 1.2 UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Di 11 sboro_Dam_Removal\Engineering\River Bank\Anal sis\Dillsb Ri k y oro_ verean _Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - Circular) TABLE NO. 43 111111111111111111111111111111111111111111111111111111111111 1 coordinate, weight, Strength and Pore water Pressure 1 1 Information for Individual slices for conventional 1 1 Computations or First stage of multi-stage computations. 1 1 (Information is for the critical shear surface in the 1 1 case of an automatic search.) 1 111111111111111111111111111111111111111111111111111111111111 Slice Slice Matl. Friction Pore No. x y weight No. cohesion Angle 11.26 1979.00 Pressure 1 11.99 1978.04 161 4 100.0 32 00 0 0 . 12.72 1977.09 . 2 13.50 1976.17 508 4 100.0 32 00 0 0 . 14.28 1975.26 . 3 14.40 1975.13 103 4 100.0 32.00 14.51 1975.00 0.0 4 15.35 1974.13 924 3 0.0 25 00 0 0 . 16.18 1973.26 . 5 17.06 1972.44 1294 3 0.0 25 00 0 0 . 17.94 1971.62 . 6 18.37 1971.25 737 3 0.0 25.00 0 0 18.79 1970.88 . 7 19.73 1970.13 1864 2 0 0 25 00 52 9 ' . . 20.67 1969.37 . 8 21.65 1968.67 2270 2 0 0 25 00 155 7 . . 22.63 1967.97 . 9 22.81 1967.84 470 2 0 0 25 00 214 7 . . 23.00 1967.71 . 10 24.02 1967.07 2506 2 0.0 25.00 25.04 1966.43 270.1 ' 11 26.02 1965.88 2231 2 0.0 25 00 356 8 . 27.00 1965.33 . 12 28.08 1964.80 2232 2 0.0 25 00 437 4 . 29.16 1964.26 . 13 29.58 1964.07 806 2 0.0 25.00 491 9 30.00 1963.88 . 14 31.11 1963.43 2098 2 0 0 25 00 534 8 ' . . 32.23 1962.97 . 15 33.37 1962.58 2158 2 0 0 25 00 588 0 . . 34.50 1962.18 . 16 35.66 1961.84 2177 2 0.0 25 00 7 633 . 36.82 1961.51 . ' 17 37 91 1961 25 200 . . 9 2 0.0 25.00 39.00 1960.99 670.8 18 40.18 1960.77 2093 2 0.0 25.00 700 5 41.37 1960.56 . 19 41.41 1960.55 77 2 0.0 25.00 714 5 41.46 1960.54 . 20 41.73 1960.50 461 5 0.0 45.00 717 5 42.00 1960.46 . 21 43.20 1960.32 1913 5 0.0 45.00 728 7 44.39 1960.18 . 22 45.59 1960.11 1699 5 0.0 45.00 742 1 46.80 1960.03 . 23 47.65 1960.02 1049 5 0.0 45.00 747 8 ' 48.50 1960.00 . 24 49.70 1960.03 1230 5 0.0 45.00 746 8 50.91 1960.06 . 25 51.70 1960.12 637 5 0.0 45.00 741 4 52.50 1960.17 . 26 53.70 1960.31 661 5 0.0 45.00 729.4 54.89 1960.45 27 56.08 1960.64 274 5 0.0 45.00 708 6 57.27 1960.84 . 28 57.48 1960.88 6 5 0.0 45.00 693 6 57.68 1960.93 . t UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates ' Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River sank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - Circular) ' TABLE No. 44 1111111111111111111111111111111111111111111111111111111111 1 Seismic Forces and Forces Due to Distributed Loads for 1 1 Individual Slices for Conventional Computations or the 1 1 First stage of multi-stage Computations. 1 1 (Information is for the critical shear surface in the 1 1 case of an automatic search.) 1 1111111111111111111111111111111111111111111111111111111111 FORCES DUE TO DISTRIBUTED LOADS Y for Slices seismic seismic Normal shear No, x Force Force Force Force x Y ' 1 11.99 0 1978.52 0 0 11.99 1978.04 2 13.50 0 1977.59 0 0 13.50 1976.17 3 14.40 0 1977.06 0 0 14.40 1975.13 4 15.35 0 1976.59 0 0 15.35 1974.13 5 17.06 0 1975.77 0 0 17.06 1972.44 6 18.37 0 1975.18 0 0 18.37 1971.25 7 19.73 0 1974.61 0 0 19.73 1970.13 8 21.65 0 1973.85 0 0 21.65 1968 67 9 22.81 0 1973.43 0 0 22.81 . 1967.84 10 24.02 0 1972.51 0 0 24.02 1967.07 11 26.02 0 1970.88 0 0 26.02 1965.88 12 28.08 0 1969.31 0 0 28.08 1964.80 13 29.58 0 1968.23 0 0 29.58 1964 07 ' 14 31.11 0 1967.52 67 0 31.49 . 1971.41 15 33.37 0 1966.68 206 0 33.49 1970.60 16 35.66 0 1965.87 352 0 35.74 1969.70 17 37.91 0 1965.12 464 0 37.96 1968.82 18 40.18 0 1964.39 648 0 40.23 1967.91 19 41.41 0 1963.99 27 0 41.41 1967.43 20 41.73 0 1963.91 171 0 41.73 1967 31 ' 21 43.20 0 1963.52 849 0 43.23 . 1966 71 22 45.59 0 1962.94 1008 0 45.62 . 1965 75 23 47.65 0 1962.48 809 0 47.66 . 1964.94 24 49.70 0 1962.08 1275 0 49.73 1964 11 25 51.70 0 1961.72 929 0 51.71 . 1963 31 26 53.70 0 1961.42 1524 0 27 56.08 0 1961.11 1665 0 53.72 56.10 . 1962.51 1961 56 28 57.48 0 1960.95 307 0 l 57.48 . 1961.01 UTExAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal Bank\Analysis\Dillsboro_Riversank_Riprap_Drawdown_Deep.dat \Engineering\River Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - circular) TABLE NO. 47 11111111111111111111111111111111111111111111111111111111111111 1 Information for the iterative solution for the Factor of 1 1 Safety and side Force Inclination by Spencer's Procedure 1 1 of multi-Stage computations 1 1 Sta1gge11111111111111111111111 111111 11111111111111111111111111111111 Allowable force imbalance for convergence: 3.4649e-001 Allowable moment imbalance for convergence: 11 Trial Trial Factor side Force Force moment Delta Iter- of Inclination imbalance imbalance Delta-F Theta ation safety (degrees) (lbs.) (ft.-lbs.) (degrees) 1 3.00000 -17.1887 -3.957e+003 7.445e+006 First-order corrections to F and Theta ............ -2.3990 0 5465 Reduced values - Deltas were too large -0.5000 . 0.1139 2 2.50000 -17.0748 -2.960e+003 5.567e+006 First-order corrections to F and Theta ............ -1 2468 0 6996 . Reduced values - Deltas were too large ............ -0.5000 . 0.2805 3 2.00000 -16.7943 -1.458e+003 2.736e+006 First-order corrections to F and Theta ............ -0.4175 1.2253 second-order corrections to F and Theta ........... -0.4480 4.5946 Reduced values - Deltas were too large ............ -0.2793 2.8648 4 1.72065 -13.9295 -6.059e+002 1.150e+006 First-order corrections to F and Theta ............ -0.1565 1.3404 Second-order corrections to F and Theta ........... -0.1903 3.1713 Reduced values - Deltas were too large ............ -0.1719 2.8648 5 1.54873 -11.0647 -5.972e+001 1.143e+005 First-order corrections to F and Theta ............ -0.0181 0.3441 second-order corrections to F and Theta ........... -0.0188 0.3837 6 1.52991 -10.6810 9.762e-003 -1.874e+001 First-order corrections to F and Theta ............ 0.0000 -0.0001 Second-order corrections to F and Theta ........... 0.0000 -0.0001 7 1.52992 -10.6810 1.933e-012 -9.313e-010 First-order corrections to F and Theta ............ 0.0000 -0.0000 uTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Rank\AnalysiS\Dillsboro_Rivereank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River sank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - circular) TABLE NO. 48 22222222222222222222222222222222222222222222222222222222222 2 Detailed information from Evaluation of Shear Strengths 2 2 for stage 2 - Information is only Given for slices with 2 2 Two-Stage shear Strengths (Strength options 6 and 7). 2 2 (information is for the critical shear surface in the 2 2 case of an automatic search.) 2 22222222222222222222222222222222222222222222222222222222222 Effective Normal Shear Slice stress at stress at strength Strength Kc Kf No. Consol. Consol. (KC = 1) (KC = Kf) 7 696.1 212.2 726.2 324.6 1.835 2.464 8 758.7 231.2 746.5 353.8 1.835 2.464 9 796.6 242.8 758.8 371.4 1.835 2.464 10 739.9 225.5 740.4 345.0 1.835 2.464 11 609.4 185.7 698.0 284.2 1.835 2.464 12 468.4 142.8 652.2 218.4 1.835 2.464 13 362.9 110.6 617.9 169.2 1.835 2.464 14 345.3 105.2 612.2 161.0 1.835 2.464 15 370.3 112.9 620.3 172.7 1.835 2.464 16 391.3 119.3 627.1 182.5 1.835 2.464 17 407.3 124.1 632.3 189.9 1.835 2.464 18 418.3 127.5 635.9 195.1 1.835 2.464 19 422.9 128.9 637.4 197.2 1.835 2.464 r uTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River sank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - Circular) TABLE NO. 49 222222222222222222222222222222222222222222222222222222222 2 Coordinate, weight, strength and Pore water Pressure 2 2 Information for Individual slices for Second 2 2 Stage of Multi-Stage Computations. 2 2 (information is for the critical shear surface in the 2 2 case of an automatic search.) 2 222222222222222222222222222222222222222222222222222222222 Slice Slice Matl. Friction Pore No. x y weight No. cohesion Angle Pressure 11.26 1979.00 1 11.99 1978.04 161 4 100.0 32.00 0.0 12.72 1977.09 2 13.50 1976.17 508 4 100.0 32.00 0.0 14.28 1975.26 3 14.40 1975.13 103 4 100.0 32.00 0.0 14.51 1975.00 4 15.35 1974.13 924 3 0.0 25.00 0.0 16.18 1973.26 5 17.06 1972.44 1294 3 0.0 25.00 0.0 17.94 1971.62 6 18.37 1971.25 737 3 0.0 25.00 0.0 18.79 1970.88 7 19.73 1970.13 1864 2 497.2 0.00 0.0 20.67 1969.37 8 21.65 1968.67 2270 2 522.6 0.00 0.0 22.63 1967.97 9 22.81 1967.84 470 2 538.0 0.00 0.0 23.00 1967.71 10 24.02 1967.07 2506 2 515.0 0.00 0.0 25.04 1966.43 11 26.02 1965.88 2231 2 462.0 0.00 0.0 27.00 1965.33 12 28.08 1964.80 2232 2 404.9 0.00 0.0 29.16 1964.26 13 29.58 1964.07 806 2 362.1 0.00 0.0 30.00 1963.88 14 31.11 1963.43 2098 2 354.9 0.00 0.0 32.23 1962.97 15 33.37 1962.58 2158 2 365.1 0.00 0.0 1 e 34.50 1962 18 . 16 35.66 1961 .84 2177 2 373 6 0 00 0 0 . . 36.82 1961.51 . 17 37.91 1961.25 2009 2 380.1 0.00 0 0 39.00 1960.99 . 18 40.18 1960.77 2093 2 384.6 0 00 0 0 . 41.37 1960.56 . 19 41.41 1960.55 77 2 386.4 0.00 0 0 41.46 1960.54 . 20 41.73 1960.50 461 5 0.0 45 00 155 9 . 42.00 1960.46 . 21 43.20 1960.32 1913 5 0.0 45 00 167 1 . 44.39 1960.18 . 22 45.59 1960.11 1699 5 0.0 45 00 180 5 . 46.80 1960.03 . 23 47.65 1960.02 1049 5 0.0 45.00 186 2 48.50 1960.00 24 49.70 1960.03 1230 5 0.0 45.00 . 185 2 50.91 1960.06 . 25 51.70 1960.12 637 5 0.0 45 00 179 8 . 52.50 1960.17 . 26 53.70 1960.31 661 5 0.0 45 00 167 8 . 54.89 1960.45 . 27 56.08 1960.64 274 5 0 0 45 00 147 0 . . 57.27 1960.84 . 