Loading...
HomeMy WebLinkAbout20181195 Ver 1_PCN Form Submission_20180829Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 8/29/2018 12:46:23 PM (Start Event) Accept by Carpenter,Kristi 8/29/2018 7:08:20 PM (DOT Initial Review) . The task was assigned to Carpenter,Kristi. The due date is: September 3, 2018 5:00 PM 8/29/2018 12:48 PM �� � �ivislan af Water Resour�es Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Davidson Is this project a public transportation project?* C Yes l' No lhis is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* f• Yes r No (NCDOT only) T.I.P. or state project number: 17BP.9. R.61 WBS # (for �ICDOT use only) 1a. Type(s) of approval sought from the Corps:* I7 Section 404 Permit (wetlands, streams and waters, Clean Water Act) I-' Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E-PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number 03 - Maintenance 73 - Bank Stabilization 12 - Utility Lines NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply r% 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: For the record onlyfor Corps Permit: f Yes C' No f' Yes C' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? IF so, attach the acceptance letter from rritigation bank a- in-lieu fee program l" Yes f' No 1f. Is the project located in anyof NC's twentycoastal counties?* f Yes C•' No 1h. Is the project located in a designated trout watershed?* C' Yes C No Link to trout information: http://�wvw.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Amy Euliss — NCDOT Div 9 EO 1b. PrimaryContact Email:* aeuliss@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (336)747-7800 1d. Who is applying for the permit? fJ Owner r7 Applicant (other than owner) r Agent/Consultant (Checkall that apply) 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Division 9 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d. Address Street Address 375 Silas Creek Parkway Address Line 2 aty Winston-Salem Fbstal / Zip Code 27127 2e. Telephone Number: (xxx)xxx-xxxx (336)747-7800 State / FYovince / F�gion NC Caurdry USA 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* aeuliss@ncdot.gov 3. Applicant Information (if different from owner) 3a. Applicant is: f Agent f' Other IF other please spec'rfy. 3b. Name: 3c. Business Name: (if applicable) 3d. Address Street Adaress Address Line 2 a�y Fbstal / Zip Code 3e. Telephone Number: (xxx)xxx-xxxx 3f. Fax Number: (xxx)xxx-xxxx 3g. Email Address:* aeuliss@ncdot.gov State / Rrnince / F�gion Country C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Replacement of Bridge #280410 on SR 1844 over Leonard Creek 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Lexingtan, NC 1d. Driving directions* IF it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. From Le�angton take SR 1844(Greensboro Street) north for appro�amately two miles to Bridge #280410 over Leonard Creek. 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address Street Address Address Line 2 a�y Fbstal / Zip Code 2d. Site coordinates in decimal degrees State / FYovince / F�gion Country Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For e�cample, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.842028 -80.222296 ex: 34208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:� Leonard Creek 3b. Water Resources Classification of nearest receiving water:* C Surface Water Lookup 3c. What river basin(s) is your project located in?* Yadkin-PeeDee River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* E�sting Conditions include SR 1844 and Bridge #280410, residential, agricultural, commercial, undeveloped forest and disturbed/maintained right-of-way. 4b. Attach an 8 7/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent USGS_Davidson_Div9_Bridge410.pdf 1.41 MB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrent Soils_Davidson_Div9_Bridge410.pdf 3.09MB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0.27 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 250 4f. Explain the purpose of the proposed project:* To improve Bridge #280410 and replace with a new, modern bridge structure. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Bridge construction using heavy construction equipment. The proposed bridge will be built on the same alignment with a temporary off-site detour. 4h. Please upload project drawings for the proposed project. Qick the upload button or drag and drop files here to attach docurrem bridge 280410-S028 Permit Drawings rev.pdf Fle type rrust be pdf 5. Jurisdictional Determinations 2.06MB 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? * C Yes C' No �' Unknown Comme nts: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* f' Preliminary �' Approved C' Unknown Corps AID Number: 6carrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Sam Beavens Mulkey f� f�UA 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d7. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurrent Bridge280410_NCDWQ Wetland Rating_20130410.pdf Bridge280410_SA NCDWQ Stream.pdf Bridge280410_SA_USACE Stream_20130710.pdf Bridge280410_WA_USACE Upland Piedmont.pdf Bridge280410_WA_USACE Wetland Piedmont Template.pdf 20141212_Bridge280410_Fig1.pdf 20141212_Bridge280410_F ig 2. pdf 20141212_Bridge280410_F ig3. pdf Fle type rrust be FDF 6. Project History 768.48KB 690.63KB 1.37MB 9.66MB 9.65MB 1.07MB 500.24KB 1.15MB 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * l' Yes C No C' Unknown 7. Future Project Plans 7a. Is this a phased project?