Loading...
HomeMy WebLinkAbout20181199 Ver 1_Plan Set revised_20180828SITE LOCATION SITE LOCATION SITE LOCATIONSITE LOCATION l:\Projects\AMLG\amlg1701-american legion site development\DESIGN\CS\AMGL1701 CS-COVER.dwg PLOTTED: 6/15/2018 1:55 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.AMGL1701 N/A AAA 2018-05-17 PCB SHEET APPROVED BY OF1 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPREPARED FOR: OWNER/DEVELOPER CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC. PO BOX 2323 CHAPEL HILL, NC 27515 ---- AMERICAN LEGION POST FACILITY   NON-RESIDENTIAL SITE PLAN APPLICATION   ORANGE COUNTY REVISION JUNE 8, 2018 LOCATION MAP Scale: 1" = 2000' CONSTRUCTION WASTE: 1.ALL EXISTING STRUCTURES 500 SQUARE FEET AND LARGER SHALL BE ASSESSED PRIOR TO THE ISSUANCE OF A DEMOLITION PERMIT TO ENSURE COMPLIANCE WITH THE COUNTY'S REGULATED RECYCLABLE MATERIALS ORDINANCE (RRMO) AND TO ASSESS THE POTENTIAL FOR DECONSTRUCTION AND/OR THE REUSE OF SALVAGEABLE MATERIALS. 2.PURSUANT TO THE COUNTY'S RRMO, CLEAN WOOD WASTE, SCRAP METAL, AND CORRUGATED CARDBOARD PRESENT IN CONSTRUCTION OR DEMOLITION WASTE MUST BE RECYCLED. 3.PURSUANT TO THE COUNTY'S RRMO, ALL HAULERS OF MIXED CONSTRUCTION AND DEMOLITION WASTE WHICH INCLUDES ANY REGULATED RECYCLABLE MATERIALS SHALL BE LICENSED BY ORANGE COUNTY. 4.PRIOR TO ANY DEMOLITION OR CONSTRUCTION ACTIVITY ON THE SITE, THE APPLICANT SHALL HOLD A PREDEMOLITION/PRE-CONSTRUCTIONCONFERENCE WITH SOLID WASTE STAFF. THIS MAY BE THE SAME PRE-CONSTRUCTION MEETING HELD WITH OTHER DEVELOPMENT/ENFORCEMENT OFFICIALS. 5.THE PRESENCE IF ANY ASBESTOS CONTAINING MATERIALS ('ACM') AND/OR OTHER HAZARDOUS MATERIALS SHALL BE HANDLED IN ACCORDANCE WITH ANY AND ALL LOCAL, STATE, AND FEDERAL REGULATIONS AND GUIDELINES.NORTHPREPARED BY: 401 Providence Road #200 Chapel Hill, NC 27514 T 919.929.1173 F 919.493.6548 Firm License F-1267 PREPARED BY: PENNONI ASSOCIATES INC. SITE DATA: APPLICANT /OWNER:CHAPEL HILL POST No. 6 AMERICAN LEGION INC. PO BOX 2323 CHAPEL HILL, NC 27515 ENGINEER:PENNONI ASSOCIATES, INC PETER BELLANTONI, PE 401 PROVIDENCE ROAD, SUITE 200 CHAPEL HILL, NC 27514 PHONE:(919) 230-9214 PIN: 9749101791; 9748194003 PROPERTY AREA: 128.334 ACRES (5,590,229± SF) ZONING: AR - (AGRICULTURAL RESIDENTIAL) WATERSHED: HAW RIVER UNPROTECTED CURRENT USE: AGRICULTURAL PROPOSED USE: CAMP RETREAT/ MEETING HALL EXISTING IMPERVIOUS: 0 SF (0%) PROPOSED IMPERVIOUS: 260,120 SF TOTAL (4.6%) 92,664 SF POND (1.6%) BUILDING SQUARE FOOTAGE: 15,713 SF BUILDING HEIGHT: 35.33 FT FAR: 0.002 BLC: 0.003 REQUIRED PARKING SPACES: 134 SPACES FOR CLUB OR LODGE [1 SPACE PER 3 MEMBERS (400 MEMBERS)] PROPOSED VEHICLE SPACES: 139 SPACES BUILDING OCCUPANCY: 615 PEOPLE FIRM MAP #3710974900J PORTIONS OF PROPERTY LOCATED IN ZONES "AE" AND 'X' STREAM BUFFERS ARE PRESENT AND DENOTED ON SITE SOLID WASTE WILL BE HANDLED BY PRIVATE SERVICE SOILS MAP Scale: 1" = 2000'NORTHUSGS MAP Scale: 1" = 2000'NORTHCS0001COVER SHEET2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCBSheet List Table Sheet Number Sheet Title Sheet Description 1 CS0001 COVER SHEET 2 CS0002 GENERAL NOTES AND LEGEND 3 CS0201 EXISTING CONDITIONS - DEMOLITION PLAN 4 CS1001 OVERALL SITE PLAN 5 CS1002 DETAILED SITE PLAN NORTH 6 CS1003 DETAILED SITE PLAN SOUTH 7 CS1501 GRADING & DRAINAGE PLAN NORTH 8 CS1502 GRADING & DRAINAGE PLAN SOUTH 9 CS1503 DRIVEWAY PROFILE 10 CS1701 UTILITY PLAN NORTH 11 CS1702 UTILITY PLAN SOUTH 12 CS6001 SITE DETAILS 13 CS6002 SITE DETAILS 14 CS8001 EROSION CONTROL - PHASE 1 15 CS8002 EROSION CONTROL - PHASE 2 16 CS8003 EROSION CONTROL DETAILS 17 CS8004 EROSION CONTROL DETAILS l:\Projects\AMLG\amlg1701-american legion site development\DESIGN\CS\CS0002.dwg PLOTTED: 6/15/2018 1:56 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY NOT FOR CONSTRUCTION CS0002 BYNO.DATEREVISIONSAMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.AMGL1701 N/A AAA 2018-05-17 PCB SHEET APPROVED BY OF2 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKGENERAL NOTES AND LEGENDPENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-12672018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB1.UTILITY NOTES: A. COMPLETENESS OR ACCURACY OF LOCATION AND DEPTH OF UNDERGROUND UTILITIES AND STRUCTURES IS NOT GUARANTEED. B. LOCATION OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND SHALL BE CONFIRMED INDEPENDENTLY WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. SANITARY SEWER AND ALL OTHER UTILITY SERVICE CONNECTION POINTS SHALL BE CONFIRMED INDEPENDENTLY BY THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED IMMEDIATELY IN WRITING TO THE ENGINEER. CONSTRUCTION SHALL COMMENCE BEGINNING AT THE LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP GRADIENT. PROPOSED INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR TO COMMENCEMENT OF CONSTRUCTION. C. ALL UTILITIES AND SERVICES INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC, ETC. WITHIN THE LIMITS OF DISTURBANCE SHALL BE VERTICALLY AND HORIZONTALLY LOCATED. THE CONTRACTOR SHALL USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION AT NO COST TO THE OWNER. 2 FIRE WATCH; DURING CONSTRUCTION AND DEMOLITION WHERE HOT WORK, MATERIALS SUBJECT TO SPONTANEOUS COMBUSTION, OR OTHER HAZARDOUS CONSTRUCTION OR DEMOLITION IS OCCURRING, THE OWNER OR THEIR DESIGNEE SHALL BE RESPONSIBLE FOR MAINTAINING A FIRE WATCH. THE FIRE WATCH SHALL CONSIST OF AT LEAST ONE PERSON WITH A MEANS OF COMMUNICATING AN ALARM TO 911, SHALL A WRITTEN ADDRESS POSTED IN A CONSPICUOUS LOCATION AND SHALL MAINTAIN CONSTANT PATROLS. NC FPC 2012 SECTION 1404. 3 CONSTRUCTION / DEMOLITION; ALL CONSTRUCTION AND DEMOLITION CONDUCTED SHALL BE IN COMPLIANCE OF THE CURRENT EDITION OF CHAPTER 14 OF THE NC FPC. 4.DISTURBED AREA = 729,707 SF (16.7 ACRES) GENERAL NOTES: 1.ALL WORK SHALL COMPLY WITH APPLICABLE STATE, FEDERAL AND LOCAL CODES AND OSHA STANDARDS ALL NECESSARY LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE UNLESS PREVIOUSLY OBTAINED BY THE OWNER/DEVELOPER. 2.THE CONTRACTOR SHALL BE REQUIRED TO REVIEW AND ABIDE BY SPECIFICATIONS OF THE PLAN AND ALL SUPPORTING DOCUMENTS, PERMITS, AND REPORTS FOR THIS SITE, INCLUDING NOT BUT NOT LIMITED TO: ·EROSION AND SEDIMENTATION CONTROL PLAN ·STORMWATER MANAGEMENT PLAN. 3.THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERROR THEY DISCOVER IN THE PLANS. 4.DEVIATION FROM THESE PLANS AND NOTES WITHOUT THE PRIOR CONSENT OF THE OWNER OR HIS REPRESENTATIVE OR THE ENGINEER MAY BE CAUSE OF THE WORK TO BE UNACCEPTABLE. 5.UTILITY COORDINATION SHALL BE INCLUDED IN THE PROJECT SCHEDULE AND IT IS THE EXPLICIT RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE PROJECT SCHEDULE INCLUDES THE NECESSARY RELOCATIONS. THE CONTRACTOR WILL NOT BE PAID ADDITIONALLY FOR THIS COORDINATION. THE CONTRACTOR SHOULD SEEK ASSISTANCE FROM ALL UTILITY COMPANIES TO LOCATE AND PROTECT THEIR FACILITIES. IF CONFLICTS ARE FOUND, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND DESIGN ENGINEER FOR INSTRUCTION BEFORE PROCEEDING WITH WORK. 6.ALL MATERIALS SHALL BE NEW UNLESS USED OR SALVAGED MATERIALS ARE AUTHORIZED BY THE OWNER AND APPLICANT. 