28 57.48 1960.88 6 5 0.0 45.00 132 0 57.68 1960.93 r . UTEXAS4 s/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal Bank\Analysis\Dillsboro Ri s k i \Engineering\River _ ver an _R prap_Drawdown_Deep.dat ' Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope Stability Analysis (Spencer - Circular) TABLE NO. 50 222222222222222222222222222222222222222222222222222222222222222222222 2 seismic Forces and Forces Due to Distributed Loads for Individual 2 ' 2 slices for the Second Stage of multi-Stage computations 2 . 2 (Information is for the critical shear surface in the 2 2 case of an automatic search.) 222222222222222222222222222222222222222222222222222222222222222222222 FORCES DUE TO DISTRIBUTED Y for Slices seismic Seismic Normal Shear LOADS No. x Force Force Force Force x y 1 11.99 0 1978.52 0 0 11.99 2 1978.04 13.50 0 1977.59 0 0 13.50 3 14 40 1976.17 . 0 1977.06 0 0 1440 . 4 15.35 0 1976 59 0 1975.13 . 0 15 .35 5 17.06 0 1975.77 0 0 17.06 1974.13 1972 44 6 18.37 0 1975.18 0 0 18.37 . 1971 25 7 19.73 0 1974.61 0 0 19.73 8 . 1970.13 21.65 0 1973.85 0 0 21.65 9 22 81 1968.67 . 0 1973.43 0 0 22.81 10 24 02 0 1967.84 . 1972.51 0 0 24.02 11 26.02 0 1970 88 0 1967.07 ' . 0 26.02 12 28.08 0 1969.31 0 0 28.08 1965.88 1964 80 13 29.58 0 1968.23 0 0 29.58 14 31 11 0 . 1964.07 . 1967.52 0 0 31.11 15 33.37 0 1966 68 0 0 3 1963.43 . 3.37 16 35.66 0 1965.87 0 0 35 66 1962.58 1961 84 . 17 37.91 0 1965.12 0 0 37.91 18 40 18 . 1961.25 ' . 0 1964.39 0 0 40.18 19 41.41 0 1963 99 0 1960.77 . 0 41.41 20 41.73 0 1963.91 0 0 41 73 1960.55 1960 50 . 21 43.20 0 1963.52 0 0 43 20 . 1960 32 . 22 45.59 0 1962.94 0 0 45.59 23 47 65 . 1960.11 . 0 1962.48 0 0 47.65 24 49 70 0 1960.02 . 1962.08 0 0 49.70 25 51.70 0 1961 72 0 1960.03 ' . 0 51.70 26 53.70 0 1961.42 77 0 54 10 1960.12 1962 36 . 27 56.08 0 1961.11 229 0 56.21 28 . 1961.52 57.48 0 1960.95 56 0 57.48 1961.01 UTExAS4 s/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Nam f i d e o nput ata file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\ Bank\Anal sis\oill b i Engineering\River y s orO_R versank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - circular) TABLE NO. 51 22222222222222222222222222222222222222222222222222222222222222 2 Information for the iterative Solution for the Factor of 2 2 safety and side Force Inclination by Spencer's Procedure 2 2 Second Stage of Multi-stage Computations 2 22222222222222222222222222222222 ' 222222222222222222222222222222 Allowable force imbalance for convergence: 3.4649e-001 Allowable moment imbalance for convergence: 11 Trial Trial Factor side Force Force Moment Delta Iter- of inclination Imbalance Imbalance Delta-F Theta ation Safety (degrees) (lbs.) (ft.-lbs.) (degrees) ' 1 3.00000 -17.1887 -6.051e+003 1.142e+007 First-order corrections to F and Theta -2 6697 0 . - .0331 Reduced values - Deltas were too large -0.5000 -0.0062 2 2.50000 -17.1949 -4.684e+003 8.838e+006 First-order corrections to F and Theta ............ -1.4192 -0.0434 1 1 Reduced values - Deltas were too large ............ -0.5000 -0.0153 3 2.00000 -17.2102 -2.602e+003 4.911e+006 First-order corrections to F and Theta ............ -0.4944 -0 0759 second-order corrections to F and Theta ........... -0.4041 . -0.3049 4 1.59588 -17.5151 1.266e+002 -2.371e+005 First-order corrections to F and Theta ............ 0.0329 -1 4049 Second-order corrections to F and Theta ........... 0.0232 . -0.6230 5 1.61904 -18.1381 -3.469e-002 6.531e+001 First-order corrections to F and Theta ............ -0.0000 -0 0001 Second-order corrections to F and Theta ........... -0.0000 . -0.0001 6 1.61904 -18.1382 7.674e-013 2.328e-010 First-order corrections to F and Theta ............ 0.0000 -0.0000 uTExAS4 s/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/200 3 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_ Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Rivereank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - Circular) TABLE N0. 52 33333333333333333333333333333333333333333333333333333333333 3 Detailed Information from Evaluation of shear strengths 3 3 for stage 3 - Information is only Given for slices with 3 3 Two-stage shear strengths (strength options 8 and 9). 3 3 (Information is for the critical shear surface in the 3 3 case of an automatic search.) 33333333333333333333333333333333333333333333333333333333333 Effective Normal stress undrained Drained slice at End of Shear shear Strength No. Second Stage Strength strength used 7 617.7 497.2 288.0 Drained 8 681.7 522.6 317.9 Drained 9 721.4 538.0 336.4 Drained 10 669.6 515.0 312.2 Drained 11 548.0 462.0 255.5 Drained 12 416.3 404.9 194.1 Drained 13 317.4 362.1 148.0 Drained 14 349.1 354.9 162.8 Drained 15 469.6 365.1 219.0 Drained 16 586.8 373.6 273.6 Drained 17 696.2 380.1 324.6 Drained 18 726.7 384.6 338.9 Drained 19 704.6 386.4 328.5 Drained f uTExA54 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River eank\Analysis\Dillsboro_Rivereank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope stability Analysis (Spencer - Circular) TABLE NO. 53 333333333333333333333333333333333333333333333333333333333 3 coordinate, weight, strength and Pore water Pressure 3 3 Information for Individual Slices for Third 3 3 Stage of multi-stage computations. 3 3 (Information is for the critical shear surface in the 3 3 case of an automatic search.) 3 333333333333333333333333333333333333333333333333333333333 slice slice Matl. Friction Pore No, x v weight No. Cohesion Angle Pressure 11 26 1979 .. 00 1 11.99 1978.04 161 4 100.0 32 00 0 0 . 12.72 1977.09 . 2 13.50 1976.17 508 4 100.0 32.00 0 0 14.28 1975.26 . 3 14.40 1975.13 103 4 100.0 32.00 0 0 14.51 1975.00 . 4 15.35 1974.13 924 3 0.0 25.00 0 0 16.18 1973.26 . 5 17.06 1972.44 1294 3 0.0 25.00 0 0 17.94 1971.62 . 6 18.37 1971.25 737 3 0.0 25 00 0 0 . 18.79 1970.88 . 7 19.73 1970.13 1864 2 0.0 25 00 52 9 . 20.67 1969.37 . 8 21.65 1968.67 2270 2 0.0 25 00 155 7 . 22.63 1967.97 . 9 22.81 1967.84 470 2 0.0 25 00 214 7 . 23.00 1967.71 . 10 24.02 1967.07 2506 2 0.0 25 00 270 1 . 25.04 1966.43 . 11 26.02 1965.88 2231 2 0.0 25 00 356 8 . 27.00 1965.33 . 12 28.08 1964.80 2232 2 0.0 25 00 437 4 . 29.16 1964.26 . 13 29.58 1964.07 806 2 0.0 25 00 491 9 . 30.00 1963.88 . 14 31.11 1963.43 2098 2 0.0 25.00 465 3 32.23 1962.97 15 33.37 1962.58 2158 2 0.0 25 00 . 377 9 . 34.50 1962.18 . 16 35.66 1961.84 2177 2 0.0 25.00 280 5 36.82 1961.51 . 17 37.91 1961.25 2009 2 0.0 25.00 177.3 1 L I I 1 FA l 39.00 1960.99 18 40.18 1960.77 2093 2 0.0 25.00 138.9 41.37 1960.56 19 41.41 1960.55 77 2 0.0 25.00 152.9 41.46 1960.54 20 41.73 1960.50 461 5 0.0 45.00 155.9 42.00 1960.46 21 43.20 1960.32 1913 5 0.0 45.00 167.1 44.39 1960.18 22 45.59 1960.11 1699 5 0.0 45.00 180.5 46.80 1960.03 23 47.65 1960.02 1049 5 0.0 45.00 186.2 48.50 1960.00 24 49.70 1960.03 1230 5 0.0 45.00 185.2 50.91 1960.06 25 51.70 1960.12 637 5 0.0 45.00 179.8 52.50 1960.17 26 53.70 1960.31 661 5 0.0 45.00 167.8 54.89 1960.45 27 56.08 1960.64 274 5 0.0 45.00 147.0 57.27 1960.84 28 57.48 1960.88 6 5 0.0 45.00 132.0 57.68 1960.93 r UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Rivereank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope Stability Analysis (spencer - Circular) TABLE No. 54 33333333333333333333333333333333333333333333333333333333333333 3 Information for the iterative Solution for the Factor of 3 3 Safety and side Force Inclination by Spencer's Procedure 3 3 Third Stage of Multi-stagge Computations 3 33333333333333333333333333333333333333333333333333333333333333 Allowable force imbalance for convergence: 3.4649e-001 Allowable moment imbalance for convergence: 11 Trial Trial Factor Side Force Force Moment Delta iter- of Inclination Imbalance Imbalance Delta-F Theta ation safety (degrees) (lbs.) (ft.-lbs.) (degrees) 1 1.61904 -18.1382 -2.437e+003 4.574e+006 First-order corrections to F and Theta ............ .0.3637 0.0963 Second-order corrections to F and Theta ........... -0.3064 0.4007 2 1.31268 -17.7375 1.084e+002 -2.056e+005 First-order corrections to F and Theta ............ -0.0023 0.9642 second-order corrections to F and Theta ........... 0.0029 0.5770 3 1.31555 -17.1605 -3.948e-002 5.454e+001 First-order corrections to F and Theta ............ -0.0001 0.0076 second-order corrections to F and Theta ........... -0.0001 0.0076 4 1.31545 -17.1529 -1.460e-008 2.000e-005 First-order corrections to F and Theta ............ -0.0000 0.0000 f UTExAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Rivereank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank With Riprap - Rapid Drawdown Slope Stability Analysis (Spencer - Circular) TABLE N0. 55 b4#ARA4bA#4R#4R#4Rtr4b4tr##A#bb#dA#b4##d4AA4R4AR4d4#4RR#A A Check of Computations by Spencer's Procedure (Results are for the • critical shear surface in the case of an automatic search.) Summation of Horizontal Forces: 4.06075e-012 summation of vertical Forces: Z.30216e-012 summation of moments: 1.25146e-009 Mohr Coulomb Shear Force/Shear strength Check Summation: 2.01794e-012 ** CAUTION * *** Forces Between Slices are NEGATIVE at Points Along the UPPER one-half of the shear Surface - A Tension crack may Be Needed * CAUTION ***** Some of the Forces Between Slices Act at Points Above the surface of the slope or Below the Shear Surface - Either a Tension crack may be Needed or the SOLUTION MAY NOT BE A VALID SOLUTION r UTEXA54 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_Drawdown_Deep.dat Dillsboro Dam - River Bank with Riprap - Rapid Drawdown slope Stability Analysis (spencer - Circular) TA LE *o? 58 #A*4ddYdtrtr*b#AAA4##4trtrtrtrd*#AdY44trtrA##Adddd*b4#*##Y#d#A#dd#dddd#d R Final Results for stresses Along the shear surface * (Results are for the critical shear surface in the case of a search.) b#4#RRR#Ytr#A##RAR4##4tr#d#4A4RY4#Y4YAAR*4dtr*trtr#trYb#AA##Rd#YtrtrtrtrtrA##*#bA##* SPENCER'S PROCEDURE USED TO COMPUTE THE FACTOR OF SAFETY Factor of Safety: 1 .315 Side Force Inclination: -17. 