* f Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): rJ Wetlands �J Streams-tributaries r Buffers r Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site #- Reason for impact* 2b. Impact type * 2c. Type of wetland* W1 - wetland fill P Bottomland Hardwood N�p label (e.g. Fd�ad Qossing 1- Qalvert, F2rrranent (� or FOfest dewatering, etc) Terrporary (� W2 - mechanized clearing P Bottomland Hardwood N�p label (e.g. Fd�ad C7ossing 1- Qalvert, �rrranent (Pj or ForeSt dewatering, etc) Terrporary (� 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.090 2g. Total Wetland Impact 0.090 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* Wetland A Yes Both 0.010 (404, 10) or D✓VR(401, (acres) other) Wetland A Yes Both 0.080 (404, 10) or [7✓�ft(401, (acres) other) 2h. Comments: Wetland impacts include stabilization fill around the bridge abutments and the mechanized clearing of wetland vegetation for utility line relocation. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * type * S1 Bank stabilization P Bank Nbp label (e.g. I�ad Qossing F2rrranerd (Fj or Stabilization 1) Terrporary (� Leonard Creek 3e. Stream 3f. Type of Type* Jurisdiction* Perennial Both F2rennial (Fffl) or interrrittent (IfVn g2 Utility line relocation T Dewatering Leonard Creek Perennial Both N�p label (e.g. Fd�ad Qossing F2rrranent (Fj or F2rennial (� or 1) Terrporary (lj ir�terrrittent (If� *� All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 179 3i. Total temporary stream impacts: 34 3i. Total stream and tributary impacts: 213 3g. Stream 3h. Impact sqfe� width * length * 15 179 2 Average (linearfeet) , (feet) 6 8 5 15 34 5 Average (linearfeet) 7 (feet) 0 3j. Comments: Temporary impacts are associated with the dewatering required for the crossing of the relocated utility lines. The open cut area will be restored to original contours upon completion. Permanent impacts will result from the bank stabilization. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Replace bridge in-place was incorporated to minimize impacts. The bridge span length was extended to reduce impacts. Riprap at the embankments is minimized to reduce impacts to surface waters. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* NCDOT Best Management Practices (BMPs) for Construction and Maintenance Activities will be employed. Top down demolition and construction methods will be used to minimize impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes C•' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Wetland impacts are belowthe 0.10 acre threshold, and bank stabilization is not a loss of water and thus non-mitigable. F. Stormwater Management and Diffuse Flow Plan (required by DWR) `*� Recent changes to the stormwater rules have required updates to this section ."` 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? f Yes r No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Project is located in the Yadkin-Pee Dee River Basin 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * C Yes r No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * G Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* l' Yes r No Comme nts: * A State Minimum Criteria Checklist has been prepared. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (75A NCAC 2B .0200)?* f Yes r No 2b. Is this an after-the-fact permit application?* l' Yes C•' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonablyanticipated future impacts) result in additional development, which could impact nearby downstream water quality?* f Yes �' No 3b. If you answered "no," provide a short narrative description. Project involves the replacement of an ewsting bridge and is not anticipated to affect future development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes C' No C•' rUA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * C•' Yes C' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* f• Yes �' No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* f Yes C No 5e. Is this a DOT project located within Division's 1-8?* C' Yes C•' No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? C•' Yes f No 5g. Does this project involve bridge maintenance or removal? G' Yes r No l" Unknown 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. C•' Yes f No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf If you answered "Yes" to 5g(1), did you discover anysigns of bat use?* C' Yes C•' No C' Unknown '""` If yes, please show the location of the bridge on the permit drawings/project plans. 5h. Does this project involve the construction/installation of a wind turbine(s)?* C' Yes C No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP data and site specific surveys. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA EFH mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes b' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?'� See attached "No Survey Required" determinations. 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent 280410 No Surveyform.pdf 1.11MB 280410 NoSurvey.pdf 1.98MB Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* f• Yes l" No 8b. If yes, explain how project meets FEMArequirements: NCDOT Hydraulics Unit Coordination with FEMA. 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM maps Miscellaneous Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent Brg 280410 Permit Cover Letter signed.pdf 47.7KB Fle rrust be FDF or VWQ Signature �7 By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Amy Euliss Signature %�1%fCjrdlc� Date Submitted: 8/29/2018 Initial Review Is this project a public transportation project?* (') r Yes f' No Change only 'rf needed. Has this project met the requirements for acceptance in to the review process? * l•' Yes C' No BIMS # Assigned �` 20181195 Version#* Reviewing Office * Winston-Salem Regional Office - (336) 776-9800 Select Project Reviewer* Dave Wanucha:eads\djwanucha Is a payment required for this project?* f No payment required C Fee received f Fee needed - send electronic notification