7.TRAFFIC CONTROL METHODS, SUCH AS BARRICADES, SUFFICIENT LIGHTS, SIGNS, ETC., MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE PUBLIC SHALL BE PROVIDED AND MAINTAINED THROUGHOUT THE CONSTRUCTION IN ACCORDANCE WITH CURRENT AND NCDOT STANDARDS. 8.CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY BARRICADES, FENCING AND OTHER APPROPRIATE SAFETY ITEMS/MEASURES NECESSARY TO PROTECT THE PUBLIC FROM THE WORK AREA CONSTRUCTION ACTIVITIES. 9.HIGH INTENSITY LIGHTING FACILITIES SHALL BE SO ARRANGED THAT THE SOURCE OF ANY LIGHT IS CONCEALED FROM PUBLIC VIEW AND FROM ADJACENT RESIDENTIAL PROPERTY AND DOES NOT INTERFERE WITH TRAFFIC. 10.THE CONTRACTOR SHALL MAINTAIN ACCESS FOR EMERGENCY VEHICLES AROUND AND TO ALL BUILDINGS NEAR CONSTRUCTION. IN TIME OF RAIN OR MUD, ROADS SHALL BE ABLE TO CARRY A FIRE TRUCK BY BEING PAVED OR HAVING A CRUSHED STONE BASE, ETC., WITH A MINIMUM WIDTH OF 20 FEET. ACCESS TO BUILDINGS THAT HAVE SPRINKLER OR STANDPIPE SYSTEMS SHALL BE WITHIN 40 FEET OF THE FIRE DEPARTMENT CONNECTOR. (NFPA 1141 3-1) 11.BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONALLY BEDDING SHALL BE REQUIRED FOR ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK. 12.BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS AND SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX (6) INCHES IN COMPACTED FILL THICKNESS. A REPORT FROM A GEOTECHNICAL ENGINEER MAY BE REQUIRED BY THE PUBLIC WORKS INSPECTOR. CORRECTION OF ANY TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 13.THE CONTRACTOR WILL ENSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS MAINTAINED AT ALL TIMES WITHIN THE PROJECT LIMITS. THIS MAY INCLUDE, BUT NOT BE LIMITED TO, A) REPLACEMENT OR RECONSTRUCTION OF EXISTING DRAINAGE STRUCTURES THAT HAVE BEEN DAMAGED OR REMOVED, OR B) REGRADING AS REQUIRED BY THE ENGINEER, EXCEPT FOR THOSE DRAINAGE ITEMS SHOWN AT SPECIFIC LOCATIONS AND HAVING SPECIFIC PAY ITEMS IN THE DETAILED ESTIMATE. NO SEPARATE PAYMENT WILL BE MADE FOR ANY COSTS INCURRED TO COMPLY WITH THIS REQUIREMENT. 14.THE CONTRACTOR SHALL PROVIDE ANY AND ALL EXCAVATION AND MATERIAL SAMPLES NECESSARY TO CONDUCT REQUIRED SOIL TESTS. ALL ARRANGEMENTS AND SCHEDULING FOR THE TESTING SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 15.SOIL TESTING AND ON-SITE INSPECTION SHALL BE PERFORMED BY AN INDEPENDENT GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS REQUIRED TO INSPECT, TEST AND CERTIFY TO THE COMPACTION OF ALL LOAD BEARING FILLS. THE GEOTECHNICAL ENGINEER SHALL PROVIDE COPIES OF TEST REPORTS TO THE CONTRACTOR, THE OWNER AND TO THE OWNER'S REPRESENTATIVE AND SHALL PROMPTLY NOTIFY THE OWNER, HIS REPRESENTATIVE AND THE CONTRACTOR, SHOULD WORK PERFORMED BY THE CONTRACTOR FAIL TO MEET THESE SPECIFICATIONS. 16.ALL PERMITS MUST BE OBTAINED PRIOR TO THE START OF CONSTRUCTION. 17.ALL PAVEMENT MARKINGS AND REGULATORY SIGNS ON PRIVATE PROPERTY SHALL CONFORM TO CURRENT MUTCD STANDARDS. GENERAL CONSTRUCTION AND GRADING NOTES: 1.ALL UTILITIES AND SERVICES INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC, ETC. WITHIN THE LIMITS OF DISTURBANCE SHALL BE VERTICALLY AND HORIZONTALLY LOCATED. THE CONTRACTOR SHALL USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.UTILITY COORDINATION SHALL BE INCLUDED IN THE PROJECT SCHEDULE AND IT IS THE EXPLICIT RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE PROJECT SCHEDULE INCLUDES THE NECESSARY RELOCATIONS. THE CONTRACTOR WILL NOT BE PAID ADDITIONALLY FOR THIS COORDINATION. 3.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATIONS AND DEPTHS OF ALL EXISTING UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK AND TO TAKE WHATEVER STEPS NECESSARY TO PROVIDE FOR THEIR PROTECTION. THE ENGINEER HAS DILIGENTLY ATTEMPTED TO LOCATE AND INDICATE ALL EXISTING FACILITIES ON THESE PLANS; HOWEVER, THIS INFORMATION IS SHOWN FOR THE CONTRACTOR'S CONVENIENCE ONLY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS OF UTILITIES SHOWN OR NOT SHOWN. COMPLETENESS OR ACCURACY OF LOCATION AND DEPTH OF UNDERGROUND UTILITIES AND STRUCTURES IS NOT GUARANTEED. 4.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES FOR EXACT LOCATION AND PROTECTION OF THEIR UTILITIES PRIOR TO STARTING CONSTRUCTION. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR AND REPLACE ANY AND ALL DAMAGE MADE TO UTILITIES BY THE CONTRACTOR. 5.CONTRACTOR MUST APPLY FOR ALL UTILITY CONNECTION APPLICATIONS. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONNECTION FEES FOR CONSTRUCTION. REFER TO COVER SHEET FOR AVAILABLE UTILITY COMPANY LIST. 6.CONTRACTOR MUST OBTAIN ANY REQUIRED UTILITY DETAILS FOR RECONNECTION OF EXISTING SERVICES OR NEW SERVICE AND IS RESPONSIBLE FOR THE CONSTRUCTION OF EACH NEW SERVICE PER THE APPROPRIATE UTILITY COMPANY'S SPECIFICATIONS. 7.THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION OF ALL UNDERGROUND UTILITIES AND APPURTENANCES TO MINIMIZE DISTURBANCE TO CURBING, PAVING, AND COMPACTED SUB-GRADE. 8.IF CONFLICTS ARE FOUND, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND ENGINEER FOR INSTRUCTION BEFORE PROCEEDING WITH WORK. 9.ALL PIPE LENGTHS AND DISTANCES BETWEEN STRUCTURES ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE ALONG A HORIZONTAL PLANE. 10.THE CONTRACTOR SHALL PROVIDE ANY AND ALL EXCAVATION AND MATERIAL SAMPLES NECESSARY TO CONDUCT REQUIRED SOIL TESTS. ALL ARRANGEMENTS AND SCHEDULING FOR THE TESTING SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 11.SOILS TESTING AND ON-SITE INSPECTION SHALL BE PERFORMED BY AN INDEPENDENT GEOTECHNICAL ENGINEER. THE SOILS ENGINEER SHALL PROVIDE COPIES OF TEST REPORTS TO THE CONTRACTOR, THE OWNER AND THE OWNER'S REPRESENTATIVE AND SHALL PROMPTLY NOTIFY THE OWNER, HIS REPRESENTATIVE AND THE CONTRACTOR SHOULD WORK PERFORMED BY THE CONTRACTOR FAIL TO MEET THESE SPECIFICATIONS. 12.CONTRACTOR SHALL EXCAVATE ONLY ENOUGH TRENCH FOR WHICH PIPE CAN BE INSTALLED AND TRENCH BACKFILLED BY THE END OF EACH WORK DAY. 13.BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL BEDDING SHALL BE REQUIRED FOR ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK. 14.COMPACTION OF THE BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS AND SHALL BE PLACED IN LIFTS NOT TO EXCEED 6 INCHES IN COMPACTED FILL THICKNESS. A REPORT FROM A GEOTECHNICAL ENGINEER MAY BE REQUIRED BY THE PUBLIC WORKS INSPECTOR. CORRECTION OF ANY TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 15.RUNOFF FROM IMPERVIOUS AREAS SHALL NOT BE DIRECTED INTO THE SANITARY SEWER NOR ONTO ADJACENT PROPERTIES. 