15 -------- VAL UES AT CENTER OF BASE OF SLICE ------ -- Total Effective ' Slice Normal Normal Shear No. x-Center Y-Center Stress Stress Stress 1 11.99 1978.04 18.2 18.2 84.7 2 13.50 1976.17 146.4 146.4 145.6 3 1440 . 1975.13 223.9 223.9 182.4 4 15 .35 1974.13 350.4 350.4 124.2 5 17.06 1972.44 487.1 487.1 172.7 6 18.37 1971.25 590.3 590.3 209.3 7 19.73 1970.13 704.2 651.3 230.9 8 21.65 1968.67 865.6 709.9 251.7 9 22.81 1967.84 961.2 746.5 264.6 10 24.02 1967.07 963.4 693.3 245.8 1 11 26.02 1965.88 926.4 569.5 201.9 12 28.08 1964.80 872.0 434.7 154.1 13 29.58 1964.07 824.9 333.0 118.0 14 31.11 1963.43 824.5 359.2 127.3 15 33.37 1962.58 850.7 472.8 167.6 16 17 35.66 37.91 1961.84 1961.25 867.3 586.8 873.8 696.5 208.0 246.9 18 40.18 1960.77 866.6 727.7 258.0 19 41.41 1960.55 857.2 704.3 249.7 20 41.73 1960.50 899.9 744.0 565.6 21 43.20 1960.32 871.8 704.7 535.7 22 45.59 1960.11 808.1 627.6 477.1 23 24 47.65 49.70 1960.02 1960.03 731.8 545.6 628.9 443.7 414.7 337.3 ' 25 51.70 1960.12 504.2 324.4 246.6 26 53.70 1960.31 397.7 229.9 174.8 27 56.08 1960.64 277.2 130.2 99.0 28 57.48 1960.88 188.5 56.5 43.0 1 i UTEXA54 S/N:00136 Licensed for use by Time and date of ru Name of input data Bank\Analysis\Dills - version: 4.0.1.5 - Latest Revision: : f, Devine Tarbell & Associates n: wed Jun 10 09:20:30 2009 file: P:\Duke_Energy\024.0029_Dillsbo boro_RiverBank_Riprap_Drawdown_Deep.d 2/15/2003 ro_Dam_Removal\Engineering\River at Dillsbo ro Dam - Riv er Bank with Riprap - Rapid Drawdown slope Stability Ana TABLE NNOp 12. ddrt### lysis (Spencer - Circular) *##*RxxAAd*rtrt###xRdA*AddrttrAtrAARxxAddtr AtrtrdR#dAA*d rtrt###R rt Final x (Resu tr#trx#xd Results for lts are for dddxrtrt#x##Ad Side Forces the critical dtrAAdArtrt*RAAR and Stresses Between slices shear surface in the case of a sear AddArtd####AR*dAA*dd***R*A4drt###*trxR ch.) AAdrtrt# _ --- --- VALUES AT RIGHT SIDE OF SLICE --- ----------- - 1 Y-Coord. of Fraction Sigma Sigma Slice side side Force of at at No. x-Right Force Location Height Top Bottom 1 2 12.72 14.28 -93 -50 1977.82 0.382 1978.53 0.874 -13.6 -41.8 -79.7 16.0 ' 3 14.51 -35 1979.97 Above -45.4 28.8 4 16.18 385 1973.37 0.018 -121.1 249.4 5 17.94 907 1972.45 0.113 -155.4 390.1 6 18.79 1176 1971.94 0.131 -168.2 445.0 7 20.67 1833 1970.81 0.150 -200.3 564.1 8 9 22.63 23.00 2592 2741 1969.67 0.155 1969.46 0.155 -240.8 -248.9 689.7 713.1 10 25.04 3509 1968.38 0.185 -284.2 921.2 11 12 27.00 29.16 4161 4789 1967.43 0.217 1966.46 0.256 -287.8 -247.1 1110.3 1313.9 13 30.00 5013 1966.10 0.273 -213.3 1393.7 14 32.23 5501 1965.21 0.274 -228.6 1521.0 15 16 34.50 36.82 5808 5915 1964.38 0.275 1963.63 0.273 -243.5 -262.5 1627.9 1718.2 ' 17 18 39.00 41.37 5823 5579 1962.99 0.270 1962.34 0.258 -287.6 -347.5 1789.8 1893.5 19 41.46 5568 1962.31 0.258 -351.0 1898.8 20 42.00 5323 1962.23 0.262 -323.5 1833.2 21 44.39 4235 1961.88 0.280 -212.6 1548.4 22 23 46.80 48.50 3164 2448 1961.62 0.302 1961.48 0.322 -109.3 -35.3 1261.0 1052.5 ' 24 50.91 1557 1961.35 0.361 69.2 763.5 25 52.50 1088 1961.29 0.394 134.9 600.6 26 54.89 507 1961.19 0.464 237.1 369.5 27 57.27 57 1960.99 0.602 349.9 84.7 28 57.68 0 1960.93 0.000 0.0 0.0 ' Read en End of d-of-file on input while looking for another command word. input data assumed - normal termination. 1 t 1 1 1 1 E N 6) c O J CL co a Y c cu co N m O O .Q N 0 O O O O N N ?r I- M d a) a) r, r 0 v rn 0 ai o 0 r Q c ca m m o? O o' o 0 CO) C' cc c g c cu m a) rn c a`' ) c. c _W ca >. 0 N c I E. ca of o. m co o p N I N O O It CM C) >, 2) i a) c w' a) O Y 0 0 -rn a a) E co c a) LL O 0) co co O O O O C) N r r ? M C) TABLE NO. 1 COMPUTER PROGRAM DESIGNATION: UTEXAS4 originally coded By Stephen G. Wright version No. 4.0.1.5 - Last Revision Date: 2/15/2003 (C) CopyrightA1985-2002 S. G. Wright - All rights reserved AAARY#xAbtr44ddxAY4YAA#dkYtr4Adbrt4bYYbARRrtbxbAAAA4babY4bgAArt##aabA * RESULTS OF COMPUTATIONS PERFORMED USING THIS SOFTWARE SHOULD NOT BE USED FOR DESIGN PURPOSES UNLESS THEY HAVE ° BEEN VERIFIED BY INDEPENDENT ANALYSES, EXPERIMENTAL DATA * OR FIELD EXPERIENCE. THE USER SHOULD UNDERSTAND THE ALGORITHMS ° ° AND ANALYTICAL PROCEDURES USED IN THIS SOFTWARE AND MUST HAVE * READ ALL DOCUMENTATION FOR THIS SOFTWARE BEFORE ATTEMPTING * TO USE IT. NEITHER SHINOAK SOFTWARE NOR STEPHEN G. WRIGHT ° MAKE OR ASSUME LIABILITY FOR ANY WARRANTIES, EXPRESSED OR * IMPLIED, CONCERNING THE ACCURACY, RELIABILITY, USEFULNESS ° OR ADAPTABILITY OF THIS SOFTWARE. AAAA4aad4xAAAa:4rtbxxtraaba##xbabaaa#bbxAA4x#rtbAAAbAaabaxaA4ba4ak#rta UTEXAS4 5/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: Wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029 Dillsboro Dam Removal\Engineering\River _ _ _ Bank\Analysis\Dillsboro_RiverBank_Riprap_LongTerm_Deep.dat l oro n e r e an k with Riprap - Lon -Term li s ope slope Stability A Anaalysis (Spencer - Circular) aa x x * * b IABLAE N40n < ea * NEW PROFILE LINE DATA 4AAbbRartb#AxA44R#kdd##4AA ' _____ - Profile Line No. 1 _-Material Type (Number): 1 _____ - - Description: Partially weathered Rock - Saturated Point X Y 1 0.00 1962.00 2 42.00 1960.00 3 100.00 1960.00 ---------------------------------------------------------- ----- Profile Line No. 2 - Material Type (Number): 2 ----- ----------------------------------------------------- oescription: Random Fill - saturated Point X Y 1 0.00 1963.00 2 39.00 1963.00 3 42.00 1960.00 ---------------------------------------------- -- Profile Line No. 3 - Material Type (Number): 3 ----- -------------------------------- -------------------------- Description: Random Fill - Moist Point x v ' 1 0.00 1975.00 2 27.00 1975.00 3 39.00 1963.00 ----------------------------------------------------------- ----- Profile Line No. 4 - Material Type (Number): 4 ----- ---------------------------------- I ------------------------ DescriptiOn: Road Bed Fill - Moist Point X Y 1 0.00 1979.00 2 23.00 1979.00 3 27.00 1975.00 ----------------------------------------- ----- Profile Line No. 5 - Material Type (Number): 5 ----- ------------------------------------- --------------------- Description: Riprap ' Point X Y 1 30.00 1972.00 2 60.00 1960.00 r UTEXAS4 S/N:00136 - Version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates ' Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_Longrerm_Oeep.dat Dillsboro Dam - River Bank with Riprap - Long-Term slope stability Analysis (spencer - Circular) 1 AABRa :4 AA44daA#R#dbAAddkk#44dAbY4AR#kdtra4bd #bxaAAA#YbAYA4k##Ybp4##xtr * NEW MATERIAL PROPERTY DATA - CONVENTIONAL/FIRST-STAGE COMPUTATIONS AAAaRbxxAAR#rtbtrAd#xAxtr44#b4A4rt#x4aAA##baAAdkYbAAAd#k#a4bAbrtbbb4AA4d#b4 ------------------------------------------------------------------ --------------------DATA FOR-MATERIAL-NUMBER-1-------------------- Description: Partially Weathered Rock - Saturated Unit weight of soil (material): 135.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS 1 Cohesion - - - - - - 1500.0 Friction angle - - - - - 35.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ---------------------------------------------- -- --------- DATA FOR MATERIAL NUMBER 2 ---------------------------------------------- oescription: Random Fill - saturated unit weight of soil (material): 115.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS Cohesion - - - - - - 0.0 Friction angle - - - - - 25.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ------------------------- ------------------- DATA ----------------------------------------- FOR MATERIAL NUMBER 3 ------------------- ------------------------ Description: Random Fill ------------------------------------------ - Moist unit weight of soil (mat erial): 108.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS Cohesion - - - - - - 0.0 Friction angle - - - - - Pore water pressures are 25.00 (degrees) defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ------------------------- ---------------- -- ------------------- DATA FOR MATERIAL NUMBER 4 ------------------- ------------------------------------------------------------------ Description: Road Bed Fill - Moist unit weight of soil (material): 115.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS Cohesion - - - - - - 100.0 Friction angle - - - - - 32.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. ------------------------------- ------------------- DATA FOR MATERIAL NUMBER 5 ------------------- __________________________________________________________________ Description: Riprap unit weight of soil (material): 125.0 CONVENTIONAL (ISOTROPIC) SHEAR STRENGTHS Cohesion--------0.0 Friction angle - - - - - 45.00 (degrees) Pore water pressures are defined by a piezometric line. Piezometric line number: 1 Negative pore water pressures are NOT allowed - set to zero. 4 UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_LongTerM-Deep.dat Dillsboro Dam - River Bank with Riprap - Long-Term Slope Stability Analysis (Spencer - Circular) TBLE N0. 