Loading...
HomeMy WebLinkAbout20090442 Ver 1_Staff Comments_20090622Kulz, Eric From: Kulz, Eric Sent: Monday, June 22, 2009 8:28 AM To: 'Jones, Amanda D SAW' Cc: Johnson, Alan Subject: Briar Creek (20090547) and Torrence Creek (20090442) Amanda The following are DWQ's comments regarding the above-referenced projects, based on review of the plans and site visits. Briar Creek This project appeared to be a good candidate for restoration and enhancement work. DWQ concurs with the proposed project approach. However, based on the level of work proposed for the Briar Creek and the anticipated uplift, DWQ feels that the appropriate credit ratio is 2.5:1 (proposed is 2:1). the project consists mostly of bank work, with the addition of several structures. The multiple utility easements limit the quality of the riuparian zone that can be established. in addition, there appear to be several storm water outfalls entering the stream, and no BMPs are shown on the plans which would treat the stormwater entering the stream. Torrence Creek Again, DWQ feels the proposed project has merit, and we generally concur with the project approach. DWQ recommends that where possible, existing trees within the riparian zone be retained, rather than cutting a belt-width corridor through the site. Also, DWQ feels that all enhancement work done as part of this project should generate credit at a 1.5:1 ratio (some proposed as 1:1). in addition, wetland enhancement should receive credit at a 2:1 ratio per the USACE website (proposed is 1.5:1). The 401 GC has been issued for this project. Please contact Alan Johnson in the Mooresville Regional Office or me if you have any questions regarding these projects. Eric