16.ALL JOINTS ON THE STORM WATER CONVEYANCE SYSTEM SHALL BE WATERTIGHT. 17.ALL CONSTRUCTION ASSOCIATED WITH WATER AND SANITARY SEWER SHALL BE IN ACCORDANCE WITH ORANGE COUNTY STANDARDS AND SPECIFICATIONS. 18.ALL ELECTRICAL SERVICE LINES TO OR AROUND THE PROPOSED STRUCTURE SHALL BE UNDERGROUND. GENERAL UTILITY NOTES: 1.HORIZONTAL AND VERTICAL SEPARATION 1.1.SANITARY SEWERS SHALL BE LAID AT LEAST 10-FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THE PUBLIC WORKS SUPPLY MAY ALLOW DEVIATION A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION ON MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT AN ELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18-INCHES ABOVE THE TOP OF THE SEWER. 1.2.IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARY SEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH THE PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150PSI TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING. 1.3.A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAIN. 1.3.1.IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (OR PRESSURE SEWERS). THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POURED AROUND WATER MAINS AND STORM SEWER TO IMMOBILIZE THE CROSSING. 2.CROSSINGS 1.1.SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18-INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS. 1.2.WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE SPECIFIED: 1.1.1.THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT 150-PSI TO ASSURE WATER TIGHTNESS PRIOR TO BACKFILLING, OR 1.1.2.EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS 10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE PUBLIC WATER SUPPLY FOR USE IN WATER MAIN CONSTRUCTION. CONTRACTORS MUST EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ADA (HANDICAP) ACCESSIBLE COMPONENTS AND ACCESS ROUTES FOR THE SITE. THESE COMPONENTS, AS CONSTRUCTED, MUST COMPLY WITH THE CURRENT ADA STANDARDS AND REGULATIONS' BARRIER FREE ACCESS AND ANY MODIFICATIONS, REVISIONS OR UPDATES TO SAME. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE OF TRAVEL FROM PARKING SPACE(S), PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, INTER-BUILDING ACCESS, TO POINTS OF ACCESSIBLE BUILDING ENTRANCE/EXIT, MUST COMPLY WITH THESE ADA CODE REQUIREMENTS. THESE INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: 1.PARKING SPACES AND PARKING AISLES - SLOPE SHALL NOT EXCEED 1:50 (1/4” PER FOOT OR NOMINALLY 2.0%) IN ANY DIRECTION. 2.CURB RAMPS - SLOPE MUST NOT EXCEED 1:12 (8.3%) FOR A MAXIMUM OF SIX (6) FEET. 3.LANDINGS - MUST BE PROVIDED AT EACH END OF RAMPS, MUST PROVIDE POSITIVE DRAINAGE, AND MUST NOT EXCEED 1:50 (1/4” PER FOOT OR NOMINALLY 2.0%) IN ANY DIRECTION. 4.PATH OF TRAVEL ALONG ACCESSIBLE ROUTE - MUST PROVIDE A 36-INCH OR GREATER UNOBSTRUCTED WIDTH OF TRAVEL (CAR OVERHANGS AND/OR HANDRAILS CANNOT REDUCE THIS MINIMUM WIDTH). THE SLOPE MUST BE NO GREATER THAN 1:20 (5.0%) IN THE DIRECTION OF TRAVEL, AND MUST NOT EXCEED 1:50 (1/4” PER FOOT OR NOMINALLY 2.0%) IN CROSS SLOPE. WHERE PATH OF TRAVEL WILL BE GREATER THAN 1:20 (5.0%), ADA RAMP REGULATIONS MUST BE ADHERED TO. A MAXIMUM SLOPE OF 1:12 (8.3%), FOR A MAXIMUM RISE OF 2.5 FEET, MUST BE PROVIDED. THE RAMP MUST HAVE ADA HAND RAILS AND “LEVEL” LANDINGS ON EACH END THAT ARE CROSS SLOPED NO MORE THAN 1:50 IN ANY DIRECTION (1/4” PER FOOT OR NOMINALLY 2.0%) FOR POSITIVE DRAINAGE. 5.DOORWAYS - MUST HAVE A “LEVEL” LANDING AREA ON THE EXTERIOR SIDE OF THE DOOR THAT IS SLOPED AWAY FROM THE DOOR NO MORE THAN 1:50 (1/4” PER FOOT OR NOMINALLY 2.0%) FOR POSITIVE DRAINAGE. THIS LANDING AREA MUST BE NO LESS THAN 60 INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE PERMITTED BY ADA STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICC/ANSI A117.1-2003 AND OTHER REFERENCED INCORPORATED BY COD.) 6.WHEN THE PROPOSED CONSTRUCTION INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF OR TO ADA COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, CONTRACTOR MUST VERIFY EXISTING ELEVATIONS SHOWN ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. PRIOR TO THE COMMENCEMENT OF WORK, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER IN WRITING OF ANY DISCREPANCIES AND/OR FIELD CONDITIONS THAT DIFFER IN ANY WAY OR ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS, IN WRITING, BEFORE COMMENCEMENT OF WORK. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINIMUM LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ADA REQUIREMENTS. 7.THE CONTRACTOR MUST VERIFY THE SLOPES OF CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY NON-CONFORMANCE IS OBSERVED OR EXISTS, CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER PRIOR TO POURING CONCRETE. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND REPLACE NON-CONFORMING CONCRETE. 8.THE SITE SHALL BE FULLY COMPLIANT WITH THE NORTH CAROLINA ACCESSIBILITY CODES (ANSI 117.1 -2009 AND CHAPTER 11 OF THE NCBC) UNLESS AND EXCEPT IN AREAS WHERE AN APPROVED STATEMENT FROM A SITE ENGINEER, SURVEYOR OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXIST WHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCE ARE POSSIBLE. 9.ACCESSIBILITY REQUIREMENTS: THAT PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY, THE APPLICANT SHALL PROVIDE THE MINIMUM REQUIRED HANDICAPPED PARKING SPACES AND DESIGN ALL HANDICAPPED PARKING SPACES, RAMPS, AND CROSSWALKS, AND ASSOCIATED INFRASTRUCTURE ACCORDING TO AMERICANS WITH DISABILITIES ACT STANDARDS, NORTH CAROLINA BUILDING CODE, AMERICAN NATIONAL STANDARDS INSTITUTE ANSI CODE, AND TOWN STANDARD.1. PARKING - NUMBER OF SPACES TO COMPLY WITH NCBC 2012 SECTION 1106.1, 1 PER 6 COMPLIANT SPACES OR PORTION THEREOF MUST BE VAN ACCESSIBLE, NO SLOPE TO EXCEED 2 PERCENT IN ANY DIRECTION. SIGNAGE PER NC REQUIREMENTS, MUT-CD AND ICC A 117.1.2. CURB CUTS AND ACCESSIBLE ROUTES PER ICC A117.1 2009 ED. CROSS SLOPE LIMITED TO 2 PERCENT, CALL FOR INSPECTION BEFORE PLACEMENT OF CONCRETE.