6 IA aR#rt art x ####R###Rtr4##4trRRx44a4 x444x x4 aRA 4 4Ax4A4axR ° NEW PIEZOMETRIC LINE DATA - CONVENTIONAL/FIRST-STAGE COMPUTATIONS a #RA#aA##aaaAx4RxRxrtaart##xxrtrtrttrtr##tr##a#rtax####aaaAaRaaaxax4xaaaaRxaa4x --------------------------------------------------------- -------------- Piezometric -Line -Number - ---__-______------ unit weight of fluid (water): 62.4 Point x V 1 0.00 1963.00 2 100.00 1963.00 UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_LongTerm_Deep.dat oillsboro Dam - River Bank With Riprap - Lon Term slope stability Analysis (spencer - Circular) TABLE N0. 11 R YArt 4##4#RRaRaR4RaRR#AA#AR#A##RtrRRRRRARRRRRRRARYYYYAAY#trR#tr4RARAR#A ° NEW DISTRIBUTED LOAD DATA - CONVENTIONAL/FIRST-STAGE COMPUTATIONS ° #4xaRRAAY4#Y###RRAxRRRAR##YYR####4#A44RR#RARARYYYAYYAYR#A##R444RYRARR Normal shear Point x y Pressure Stress Distributed loads will be generated from piezometric line number 1 See Output Table number 27 i UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P!\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_LongTerm_Deep.dat Dillsboro Dam - River Bank with Riprap - Lon Term - Slope Stability Analysis (Spencer - circular? TABLE NO. 16 R#ARA#**##idAd4*rtrt#i#AAAAAiA * NEW ANALYSIS /COMPUTATION DATA RAA}A}##rtrtrtAAAiA}#A*#*##AfA#trrt*AA Starting Center Coordinate for search at - x: 42. 00 Y: 200 0.00 Required accuracy for critical center (= minimum spacing between grid points): 0.500 Critical shear surface not allowed to pass below Y: 1900.00 For the initial mode Of search circles are tangent to horizontal line at - Y: 1960.00 Radius: 40.00 Conventional (single-stage) computations will be performed. - -- - - - - - - -- -- - ------------------------------------------------------------------ The following represent default values or values that were prevously defined: subtended angle for slice subdivision: 3.00(degrees) Th re e is no c rack. There is no water in a crack. seismic coefficient: 0.000 unit weight of water (or other fluid) in crack: 62.4 Automatic search output will be in long form. Search will be continued after the initial mode to find a most critical circle. Maximum number of trial grids for a given search mode: 50 No restrictions exist on the lateral extent of the search. No shear surfaces other than the most critical will be saved for display later. Neither slope face was explicitly designated for analysis. standard sign convention used for direction of shear stress on shear surface. Procedure of Analysis: spencer 1 iteration limit: 100 Force imbalance: 1.000000e-005 (fraction of total weight) Moment imbalance: 1.0000OOe-005 (fraction of moment due to total weight) Minimum weight required for computations to be performed: 100 initial trial factor of safety: 3.000 Initial trial side force inclination: 17.189 (degrees) Minimum (most negative) side force inclination allowed in Spencer's procedure: -10.00 r UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riveraank_Riprap_LongTerm-Deep.dat Dillsboro Dam - River Bank with Riprap - Long-Term slope stability Analysis (spencer - circular) BLE NO. 26 IA 1 A *#rt##rtAdRA}**rt*AAAAARAR#rtArtidki#Atr NEW, COMPUTEDA SLOPE GEOMETRY DATA Artrt AAA#Rrtrtrt #i#Atr#*#rtAiA}#RAAArtrt# These slope geometry were generated from the Profile Lines. Point X Y 1 0.00 1979.00 ' 2 23.00 1979.00 3 27.00 1975.00 4 30.00 1972.00 5 39.00 1968.40 6 42.00 1967.20 7 60.00 1960.00 8 100.00 1960.00 f UTExAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Di 11 sborO_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_LongTerm_Deep.dat Dillsboro Dam- River Bank with Riprap - Long-Term slope Stability Analysis (Spencer - Circular) TABLE NO 27 ##AA#}A#rtAR*rtrtrti#RdtrrtrtAAd}#RrtrtiAdR#Art*#i9id rt#A#i#dA**rtAd}#Adrtrt#ii#AR ANEW DISTRIBUTED LOAD DATA - CONVENTIONAL/FIRST-STAGE COMPUTATIONS * *AAA*##i#ARRAArtrtA#d*ArtA##ARrt#rtrtAd#RrtArt##Atr#rtArt*###4A*rtrtA#k#}rtArtrtAiA 1 Normal Shear point x Y Pressure Stress 1 52.50 1963.00 0.0 0.0 2 60.00 1960.00 187.2 0.0 3 100.00 1960.00 187.2 0.0 The above data were generated automatically from piezometric line number 1. Search will be conducted for RIGHT face of slope UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 1 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_LongTerm_Deep.dat Dillsboro slope Stab Dam - River ility Analys Bank with Riprap - Lon9-Term is (Spencer - Circular) I"BOLE 40 A 30 ## ##4 4A###A#AA4#444 #AA4##R#4A##444 R 40UTPUTAFOR4TY PE#1 AUTOMATIC45ARCH WZTH#4CIRCLESA ° #A##44 AAA AAA# AAAA#44R### EA#444A##44###A## - output for circ ------ Tangent line el les Tangent to a Given Horizontal Line evation, v: 1960.00 -- center Coo rdinates 1-Stage Factor side Force of inclination x y Radius Safety (degrees) Iteratio ns Messages 27.00 iterations 1985.00 25.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 Solution did not converge in iteration limit of 1.00 Failed to converge during stage 1 computations ' 42.00 57.00 27.00 1985.00 1985.00 2000.00 25.00 2.158 -19.500 5 25.00 2.395 -15.788 4 40.00 Center rejected as follows: UTEXAS NOTICE NUMBER 8060 circle does not intersect he slope. 42.00 57.00 27.00 2000.00 2000.00 2015.00 40.00 2.149 -17.054 4 40.00 2.121 -21.093 5 55.00 Center rejected as follows: UTEXAS NOTICE NUMBER 8060 Circle does not intersect he slope. 42.00 57.00 - - - 72.00 2015.00 55.00 2.362 -15.259 4 2015.00 55.00 1.586 -21.435 9 New 9-Point Grid (only new points calculated) - - 2000.00 40.00 center rejected as follows: - - - - UTEXAS NOTICE NUMBER 8130 Circle intersects slope 2 entirely within the slope imes, but there is no segment 72.00 2015.00 55.00 center rejected as follows: UTEXAS NOTICE NUMBER 8130 circle intersects slope 2 entirely within the slope times, but there is no segment ' 42.00 2030.00 70.00 Center rejected as follows: UTEXAS NOTICE NUMBER 8060 circle does not intersect the slope. 57.00 72.00 42.00 2030.00 2030.00 New 9-Point 2045.00 70.00 1.574 -18.574 6 70.00 2.501 -26.080 6 Grid (only new points calculated) - 85.00 Center rejected as follows: TEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. ' 1 1 57.00 72.00 - - - 54.50 57.00 59.50 54.50 59.50 54.50 57.00 59.50 54.50 57.00 59.50 - - - - 54.50 57.00 59.50 - 52.00 54.50 57.00 52.00 52.00 52.00 54.50 57.00 - - - 52.00 54.50 57.00 49.50 52.00 54.50 49.50 54.50 49.50 52.00 54.50 - - - 49.50 52.00 54.50 iterations 2045.00 2045.00 New 9-Point 2027.50 2027.50 2027.50 2030.00 2030.00 2032.50 2032.50 2032.50 New 9-Point 2025.00 2025.00 2025.00 New 9-Point 2022.50 2022.50 2022.50 New 9-point 2020.00 2020.00 2020.00 2022.50 2025.00 New 9-Point 2017.50 2017.50 2017.50 New 9-Point 2015.00 2015.00 2015.00 New 9-Point 2012.50 2012.50 2012.50 2015.00 2015.00 2017.50 2017.50 2017.50 New 9-Point 2010.00 2010.00 2010.00 85.00 1.647 -16.612 6 85.00 1.883 -25.323 7 Grid (only new points calculated) - - 67.50 1.577 -17.731 6 67.50 1.567 -18.976 6 67.50 1.586 -20.440 6 70.00 1.589 -17.386 6 70.00 1.584 -19.956 6 72.50 1.603 -17.063 6 72.50 1.583 -18.195 6 72.50 .585 -19.504 6 Grid (only new points calculated) - 65.00 1.566 -18.103 6 65.00 1.562 -19.409 6 65.00 1.592 -20.939 9 Grid (only new points calculated) - - 62.50 1.556 -18.501 6 62.50 1.561 -19.871 8 62.50 1.603 -21.461 7 Grid (only new points calculated) - 60.00 1.564 -17.697 6 60.00 1.549 -18.926 8 60.00 1.564 -20.365 8 62.50 1.577 -17.336 6 65.00 1.591 -16.996 6 Grid (only new points calculated) - 57.50 1.553 -18.083 6 57.50 1.545 -19.380 12 57.50 1.571 -20.889 9 Grid (only new points calculated) - - 55.00 1.544 -18.495 8 55.00 1.545 -19.860 9 55.00 1.586 -21.435 9 Grid (only new points calculated) - 52.50 1.557 -17.656 6 52.50 1.539 -18.936 8 52.50 1.550 -20.370 7 55.00 1.569 -17.279 6 55.00 1.545 -19.860 9 57.50 1.583 -16.926 6 57.50 1.553 -18.083 6 57.50 1.545 -19.380 12 Grid (only new points calculated) - - - 50.00 1.547 -18.060 6 50.00 1.537 -19.408 7 50.00 center rejected as follows: - - - - - - - - - - - UTEXAS ERROR NUMBER 9270 Solution did not converge i teration limit of 100 Failed to converge during s tage 1 computations ' - - - - - - 49.50 New 9-Point 2007.50 Grid (only new points calculated) - 47.50 Center rejected as follows: UTEXAS ERROR NUMBER 9270 iterations Solution did not converge in iteration limit of 100 I 52.00 54.50 50.SO 52.00 53.50 50.50 iterations 2007.50 47.50 1.539 -19.911 7 2007.50 47.50 1.580 -21.469 14 New 9-Point Grid (only new points calculated) - 2008.50 48.50 1.537 -18.857 7 2008.50 48.50 1.538 -19.705 7 2008.50 48.50 1.552 -20.608 7 2010.00 50.00 Center rejected as follows: Failed to converge during stage 1 computations TEXAS ERROR NUMBER 9270 solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations ' 53.50 2010.00 50.00 1.546 -20.286 7 50.50 2011.50 51.50 1.544 -18.320 8 52.00 2011.50 51.50 1.537 -19.121 7 53.50 2011.50 51.50 1.542 -19.977 7 New 9-Point Grid (only new points calculated) - 51.50 2009.50 49.50 1.536 -19.223 7 52.00 2009.50 49.50 1.537 -19.506 7 52.50 2009.50 49.50 1.539 -19.795 7 51.50 2010.00 50.00 1.536 -19.128 7 52.50 2010.00 50.00 1.538 -19.694 7 51.50 2010.50 50.50 1.537 -19.034 7 52.00 2010.50 50.50 1.537 -19.311 7 52.50 2010.50 50.50 1.538 -19.593 7 - - - New 9-Point Grid (only new points calculated) - - 51.00 2009.00 49.00 1.536 -19.040 7 51.50 2009.00 49.00 1.536 -19.320 7 52.00 2009.00 49.00 1.537 -19.605 7 51.00 2009.50 49.50 1.537 -18.946 7 51.00 2010.00 50.00 1.538 -18.853 8 New 9-Point Grid (only new points calculated) - 51.00 2008.50 48.50 1.536 -19.135 7 51.50 2008.50 48.50 1.536 -19.418 7 ----- critical Circle After the Current mode of search ----- X: 51.50 Y: 2009.00 Radius: 49.000 Factor of safety: 1.536 Side force inclination: -19.320 R - - UTExAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy1024.0029_Dillsboro_Darn_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_LongTerm_Deep.dat ' Dillsboro D slope stabi am - River Bank with Riprap - Long-Term lity Analysis (Spencer - Circular) TABLE NxBe4: rt : x xx ##4 rtrt4# # OUTPUT FO #4x>##4x4 4 x x 4## xxrt##4x #rt4 44#rt44x4rt#x4x R TYPE 1 AUTOMATIC SEARCH WITH ##x44#R#44R###4xRrt###A4##444A4*CIRCLES* x4#rt###A - outp ------ Radi ut for circl us: 49.00 es with a Given, Constant Radius ------ ' Center Coor dinates 1-Stage Factor side Force of Inclination x Y R adius Safety (degrees) Iterations messages 36.50 1994.00 49.00 Center rejected as follows: UTEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. 