Loading...
HomeMy WebLinkAboutNCG020279_NOD_20180829Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY August 29, 2018 CERTIFIED MAIL: 7012 3050 0001 9398 7270 RETURN RECEIPT REQUESTED Southern Products and Silica Co., Inc. Attn: Robert Bradsher PO Box 189 Hoffman, NC 28347 ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director Subject: NOTICE OF DEFICIENCY (NOD -2018 -PC -0280) NPDES General Permit NCG020000 Southern Products and Silica Co., Inc. Drowning Creek Deposit Mine, Certificate of Coverage NCG020279 Richmond County Dear Mr. Bradsher: On August 22, 2018, Mike Lawyer, Environmental Program Consultant from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Drowning Creek Deposit Mine located at 4303 US Highway 1 in Richmond County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Mr. Steve Mills, Mr. Eric Hartman and Mr. Scott Bradsher were also present during the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES General Permit NCG020000 under Certificate of Coverage NCG020279. Permit coverage authorizes the discharge of stormwater, mine dewatering wastewater and/or process wastewater from the facility to receiving waters designated as Drowning Creek, a Class WS-II;Sw,HQW waterbody in the Lumber River Basin. As a result of the site inspection, the following deficiency is noted: 1) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the deficiency has occurred as well as a Plan of Action to prevent this deficiency from recurring. Thank you for your attention to this matter. This office requires that the deficiency, as noted above and detailed in the enclosed inspection report, be properly resolved. Failure to address the deficiency could result in the issuance of a Notice of Violation, which is subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have any questions or concerns, please contact Mike Lawyer or myself at (910) 433-3300. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville, NC 28301 910-433-3300 Sincerely, imothy L. La unty, PE Regional Engineer DEMLR TL/ml Enclosure ec: Eric Hartman — Southern Products and Silica Co., Inc. Scott Bradsher — Southern Products and Silica Co., Inc. Annette Lucas, PE, Program Manager - DEMLR, Stormwater Permitting Program Laura Alexander, Administrative Assistant — DEMLR, Stormwater Permitting Program cc: FRO — DEMLR, Stormwater Files Compliance Inspection Report Permit: NCG020279 Effective: 10/01/15 Expiration: 09/30/20 Owner: Southern Products and Silica Co Inc SOC: Effective: Expiration: Facility: Drowning Creek Deposit Mine County: Richmond 4303 Hwy US #1 N Region: Fayetteville Hoffman NC 28347 Contact Person: Robert L Bradsher Title: Phone: 919-614-4123 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On-site representative Steve Mills 910-281-3189 On-site representative Eric Hartman 910-281-3189 On-site representative Scott Bradsher 910-281-3189 Related Permits: Inspection Date: 08/22/2018 E try Time: 09: AM Exit Time: 11:55AM Primary Inspector: Mike La wy Phone: 910-433-3300 Exl,72J' 11 Secondary Inspector(s): 339' Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NCG020279 Owner - Facility: Southern Products and Silica Co Inc Inspection Date: 08/22/2018 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Facility's Stormwater Pollution Prevention Plan contains all permit -required components and there is documentation of an annual review and update. -Monitoring records for 2016 and 2017 were not available at the time of inspection, but were provided by e-mail on August 29, 2018. Based on the monitoring records for 2016 and 2017, monitoring was not conducted in the third quarter of 2016. Records for fourth quarter 2015 and first and second quarter 2016 were reviewed during the previous inspection on July 26, 2016. Third quarter 2016 would have been the fourth quarterly sampling event for the first year of coverage under the current permit. For 2017, monitoring was conducted in the first, third and fourth quarters. Monitoring has thus far not been conducted in 2018 due to a misunderstanding of the permit conditions related to upstream and downstream monitoring where the upstream and downstream sampling locations were reportedly inaccessible. Specific monitoring requirements of the NCG020000 permit were reviewed and discussed during the inspection. Facility personnel were informed that a Notice of Deficiency would be issued for failing to adhere to the monitoring requirements of the permit. All available monitoring results are below the applicable effluent limitations contained in the permit. Therefore, the facility may reduce their monitoring frequency from quarterly to semi-annually per Footnote 1 under Table 7 in the NCG020000 permit beginning with the second half of 2018. Page: 2 Permit: NCG020279 Owner - Facility: Southern Products and Silica Co Inc Inspection Date: 08/22/2018 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 1:11:1 ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ 0 ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ 0 ❑ Comment: Facility has no stormwater-only outfalls. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ M ❑ Comment: No monitoring results for third quarter 2016, which would have been the fourth quarterly sampling event for the first year of coverage under the current permit's wastewater monitoring schedule. No monitoring results for the first half of 2018. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? 1-11:1 ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ M ❑ Comment: Page: 3