€¢ SLOPE GREATER THAN 5 PERCENT REQUIRES CONSTRUCTION AS A RAMP. IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR REVIEW THE INTENDED CONSTRUCTION WITH THE LOCAL BUILDING CODE PRIOR TO COMMENCEMENT OF CONSTRUCTION. ADA INSTRUCTIONS TO CONTRACTOR: WATER AND SEWER SERVICE NOTES: LEGEND PROPERTY, LINE PROPERTY, CORNER FOUND PROPERTY, ADJOINING LINED LEGAL RIGHT-OF-WAY PROPERTY, CORNER FOUND (OTHERS) EXISTING PROPOSED PROPERTY, CONCRETE MONUMENT PROPERTY, LINE RESERVED BUILDING CABLE TV, MANHOLE CABLE TV, JUNCTION BOX CABLE TV, PANEL BOX CABLE TV, PEDESTAL CABLE TV, STUB OUT CABLE TV, UNDERGROUND CABLE TV, OVERHEAD CHANNEL COMMUNICATION, MANHOLE COMMUNICATION, JUNCTION BOX COMMUNICATION, PANEL BOX COMMUNICATION, PEDESTAL COMMUNICATION, STUB OUT COMMUNICATION, UNDERGROUND COMMUNICATION, OVERHEAD CABLE TV, WITNESS POST COMMUNICATION, HANDHOLE COMMUNICATION, WITNESS POST CONTROL, GPS CONTROL, MAPPING CONTROL, REFERENCE CONTROL, TRAVERSE CURB CURB DEPRESSION EDGE OF PAVEMENT EDGE OF GRAVEL EASEMENT FENCE FIBER OPTIC, MANHOLE FIBER OPTIC, JUNCTION BOX FIBER OPTIC, PANEL BOX FIBER OPTIC, PEDESTAL FIBER OPTIC, STUB OUT FIBER OPTIC, UNDERGROUND FIBER OPTIC, OVERHEAD FIBER OPTIC, HANDHOLE FIBER OPTIC, WITNESS POST FLOODPLAIN FUEL, PLUG FUEL, PUMP FUEL, MANHOLE FUEL, UNDERGROUND FUEL, OVERHEAD GUIDE RAIL MARKING, HANDICAP PARKING NATURAL GAS, MANHOLE NATURAL GAS,VALVE NATURAL GAS, WITNESS POST NATURAL GAS, STUB OUT NATURAL GAS, UNDERGROUND NATURAL GAS, METER NATURAL GAS, OVERHEAD CONTROL, BENCHMARK PHONE, MANHOLE PHONE, JUNCTION BOX PHONE, PANEL BOX PHONE, PEDESTAL PHONE, STUB OUT PHONE, UNDERGROUND PHONE, OVERHEAD PHONE, HANDHOLE PHONE, WITNESS POST POWER, HANDHOLE POWER, GUY WIRE POWER, SINGLE HEAD LIGHT POWER, JUNCTION BOX POWER, GUY POLE POWER, DOUBLE HEAD LIGHT POWER, THREE HEAD LIGHT POWER, FOUR HEAD LIGHT POWER, LIGHT POWER, MANHOLE POWER, OVERHEAD POWER, METER POWER, PANEL BOX POWER, PEDESTAL POWER, TRANSFORMER POWER, SPOT LIGHT POWER, LIGHT POLE SINGLE POWER, LIGHT POLE DOUBLE POWER, UTILITY POLE POWER, WITNESS POST POWER, YARD LIGHT POWER, UNDERGROUND POWER, STUB OUT RAIL, MILE MARKER RAIL, PANEL BOX RAIL, TRACK SITE, AIR COMPRESSOR SITE, AIR CONDITIONER SITE, BOLLARD SITE, BORING LOCATION SITE, FLAG POLE SITE, HEAD STONE SITE, MAIL BOX SITE, MONITOR WELL SITE, PARKING METER SITE, POST SITE, SIGN POST AND BOARD SITE, TRAFFIC SIGN DESCRIPTION SOIL BOUNDARY STREAM WaC SOIL LABEL SANITARY SEWER, MANHOLE SANITARY SEWER, FORCE MAIN MANHOLE SANITARY SEWER, UNDERGROUND (4" DIA TO 10" DIA) SANITARY SEWER, SEPTIC TANK SANITARY SEWER, STUB OUT SANITARY SEWER, VALVE SANITARY SEWER, FORCE MAIN SANITARY SEWER, LATERAL SANITARY SEWER, FORCE STUB OUT SANITARY SEWER, WITNESS POST STORM SEWER, MANHOLE STORM SEWER, INLET STORM SEWER,HEADWALL STORM SEWER, UNDERGROUND STORM SEWER, ROOF DRAIN LINE STORM SEWER, STAND PIPE STORM SEWER, CLEAN-OUT STORM SEWER, WITNESS POST SANITARY SEWER, CLEAN-OUT MINOR CONTOUR MAJOR CONTOUR SPOT ELEVATION 101 100 X 100.5 TRAFFIC, PAVEMENT MARKING, BIKE LANE TRAFFIC, PAVEMENT MARKING, TURN ARROWS TRAFFIC, PAVEMENT MARKING, HOV LANE TRAFFIC, HAND HOLE TRAFFIC, JUNCTION BOX TRAFFIC, MANHOLE TRAFFIC, PANEL BOX TRAFFIC, PEDESTAL TRAFFIC, PEDESTRIAN SIGNAL TRAFFIC, SIGNAL POLE TRAFFIC, SIGNAL POLE & LIGHT ARM TRAFFIC, STUB OUT VEGETATION, SHRUB VEGETATION, GRASS LINE / LANDSCAPED AREA VEGETATION, DECIDUOUS SHOWING CANOPY VEGETATION, CONIFEROUS SHOWING CANOPY VEGETATION, TREE LINE WATER, HOSE BIB WATER, FIRE HYDRANT WATER, IRRIGATION HEAD WATER, IRRIGATION VALVE BOX WATER, MANHOLE WATER, METER WATER, POST INDICATOR VALVE WATER, SIAMESE CONNECTION WATER, STUB OUT WATER, UNDERGROUND WATER, VALVE WATER, UNDERGROUND FIRE WATER, WITNESS POST 101 100 LEGEND EXISTING PROPOSED DESCRIPTION TO BE REMOVEDT.B.R. 100.5 LIMITS OF DISTURBANCE *STORM SEWER, DOWNSPOUT LOCATION 1.CONSTRUCTION WASTE a.ALL EXISTING STRUCTURES 500 SQUARE FEET AND LARGER SHALL BE ASSESSED PRIOR TO THE ISSUANCE OF A DEMOLITION PERMIT TO ENSURE COMPLIANCE WITH THE COUNTY'S REGULATED RECYCLABLE MATERIALS ORDINANCE (RRMO) AND TO ASSESS THE POTENTIAL FOR DECONSTRUCTION AND/OR THE REUSE OF SALVAGEABLE MATERIALS.. b.PURSUANT TO THE COUNTY'S RRMO, CLEAN WOOD WASTE, SCRAP METAL, AND CORRUGATED CARDBOARD PRESENT IN CONSTRUCTION OR DEMOLITION WASTE MUST BE RECYCLED. c.PURSUANT TO THE COUNTY'S RRMO, ALL HAULERS OF MIXED CONSTRUCTION AND DEMOLITION WASTE WHICH INCLUDES ANY REGULATED RECYCLABLE MATERIALS SHALL BE LICENSED BY ORANGE COUNTY. d.PRIOR TO ANY DEMOLITION OR CONSTRUCTION ACTIVITY ON THE SITE, THE APPLICANT SHALL HOLD A PRE-DEMOLITION/PRE-CONSTRUCTION CONFERENCE WITH SOLID WASTE STAFF. THIS MAY BE THE SAME PRE-CONSTRUCTION MEETING HELD WITH OTHER DEVELOPMENT/ENFORCEMENT OFFICIALS. e.THE PRESENCE IF ANY ASBESTOS CONTAINING MATERIALS (ACM) AND/OR OTHER HAZARDOUS MATERIALS SHALL BE HANDLED IN ACCORDANCE WITH ANY AND ALL LOCAL, STATE, AND FEDERAL REGULATIONS AND GUIDELINES. ORANGE COUNTY SOLID WASTE NOTES 1.A SINGLE ELECTRICAL SERVICE SHALL BE PROVIDED TO SERVE THE STRUCTURE WITH THE EXCEPTION IF A FIRE PUMP WAS REQUIRED. ARTICLE 230.2 A 2014 EDITION OF NORTH CAROLINA ELECTRIC CODE. 2.ADDRESS NUMBERS MUST BE A MINIMUM OF 4 INCHES HIGH AND OF CONTRASTING COLOR TO THEIR BACKGROUND. REFLECTIVE NUMBERS ARE PREFERRED. WHEN THE DISTANCE FROM THE STREET OR FIRE DEPARTMENT ACCESS LANE TO THE FRONT OR ADDRESS SIDE OF THE BUILDING EXCEEDS 25 FEET, LARGER NUMBERS ARE REQUIRED. 26 FEET TO 50 FEET SHALL HAVE 8 INCH NUMBERS, 51-75 FEET SHALL HAVE 12 INCH NUMBERS AND OVER 75 FEET SHALL HAVE 18 INCH NUMBERS. WHERE ACCESS IS BY PRIVATE MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. 3.KEY BOXES SHALL BE REQUIRED ON ANY BUILDING THAT HAS A FIRE ALARM SYSTEM, A FIRE SPRINKLER SYSTEM, AN ELEVATOR, OR SPECIAL LOCKING ARRANGEMENTS. THE KEY BOX SHALL BE OF AN APPROVED TYPE AS REQUIRED FROM THE CHAPEL HILL FIRE DEPARTMENT. THE SIZE OF THE KEY BOX WILL BE DETERMINED BY THE NUMBER OF KEYS NECESSARY TO MITIGATE ANY EMERGENCY SITUATION BASED ON THE BUILDING AND ITS OCCUPANCY. AN APPROVED LOCK SHALL BE INSTALLED ON GATES OR SIMILAR BARRIERS WHEN REQUIRED BY THE FIRE CODE OFFICIAL. KEYS SHALL BE CHANGED OUT IMMEDIATELY IF THE LOCKS ARE CHANGED OR REKEYED INSPECTION NOTES 1.FIRE APPARATUS ACCESS ROADS; ANY FIRE APPARATUS ACCESS ROADS, ANY PUBLIC/PRIVATE STREET, PARKING LOT ACCESS, FIRE LANES AND ACCESS ROADWAYS, USED FOR FIRE DEPARTMENT ACCESS SHALL BE ALL WEATHER AND DESIGNED TO CARRY THE IMPOSED LOAD OF FIRE APPARATUS WEIGHING AT LEAST 80,000 LBS. FIRE APPARATUS ACCESS ROADS SHALL HAVE A MINIMUM WIDTH OF 20' EXCLUSIVE OF SHOULDERS WITH AN OVERHEAD CLEARANCE OF AT LEAST 13'-6" FOR STRUCTURES NOT EXCEEDING 30' IN HEIGHT AND SHALL PROVIDE ACCESS TO WITHIN 150' OF ALL EXTERIOR PORTIONS OF THE BUILDING. STRUCTURES EXCEEDING 30' IN HEIGHT SHALL BE PROVIDED WITH AN AERIAL APPARATUS ACCESS ROAD 26' IN WIDTH IN THE IMMEDIATE VICINITY OF THE BUILDING OR PORTION THEREOF AND SHALL PROVIDE AT LEAST ONE OF THE REQUIRED ACCESS ROADS TO BE LOCATED NOT LESS THAN 15' AND NOT MORE THAN 30' FROM THE STRUCTURE PARALLEL TO ONE ENTIRE SIDE OF THE STRUCTURE. NC FPC 2012 502.1,503.1.1, 503.2.1, D102.1 2.GRADE AND APPROACH; FIRE APPARATUS ACCESS ROADS SHALL NOT EXCEED 10% IN GRADE UNLESS APPROVED BY THE FIRE CHIEF AND ALL APPROACH AND DEPARTURE ANGLES SHALL BE WITHIN THE LIMITS ESTABLISHED BASED ON THE DEPARTMENT'S APPARATUS. NC FPC 2012, 503.2.7, 503.2.8 and D103.2 3.GATES AND BARRICADES; WHERE REQUIRED OR AUTHORIZED BY THE FIRE CODE OFFICIAL AND PERMANENT OR TEMPORARY CONSTRUCTION, ANY GATES ACROSS FIRE APPARATUS ACCESS ROADS SHALL BE A MINIMUM WIDTH OF 20 FEET, BE OF SWINGING OR SLIDING TYPE, HAVE AN EMERGENCY MEANS OF OPERATION, SHALL BE