51.50 iterations 1994.00 49.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations 66.50 1994.00 49.00 Center rejected as follows: UTEXAS NOTICE NUMBER 8060 36.50 2009.00 49.00 Center rejected as follows: Circle does not intersect the slope. UTEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. 66.50 36.50 allowed. 2009.00 2024.00 49.00 2.419 -20.469 5 49.00 center rejected as follows: UTEXAS ERROR NUMBER 9280 The side force inclination fell outside the range of values ' The minimum value allowed is: -8.00000e+001 degrees. The maximum value allowed is: 1.00000e+001 degrees. 51.50 2024.00 49.00 Center rejected as follows: UTEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. 66.50 2024.00 49.00 center rejected as follows: UTEXAS NOTICE NUMBER 8060 Circle does not intersect the slope. ' 1 49.00 51.50 54.00 49.00 54.00 49.00 51.50 54.00 - - - - - - 50.00 51.50 53.00 50.00 53.00 50.00 51.50 53.00 New 9-point Grid (only new points calculated) - - - 2006.50 49.00 4.826 -15.566 6 2006.50 49.00 5.005 -15.760 8 2006.50 49.00 5.317 -15.905 7 2009.00 49.00 1.549 -17.976 6 2009.00 49.00 1.557 -20.814 10 2011.50 49.00 1.625 -19.335 7 2011.50 49.00 1.631 -21.125 7 2011.50 49.00 1.690 -23.082 8 New 9-Point Grid (only new points calculated) - - - 2007.50 49.00 4.316 -16.336 5 Z007.50 49.00 4.406 -16.450 5 2007.50 49.00 4.541 -16.538 6 2009.00 49.00 1.541 -18.491 12 2009.00 49.00 1.543 -20.194 6 2010.50 49.00 1.582 -19.594 6 2010.50 49.00 1.589 -20.624 7 2010.50 49.00 1.612 -21.711 7 - - - - - N 9- i ew Po nt Grid (only new points calculate d) - - - - - - 51.00 2008.50 49.00 3.279 -17.095 3 51.50 2008.50 49.00 3.327 -17.190 3 52.00 2008.50 49.00 3.380 -17.285 3 51.00 2009.00 49.00 1.536 -19.040 7 52.00 2009.00 49.00 1.537 -19.605 7 51.00 2009.50 49.00 Center rejected as follows: UTEXAS ERROR NUMBER 9270 iterations Solution did not converge in iteration limit of 100 Failed to converge during stage 1 computations . 51.50 2009 50 49.00 1 549 -19 786 . . 9 52.00 2009 .50 49.00 1 .551 -20.094 7 Critical Circle After the Current Mode of Search ----- X: 51.50 Y: 2009.00 Radius: 49.000 Factor of safety: 1.536 Side force inclination: -19 .320 RA#AA*4#*#4d##*44A##A4A##tr44RR**4A***A44##*tr444#*44Artd CAU* ION T HE FACTOR OF SAF TY COULD NOT BE COMPUTED #4Ad* TM * A E FOR SOME*AE GRID POINTS AROUND#THE4MINIMUM A RRrtOF TH4 *tr4a### 4Art4A4 #*#A4A*#4*4*tr44tr*#trAR * R rt4 f AA#*# UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision : 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Di 11 sboro_Dam_RemOVal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_LongTerr2Deep.dat Dillsboro Dam - River Bank with Riprap - Long-Term Slope Stability Analysis (Spencer - Circular) AB-S AG 4*rtAR4####4Rd#AAR###4444*4AA4*d4A T T ° 1-STAGE FINAL CRITICAL CIRCLE INFORMATION * ER 4 d44AtrA# RR#*A 4R##*4d#**trRd#*A4R*d#4dd#dtrAA CAUTION - THE FACTOR OF SAFETY COULD NOT BE COMPUTED FOR SOME OF THE GRID POINTS AROUND THE MINIMUM X Coordinate of Center 51.50 Y Coordinate of center 2009.00 a . R dius 49.00 Factor of Safety . . 1.536 side Force Inclination (degrees) . . . . -19.32 Number of circles Tried . . 111 Number Of Circles F Calculated for . . . 93 Time Required for Search (seconds) 0.5 UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date Of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Di 11 sboro_Dam_R emoval\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_LongTerM-Deep.dat Dillsboro Dam - River Bank with Riprap - Long-Term Slope Stability Analysis (Spencer - Circular) TABLE N0. 43 d###AA44*4AA#R*#RR#A4AAd*4#A4 #*4RA**tr44A*#*444#*444d*# tr Coordinate, weight, Strength and Pore water Pressure 4#4R * Information for Individual slices for conventional Computations or First Stage of Multi-stage Computation s. * * (Information is for the critical shear surface in the * case of an automatic search.) ##4RRd#rt#d4ArtAAArt*#A44**AAdArtA44***AR#*4AR4d#Atr*#*trAAdrt4 A tr4RR Slice Slice Matl. Friction Pore NO. x Y weight No. Cohesion Angle Pressure 12.76 1979.00 1 13.57 1978.01 185 4 100.0 32.00 0 0 14.38 1977.01 . 2 15.24 1976.06 582 4 100.0 32.00 0 0 16.11 1975.11 . 3 16.16 1975.06 50 4 100.0 32.00 0 0 16.22 1975.00 . 4 17.13 1974.10 1018 3 0.0 25.00 0 0 18.04 1973.20 . 5 19.00 1972.35 1433 3 0.0 25.00 0 0 19.96 1971.50 . 6 20.97 1970.70 1855 3 0.0 25.00 0 0 21.97 1969.90 . 7 22.48 1969.52 1085 3 0.0 25 00 0 0 23.00 1969.14 . . 8 24.06 1968.42 2228 3 0.0 25 00 0 0 25.13 1967.70 . . 9 26.06 1967.13 1795 3 0.0 25 00 0 0 27.00 1966.56 . . 10 28.13 1965.95 1928 3 0.0 25.00 0 0 29.25 1965.34 . ' 11 29.63 1965.15 581 3 0.0 25.00 0 0 30.00 1964.97 . 12 31.17 1964.44 1817 3 0.0 25 00 0 0 32.33 1963.90 . . 13 33.48 1963.45 1847 3 0.0 25 00 0 0 34.62 1963.00 . . 14 35.83 1962.59 2009 2 0.0 25 00 25 6 37.05 1962.18 . . ' 15 38.02 1961.90 1627 2 0.0 25 00 68 6 39.00 1961.62 . . 16 39.91 1961.40 1499 2 0.0 25 00 99 9 40.82 1961.18 . , 17 41.41 1961.05 939 5 0.0 45 00 121 5 42.00 1960.93 . . 18 43.26 1960.71 1890 5 0.0 45 00 142 6 44.53 1960.50 . . 19 45.80 1960.35 1697 5 0.0 45 00 165 4 47.08 1960.20 . . 20 48.36 1960.12 1453 5 0.0 45 00 179 9 49.64 1960.04 . . 1 t 1 1 1 1 1 1 1 1 1 1 1 1 21 50.57 1960.02 875 5 0.0 45.00 186.1 51.50 1960.00 22 52.00 1960.01 399 5 0.0 45.00 186.9 52.50 1960.01 23 53.78 1960.07 774 5 0.0 45.00 182.8 55.06 1960.13 24 56.34 1960.26 385 5 0.0 45.00 171.2 57.62 1960.38 25 58.15 1960.46 38 5 0.0 45.00 158.8 58.68 1960.53 f UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Di 11 sboro_DartLRemoval\Engineering\River Bank\Analysis\Dillsboro_Rivereank_Riprap_LongTerm Deep.dat Dillsboro Dam - River sank with Riprap - Lon -Term Slope Stability Analysis (spencer - Circular) IAILI N0. 44 A#A##RA*trA#YA#*R*#dY####trq#AR##d*YYA**trAdRtr4dR*#4* * Seismic Forces and Forces Due to Distributed Loads for * Individual Slices for conventional Computations or the * * First stage of multi-Stage Computations. * (Information is for the critical shear surface in the case *#d#4#Aof an automatic search.) YARtrA44d*q#Atrtrq#*d#trAR*q4* FORCES DUE TO DISTRIBUTED LOADS Y for slices seismic seismic Normal Shear No. x Force Force Force Force x V 1 13.57 0 1978.50 0 0 13.57 1978.01 2 15.24 0 1977.53 0 0 15.24 1976.06 3 16.16 0 1977.03 0 0 16.16 1975.06 4 17.13 0 1976.57 0 0 17.13 1974.10 5 19.00 0 1975.72 0 0 19.00 1972.35 6 20.97 0 1974.91 0 0 20.97 1970.70 7 22.48 0 1974.33 0 0 22.48 1969.52 8 24.06 0 1973.24 0 0 24.06 1968.42 9 26.06 0 1971.56 0 0 26.06 1967.13 10 28.13 0 1969.91 0 0 28.13 1965.95 11 29.63 0 1968.76 0 0 29.63 1965.15 12 31.17 0 1968.03 0 0 31.17 1964.44 13 33.48 0 1967.14 0 0 33.48 1963.45 14 35.83 0 1966.25 0 0 35.83 1962.59 15 38.02 0 1965.42 0 0 38.02 1961.90 16 39.91 0 1964.74 0 0 39.91 1961.40 17 41.41 0 1964.24 0 0 41.41 1961.05 18 43.26 0 1963.70 0 0 43.26 1960.71 19 45.80 0 1963.01 0 0 45.80 1960.35 20 48.36 0 1962.39 0 0 48.36 1960.12 21 50.57 0 1961.90 0 0 50.57 1960.02 22 52.00 0 1961.60 0 0 52.00 1960.01 23 53.78 0 1961.28 88 0 54.21 1962.32 24 56.34 0 1960.86 263 0 56.48 1961.41 25 58.15 0 1960.60 161 0 58.16 1960.73 UTEXAs4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_RiverBank_Riprap_LongTernt_Deep.dat Dillsboro Dam - River Bank with Riprap - Long-Term Slope Stability Analysis (Spencer - Circular) TAIL N0. 47 dm#AmA4#ARq#dmaR#dq#uqugtAdgtd##q#Amq#RtrY#AAtrtr#*dqu#Atr Information for the Iterative Solution for the Factor of Safety and Side Force Inclination by Spencer's Procedure #q#ARY4RaY#4Rfr##*q#A4RA4A#qud#u#td#Y#d#fr RAdY#A#Y4#Rd Allowable force imbalance for convergence: 2.9990e-001 Allowable moment imbalance for convergence: 10 Trial Trial Factor side Force Force moment Delta iter- of inclination Imbalance Imbalance Delta-F Theta ation Safety (degrees) (lbs.) (ft.-lbs.) (degrees) 1 3.00000 -17.1887 -5.661e+003 1.069e+007 First-order corrections to F and Theta ............ -2.9875 -0.0713 Reduced values - Deltas were too large ............ -0.5000 -0.0119 2 2.50000 -17.2007 -4.522e+003 8.538e+006 First-order corrections t0 F and Theta ............ -1.6496 -0.0903 Reduced values - Deltas were too large ............ -0.5000 -0.0274 3 2.00000 -17.2280 -2.802e+003 5.291e+006 First-order corrections to F and Theta -0.6473 -0.1436 Reduced values - Deltas were too large ............ -0.5000 -0.1109 4 1.50000 -17.3390 1.133e+002 -2.098e+005 First-order corrections to F and Theta 0.0624 -4.5430 Reduced values - Deltas were too large 0.0394 -2.8648 5 1.53938 -20.2037 5.160e+001 -9.759e+004 First-order corrections to F and Theta ............ -0.0072 1.2145 Second-order corrections to F and Theta ........... -0.0032 0.8728 6 1.53621 -19.3310 -3.383e-002 4.034e+001 First-order corrections to F and Theta -0.0001 0.0112 Second-order corrections to F and Theta ........... -0.0001 0.0112 7 1.53609 -19.3198 -2.912e-008 3.849e-005 First-order corrections to F and Theta ............ -0.0000 0.0000 F ' UTEXA54 5/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_oillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_LongTerm_Deep.dat Dillsboro Dam - River Bank with Riprap - Long-Term Slope Stability Analysis (spencer - Circular) TABLE 11;..11 Ad trRAAR*Yd*R444YAA4ARAA**Y*A#A*R*AtrYYA4AR*tr+trAARtr+}}4A * check of Computations by Spencer's Procedure (Results * critical shear surface in the case of an automatic se A}*RRAR# RYYA} YAARAAARA4#AYYR*d4#AA+tr}**4R}tr}*4A#}AY +4}*AYtrA*AAbdR are for the arch.) Rd44*btrtr#}YRbtr summation of Horizontal Forces: 2.81375e-012 summation of vertical Forces: 1.68399e-012 ' Summation of moments: 2.16824e-009 Mohr Coulomb shear Force/Shear strength check summation : 2.51177e-012 "** ** CAUTION * * ** Forces Between Slices are NEGATIVE Along the UpPERAone_ half of the Shear Surface - at Points ' A Tension crack may Be Needed * ? ? "*# * CAUTION *Y 4 Some of the Forces Between Slices Act at Points Above the Surface of the Slope or Below the Shear Surface - Either a Tension Crack may be Needed or the SOLUTION MAY NOT BE A VALID SOLUTION UTEXA54 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_Longrerm_Deep.dat Dillsboro Dam - River Bank with Riprap - Long-Term slope Stability Analysis (Spencer - circular) TrtABLE N0. 58 *}*RA#A4Ybl+A#Y+A4}*4Y4gAA*44! }AARtrbl4g4Ytr*RAYAYtrgA#AYA4trARRf R}f44AA}d} * Final Results for stresses Along the shear Surface 4q(Results Aaredfor4the critical shear surface in the case of a search.) R4d4AY# !RA Y+! 4gYRbRd4*4#ddAA44#44tr#YYAf!#4YARtrAd#Adl4#A#trRAAAAYYA4# ' SPENCER'S PROCEDURE USED TO COMPUTE THE FACTOR OF SAFETY Factor of safety: 1.536 side Force inclination: -19.32 -------- VALUES AT CENTER OF BASE OF SLICE ------ -- Total Effective slice Normal Normal Shear No. X-Center Y-Center Stress Stress Stress 1 13.57 1978.01 32.2 32.2 2 15.24 1976.06 170.8 170.8 3 16.16 1975.06 248.2 248.2 4 17.13 1974.10 362.3 362.3 5 19.00 1972.35 506.5 506.5 6 20.97 1970.70 653.4 653.4 7 22.48 1969.52 765.4 765.4 8 24.06 1968.42 784.6 784.6 9 26.06 1967.13 741.5 741.5 10 28.13 1965.95 685.0 685.0 11 29.63 1965.15 639.0 639.0 12 31.17 1964.44 653.0 653.0 13 33.48 1963.45 701.5 701.5 14 35.83 1962.59 741.7 716.1 15 38.02 1961.90 770.1 701.5 16 39.91 1961.40 778.3 678.4 17 41.41 1961.05 800.6 679.2 18 43.26 1960.71 775.3 632.7 19 45.80 1960.35 721.1 555.7 20 48.36 1960.12 638.5 458.7 21 50.57 1960.02 542.7 356.6 22 52.00 1960.01 466.8 279.9 23 53.78 1960.07 401.9 219.0 24 56.34 1960.26 312.5 141.3 25 58.15 1960.46 230.1 71.3 78.2 134.6 166.0 110.0 153.7 198.3 232.3 238.2 225.1 207.9 194.0 198.2 213.0 217.4 213.0 205.9 442.2 411.9 361.7 298.6 232.2 182.2 142.6 92.0 46.4 UTEXAS4 S/N:00136 - version: 4.0.1.5 - Latest Revision: 2/15/2003 Licensed for use by: f, Devine Tarbell & Associates Time and date of run: wed Jun 10 09:20:30 2009 Name of input data file: P:\Duke_Energy\024.0029_Dillsboro_Dam_Removal\Engineering\River Bank\Analysis\Dillsboro_Riversank_Riprap_Longrerm_Deep.dat Dillsboro Dam - River Bank with Riprap - Long-Term slope Stability Analysis (spencer - Circular) TABLE NO. 59 dA#AAq}#*dYdAYR R ' rt #*4ARAYYAAAY}AtraA*Adq}RAdA*#YARR#YbRgAY+b}A#Rd+ * Final Results for side Forces and stresses Between Slices <*(Results#are}for the critical shear surface in the case of a search.) d4*ReA} +bd 4RA}4}AAd*4RtrRYYtr444A4tr4}#Y++trAYA!#A#bAl4dYA44R*AAadRYAARR - VALUES AT RIGHT SIDE OF SLICE --- ------------ Y-Coord. of Fraction slice side side Force of N0. X-Right Force Location Height Sigma Sigma at at TOP Bottom ' 1 14.38 -67 1977.72 0.357 2 16.11 31 1972.83 Below 3 16.22 42 1973.37 Below 4 18.04 520 1973.70 0.085 5 19.96 1120 1972.48 0.131 -4.5 -59.0 -41.5 56.5 -43.6 63.3 -125.8 294.9 -171.1 452.9 1 6 21.97 1806 1971.23 0.147 -209.6 584.1 7 23.00 2167 1970.62 0.150 -228.4 643 2 8 25.13 2825 1969.45 0.190 -249.7 . 831 2 9 27.00 3273 1968.52 0.232 -223.4 . 955 7 10 29.25 3665 1967.50 0.291 -118.3 . 1052 4 11 30.00 3763 1967.18 0.314 -58.3 . 1068.5 12 32.33 4010 1966.22 0.323 -33.6 1090 2 13 34.62 4166 1965.33 0.325 -26.9 . 1126 2 14 37.05 4251 1964.43 0.321 -42.0 . 1188 1 15 39.00 4267 1963.74 0.312 -76.2 . 1264 2 16 40.82 4235 1963.11 0.298 -130.8 . 1361 7 17 42.00 3893 1962.86 0.308 -88.7 . 1260 6 18 44.53 3144 1962.38 0.331 -7.6 . 1050 5 19 47.08 2395 1961.98 0.359 69.8 . 840 0 20 49.64 1697 1961.67 0.398 150.2 . 629 0 21 51.50 1259 1961.48 0.435 212.1 . 486 6 22 52.50 1061 1961.37 0.454 243.4 . 426 2 23 55.06 588 1961.08 0.518 332.2 . 269 0 24 57.62 151 1960.74 0.628 442.7 . 57 6 25 58.68 -0 1960.53 0.000 0.0 . 0.0 Read end-of-file on input while looking for another command word. End of input data assumed - normal termination. Attachment 3 Geotechnical Exploration rr r rr r rr r r rr ar rr rr rr r r ?r rr rr rr rr 1 1 1 1 i 1 1 1 1 1 1 1 1 1 i W co r- ? Cl rn rn rn Drn Drn rn (DD 00 rn CN COO CAD Drn rn rn O o am ° O CY) CV O O ID ....:.............:..............:.......................................:... ........ ....... ... ......... ........ . O 00 fn o O •L ? m O E E 0 Z Z Z M CL Q C W O ......... Q ?.: .. • . .. .. } : .............. ............. . .. t ........ .. . ....... ... ........ . L - n Fu O '0 C) CD 0 O °p .................. :............... .................. ........ .. .. .. .......... ........ ..... ..... ; •• O O O (D v m n' II 11 II • 11 11 Z z z' z in I p • O O .... .... ...}. •.. .. .. Q LO p L O m N n N; II 11 11 • •N • II z z Z : • ' a Q p. ....?.... ? ... .. .. .•. .. ? .. ... . ....... ... .......... ............ o C , v p LP O Cn O t7 : ^ 0 m E N C c, U 0 M z z z: 3., z ....... Q .. .. ...... . .....: .......................... p Cl) C) Lb O } ? rn : r O ^ z 1 N 1 ° ° Z Z: n it 0 ?. .. .. .. .. .. .. ....: ... ................. . ......... ........... p O L% J O V DLO C O co In m 'IT CnN co : N Z z Zit: • • Z z N co =' C6 N ......... .. .. .. .. .. .. .• .. .. • . O 'U O_ O 11) . U o Lb ° 06 c - O _ 1 ? o vl { Z . ca (D 7 z z Z. z z z z rl ) a U) ° p ....:...0 ...... .. .. .. p Q O U o Lb 111 ? ? -! C) CO O r.- r r ° clO O CA CA Cl r r r r r ? O ? ? C\j (3 O O ? O m L `f 1 '?, (4) U011BA913 .`=t 5- 60/W9 lOJ'VlO fdD'WV2dOVIO 30N3J 900Z WVO ONOSS IIIG 30N71d M3N 1.531 u 1 1 1 1 1 D Project: Dillsboro Dam Boring: D-1 T Geotechnical Exploration A Roadway and Slope Borings Sheet: 1 of 1 Location: Dillsboro Dam Devine Tarbell & Associa tes, inc. Project Location: Dillsboro Dam yy ..; a aywy. Coordinates: , Jackson County, NC Client: Duke Energy Carolinas, LLC Ground Surface Elevation: ± 1979 ft. MSL Charlotte, North Carolina Project Number: 024.0029.00900 Datum: NC State Plane - NAD83 Boring Contractor: S&ME Wa ter Lev el Obse rvations Boring Foreman: Justin Millwood Date Time Casing (ft) Water (ft) Caved (ft) Drilling Method: 3-1/4" Hollow Stem Augers Completion 10/13/08 2:00 pm 11.0 6.0 Core Barrel: N/A Drilling Equipment: Diedrich D-50 Turbo Track Boring Logged By: YES/BFC Dates Started: 10/13/08 Finished: 10/13/08 Depth Sampling & Material Description PL VIC LL Laboratory Well Elevation F Type Sample Name Data Rec. i & Classification Lithology N_valloWSft 6 Tests & Comments (no well installed) ( eet) ( n.) so 10 Gravel and Soil Hard Pack 1-SS 5+5+8 15" FILL : SILTY Fine to Medium SAND, fine to N=13 medium, medium dense, dark brown, micaceous, contains rock fragments 2 - SS a+a+s 9.. FILL: Fine to Medium SANDY SILT stiff, 5 N=9 brown and red orange, micaceous, contains rock 1974.0 fragments 3-SS 1+1 +1 + 10" ALLUVIUM: SILT WITH Fine to Medium 1 N SAND, soft, gray brown to brown gray, contains clay, rock fragments, mica, and organic material " ALLUVIUM: SILT, soft, brown gray, contains 10 4-SS 2+2+2 N=a 12 mica and fine sand 1969.0 '• Continued :gray brown to dark brown, wet Water at approx. 11.0' 5-3S 1+1+1 15 N=2 i i 6-SS 7+7+14 13" Continued : stiff, tan and brown, contains mica, 1 N=2 wood fragments, and weathered rock fra ments 5 1964.0 1 ALLUVIUM: SILTY SAND fine to medium, medium dense, brown and gray, micaceous, ' " i :50/3 7-SS 31+50/3• 7 conta ns wood fra ments ALLUVIUM: SILTY SAND fine to coarse, very dense white and gray PARTIALLY WEATHERED ROCK (PWR) Sampled as white and gray silt sand 3-1/4" Hollow Stem AUGER REFUSAL encountered at depth of approximately 17 feet. Boring backfilled with NCDOT #78M aggregate upon completion and topped with cold patch asphalt. Bottom of Boring at 17 feet. Notes: 1. Standard Penetration Tests performed with Autohammer. 