Loading...
HomeMy WebLinkAbout20180612 Ver 1 _SW O&M Agreement _20180831wN�r �rrrurr rx rrrc�rrrr`�rr�air�.� r��.�r��rrr�rir4 Project Name: Project Location: WCU - Central Drive Parking Cullowhee, North Carolina Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known sei location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & correspc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: 1 Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: 0 Disconnected Impervious Area Present: No User Defined BMP Present: No O&M tables will be added automatically): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Central Drive Parking Lot Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible parry. * Responsible Party: Title & Organization: Street address - City, state, zip: Phone number(s): Email: Signature: County of Western Carolina University Joe Walker, PE Asst. Vice Chancellor for Facilities Management 3476 Old Cullowhee Road Cullowhee, North Carolina 28723 (828) 227-7441 jwalker@email.wcu.edu Date: P/2 4) ( g , a Notary Public for the State of , do hearby certify that Icer- ^� personally appeared before me this �D�h day of ALbL),r and acknowledge the due execution of the O rations and Mainte ante Agreement. Witness mK,b", ppd official seal, U o 6A'�--.- P -P �� �pTARY i - � rn .a N CO -"111uua,ulkLO% ` My rnmmiscinn pxnirPc ma a V-C�A 111�1 a0ea 1 812812( Projrial em Maintenance Requimmente How many devices are Contech StormFilters? 1 Important operation and maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the StormFilter. - The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. The StormFilter system will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: Flow to remediate the problem: Adjacent pavement (if applicable) Trash/debris is present. Remove the trash/debris. Flow diversion structure Sediment is present on the pavement surface. Sweep or vacuum the sediment as soon as possible. StormFilter Cartridges The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage have occurred at the outlet. Contact the 401 Oversight Unit at 919-733-1786. All other operation and maintenance activities should be in accordance with Contech's StormFilter Inspection and Maintenance Procedures document. Any problems that are found shall be repaired immediately. The responsible party shall have received and understand Contech's StormFilter Inspection and Maintenance Procedures document. ORM-EZ 812812(