OPENABLE BY EITHER FORCIBLE ENTRY OR KEYED, CAPABLE OF BEING OPERATED BY ONE PERSON, AND SHALL BE INSTALLED AND MAINTAINED ACCORDING TO UL 325 and ASTM F 2200. NC FPC 2012, 503.5, 503.6, D103.5 4.FIRE LANES; WHERE REQUIRED, APPROVED MARKING SIGNS INCLUDING THE WORDS, NO PARKING-FIRE LANE SIGNS SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS. NC FPC 2012, 503.3, D103.6, D103.6.1, D103.6.2 5.PREMISE IDENTIFICATION; APPROVED BUILDING ADDRESS NUMBERS, PLACED IN ACCEPTABLE POSITION TO THE FIRE CODE OFFICIAL, SHALL BE REQUIRED ON ALL NEW BUILDINGS. NC FPC 2012, 505.1 6.KEY BOXES; WHERE REQUIRED BY THE FIRE CODE OFFICIAL, A SECURE KEY BOX, MOUNTED ON THE ADDRESS SIDE OF THE BUILDING, NEAR THE MAIN ENTRANCE, SHALL BE PROVIDED TO ENSURE ADEQUATE ACCESS TO THE BUILDING BASED ON LIFE SAFETY AND/OR FIRE PROTECTION NEEDS. NC FPC 2012, 506 7.FIRE HYDRANTS; THE ADDITION OF ANY REQUIRED HYDRANTS TO SERVE THE SUBMITTED BUILDING MUST FLOW A MINIMUM OF 2500 GPM PER TOWN ENGINEERING STANDARDS UNLESS APPROVED BY THE FIRE CODE OFFICIAL. THE FARTHEST HYDRANT SERVING A PROPOSED STRUCTURE MUST BE NO MORE THAN 500 FEET DISTANT. A MAXIMUM DISTANCE OF 500 FEET SPACING BETWEEN HYDRANTS MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE FIRE CODE OFFICIAL. LESSER SPACING DISTANCES MAY BE REQUIRED. A MINIMUM WORKING SPACE OF 3 FEET MUST BE MAINTAINED AROUND ALL HYDRANTS. WHERE HYDRANTS ARE SUBJECT TO PHYSICAL IMPACT, PHYSICAL PROTECTION MAY BE REQUIRED, NC FPC 2012, 507.5.6. THE MINIMUM NUMBER OF REQUIRED HYDRANTS AND THEIR SPACING MUST MEET NC FPC 2012, APPENDIX C, TABLE C 105.1 8.FIRE DEPARTMENT CONNECTIONS, LOCATIONS; ANY REQUIRED FDCS FOR ANY BUILDINGS SHALL MEET THE DESIGN AND INSTALLATION REQUIREMENTS FOR THE CURRENT, APPROVED EDITION OF NFPA 13, 13D, 13R, OR 14 OF THE NC FPC 2012 AND TOWN ORDINANCES; 7-38 FOR LOCATION. FDCS SHALL BE INSTALLED ON THE STREET/ ADDRESS SIDE OF THE BUILDING AND WITHIN 100' OF A HYDRANT OR UNLESS OTHERWISE APPROVED BY THE FIRE CODE OFFICIAL AND SHALL NOT BE OBSTRUCTED OR HINDERED BY PARKING OR LANDSCAPING. FDC'S SHALL BE EQUIPPED WITH NST. 9.FIRE DEPARTMENT CONNECTIONS, INSTALLATION; A WORKING SPACE OF NOT LESS THAN 36 INCHES IN WIDTH AND DEPTH AND A WORKING SPACE OF 78 INCHES IN HEIGHT SHALL BE PROVIDED ON ALL SIDES WITH THE EXCEPTION OF WALL MOUNTED FDC'S UNLESS OTHERWISE APPROVED BY THE FIRE CODE OFFICIAL. THE FDC'S WHERE REQUIRED MUST BE PHYSICALLY PROTECTED BY AN APPROVED BARRIER FROM IMPACTS. NC FPC 2012, 912.1, 912.2 912.2.1, 912.3.2, 312 FIRE DEPARTMENT NOTES 500500505 505510 510 510 515515515520 520520520525525 525 530535 540540540545545 545550550 550555555555560565565500500500505505505505510510 510510 510510515515515515515515520520520520520 525525525 530 530530530530535535535535535535540540540540540540 545545545545545545550 550550550 S 70°06'44" W628.47'N 05°28'49" E361.26'S 87°07'48" W239.87'N 00°38'25" W 2833.98' S 48° 3 3' 3 4" E 355. 0 8'S 37°54'25" W 453.45'S 21°0 4 ' 5 3 " E 3 5 6 . 1 9 'S 68°51'39" E274.40'S 12°12'4 5 " E 299.89' S 12°12'2 0 " E 384.79'S 03°12'04" W215.24'S 66°38'04" W301.39'S 14°30'22" W574.28'S 13°31'18" W267.89'S 46°34'29" W341.32'S 80°08'58" W350.02'L1L2L3L4L5L6L7 L8L9L10L11L12L13 L14 L15L16L17L18L19L20L21L22L23L24L25L26 PROPOSED CLEARING LIMITS (TYP.) ℄ STREAM PER ORANGE COUNTY GIS (TYP.) 100' BUFFER 100' BUFFER 100' BUFFER 100' BUFFER STREAM BUFFER (TYP.) APPROX. LOCATION OF TREELINE BASED UPON AERIAL PHOTOGRAPHY FEMA FLOOD PLAIN "AE" BOUNDARY 80' FLOOD PLAIN BUFFER LINE 80' FLOOD PLAIN BUFFER LINE 80' FLOOD PLAIN BUFFER LINE A-ANNO-IDEN-ROOMROOM NAMEA-AREAGENERAL AREA TAKE OFFSA-AREA-2AREA 2 BOUNDARYNC HIGHWAY 54 (SR 54)(120' PUBLIC RIGHT-OF-WAY)L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 11/2/2017 8:31 AM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 1"=150' AAA PCB SHEET APPROVED BY OF3 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 150'300'NORTHAMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.EXISTING CONDITIONS NOTES: 1.THIS PLAN REFERENCE DOCUMENTS AND INFORMATION BY: A.) PRELIMINARY BOUNDARY SURVEY BY PENNONI, FIELD DATE: 07/20/2017 B.) ORANGE COUNTY TOPOGRAPHIC, GIS DATA ACCESSED 9/6/2017 C.) ORANGE COUNTY UNIFIED DEVELOPMENT ORDINANCE SURFACE WATER IDENTIFICATION, DATED 8/9/2015 D.) FEMA FIRM MAP, #3710974900J E.) LIMITED TOPOGRAPHIC INFORMATION OBTAINED BY PENNONI ASSOCIATES ON OR ABOUT 03/26/2018. 2.OWNER/ APPLICANT:CHAPEL HILL POST No. 6 AMERICAN LEGION INC PO BOX 2323 CHAPEL HILL, NC 27515 3.PARCEL: PARCEL: 9749101791; 9748194003 2018-05-17 CS0201EXISTING CONDITIONS - DEMOLITION PLAN2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB S 70°06'44" W628.47'N 05°28'49" E361.26'S 87°07'48" W239.87'N 00°38'25" W 2833.98' S 48° 3 3' 3 4" E 355. 0 8'S 37°54'25" W 453.45'S 21°0 4 ' 5 3 " E 3 5 6 . 1 9 'S 68°51'39" E274.40'S 12°12'4 5 " E 299.89' S 12°12'2 0 " E 384.79'S 03°12'04" W215.24'S 66°38'04" W301.39'S 14°30'22" W574.28'S 13°31'18" W267.89'S 46°34'29" W341.32'S 80°08'58" W350.02'L1L2L3L4L5L6L7 L8L9L10L11L12L13 L14 L15L16L17L18L19L20L21L22L23L24L25L26 PROPOSED ASPHALT DRIVE PROPOSED POND W.S. ELEV. 519.00 PROPOSED DROP OFF LANE PROPOSED ASPHALT PARKING AREA PROPOSED CLEARING LIMITS (TYP.) PROPOSED NCDOT ENTRANCE APRON PROPOSED STREAM CROSSING ℄ STREAM PER ORANGE COUNTY GIS (TYP.) PROPOSED 45' FLAG POLES (TYP.) 100' BUFFER 100' BUFFER 100' BUFFER 100' BUFFER APPROXIMATE LOCATION OF PROPOSED SIGN PROPOSED HEAVY DUTY ASPHALT AREA FOR FIRE ACCESS STREAM BUFFER (TYP.) PROPOSED HEAVY-DUTY ASPHALT DRIVE PROPOSED POST HALL 1 STORY BUILDING FIN. FLR. ELEV. = 531.50 ±15,713 SF PROPOSED FUTURE STORAGE BUILDING ±3,500 SF PROPOSED FUTURE PICNIC SHELTER PROPOSED FUTURE GAZEBO APPROX. LOCATION OF TREELINE BASED UPON AERIAL PHOTOGRAPHY FEMA FLOOD PLAIN "AE" BOUNDARY 80' FLOOD PLAIN BUFFER LINE 80' FLOOD PLAIN BUFFER LINE 80' FLOOD PLAIN BUFFER LINE A-ANNO-IDEN-ROOMROOM NAMEA-AREAGENERAL AREA TAKE OFFSA-AREA-1AREA 1 BOUNDARYA-AREA-2AREA 2 BOUNDARY GRAVEL RECREATIONAL VEHICLE PARKING PROPOSED 6' WIDE ASPHALT WALK PROPOSED 3' WIDE STONE SHOULDER PROPOSED STOP SIGN AND BARNC HIGHWAY 54 (SR 54)(120' PUBLIC RIGHT-OF-WAY) PROPOSED OVERFLOW GRASS PARKING AREA PROPOSED STOP SIGN AND BAR (TYP) FFE = 531.50 PROPOSED PORCH PROPOSED FIRE LANE PROPOSED FLUSH CURB/SIDEWALK 109810101088886611559PROPOSED FOREBAY L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 11/3/2017 9:53 AM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 1"=150' AAA PCB SHEET APPROVED BY OF4 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 150'300'AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.LAND USE & ZONING NOTES: 1.THIS PLAN REFERENCE DOCUMENTS AND INFORMATION BY: A.) PRELIMINARY BOUNDARY SURVEY BY PENNONI, FIELD DATE: 07/20/2017 B.) ORANGE COUNTY GIS DATA ACCESSED 9/6/2017 C.) ORANGE COUNTY UNIFIED DEVELOPMENT ORDINANCE SURFACE WATER IDENTIFICATION, DATED 8/09/2017 D.) LIMITED SITE TOPOGRAPHY INFORMATION OBTAINED BY PENNONI ASSOCIATES ON OR ABOUT 03/26/2018. 