0 1 1 1 1 1 1 1 D Project: Dillsboro Dam Boring: D-2 T Geotechnical Exploration A Roadway and Slope Borings Sheet: 1 of 1 Location: Dillsboro Dam Devine Tarbell & Associates, Inc. Project Location: Dillsboro Dam Coordinates: Jackson County, NC Client: Duke Energy Carolinas, LLC Ground Surface Elevation: ± 1979 ft. MSL Charlotte, North Carolina Project Number: 024.0029.00900 Datum: NC State Plane - NAD83 Boring Contractor: S&ME Wa ter Lev el Obse rvations Boring Foreman: Justin Millwood Date Time Casing (ft) Water (ft) Caved (ft) Drilling Method: 3-1/4" Hollow Stem Augers Completion 10/14/08 8:52 am 10.2 10.8 Core Barrel: N/A Drilling Equipment: Diedrich D-50 Turbo Track Boring Logged By: YES Dates Started: 10/14/08 Finished: 10/14/08 Depth Sampling Material Description PL Mc LL Laboratory Well Elevation T TSN m p Data Rec. i & Classification Lithology N-Value 0 Tests & Comments (no well installed) (Feet) a m e ( n) 10 50 10 ASPHALT (6 inch ' AGGREGATE BASE COURS 5 1-SS 5+3+2 11" FILL: SILTY SANCI fine to mediu N=5 brown and red, micaceous, conta rock fragments I FILL: Fine to Medium SANDY S 5 2-SS 3+2+4 N=6 15" stiff, brown, micaceous, contains 1974.0 " Continued : gray and brown 3 - ss 3+4+3 N=7 10 FILL: SILT, medium stiff, dark gray, micaceous, contains fine sand and rock fra ments 4-SS 2+1+1 12" ALLUVIUM: Fine to Medium SANDY SILT 10 N=2 ft d k d b t i i d Q 1969.0 so , ar gray an rown, con ns m a ca an organic material RESIDUUM: Fine to Medium SANDY SILT 5-SS 5+3+10 N=13 11" stiff, brown and orange, micaceous, contains weathered rock fragments and coarse sand grains 3-1/4" Hollow Stem AUGER REFUSAL encountered at depth of approximately 13.8 feet. Boring backfilled with bentonite plug and NCDOT #78M aggregate upon completion and topped with cold patch asphalt. Bottom of Boring at 13.8 feet. Notes: 1. Standard Penetration Tests performed with Autohammer. 1 1 1 11 C C D Project : Dillsboro Dam Boring: D-3 T Geotechnical Exploration A Roadway and Slope Borings Sheet: 1 of 1 Devine Tarbell & Associates, Inc. Project Location: Dillsboro Dam Location: Dillsboro Dam '"'"'`"'"'"'w""`"'"""•"w'"""?"° Coordinates: Jackson County, NC , Client: Duke Energy Carolinas, LLC Ground Surface Elevation: f 1979 ft. MSL Charlotte, North Carolina Project Number: 024.0029.00900 Datum: NC State Plane - NAD83 Boring Contractor: S&ME Wa ter Lev el Obse rvations Boring Foreman: Justin Millwood Date Time Casing (ft) water (ft) Caved (ft) Drilling Method: 3-1/4" Hollow Stem Augers Completion 10/13/08 3:30 pm Dry 8.4 Core Barrel: N/A Drilling Equipment: Diedrich D-50 Turbo Track Boring Logged By: YES/BFC D t S a es tarted: 10/13/08 Finished: 10/13/08 Depth Sampling & Material Description PL me LL XF - - Laboratory Well Elevation F F t qype ame p e Data Rnc. ( & Classification Lithology ? -r? -"N-Value, loW- Tests & Comments (no well installed) ( ee ) 50 10 ASPHALT 5.5 inch AGGREGATE BASE COURS 4 inch 1 - ss 6+5+4 11" FILL : SILTY SANq fine to medium, loose, N=9 brown and red, contains mica 2 - SS 7+13+6 11" FILL: SILTY SANq fine to medium, medium i 5 N=19 dense, gray brown, contains mica and rock 1974.0 fragments 3-SS 10+5+10 11" Continued: brown N=15 " 4-SS 50i0.75 0 NO RECOVERY Difficult drilling ' ' 3-1/4" Hollow Stem AUGER REFUSAL approx. 8.5 - 9.2 encountered at depth of approximately 9.2 feet. Boring backfilled with NCDOT #78M aggregate upon completion and topped with cold patch asphalt. > s i i i i Bottom of Boring at 9.2 feet. Notes: 1. Standard Penetration Tests performed with Autohammer. 0 1 J 1 D Project : Dillsboro Dam Boring: D-4 T Geotechnical Exploration A Roadway and Slope Borings Sheet: 1 of 1 Location: Dillsboro Dam Devine Tarbell & Associates, Inc. Project Location: Dillsboro Dam Q-~ ''^ - ? «"u Coordinates: , Jackson County, NC Client: Duke Energy Carolinas, LLC Ground Surface Elevation: ± 1979 ft. MSL Charlotte, North Carolina Project Number: 024.0029.00900 Datum: NC State Plane - NAD83 Boring Contractor: S&ME Wa ter Lev el Obse rvations Boring Foreman: Justin Millwood Date Time Casing (ft) Water (ft) Caved (ft) Drilling Method: 3-1/4" Hollow Stem Augers Completion 10/14/08 9:40 am 9.2 10.9 Core Barrel: N/A Drilling Equipment: Diedrich D-50 Turbo Track Boring Logged By: YES Dates Started: 10/14/08 Finished: 10/14/08 Depth Sampling & Material Description Pt_ nnc LL Laboratory Well Elevation Type Sample N Data Rec. & Classification Lithology N-Valuebo? ws/ft Tests & Comments (no well installed) (Feet) ame (in.) 0 50 10 ASPHALT (7 inch AGGREGATE BASE COURS 8 inch ?J o' 1-3S 11+7+12 12" FILL : Fine to Medium SANDY SILT very stiff, N=19 brown, micaceous, contains rock fragments z - ss s+s+s 12" Continued: stiff, red orange and brown 5 N=10 1974.0 3-SS 7+s 11" FILL: SILTY SAND fine to medium, medium N=13 3 dense, gray and brown, micaceous, contains rock framents and coarse sand grains " FILL: Fine to Medium SANDY SILT medium 10 4-SS 5+4+3 N=7 10 stiff, brown contains mica, wet gray, 1969.0 " SS soio.s 0 NO RECOVERY 3-1/4" Hollow Stem AUGER REFUSAL encountered at depth of approximately 12.0 feet. Boring backfilled with NCDOT #78M aggregate upon completion and topped with cold patch asphalt. Bottom of Boring at 12 feet. Notes: 1. Standard Penetration Tests performed with Autohammer. I 1 D Project: Dillsboro Dam Boring: D-5 T Geotechnical Exploration A Roadway and Slope Borings Sheet: 1 of 1 Location: Dillsboro Dam Devine Tarbell & Associates, inc. Project Location: Dillsboro Dam G .,.,a,,,x r x,.,,..16'- a<n i,?w. ' S'. .u: Coordinates: , Jackson County, NC Client: Duke Energy Carolinas, LLC Ground Surface Elevation: ± 1979 ft. MSL Charlotte, North Carolina Project Number: 024.0029.00900 Datum: NC State Plane - NAD83 Boring Contractor: S&ME Wa ter Lev el Obse rvations Boring Foreman: Justin Millwood Date Time Casing (ft) Water (ft) Caved (ft) Drilling Method: 3-1/4" Hollow Stem Augers Completion 10/14/08 10:53 am 9.0 9.9 Core Barrel: N/A Drilling Equipment: Diedrich D-50 Turbo Track Boring Logged By: YES Dates Started: 10/14/08 Finished: 10/14/08 Depth Sampling & Material Description PL Mc LL X Laboratory Well Elevation Type Sample Nam Data Rec. i & Classification Lithology z loWs/ft N-Valu Tests & Comments (no well installed) (Feet) e ( n.) 50 10 ,ASPHALT (6 inch AGGREGATE BASE COURS 6 inch ° - Ss 8+10+18 13" FILL: SILTY SAND fine to medium, medium N=28 dense, red and brown, micaceous, contains coarse sand grains " Continued 5 2-SS 13+4+9 N=13 15 FILL: WELL-GRADED SAND WITH SIL,Tfine 1974.0 to medium, medium dense, white and gray, contains mica rock fragments and coarse sand , " rains 3-SS 4+5+7 N=12 12 FILL: SILTY SAND fine to medium, medium ! dense, brown and gray, micaceous, contains rock fragments and coarse sand rains 4-SS 11+5+50i5 9" FILL: SILTY Fine to Medium SAND, medium dense dark ra micaceous contains r k :5015' S7 10 , g y, , oc 1969.0 fra ments and coarse sand rains wet PARTIALLY WEATHERED ROCK (PWR) Sampled as micaceous dark gray silty sand with I rock fragments 3-1/4" Hollow Stem AUGER REFUSAL encountered at depth of approximately 10.4 feet. Boring backfilled with bentonite plug and NCDOT #78M aggregate upon completion and topped with cold patch asphalt. Bottom of Boring at 10.4 feet. Notes: 1. Standard Penetration Tests performed with Autohammer. 1 1 1 1 D Project: Dillsboro Dam Boring: D-6 V T Geotechnical Exploration A Roadway and Slope Borings Sheet: 1 of 1 Location: Dillsboro Dam Devine Tarbcllbell & Associates, Inc. Project Location: Dillsboro Dam m Kr ??xx?ny s. Coordinates: , Jackson County, NC Client: Duke Energy Carolinas, LLC Ground Surface Elevation: ± 1979 ft. MSL Charlotte, North Carolina Project Number: 024.0029.00900 Datum: NC State Plane - NAD83 Boring Contractor: S&ME Wa ter Lev el Obse rvations Boring Foreman: Justin Millwood Date Time Casing (ft) Water (ft) Caved (ft) Drilling Method: 3-1/4" Hollow Stem Augers Completion 10/14/08 12:15 pm Dry 11.0 Core Barrel: N/A Drilling Equipment: Diedrich D-50 Turbo Track Boring Logged By: YES Dates Started: 10/14/08 Finished: 10/14/08 Depth Sampling & Material Description PL MC LL Laboratory Well Elevation (Feet) Type Sample Name Data Rec. (in) & Classification Lithology NN-Valulows/ft Tests & Comments (no well installed) so 10 'ASPHALT (6 inch AGGREGATE BASE COURS 7 inch ° 1-SS 8+7+7 T. FILL: Fine to Medium SANDY SILT stiff, N=14 brown and light orange, micaceous, contains rock fragments 2 - SS 7+7+6 5 Continued: brown, contains mica and rock 5 N=13 fragments 1974.0 Continued: brown, contains mica and rock 3 - ss a.a+s N=13 9" fragments Continued: soft, brown, contains mica and rock 10 X a - SS 1+1+1 N=Z 5.. fragments, wet 1969.0 Ss son.zs NO RECOVERY 3-1/4" Hollow Stem AUGER REFUSAL encountered at depth of approximately 11.8 feet. Boring backfilled with bentonite plug and NCDOT #78M aggregate upon completion and topped with cold patch asphalt. Bottom of Boring at 11.8 feet. Notes: 1. Standard Penetration Tests performed with Autohammer. 1 1 D ' Project: Dillsboro Dam Boring: D-7 T Geotechnical Exploration Notiota A Roadway and Slope Borings Sheet: 1 of 1 Devine Tarbell & Associates, ins. Project Location: Dillsboro Dam Location: Dillsboro Dam Coordinates: Jackson County, NC , Client: Duke Energy Carolinas, LLC Ground Surface Elevation: t 1979 ft. MSL Charlotte, North Carolina Project Number: 024.0029.00900 Datum: NC State Plane - NAD83 Boring Contractor: S&ME Wa ter Lev el Obse rvations Boring Foreman: Justin Millwood Date Time Casing (ft) Water (ft) Caved (ft) Drilling Method: 3-1/4" Hollow Stem Augers Completion 10114/08 1:08 pm Dry 4.0 Core Barrel: N/A Drilling Equipment: Diedrich D-50 Turbo Track Boring Logged By: YES Dat St d 10/14/ t es ar : e 08 Finished: 10/14/08 Depth Sampling & Material Description PL Mc LL Laboratory Well Elevation F t 7SN Data Rec. (in ) & Classification Lithology N-Value,bl? ,blows/ft Tests & Comments (no well installed) ( ee ) . so 10 ASPHALT 4 inch a AGGREGATE BASE COURS 6 inch 1 - SS 23+31+32 15" FILL : SILTY SANQ fine to coarse, very dense, N=63 gray, contains mica and rock fragments Continued: gray and dark brown micaceous 2-SS 38*50I1" 10" 5 PARTIALLY WEATHERED ROCK (PWR) 1974.0 Sampled as micaceous gray and dark brown silty sand with rock fragments 3-1/4" Hollow Stem AUGER REFUSAL encountered at depth of approximately 5.1 feet. Boring backfilled with NCDOT #78M aggregate upon completion and topped with cold patch asphalt. i Bottom of Boring at 5.1 feet. Notes: 1. Standard Penetration Tests performed with Autohammer. 