Loading...
HomeMy WebLinkAbout20170142 Ver 1_Certification of Completion_20180718NC. Water Resources Environmental Quality DWQ Project No.: /VG kl;l ap- /�saaurt�s �ow+s..,ission - ��N c�itf %[iyliC CJOG�/kL �CGL�S /Ir � K','Vox[7H : la /;k-'! Ata L✓jyt0`1 Applicant: Project Name: ao / %- oNg County: ROY COOPER, Governor MICHAEL S. REGAN Secretary S. JAY ZIlV[MERMAN Director t tyroQ Date of issuance of Wetland Permit: / 2-017 Upon completion of all work approved within the 401 Water Quality Certification and/or Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to sendcertificates from all of these. Applicant's Certification I, /JE02& C f'1 / v, aot srwG^ . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting materials. L Signature: Z Date: ZAZe%a Agent's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of. the 401 Water Quality Ceitification and /or Buffer Rules, the approved plans and specifications, and other 'supporting materials. Signature: Date: if this project was designed by a Certified Professional 1, as a ' duly registered Professional (Le., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration. No. Date -: " Nothing Com es :.:_�-F State of North Carolina I Envummental Quality I Water Rwour yes -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481