2.OWNER/ APPLICANT:CHAPEL HILL POST No. 6 AMERICAN LEGION INC PO BOX 2323 CHAPEL HILL, NC 27515 3.PARCEL: PARCEL: 9749101791; 9748194003 4.ZONE:AR (AGRICULTURAL RESIDENTIAL) PROPOSED USES: CLUBS OR LODGES [SECTION 5.2 ] = PERMITTED CAMP/ RETREAT [SECTION 5.2] = SPECIAL USE PERMIT CLASS B GRANTED BY ORANGE COUNTY BOA ON 01/08/2018. 5.DESIGN REQUIREMENTS: N/A = NOT APPLICABLE N/S = NOT SPECIFIED (V) = VARIANCE (W) = WAIVER (E) = EXISTING NON-CONFORMANCE TBD = TO BE DETERMINED (C) = COMPLIES 6.PARKING SUMMARY : NUMBER OF PARKING SPACES REQUIRED [ORD. SECTION 6.9]: REQUIRED: CLUB OR LODGE: MINIMUM PARKING - 1 SPACE / 3 MEMBERS = 400 MEMBERS - 134 SPACES PROPOSED: TOTAL PROPOSED PARKING = 139 TOTAL SPACES / 5 ADA ACCESSIBLE SPACES 8. FLOODPLAIN: FIRM MAP #3710974900J PROPERTY LOCATED IN ZONES "AE" AND 'X' AREAS 9.ACCESS TO CEMETERY FOR THE FAMILY OF THE DECEASED SHALL BE PERMITTED BY THE AMERICAN LEGION WITH PRIOR COMMUNICATION TO VISIT. METHOD OF ACCESS AND DELINEATION TO BE DETERMINED AT A LATER DATE.NORTH2018-05-17 CS1001OVERALL SITE PLAN2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB PROPOSED ASPHALT DRIVE PROPOSED CLEARING LIMITS (TYP.) PROPOSED NCDOT ENTRANCE APRON PROPOSED STREAM CROSSING ℄ STREAM PER ORANGE COUNTY GIS (TYP.) 100' BUFFER STREAM BUFFER (TYP.) APPROX. LOCATION OF TREELINE BASED UPON AERIAL PHOTOGRAPHY-0+250+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0 0 14+00 14+ 6 6 A-ANNO-IDEN-ROOM ROOM NAME A-AREA GENERAL AREA TAKE OFFSA-AREA-1AREA 1 BOUNDARY A-AREA-2 AREA 2 BOUNDARY22.00'3.00'3.00'R160.00'PROPOSED 3' WIDE STONE SHOULDERR25.00'R25.00'R150.00'R140.00'R140.00'PROPOSED STOP SIGN AND BARNC HIGHWAY 54 (SR 54)(120' PUBLIC RIGHT-OF-WAY)R4.00'R33.03'2 2 . 4 '13.6'61111.00'11.00'11.00'L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 7/20/2017 3:15 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 AAA PCB SHEET APPROVED BY OF5 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 40'80' NORTH AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.2018-05-17 CS1002DETAILED SITE PLAN NORTH2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB1"=30'2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB PROPOSED POND W.S. ELEV. 519.00 PROPOSED DROP OFF LANE PROPOSED ASPHALT PARKING AREA (TYP.) PROPOSED DUMPSTER AREA SEE DETAIL ON SHEET CS60001 PROPOSED 45' FLAG POLES (TYP.) REFUSE DUMPSTER PROPOSED HEAVY DUTY ASPHALT AREA FOR FIRE ACCESS PROPOSED HEAVY-DUTY ASPHALT DRIVE20.00 ' 9.00' 20.00' 24.00 20.00' 2 4 . 0 0 '9'9'9'PROPOSED POST HALL 1 STORY BUILDING FIN. FLR. ELEV. = 531.50 ±15,713 SF PROPOSED FUTURE STORAGE BUILDING ±3,500 SF PROPOSED FUTURE PICNIC SHELTER PROPOSED FUTURE GAZEBO APPROX. LOCATION OF TREELINE BASED UPON AERIAL PHOTOGRAPHY FEMA FLOOD PLAIN "AE" BOUNDARY 80' FLOOD PLAIN BUFFER LINE 13+0 0 14+00 14+ 6 6 F L A G U P L I G H T F L A G U P L I G H T F L A G U P L I G H T 30.00'6 7 . 0 0 ' GRAVEL RECREATIONAL VEHICLE PARKING PROPOSED 6' WIDE ASPHALT WALK R140.00'PROPOSED OVERFLOW GRASS PARKING AREA R4.00'R4.00'R13.75'R41.47'R4.00'24.00'R33.03'24.00'PROPOSED STOP SIGN AND BAR (TYP)R70.00'R20.13'R50.00'20.00'PROPOSED HEAVEY DUTY ASPHALT AREA FOR FIRE ACCESS AND BASKETBALL COURT60.00'50.00'8.00'8.00'20.00'R115.00'R115.00'R24.58'FFE = 531.5022.00'67.57'PROPOSED PORCH PROPOSED FIRE LANE 24.00'R20.00'R20.00'PROPOSED FLUSH CURB/SIDEWALK9.00'20.00'109810101088886611559PROPOSED FOREBAY L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 7/20/2017 3:15 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 AAA PCB SHEET APPROVED BY OF6 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 40'80' NORTH AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.2018-05-17 CS1003DETAILED SITE PLAN SOUTH1"=2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB PROPOSED CLEARING LIMITS (TYP.) ℄ STREAM PER ORANGE COUNTY GIS (TYP.) 100' BUFFER STREAM BUFFER (TYP.) APPROX. LOCATION OF TREELINE BASED UPON AERIAL PHOTOGRAPHY IDENTIFIED SUITABLE SEPTIC SOILS PROPOSED UNDERGROUND ELECTRIC SERVICE-0+250+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0 0 14+00 14+ 6 6 A-ANNO-IDEN-ROOM ROOM NAMEA-AREA GENERAL AREA TAKE OFFS A-AREA-1 AREA 1 BOUNDARYA-AREA-2 AREA 2 BOUNDARY521NC HIGHWAY 54 (SR 54)(120' PUBLIC RIGHT-OF-WAY) PROPOSED SEPTIC AREA 611I-71 15 IN FES RIM 520.44 INV OUT 519.00 (NW) AD-20 2' X 4' RIM 530.50 INV IN 525.00 (SE) INV OUT 524.80 (W) AD-21 2' X 4' RIM 529.90 INV OUT 526.90 (NW) AD-11 2' X 4' RIM 528.25 L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 7/20/2017 3:15 PM, BY: Donald Chitty PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 AAA PCB SHEET APPROVED BY OF7 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 40'80'PENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267NORTH AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.2018-05-17 CS1501GRADING & DRAINAGE PLAN NORTH1"=40'2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB PROPOSED POND W.S. ELEV. 519.00 APPROX. LOCATION OF TREELINE BASED UPON AERIAL PHOTOGRAPHY FEMA FLOOD PLAIN "AE" BOUNDARY 80' FLOOD PLAIN BUFFER LINE 14+ 6 6 541560 I-79 18 IN FES RIM 502.75 PROPOSED OUTLET STRUCTURE I-78 4' X 4' RIM 521.50 INV OUT 512.00 (N) FES-1 18 IN FES RIM 521.43 INV IN 519.77 (E)194 LF 15" RCP @ 0.80%CB-1 2' X 4' RIM 531.29 INV IN 521.42 (NE) INV IN 521.50 (E) INV OUT 521.32 (W) 3 1 5 L F 1 5 " R C P @ 0 . 8 0%264 LF 15" RCP @ 1.25%AD-20 2' X 4' RIM 530.50 INV IN 525.00 (SE) INV OUT 524.80 (W) AD-11 2' X 4' RIM 528.25 INV OUT 525.00 (NW) CB-10 2' X 4' RIM 528.71 INV IN 524.04 (SE) INV OUT 523.94 (SW)121 LF 15" RCP @ 0.80%121 LF 15" RCP @ 1.57% PROPOSED FOREBAY L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 7/20/2017 3:15 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 AAA PCB SHEET APPROVED BY OF8 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 40'80'PENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267NORTH AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.2018-05-17 CS1502GRADING & DRAINAGE PLAN SOUTH1"=40'2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB DRIVEWAY (1) HORIZONTAL SCALE: 1" = 80' VERTICAL SCALE: 1" = 8' 480 490 500 510 520 530 540 550 480 490 500 510 520 530 540 550 -2+00 -1+00 0+00521.92522.801+00523.14521.302+00518.92516.553+00514.17511.804+00509.42507.055+00504.98503.446+00502.43501.957+00502.00502.588+00503.68505.329+00507.48510.1710+00513.17516.1711+00519.17522.1712+00525.17528.1613+00530.37531.3314+00531.52531.6915+00 16+00 0.35% 6.00 % -4. 