1 it 1 F LI 1 1 D Project : Dillsboro Dam Boring: /?pv-1 ?'1 T Geotechnical Exploration ? Roadway and Slope Borings Sheet: 1 of 1 Dceinc Tarbell & Associates, Inc. Project Location: Dillsboro Dam Location: Dillsboro Dam Coordinates: , Jackson County, NC Client: Duke Energy Carolinas, LLC Ground Surface Elevation: ± 1979 ft. MSL Charlotte, North Carolina Project Number: 024.0029.00900 Datum: NC State Plane - NAD83 Boring Contractor: S&ME Wa ter Lev el Obse rvations Boring Foreman: Justin Millwood Date Time Casing (ft) Water (ft) Caved (ft) Drilling Method: 3-1/4" Hollow Stem Augers Core Barrel: N/A Drilling Equipment: Diedrich D-50 Turbo Track Boring Logged By: YES Dates Started: 10/14/08 Finished: 10/14/08 Depth Sampling & Material Description PL Mc LL Laboratory Well Elevation (Feet) Type Sample Name Data Rec. (in.) & Classification Lithology N-Valu Wslft 0 Tests & Comments (no well installed) 50 10 Auger boring with no split spoon sampling from 0' to approximately 9.5'. Bulk sample obtained from auger cuttings between depth of 0' to appproximately 4.5'. 5 AUGER 1974.0 I Boring terminated at depth of approximately 9.5' feet. Boring backfilled with auger cuttings upon completion. Bottom of Boring at 9.5 feet. Notes: 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Attachment 4 Excerpt from Reference 1 1 0 1 1 1 Section .1040 1040-7 WATER Water shall meet the requirements of Article 1024-4 1040-8 MORTAR Mortar used in all brick masonry and block masonry shall be proportioned as shown below for either mix No. 1 or No. 2. All proportions are by volume. Do not add any more water than is necessary to make a workable mixture. Mix No. 1: 1 part portland cement 1/4 part hydrated lime 3 3/4 parts mortar sand (maximum) Mix No. 2: 1 part portland cement 1 part masonry cement 6 parts mortar sand (maximum) The requirements of Articles 1040-4, 1040-5, 1040-6, and 1040-7, are applicable to all cement, hydrated lime, mortar sand, and water. For the hydrated lime and cement portion of Mix No. l,the Contractor may substitute rypc M or Type S masonry cement that meets ASTM C270 For Type S masonry cement the minimum compressive strength of the test specimens shall be 2500 psi at 28 days and the test specimens shall be composed of 1 part Type S masonry cement and 3 parts sand. l" urnish a 'T'ype 3 certification for the Type M or Type S masonry cement. 1040-9 CEMENT GROUT Use cement grout that consists of a mixture of 1 part portland cement to 3 parts mortar sand with no more water than is necessary to make a workable mixture. Apply the requirements of Article 1040-4, 1040-6, and 1040-7 to all cement, mortar sand, and water. ' SECTION 1042 RIPRAP MATERIALS ' 1042-1 PLAIN RIPRAP Stone for plain riprap consists of field stone or rough unhewn quarry stone. The stone shall be sound, tough, dense, resistant to the action of air and water, and suitable in all other respects for the purpose intended. Where broken concrete from demolished structures or pavement is available, it may be used in place of stone provided that such use meets with the approval of the Engineer. However, the use of broken concrete that contains reinforcing steel will not be permitted. All stone shall meet the approval of the Engineer. While no specific gradation is required, there should be equal distribution of the various sizes of the stone within the 1 10-83 1 1 Section 1042 required size range. The size of an individual stone particle will be determined by measuring its tong dimension. ' Stone or broken concrete for riprap shall meet the requirements of 'T'able 1042-1 for the class and size distribution. ' TABLE 1042-1 ACCEPTANCE CRITERIA FOR RIPRAP AND STONE FOR EROSION CONTROL ' REQUIRED STONE SIZES - INCHES ' CLASS A MINIMUM MIDRANGE 2 4 MAXIMUM 6 B 5 8 12 1 5 10 17 2 9 14 23r No more than 5.0% of the material furnished can be less than the minimum size specified nor no more than 10.0% of the material can exceed the maximum size specified. 1042-2 TESTING Test riprap materials in accordance with the requirements of this section and Sections 1005-4(E) Resistance to Abrasion, and 1005-4(F) Soundness. Satisfactory ' resistance to abrasion will be considered to be a percentage of wear of not greater than 55 percent. Satisfactory soundness will be considered to be a loss in weight of not greater than 15 percent when subjected to 5 alterations of the soundness test. ' SECTION 1044 SUBSURFACE DRAINAGE MATERIALS ' 1044-1 SUBDRAIN FINE AGGREGATE The subdrain fine aggregate shall meet the gradation requirements for No. 2S or No. 2MS sand as shown in Table 1005-2. 1044-2 PIPE AND FITTINGS--GENERAL Pipe and fittings may be, at the option of the Contractor, either concrete, corrugated steel, bittuninized fiber, or corrugated plastic. ' 1044-3 CONCRETE PIPE AND FITTINGS Non-perforated concrete pipe and pipe fittings shall meet the requirements of AASHTO M86 for standard strength nonreinforced concrete pipe. Perforated concrete pipe shall meet the requirements of AASHTO M175 for standard strength perforated nonreinforced concrete underdrainage pipe. t Joint materials shall meet the requirements of Section 1028. 10-84 1 4 5 6 7 8 2 3 1 ~ . , REV. ~,a ~ ~ , ~ ~ , ~ - _~_..N~. \ r ~ r. DWGo NOo X24-~~29-~4 - _ ~ s~ t r s ~ - _ " ~ _ k s ' ~ ~4 S - l I ~ . ~ - r~ ~ ~ ,L `„s j ~ sw ~ l , i t x ~ i r t 1 F 1 - rM s s - 1 . 1 ~ \ t ,e J' t ~ 1 , S . ' ti ; a ~ ~ ~ ' ~ _ _ t` r , ~ NOTES: \ i4 i It ~ 1. RIPRAP SHALL CONSIST OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) CLASS 2 RII'RAP AS ~ POWERHOUSE .h ~ r, ' _ , l DEFINED IN "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES," 2006 OR LATEST EDITION. \ ~ ~ , - _ , r ~ ti. y r ~ , 2. RII'RAP SHALL BE DUMPED W SUCCESSNE LIFTS FROM ANTICIPATED TOE OF RIPRAP SLOPE TOWARD THE , a;°'~, . n rn r. RNER BANK TO REDUCE DOWN SLOPE MOVEMENT OF RIPRAP DURING PLACEMENT. , a , 3. SLOPE OF RIPRAP SHALL BE FIELD VERIFIED TO LOCATE AREAS WHICH MAY REQU1fRE ADDITIONAL MATERIAL O i 'r ~ 'r ~ _ .1 , BEFORE DEWATERING OCCURS. w.~ f ~ . , \ ~ . e vl , v ~ _ , , r , 4. A MAXIMUM SLOPE OF 2.SH,1V SHALL BE OBTAINED. A MINIMUM SLOPE OF 3.OH:1V SHALL BE MAINTAINED. , \ .x , , ` , ~ , , 5. SLOPE SHALL BE MONITORED DAILY FOR EVIDENCE OF SLOPE FAILURE OR SUBSIDENCE. "l - _ t r, . ~ * F~ h _y, } N~ . ~ u ~ \ B B _ _ ~ . IT _ s . w, . ~ ~ _ ..M. _ x _ , ~ SPILLWAY ~ ~ - . ~ EL 1979.E .m_. ~ ~ FULL POND ,r ~ ' ~ . , ~ r s _ r , _ z _ ~ r EL 1972.OOf r ~ 1 ~t,.. ~ 'art t ~ O~ __d - r Y ~ ~ ~ ~ RIVER BANK . \ h., ~ i , r ~ w , r. ~ ~ , 0 q 2.5 , _ . 1 ~ ~ ~1 J ~ ~ r ~ _ ~~l _ VARIES RNERBED 00 O O ~ - ~ . _ FLO } 'vr ~ - ~ ~ RIPRAP/BOULDER5 0°, ~p o0 pQ~q C " 113 ~ ° rr ~ o EL 1960.OOt k , a PWR VARIES . I~-30 r _ ~ 1.,s G~ ~ ~ ~ a d t. E\ ~ jam. ~ ! ~ I ,t r ~ ~ ~ , tip'`. ~ - v ~ ~ ( r ~ r~ ~ i ~ r r;~. f 7 t' ~ ~ ~ ~ `y, ti ' ~ e 1 1 ~ ~i 1' , } ~ r } a ~ ~ ~ ~ v ! r' i a~ ~ p ~ ~ ~ ~ ~ i f ~ r- t \ 1 , a, ~ a ~ 1 , I ~ ,r. ~ 1, ,E SCALE: NTS 024-0029-04 ~ _ ~ _ 1 ~ `i ~ `v ~r D r ~v D r 5~ yy 1 ~ i / \ 1 ~ \ ~za. R\ a. ~ alt t r' ~ l 1 ! L ~ ~ a ' W ~ ~ r _ ~ , z l ~ ~ e , `v ~ . 1 e ~ T , i t, ti r" ~ f t s 7 ~ r ~ : A 1 °ti rvr ` ° la _ _ o r ~ , h a rid ,i - . ~ ~ \ v. ? A + ~a f ~ ~ 'Gt ~ w, ''41 ~ ti ~ ~ o of i t: , ~tia l ~ ~ ~ y ~ r` i jj f~ 1 E f v V ~ ~ ~ i r ' 1 ~ 7 ~ i ~ 1~ \ a ~ \ S ~ , µ I i - . t h, Y l ~ l r` ~ t t ~ ~ , ~ ~ A r ~ d ~ ~ , t J~ r r ~ ~r~ , ~ i ~k t h _ R t 1 i J a ti ` l ~ ~ ( ~ ~ ~ ~ r ~ , a~t i V i % r ~ , i ; _ ~ r ~ f }1 ~ 1, } ~1 ~ . r ~ v' . r . a a 'a i ` t 3 t C ~ I V M . ~ z E a> ~ 7` Ja ~ r 4` ~ tit ~ ~ a ~ ~ 'i ~ 1 ~ ~ y f u ~ F t f J `S { , r~ a I ~ I I ~ fl f ~ 1 r ~ ~ ~ ~ 1 ~ It ~ ~ ~ !t ` \ ~J . ' k ~i ~ e.r ` F.~.~ p Ir 1 r ~ , ~ s i ~ Q 3 2 ~ ! 1 i ~ U r { b d I ~ r~ , 4y~r ~ / 4 ' ! t ~ ~ J ~ r t ~ 1 r ~ 7 7 1 rat b / f . 1~ 1~ ~ ~ rl ~ ~ ~ t 7 t ~ l~ I ~ j r 7 ~ I ! ~ a i ~ ~ j t A ~ ~ ~ ,E f ) l ~ ~ f ~ ' r' ~ ~ a ~ ~ ~ ~ i ~ ~ ` t t 1 f~ t / r ~ / r _ ~ ~ - ~ t / ~ J ` a`.. . f , ~ ~ ~ j f t , t ~ ! ~ ~ a a J 1 ~ ~ r ` ~ ~ ~ ~ ~ ~ a + i ~ , , t an. t` i 1 ! ~ r ~ , \ 1 1 ' ' ~ ~ r ~ ~ l , > ~ ~ i; r i a a ~ ~ ;a. s - _ , t t ! / \ ~ t ~ _ r_~ ' ( , F E ~ r ~ ~ ~ ~ ~_,a , q t } ~ i , ' s ~ ' ~ ~ ~ ~ ~ ~ ' , P \ 1 7r f ~ r l l t~ . 60 30 0 60 120FT L . SCALE.1 - 60 SCALE:1"=b0' Cv7 DRAWN BYE CIVIL DUKE ENERGY CAROLINAS, LLC MA cATHEY DILLSBORO HYDROELECTRIC PROJECT DESIGNED BYE MECHANICAL BF cHRZSMAN DECOMMISSIONING & REMOVAL PLAN CHECKED BYE ELECTRICAL H N.C.B.E.L.. License Number: F-0116 ~ H f~; ' 400 South Tryon Street ~i RIVERBANK STABILIZATION ~ n~.._'..aa., won eoeoc nooonvcn ?v• nnT~. ® 411Q1IV46Cy Ir4 LOG®:7 ® ° ni 1 iwvL- u ui univ HDR Engineering, Inc. of the Carolinas - 06/04/09 ISSUED FOR REVIEW. MAC BFC - - PROJECT NO. SCALE: DRAWING NO. REV. NO. DATE REVISION EVISION DRN DSGN CHKD APPR CIVIL ELEC MECH 024, 0029 NOTED 0 2 4 - 0 0 2 9 - 0 4 - 3 4 5 6 7 8 1 2