HomeMy WebLinkAbout20170142 Ver 1_Certification of Completion_20180718NC.
Water Resources
Environmental Quality
DWQ Project No.:
/VG kl;l ap- /�saaurt�s �ow+s..,ission - ��N c�itf
%[iyliC CJOG�/kL �CGL�S /Ir � K','Vox[7H : la /;k-'! Ata L✓jyt0`1
Applicant:
Project Name:
ao / %- oNg County:
ROY COOPER,
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIlV[MERMAN
Director
t tyroQ
Date of issuance of Wetland Permit: / 2-017
Upon completion of all work approved within the 401 Water Quality Certification and/or Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 & Buffer Permitting Unit,
North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to
sendcertificates from all of these.
Applicant's Certification
I, /JE02& C f'1 / v, aot srwG^ . hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and/or Buffer Rules, the approved plans
and specifications, and other supporting materials.
L
Signature: Z Date: ZAZe%a
Agent's Certification
hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of. the 401 Water Quality Ceitification and /or Buffer Rules, the approved plans
and specifications, and other 'supporting materials.
Signature: Date:
if this project was designed by a Certified Professional
1, as a ' duly registered Professional (Le., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due
care and diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and/or Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Registration. No. Date
-: " Nothing Com es :.:_�-F
State of North Carolina I Envummental Quality I Water Rwour yes -Water Quality Regional Operations Section -Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889
252-946-6481