7 5 % 1.75%STA 0+00ELEV 521.92STA 14+66.12ELEV 531.75PVI STA = 1+00 PVI ELEV = 523.67 A.D. = -6.50 K = 10.00 BVCS: 0+67.50BVCE: 523.10EVCS: 1+32.50EVCE: 522.13HIGH POINT ELEV = 523.25 HIGH POINT STA = 0+85 65' VC PVI STA = 13+00 PVI ELEV = 531.17 A.D. = -5.65 K = 20.00 BVCS: 12+43.49BVCE: 527.78EVCS: 13+56.51EVCE: 531.37113' VC PVI STA = 7+00 PVI ELEV = 495.17 A.D. = +10.75 K = 47.28 BVCS: 4+45.87BVCE: 507.24EVCS: 9+54.13EVCE: 510.42LOW POINT ELEV = 501.91 LOW POINT STA = 6+70.45 508' VC 15 in HDPE EXISTING CENTERLINE GRADE PROPOSED CENTERLINE GRADE PRO P O S E D C L E A RI N G LIMI T S ( T Y P.) APPR O X . LOCA T I O N OFTREE L I N E BASE D UPON AERI A L PHOT O G R A P H Y IDEN TI FI E D SUIT A B L E S E P TI C SOIL S PROPOSEDUNDERGROUNDELECTRIC SERVICE-0+250+001+002+003+004+005+006+007+008+009 + 0 0 1 0 + 0 0 11+0012+0013+0014+ 00 14+66 A-ANNO-IDEN-ROOMROOM NAME A-AREAGENERAL AREA TAKE OFFSA-AREA-1AREA 1 BOUNDARYA-AREA-2AREA 2 BOUNDARY FLAG UPLIGHT FLAG UPLIGHT521PROPOSED SEPTIC AREAI-71 15 IN FES RIM 520.44 INV OUT 519.00 (NW) 71 LF 15" HDPE @ 0.70% I-72 15 IN FES RIM 520.44 INV IN 518.50 (SE)264 LF 15 " RCP @ 1 .25% AD-20 2' X 4' RIM 530.50 INV IN 525.00 (SE) INV OUT 524.80 (W) AD-21 2' X 4' RIM 529.90 INV OUT 526.90 (NW) AD-11 2' X 4' RIM 528.25 INV OUT 525.00 (NW)121 LF 15" RCP @ 0.80%121 LF 15" RCP @ 1.57%60'' INV OUT 492.57 PROPOSED (2 RUNS) 42 LF 60'' INV OUT 493.28 L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 7/20/2017 3:15 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 AAA PCB SHEET APPROVED BY OF9 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 40'80'PENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267NOR T H AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.2018-05-17 CS1503DRIVEWAY PROFILE1"=40'2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB PROPOSED CLEARING LIMITS (TYP.) ℄ STREAM PER ORANGE COUNTY GIS (TYP.) 100' BUFFER STREAM BUFFER (TYP.) IDENTIFIED SUITABLE SEPTIC SOILS PROPOSED UNDERGROUND ELECTRIC SERVICE-0+250+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0 0 14+00 14+ 6 6 A-ANNO-IDEN-ROOM ROOM NAME A-AREA GENERAL AREA TAKE OFFS A-AREA-1 AREA 1 BOUNDARY A-AREA-2 AREA 2 BOUNDARY521NC HIGHWAY 54 (SR 54)(120' PUBLIC RIGHT-OF-WAY) PROPOSED SEPTIC AREA 611I-71 15 IN FES RIM 520.44 INV OUT 519.00 (NW) 71 LF 15" HDPE @ 0.70% AD-20 2' X 4' RIM 530.50 INV IN 525.00 (SE) INV OUT 524.80 (W) AD-21 2' X 4' RIM 529.90 INV OUT 526.90 (NW)121 LF 15" RCP @ 1.57% 60'' INV OUT 492.57 60'' INV OUT 493.28 L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 7/20/2017 3:15 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 AAA PCB SHEET APPROVED BY OF 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 40'80'PENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267NORTH AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.2018-05-17 CS1701UTILITY PLAN NORTH1"=40'2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB10 PROPOSED POND W.S. ELEV. 519.00 IDENTIFIED SUITABLE SEPTIC SOILS 80.00' STREAM BUFFER LINE 14+ 6 6 PROPOSED WATER WELL 541PROPOSED DRY FIRE HYDRANT (TYP) 560 I-79 18 IN FES RIM 502.75 107 LF 15" HDPE @ 9 . 3 2 % PROPOSED OUTLET STRUCTURE I-78 4' X 4' RIM 521.50 INV OUT 512.00 (N) FES-1 18 IN FES RIM 521.43 INV IN 519.77 (E)194 LF 15" RCP @ 0.80%CB-1 2' X 4' RIM 531.29 INV IN 521.42 (NE) INV IN 521.50 (E) INV OUT 521.32 (W) 3 1 5 L F 1 5 " R C P @ 0 . 8 0%264 LF 15" RCP @ 1.25%AD-20 2' X 4' RIM 530.50 INV IN 525.00 (SE) INV OUT 524.80 (W) INV OUT 526.90 (NW) AD-11 2' X 4' RIM 528.25 INV OUT 525.00 (NW) CB-10 2' X 4' RIM 528.71 INV IN 524.04 (SE) INV OUT 523.94 (SW)121 LF 15" RCP @ 0.80%121 LF 15" RCP @ 1.57% PROPOSED FOREBAY PROPOSED 8" D.I.P. WATER - FIRE LINE L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 7/20/2017 3:15 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 AAA PCB SHEET APPROVED BY OF11 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 40'80'PENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267NORTH AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.2018-05-17 CS1702UTILITY PLAN SOUTH1"=40'2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB l:\Projects\AMLG\amlg1701-american legion site development\DESIGN\CS\AMGL1701 CS-DETAILS.dwg PLOTTED: 6/15/2018 1:59 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.AMGL1701 1"= AAA 2018-05-17 PCB SHEET APPROVED BY OF12 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267CS6001SITE DETAILS3'-0"2"GRADE7'-0"A SECTION "A" THRU BOLT 1 1/2" SQ. STEEL TUBULAR POST ALUMINUM SIGN SEE SHEETS CS1001 - CS1002 FOR SIGNS AND LOCATIONS 4,000 PSI CONCRETE FOOTING 8" DIA. FOOTING N.T.S.WHEN ADJACENT TO PEDESTRIAN WALKWAY (5'-0" OTHERWISE)STOP R1-1 2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB l:\Projects\AMLG\amlg1701-american legion site development\DESIGN\CS\CS6002.dwg PLOTTED: 6/15/2018 1:59 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION CS6002 BYNO.DATEREVISIONSAMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.AMGL1701 N/A DMC 2018-05-17 PCB SHEET APPROVED BY OF13 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKSITE DETAILSPENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267CROSS SECTION SCHEMATIC OF WET DETENTION BASIN NOT TO SCALE INFLOW BOTTOM OF POND @ ELEV. 513.00 1 3 FOREBAY BOTTOM ELEVATION @ 513.00 3 1 PERMANENT POOL @ ELEVATION 519.50 6.0' VEGETATED SHELF 6 1 3 1 TOP OF BERM @ ELEV. 523.00 TEMPORARY POOL @ ELEVATION 519.67 ANTI-SEEP COLLAR (SEE DETAIL) RISER SPILLWAY ELEVATION @ 521.50 TOP OF BERM @ ELEV. 523.00 1 3 1 3 RIP-RAP (SEE DETAIL) EMERGENCY SPILLWAY @ ELEV. 522.00 BOTTOM ELEV. OF SEDIMENT STORAGE @ 512.00 SEDIMENT STORAGE BOTTOM ELEV. OF SEDIMENT STORAGE @ 512.00 SEDIMENT STORAGE (ALL SIDES OF MAIN POND EXCLUDING FOREBAY, SEE GRADING PLAN) BOTTOM OF VEGETATED SHELF @ ELEV. 519.00 3 1 SLOPE BEYOND TO EXISTING GRADETOP OF VEGETATED SHELF @ ELEV. 520.00 6 1 6.0' VEGETATED SHELF 1 6 6 1 RISER STRUCTURE DETAIL PERMANENT POOL 4' X 4' BOX STRUCTURE TOP OF RISER NOTE: SEE NCDOT STANDARDS FOR DETAILS FOR OUTLET STRUCTURE BOX, GRATE, REINFORCING, ETC. NOTE: ALL CONCRETE TO BE 4,000 P.S.I. COMPRESSIVE STRENGTH.6"ELEV. 512.00(24" RCP WITH RUBBER GASKETED JOINTS) PROP. 3" Ø DRAW DOWN ORIFICE @ ELEV. 319.5 SPILLWAY ELEV. 522.00 AT ELEV. 519.50 6"3.5'AREA TO BE FILLED WITH CONCRETE PEAKED TRASH RACK NTS PERMANENT POOL OUTLET STRUCTURE WALL WATER QUALITY (DRAW DOWN) ORIFICE DETAIL 4" PVC DRAW DOWN TEE WITH SOLID CAP 4" PVC CAP WITH DRILLED ORIFICE (1.5"Ø ORIFICE) INV. 382.50 4" PVC DRAW DOWN TEE WITH SCREEN CAP 6"6"6"SCALE:NTS PROP. 3" Ø WATER QUALITY DRAW DOWN TEE (SEE DETAIL) ONE INCH WATER QUALITY AT ELEV. 383.33 1 YR STORM EVENT AT ELEV. 519.89 2 YR STORM EVENT AT ELEV. 520.13 25 YR STORM EVENT AT ELEV. 521.43 1 4" x 2" ALUMINUM FRAME. FRAME SHALL BE BOLTED TO TOP OF STRUCTURE WITH STAINLESS STEEL HARDWARE. MOUNTING TO STRUCTURE IN SHEAR PROHIBITED 1 2" REBAR 6' O.C. EACH WAY 2' X 3' LOCKABLE ACCES HATCH APPROXIMATE HINGE LOCATIONS 1 2" REBAR 6' O.C. EACH WAY 2.25'2.25'2.50'8"13.5"27"8"13.5"TOP VIEW SIDE VIEW SIDE VIEW TRASH RACK PROPOSED STEPS 12" O.C. TO ALIGN WITH TRASH RACK ACCESS HATCH GRADE ON NORTH SIDE OF STRUCTURE AT ELEV. 512.00 PROPOSED SURFACE PROPOSED SURFACE PROVIDE LOCK 2:1 TO ELEV. 512.00 ELEV. 508.50 INV. 382.30 18" RUBBER GASKET JOINTED RCP 2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCBANTI-SEEP COLLAR DETAIL KEY TRENCH (SEE DETAIL ON SHT. CS8004) ℄ STREAM PER ORANGE COUNTY GIS (TYP.) 100' BUFFER 100' BUFFER STREAM BUFFER (TYP.) FEMA FLOOD PLAIN "AE" BOUNDARY PROPOSED CONSTRUCTION ENTRANCE PROPOSED LIMIT OF DISTURBANCE (14.41 ACRES) PROPOSED SILT FENCE (TYP.) A-ANNO-IDEN-ROOMROOM NAMEA-AREAGENERAL AREA TAKE OFFSA-AREA-2AREA 2 BOUNDARY 541521NC HIGHWAY 54 (SR 54)(120' PUBLIC RIGHT-OF-WAY) INLET PROTECTION (TYP.) INLET PROTECTION (TYP.) INLET PROTECTION (TYP.) INLET PROTECTION (TYP.) INLET PROTECTION (TYP.) SILT FENCE OUTLET SILT FENCE OUTLET 560 5 4 0 L:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 11/3/2017 9:53 AM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 1"=80' AAA PCB SHEET APPROVED BY OF14 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.NORTH2018-05-17 CS8001EROSION CONTROL - PHASE 12018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCBCONSTRUCTION SEQUENCE PROPOSED POND W.S. ELEV. 519.00 PROPOSED CLEARING LIMITS (TYP.) ℄ STREAM PER ORANGE COUNTY GIS (TYP.) 100' BUFFER 100' BUFFER 100' BUFFER STREAM BUFFER (TYP.) 80.00' STREAM BUFFER LINE APPROX. LOCATION OF TREELINE BASED UPON AERIAL PHOTOGRAPHY FEMA FLOOD PLAIN "AE" BOUNDARY 80' FLOOD PLAIN BUFFER LINE A-ANNO-IDEN-ROOMROOM NAMEA-AREAGENERAL AREA TAKE OFFSA-AREA-1AREA 1 BOUNDARYA-AREA-2AREA 2 BOUNDARY F L A G U P L I G H T F L A G U P L I G H T F L A G U P L I G H T PROPOSED WATER WELL 541521PROPOSED D R Y F I R E HYDRANT ( T Y P )NC HIGHWAY 54 (SR 54)(120' PUBLIC RIGHT-OF-WAY)8.00'8.00'20.00'560 535 5 4 01098 10101088886611559I-71 15 IN FES RIM 520.44 INV OUT 519.00 (NW) I-72 15 IN FES RIM 520.44 INV IN 518.50 (SE) FES-1 18 IN FES RIM 521.43 INV IN 519.77 (E) CB-1 2' X 4' RIM 531.29 INV IN 521.42 (NE) INV IN 521.50 (E) INV OUT 521.32 (W) AD-20 2' X 4' RIM 530.50 INV IN 525.00 (SE) INV OUT 524.80 (W) AD-21 2' X 4' RIM 529.90 INV OUT 526.90 (NW) AD-11 2' X 4' RIM 528.25 INV OUT 525.00 (NW) CB-10 2' X 4' RIM 528.71 INV IN 524.04 (SE) INV OUT 523.94 (SW) PROPOSED FOREBAYPROPOSED 8" D.I.P.WATER - FIRE LINEL:\Projects\AMLG\AMLG1701-American Legion Site Development\DESIGN\CS\AMGL1701 CS-BASEMAP.dwg PLOTTED: 11/3/2017 9:53 AM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMGL1701 1"=100' AAA PCB SHEET APPROVED BY OF15 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 100'200'PENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267AMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.2018-05-17 CS8002EROSION CONTROL - PHASE 22018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB l:\Projects\AMLG\amlg1701-american legion site development\DESIGN\CS\CS8003.dwg PLOTTED: 6/15/2018 2:01 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.AMGL1701 1"= AAA 2018-05-17 PCB SHEET APPROVED BY OF16 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267CS8003EROSION CONTROL DETAILS2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCB l:\Projects\AMLG\amlg1701-american legion site development\DESIGN\CS\CS8004.dwg PLOTTED: 6/15/2018 2:01 PM, BY: Amir Arabi PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----PRELIMINARY - NOT FOR CONSTRUCTION BYNO.DATEREVISIONSAMERICAN LEGION POST FACILITYHIGHWAY 54CHAPEL HILL, NORTH CAROLINAPO BOX 2323CHAPEL HILL, NC 27515CHAPEL HILL POST NO. 6 AMERICAN LEGION, INC.AMGL1701 1"= AAA 2018-05-17 PCB SHEET APPROVED BY OF17 17 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.401 Providence Road #200Chapel Hill, NC 27514T 919.929.1173F 919.493.6548Firm LicenseF-1267CS8004EROSION CONTROL DETAILS2018-06-08 1 STORM WATER - EROSION CONT. & NCDOT SUBMITTALPCBNOTE: SEE GRADING PLAN FOR SLOPE OF EACH RESPECTIVE BERM 6" TOPSOIL & SEEDED STANDARD BASIN BERM NOTES: 1.) PRIOR TO PLACEMENT OF FILL MATERIAL, THE EXISTING GROUND BENEATH THE EMBANKMENT SHALL BE CLEARED OF ALL TREE STUMPS, BRUSH, ROOTS, AND OTHER ORGANIC MATERIAL SUBJECT TO DECOMPOSITION, OVERSIZED STONES, AND ANY OTHER OBJECTIONABLE MATERIAL. FOLLOWING CLEARING, THE SURFACE ON OR AGAINST WHERE THE FILL IS TO BE PLACED SHALL BE SCARIFIED (BROKEN TO A DEPTH OF SIX (6) INCHES) PRIOR TO PLACEMENT OF FILL. THE CUT-OFF TRENCH SHALL BE EXCAVATED TO A DEPTH OF FOUR (4) FEET BELOW EXISTING GRADE. THE EXCAVATION SHALL BE DONE PARALLEL TO THE CENTERLINE OF THE EMBANKMENT. THE MINIMUM BOTTOM WIDTH OF THE CUT-OFF TRENCH SHALL BE EIGHT (8) FEET BUT WIDE ENOUGH TO PERMIT OPERATION OF COMPACTION EQUIPMENT. THE SIDE SLOPES SHALL BE NO STEEPER THAN 1:1. THE TRENCH SHALL BE KEPT FREE OF STANDING WATER DURING THE BACKFILL OPERATIONS. 2.) ALL FILL SHALL BE TAKEN FROM SELECT BORROW AREAS. IT SHALL BE FREE FROM BRUSH, ROOTS, AND OTHER ORGANIC MATERIAL SUBJECT TO DECOMPOSITION, OVERSIZED STONES, AND ANY OTHER OBJECTIONABLE MATERIAL. 4.) FILL MATERIAL IN ALL EMBANKMENTS SHALL PLACED IN 6 TO 8 INCH LIFTS AND SHALL BE CONTINUOUS OVER THE ENTIRE LENGHT OF THE FILL. FILL MATERIAL SHALL BE BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DENSITY OBTAINED FROM THE COMPACTION TESTS PERFORMED BY THE APPROPRIATE METHOD IN ASTM 0698. COMPACTION SHALL BE OBTAINED BY USING MECHANICAL SHEEP FOOT ROLLERS. 5.) THE EMBANKMENT SHALL BE CONSTRUCTED TO AN ELEVATION 5% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLEMENT. 6.) NO ROCK FILL AND/OR GRAVEL SHALL BE PLACED BELOW THE CLAY CORE. EMBANKMENT: APPROVED ON-SITE MATERIALS CONSISTING OF SOIL DESIGNATIONS: USCS: SP, SM, SC, ML AND CL COMPACTED TO 95% MAX. DRY DENSITY (AS DETERMINED BY MODIFIED PROCTOR). TO CONFIRM PROPER COMPACTION IS ACHIEVED, DENSITY TESTS SHOULD BE COMPLETED BY THE GEOTECHNICAL ENGINEER OF RECORD ON EACH LIFT OF FILL PLACED. 3 10' NATURAL SOIL4.0' MIN.BASIN BOTTOM CORE: CLAY AND/OR SILT SOIL (SOIL DESIGNATIONS: USCS: CL AND/OR ML) WITH A MAXIMUM PERMEABILITY OF 10 CM /SEC. COMPACTED TO 95% MAX. DRY DENSITY (AS DETERMINED BY MODIFIED PROCTOR) AND TO BE EXTENDED 4' MINIMUM UNDER BASIN BOTTOM 1 1 1 1 NOTE: PLACE AND COMPACT MATERIAL IN 6" TO 8" MAX LIFTS. TYPICAL EXISTING GRADE, REMOVE TOPSOIL, LOOSE OR FOREIGN MATERIALS, AND ALL VEGETATION & ROOTS 8.0' (MIN.)' 3 EMBANKMENT: APPROVED ON-SITE MATERIALS CONSISTING OF SOIL DESIGNATIONS: USCS: SP, SM, SC, ML AND CL COMPACTED TO 95% MAX. DRY DENSITY (AS DETERMINED BY MODIFIED PROCTOR). TO CONFIRM PROPER COMPACTION IS ACHIEVED, DENSITY TESTS SHOULD BE COMPLETED BY THE GEOTECHNICAL ENGINEER OF RECORD ON EACH LIFT OF FILL PLACED. 8.0' (MIN.) EXISTING GRADE SCALE: N.T.S. BERM & CUTOFF TRENCH DETAIL (FOR BERMS IN FILL CONDITION) (KEY TRENCH)